Over 33years of progressively responsible work support experience. Extensive track record of
Petrochemical refinery, Oil and Gas related operations, Carter to Construction, Drilling,
production, Procurements. Maintenance, Mechanical, Electrical, Instrumentation, Base Co-
ordinating, etc.
Highly motivated person in operating efficiency so that project portfolio is delivered in
compliance with the Project controls systems to agreed standards and targets. Act decisively
to rectify any ad verse circumstances that threaten the delivery of project quality or schedule.
Looking for the Position:
 Material controller for projects
 Senior Production Controller ( Coating & Lining )
 Material Controller ( Engineering & Maintenance )
 Management of Transport and logistics.
 Senior Project Material Co Coordinator
 Material Procurements & Planning (Oil & Gas, Petrochemical Industries)
EDUCATION AND AFFILIATIONS:
• Automobile and Engineering Diploma
• Material/Equipment handling procedures
• Material and warehouse procedure (Shell Group)
• UNI EN ISO-9001-1994 store procedure
• Fire and Safety training course
COMPUTER COURSES:
• SHELL GROUP “MESC” System (material equipment standard code)
• MS Office,
PERSONAL INFORMATION AND STRENGHTS:
• PASSPORT NUMBER : G1272938
• PLACE OF ISSUE : DUBAI
• DATE OF ISSUE: 19.04.2007
• DATE OF EXPIRY : 18.04.2017
• MARITAL STATUS : MARRIED
Strong analytical, organized skills, demonstrated communication, interpersonal skills initiate a
structural creative approach to problem solving and people management, practice team work.
JOB HIGHLIGHTS:
2015 Worked in Kuwait as Project Coordinator for Equate awarded project.
2003 Working with Kharafi National as Logistic Supervisor for Equate Mechanical
Maintenance Service Contract Project #1196
PROJECTS:
2002-2001 Worked with NAS Hauliers Limited, Dar-Es-Salaam, Tanzania as Project Manager
Warehouse, Fuel Logistics Operations.
2000-1999 Worked with Madras Conveyers Limited, Chennai (India) as Manager Material
Controller and Transport.
1998-1997 Worked with Petrofac International Limited, Dubai Contract with Total Yemen
Refinery Maintenance Project as Material Controller.
1997-1995 Worked with ABB Soimi SA Limited, Saudi Arabia for Savola Refinery Project as
Manager Warehouse and Procurements Operations.
1995-1994 Worked with Wood Group Kuwait For Kuwait Oil Company their mobile and
maintenance project as Material Controller.
1993-1991 Worked with QGPC (Qatar General Petroleum Corporation) as Material
Controller.
1990-1980 Worked with Petroleum Development Oman (PDO) Shell Refinery as Head of
Supply & Transport.
FIRE AND SAFETY AWARD RECEIVED:
1. M/s Taylor Wood Row Group Oman – 1989
2. M/s Petroleum Development Oman – 1990
3. M/s ABB Soimi SA Limited, Saudi Arabia Completion of Project – 1996,1997
WORK HISTORY:
2006- 2015 ANTICORROSION PROTECTIVE SYSTEMS
SENIOR PRODUCTION CONTROLLER (Coating & Lining Division)
One of the Leading National Company in the Field of Oil & Gas Sector, Doing
Coating & Lining, Rubber Lining, GRP Lining & Derakane Lining, TSA Coating,
Metalization, Formally Known as APS Company Establish in - 1978.
Project Handled: Equate Petrochemical Co, Kuwait- Shutdown Project –
Rehabilitation Of Sea water Cooling System Using Glass Flake Lining and
Channaline
GRP Lining, Work activities involved site inspection of water system ( 24” to 52”
OD ) Line and 20 Feet Below Ground.
Dutco McConnell Dowell – External Coating of 48” – Gas Line &BW Fittings for
DUSUP Gas Line Project, Dubai.
Dodsal Engineering – Internal & External Coating of 72” Pipe Works& BW Fittings for
Fujairah Water Transmission Project Phase – 2.
Van Leeuwen Pipe & Tubes – TSA Coating to piles ( 48” & 52” ) for Qatar Gas Phase -
11 – 5 Project.
Bredero Shaw: Neoprene Coating to 28” & 32” Riser for Ras Gas Phase – 11 – 5 Project
NPCC: Neoprene & PU Coating to Risers and Clamps for Qatar Gas Project
Overseas AST- Dubai World International Airport (Jebal Ali Project) Associated Jet
Fuel Pipe Lines From 3” OD to 36” , Internal Copon EA – 4 – 2217 & External Epoxy
Three Coat Systems.
Al – Shirawi Equipment’s - New Fabricated Acid Storage Tanks, Frac Tanks – 500BBLM
Acid Transport Tanks , Skid Mounted Tanks , and Associated Pipe Spools, Internal Glass
Flake Systems ( Derakane Laminate Systems - 411 – 45 ) For Transportation of HCL –
32% To 36% , Projects of Halliburton, Schlumberger, Baker Hughes, BJ Services,
Gorica Industries,
AL – Rawabi Marketing & Transporting, Al – Manhal Engineering,
Galfar Engineering, Special Technical Services, Punj Lloyd – Internal & External Coating
of pipes pools and Fittings for PDO Oman Lekhwair Projects
Josef Gartner GmbH – Internal and External architectural steel works for Dubai
International Airport – Terminal - 3 Expansion Projects.
Dutco Mc Connell – Internal & External Coating of Pipeline for Cross Country Jet Fuel
Pipeline from JAFZA to DIA Projects.
DEWA & DPC – Internal Glass Flake Lining, Celicote Flake Line 252 of Water Intake,
Separators, Knock out Drums, Etc.
To monitor the Internal/External of Acid tanks projects and rubber lining
projects and ensure to update the contracts manager from time to time so that
sufficient capable resources to meet deadlines. Maintain regular liaison with all
the clients and contracts manager on the progress of projects by preparing the
necessary report.
KEY TASKS AND RESPONSIBILITIES:
• To manage and Controlling a portfolio of rubber lining project and Acid tank
project.
• Responsible in monitoring the project portfolio for the company and clients in
order
• To give the best result in terms of clients satisfaction and company financial
profitability.
• Submit weekly report to the Contracts manager for the project updates. Etc.
• Ensure that the crew who will carry out the work was having proper
documentation before mobilising.
• With the support of the commercial team, ensure that the contracts are in place
before work commences. Approved expenditures within limits of delegated
authority.
• Maximise the efficiency and effectiveness of the crew to provide quality works
to the clients.
• Project Material Planning, Placing Order for Hiring Machineries / Equipment’s as
project requirements, Placing Enquires for Quotes, Minimum Receive three
quote for tabulation and confirm with the supplier the material availability and
price negotiation and final approval with Contract Manager.
• Material Inventory Control Update with Stores, stock availability and
outstanding materials status.
• Close relation with project site team, Daily work schedule, Material
Planning,Daily Project Updating, Etc.
• All the Vessels & Spools physical Identification and Keeping separate coating
bay with identification and project code.
AWARD RECEIVED:
1. Fire and Safety award from Taylor Woodrow Group Oman-1989
2. Fire and Safety award from Petroleum Development Oman-1990
LANGUAGES KNOWN:
English, Hindi, Tamil, Malayalam, Suhaili and Arabic.
• Ensure that the crew who will carry out the work was having proper
documentation before mobilising.
• With the support of the commercial team, ensure that the contracts are in place
before work commences. Approved expenditures within limits of delegated
authority.
• Maximise the efficiency and effectiveness of the crew to provide quality works
to the clients.
• Project Material Planning, Placing Order for Hiring Machineries / Equipment’s as
project requirements, Placing Enquires for Quotes, Minimum Receive three
quote for tabulation and confirm with the supplier the material availability and
price negotiation and final approval with Contract Manager.
• Material Inventory Control Update with Stores, stock availability and
outstanding materials status.
• Close relation with project site team, Daily work schedule, Material
Planning,Daily Project Updating, Etc.
• All the Vessels & Spools physical Identification and Keeping separate coating
bay with identification and project code.
AWARD RECEIVED:
1. Fire and Safety award from Taylor Woodrow Group Oman-1989
2. Fire and Safety award from Petroleum Development Oman-1990
LANGUAGES KNOWN:
English, Hindi, Tamil, Malayalam, Suhaili and Arabic.

More Related Content

What's hot (19)

Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
Keith Wilkinson Paint Dept. Head 28-11-15 CV
Keith Wilkinson Paint Dept. Head  28-11-15 CVKeith Wilkinson Paint Dept. Head  28-11-15 CV
Keith Wilkinson Paint Dept. Head 28-11-15 CV
 
JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)
 
Piping foreman resume Binoy tc
Piping foreman resume Binoy tcPiping foreman resume Binoy tc
Piping foreman resume Binoy tc
 
razwan ali cv
razwan ali cvrazwan ali cv
razwan ali cv
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
Amir QC
Amir QCAmir QC
Amir QC
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
Scott, Gary 20150415
Scott, Gary 20150415Scott, Gary 20150415
Scott, Gary 20150415
 
Resume - Imane Mansouri
Resume - Imane MansouriResume - Imane Mansouri
Resume - Imane Mansouri
 
Topside
TopsideTopside
Topside
 
CV - CJR - Rev 02
CV - CJR - Rev 02CV - CJR - Rev 02
CV - CJR - Rev 02
 
CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015
 
Jamie Shankland CV
Jamie Shankland CVJamie Shankland CV
Jamie Shankland CV
 
Kal resume
Kal resumeKal resume
Kal resume
 
MG Resume 160727
MG Resume 160727MG Resume 160727
MG Resume 160727
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
CV rajesh
CV rajeshCV rajesh
CV rajesh
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 

Similar to curriculum vitae- koshyvarghese dec2015

Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
 
Rajesh kumar- Project Engineer
Rajesh kumar- Project EngineerRajesh kumar- Project Engineer
Rajesh kumar- Project EngineerRajesh Kumar
 
Sreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith Nair
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineerHashim Vayalilakath
 
Kevin Barraclough CV NACE CIP 2
Kevin Barraclough CV NACE CIP 2Kevin Barraclough CV NACE CIP 2
Kevin Barraclough CV NACE CIP 2Kevin Barraclough
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical EngineerVishnu Mohan
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Ibrahim
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CVzetiengg
 
SANTOSH NAIR RESUME
SANTOSH NAIR RESUMESANTOSH NAIR RESUME
SANTOSH NAIR RESUMESantosh Nair
 
CVarjun.
CVarjun.CVarjun.
CVarjun.Arjun C
 
Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019Gagan Grover
 

Similar to curriculum vitae- koshyvarghese dec2015 (20)

Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Rajesh kumar- Project Engineer
Rajesh kumar- Project EngineerRajesh kumar- Project Engineer
Rajesh kumar- Project Engineer
 
Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
Sreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith_2484_b (2).doc
Sreejith_2484_b (2).doc
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 
Moh.Ramadan-CV
Moh.Ramadan-CVMoh.Ramadan-CV
Moh.Ramadan-CV
 
Kevin Barraclough CV NACE CIP 2
Kevin Barraclough CV NACE CIP 2Kevin Barraclough CV NACE CIP 2
Kevin Barraclough CV NACE CIP 2
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical Engineer
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
M SUBBA RAO CV latest
M SUBBA RAO CV latestM SUBBA RAO CV latest
M SUBBA RAO CV latest
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
updated CV
updated CVupdated CV
updated CV
 
SANTOSH NAIR RESUME
SANTOSH NAIR RESUMESANTOSH NAIR RESUME
SANTOSH NAIR RESUME
 
CVarjun.
CVarjun.CVarjun.
CVarjun.
 
Salman Resume 2016
Salman Resume  2016Salman Resume  2016
Salman Resume 2016
 
Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019
 

curriculum vitae- koshyvarghese dec2015

  • 1. KOSHY VARGHESE EMCON DUBAI LLC P.O.BOX: 124288 Dubai. Mobile: 00971 50 4251869 Email: rajajiparampil74@gmail.com Over 33years of progressively responsible work support experience. Extensive track record of Petrochemical refinery, Oil and Gas related operations, Carter to Construction, Drilling, production, Procurements. Maintenance, Mechanical, Electrical, Instrumentation, Base Co- ordinating, etc. Highly motivated person in operating efficiency so that project portfolio is delivered in compliance with the Project controls systems to agreed standards and targets. Act decisively to rectify any ad verse circumstances that threaten the delivery of project quality or schedule. Looking for the Position:  Material controller for projects  Senior Production Controller ( Coating & Lining )  Material Controller ( Engineering & Maintenance )  Management of Transport and logistics.  Senior Project Material Co Coordinator  Material Procurements & Planning (Oil & Gas, Petrochemical Industries) EDUCATION AND AFFILIATIONS: • Automobile and Engineering Diploma • Material/Equipment handling procedures • Material and warehouse procedure (Shell Group) • UNI EN ISO-9001-1994 store procedure • Fire and Safety training course COMPUTER COURSES: • SHELL GROUP “MESC” System (material equipment standard code) • MS Office, PERSONAL INFORMATION AND STRENGHTS: • PASSPORT NUMBER : G1272938 • PLACE OF ISSUE : DUBAI • DATE OF ISSUE: 19.04.2007 • DATE OF EXPIRY : 18.04.2017 • MARITAL STATUS : MARRIED
  • 2. Strong analytical, organized skills, demonstrated communication, interpersonal skills initiate a structural creative approach to problem solving and people management, practice team work.
  • 3. JOB HIGHLIGHTS: 2015 Worked in Kuwait as Project Coordinator for Equate awarded project. 2003 Working with Kharafi National as Logistic Supervisor for Equate Mechanical Maintenance Service Contract Project #1196 PROJECTS: 2002-2001 Worked with NAS Hauliers Limited, Dar-Es-Salaam, Tanzania as Project Manager Warehouse, Fuel Logistics Operations. 2000-1999 Worked with Madras Conveyers Limited, Chennai (India) as Manager Material Controller and Transport. 1998-1997 Worked with Petrofac International Limited, Dubai Contract with Total Yemen Refinery Maintenance Project as Material Controller. 1997-1995 Worked with ABB Soimi SA Limited, Saudi Arabia for Savola Refinery Project as Manager Warehouse and Procurements Operations. 1995-1994 Worked with Wood Group Kuwait For Kuwait Oil Company their mobile and maintenance project as Material Controller. 1993-1991 Worked with QGPC (Qatar General Petroleum Corporation) as Material Controller. 1990-1980 Worked with Petroleum Development Oman (PDO) Shell Refinery as Head of Supply & Transport. FIRE AND SAFETY AWARD RECEIVED: 1. M/s Taylor Wood Row Group Oman – 1989 2. M/s Petroleum Development Oman – 1990 3. M/s ABB Soimi SA Limited, Saudi Arabia Completion of Project – 1996,1997 WORK HISTORY: 2006- 2015 ANTICORROSION PROTECTIVE SYSTEMS SENIOR PRODUCTION CONTROLLER (Coating & Lining Division) One of the Leading National Company in the Field of Oil & Gas Sector, Doing Coating & Lining, Rubber Lining, GRP Lining & Derakane Lining, TSA Coating, Metalization, Formally Known as APS Company Establish in - 1978. Project Handled: Equate Petrochemical Co, Kuwait- Shutdown Project – Rehabilitation Of Sea water Cooling System Using Glass Flake Lining and Channaline
  • 4. GRP Lining, Work activities involved site inspection of water system ( 24” to 52” OD ) Line and 20 Feet Below Ground. Dutco McConnell Dowell – External Coating of 48” – Gas Line &BW Fittings for DUSUP Gas Line Project, Dubai. Dodsal Engineering – Internal & External Coating of 72” Pipe Works& BW Fittings for Fujairah Water Transmission Project Phase – 2. Van Leeuwen Pipe & Tubes – TSA Coating to piles ( 48” & 52” ) for Qatar Gas Phase - 11 – 5 Project. Bredero Shaw: Neoprene Coating to 28” & 32” Riser for Ras Gas Phase – 11 – 5 Project NPCC: Neoprene & PU Coating to Risers and Clamps for Qatar Gas Project Overseas AST- Dubai World International Airport (Jebal Ali Project) Associated Jet Fuel Pipe Lines From 3” OD to 36” , Internal Copon EA – 4 – 2217 & External Epoxy Three Coat Systems. Al – Shirawi Equipment’s - New Fabricated Acid Storage Tanks, Frac Tanks – 500BBLM Acid Transport Tanks , Skid Mounted Tanks , and Associated Pipe Spools, Internal Glass Flake Systems ( Derakane Laminate Systems - 411 – 45 ) For Transportation of HCL – 32% To 36% , Projects of Halliburton, Schlumberger, Baker Hughes, BJ Services, Gorica Industries, AL – Rawabi Marketing & Transporting, Al – Manhal Engineering, Galfar Engineering, Special Technical Services, Punj Lloyd – Internal & External Coating of pipes pools and Fittings for PDO Oman Lekhwair Projects Josef Gartner GmbH – Internal and External architectural steel works for Dubai International Airport – Terminal - 3 Expansion Projects. Dutco Mc Connell – Internal & External Coating of Pipeline for Cross Country Jet Fuel Pipeline from JAFZA to DIA Projects. DEWA & DPC – Internal Glass Flake Lining, Celicote Flake Line 252 of Water Intake, Separators, Knock out Drums, Etc. To monitor the Internal/External of Acid tanks projects and rubber lining projects and ensure to update the contracts manager from time to time so that sufficient capable resources to meet deadlines. Maintain regular liaison with all the clients and contracts manager on the progress of projects by preparing the necessary report. KEY TASKS AND RESPONSIBILITIES: • To manage and Controlling a portfolio of rubber lining project and Acid tank project. • Responsible in monitoring the project portfolio for the company and clients in order • To give the best result in terms of clients satisfaction and company financial profitability. • Submit weekly report to the Contracts manager for the project updates. Etc.
  • 5. • Ensure that the crew who will carry out the work was having proper documentation before mobilising. • With the support of the commercial team, ensure that the contracts are in place before work commences. Approved expenditures within limits of delegated authority. • Maximise the efficiency and effectiveness of the crew to provide quality works to the clients. • Project Material Planning, Placing Order for Hiring Machineries / Equipment’s as project requirements, Placing Enquires for Quotes, Minimum Receive three quote for tabulation and confirm with the supplier the material availability and price negotiation and final approval with Contract Manager. • Material Inventory Control Update with Stores, stock availability and outstanding materials status. • Close relation with project site team, Daily work schedule, Material Planning,Daily Project Updating, Etc. • All the Vessels & Spools physical Identification and Keeping separate coating bay with identification and project code. AWARD RECEIVED: 1. Fire and Safety award from Taylor Woodrow Group Oman-1989 2. Fire and Safety award from Petroleum Development Oman-1990 LANGUAGES KNOWN: English, Hindi, Tamil, Malayalam, Suhaili and Arabic.
  • 6. • Ensure that the crew who will carry out the work was having proper documentation before mobilising. • With the support of the commercial team, ensure that the contracts are in place before work commences. Approved expenditures within limits of delegated authority. • Maximise the efficiency and effectiveness of the crew to provide quality works to the clients. • Project Material Planning, Placing Order for Hiring Machineries / Equipment’s as project requirements, Placing Enquires for Quotes, Minimum Receive three quote for tabulation and confirm with the supplier the material availability and price negotiation and final approval with Contract Manager. • Material Inventory Control Update with Stores, stock availability and outstanding materials status. • Close relation with project site team, Daily work schedule, Material Planning,Daily Project Updating, Etc. • All the Vessels & Spools physical Identification and Keeping separate coating bay with identification and project code. AWARD RECEIVED: 1. Fire and Safety award from Taylor Woodrow Group Oman-1989 2. Fire and Safety award from Petroleum Development Oman-1990 LANGUAGES KNOWN: English, Hindi, Tamil, Malayalam, Suhaili and Arabic.