PE6603 WELL COMPLETION TESTING AND WORK OVER
Lecture by
Velmurugan senthooran.Er
B.Tech, FAFS,M.S Research in china, M.B.A at UOP
DEPARTMENT OF PETROLEUM ENGINEERING
DHANALAKSHMI SRINIVASAN INSTITUTE OF RESEARCH AND TECHNOLOGY
๏ƒผIntroduction to well completion
๏ƒผGeneral Procedure of well completion
๏ƒผOpen hole well completion
๏ƒผCased hole well completion
Informal definition:
The high time of the well when engineer and
personnel comes to decide whether to install the
production casing in order to initiate the production at
the surface or it should be abandoned .
Technical Definition:
Well completion means to prepare the well for
production by installing the necessary
equipments into the well in order to allow the safe
and controlled flow of HCS at the surface.
๏‚งIn an open hole well completion the production casing is
just set above the pay zone, while the entire deepen bottom
of pay zone is left uncased.
OPEN HOLE WELL COMPLETION:
โ€ขMaximum exposure of pay zone
โ€ขLess pressure drawdown during flow
โ€ขNo formation damage occurs due to cementing
and perforation.
โ€ขLess formation damage
โ€ขInability to plug off water or gas zones
โ€ขInability to stimulate the separate zones within the
productive zones
โ€ขFor the most common type of well completion today
involves the cased hole completion, in which the
production casing and liner are cemented and
perforated subsequently.
โ€ขSelect the sections of the pay zone we wish to produce
โ€ขStimulate the separate pay zone from the well
โ€ขMultiple completion zones
โ€ขA Liner is installed across the pay zone
โ€ขIt can be divided into two: Screen Liner and perforated
liner
โ€ขScreen Liner : Casing is set above the producing zone and
an uncemented screen and liner assembly is installed
across the pay zone
โ€ขCasing is set above the producing
zone and a liner assembly is installed
across the pay zone and cemented
in place. The liner is then perforated
selectively for production.
โ€ขProduction casing is cemented through the
producing zone and pay section is selectively
perforated
โ€ขProduction tubing is perforated and cemented
โ€ขCasing flow: large flow rate no tubing is required, used in middle
east.
โ€ขTubing andAnnulus flow: large flow rate flow segregation.
โ€ขTubing flow: Used widely in Malaysia due to safety, may use one
more tubing strings.
โ€ขSimplest way of completing the well
โ€ขIn this method well is completed by single zone with single
tubing
โ€ขIn this multiple branches are drilled from a single zone
โ€ขIt is used to improve productivity from closely spaced target zones.
Well completion techniques

More Related Content

What's hot

Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
Elsayed Amer
ย 
Formation Damage Presentation Group F
Formation Damage Presentation Group FFormation Damage Presentation Group F
Formation Damage Presentation Group F
Shaho Mohamedali
ย 
Drill stem testing
Drill stem testingDrill stem testing
Drill stem testing
diego20144415
ย 

What's hot (20)

Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
ย 
Tubing string
Tubing stringTubing string
Tubing string
ย 
Well completion and testing
Well completion and testingWell completion and testing
Well completion and testing
ย 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
ย 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
ย 
Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6
ย 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a Well
ย 
Casing design
Casing designCasing design
Casing design
ย 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
ย 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1
ย 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
ย 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wleg
ย 
Formation Damage Presentation Group F
Formation Damage Presentation Group FFormation Damage Presentation Group F
Formation Damage Presentation Group F
ย 
Well Control
Well ControlWell Control
Well Control
ย 
Well Workover
Well Workover Well Workover
Well Workover
ย 
workover presentation (1)
workover presentation (1)workover presentation (1)
workover presentation (1)
ย 
Well test analysis
Well test analysisWell test analysis
Well test analysis
ย 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
ย 
Drilling Engineering - Primary Cementing
Drilling Engineering - Primary CementingDrilling Engineering - Primary Cementing
Drilling Engineering - Primary Cementing
ย 
Drill stem testing
Drill stem testingDrill stem testing
Drill stem testing
ย 

Similar to Well completion techniques

Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdf
LokmanDridah
ย 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
AZLANAiyub
ย 
Defining Well completion
Defining Well completionDefining Well completion
Defining Well completion
Andy Varoshiotis
ย 

Similar to Well completion techniques (20)

Casing design
Casing designCasing design
Casing design
ย 
Open Hole Completion Design
Open Hole Completion DesignOpen Hole Completion Design
Open Hole Completion Design
ย 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdf
ย 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
ย 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
ย 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
ย 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptx
ย 
UNIT 1a.pdf
UNIT 1a.pdfUNIT 1a.pdf
UNIT 1a.pdf
ย 
Well completion d.pptx
Well completion d.pptxWell completion d.pptx
Well completion d.pptx
ย 
Pressure Draw Down Test
Pressure Draw Down TestPressure Draw Down Test
Pressure Draw Down Test
ย 
260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examples260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examples
ย 
Construction and testing of sewer line
Construction and testing of sewer lineConstruction and testing of sewer line
Construction and testing of sewer line
ย 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary Cementing
ย 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
ย 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
ย 
Presentation on surface investigation techniques for foundation
Presentation on surface investigation techniques  for foundationPresentation on surface investigation techniques  for foundation
Presentation on surface investigation techniques for foundation
ย 
Defining Well completion
Defining Well completionDefining Well completion
Defining Well completion
ย 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
ย 
Caissons
Caissons Caissons
Caissons
ย 
Well foundations notes
 Well foundations notes Well foundations notes
Well foundations notes
ย 

Recently uploaded

VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
ย 

Recently uploaded (20)

VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
ย 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
ย 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
ย 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
ย 

Well completion techniques

  • 1. PE6603 WELL COMPLETION TESTING AND WORK OVER Lecture by Velmurugan senthooran.Er B.Tech, FAFS,M.S Research in china, M.B.A at UOP DEPARTMENT OF PETROLEUM ENGINEERING DHANALAKSHMI SRINIVASAN INSTITUTE OF RESEARCH AND TECHNOLOGY
  • 2. ๏ƒผIntroduction to well completion ๏ƒผGeneral Procedure of well completion ๏ƒผOpen hole well completion ๏ƒผCased hole well completion
  • 3. Informal definition: The high time of the well when engineer and personnel comes to decide whether to install the production casing in order to initiate the production at the surface or it should be abandoned . Technical Definition: Well completion means to prepare the well for production by installing the necessary equipments into the well in order to allow the safe and controlled flow of HCS at the surface.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. ๏‚งIn an open hole well completion the production casing is just set above the pay zone, while the entire deepen bottom of pay zone is left uncased. OPEN HOLE WELL COMPLETION:
  • 11.
  • 12. โ€ขMaximum exposure of pay zone โ€ขLess pressure drawdown during flow โ€ขNo formation damage occurs due to cementing and perforation. โ€ขLess formation damage
  • 13. โ€ขInability to plug off water or gas zones โ€ขInability to stimulate the separate zones within the productive zones
  • 14. โ€ขFor the most common type of well completion today involves the cased hole completion, in which the production casing and liner are cemented and perforated subsequently.
  • 15. โ€ขSelect the sections of the pay zone we wish to produce โ€ขStimulate the separate pay zone from the well โ€ขMultiple completion zones
  • 16. โ€ขA Liner is installed across the pay zone โ€ขIt can be divided into two: Screen Liner and perforated liner โ€ขScreen Liner : Casing is set above the producing zone and an uncemented screen and liner assembly is installed across the pay zone
  • 17.
  • 18. โ€ขCasing is set above the producing zone and a liner assembly is installed across the pay zone and cemented in place. The liner is then perforated selectively for production.
  • 19.
  • 20. โ€ขProduction casing is cemented through the producing zone and pay section is selectively perforated
  • 21.
  • 22. โ€ขProduction tubing is perforated and cemented
  • 23.
  • 24. โ€ขCasing flow: large flow rate no tubing is required, used in middle east. โ€ขTubing andAnnulus flow: large flow rate flow segregation. โ€ขTubing flow: Used widely in Malaysia due to safety, may use one more tubing strings.
  • 25. โ€ขSimplest way of completing the well โ€ขIn this method well is completed by single zone with single tubing
  • 26. โ€ขIn this multiple branches are drilled from a single zone โ€ขIt is used to improve productivity from closely spaced target zones.