1. Page 1 of 3
G.Sachithananthan
PROFILE:
POSITION: H/P: +65 86068631
EXPERIENCE: Over 15 years in the Oil and Gas Industry EMAIL: sachi1803@gmail.com
DATE OF BIRTH: 20-05-1975 ADDRESS: Blk 269C, #02-93, Compassvalelink
NATIONALITY: Indian Singapore543269
PERSONAL SUMMARY:
A profoundly hard working and career driven professional, with over fifteen year’s experience, working in the oil and gas
construction sector. An extremely focused and strategic planner with a fully comprehensive understanding of all construction
competencies, as well as planning,budgeting and site supervisory duties. Possessing a strongunderstandingof all elements of a
project from front end engineering through to implementation and commissioning of FPSO’s Top Side Modules. Excellent
interpersonal skillsand a highly competent attitude to adaptingto change have led to an extremely determined manager with a
flexible and confident approach. Currently seeks a managerial position within the oil and gas construction sector.
SKILLSETS AND COMPETENCIES: MANAGEMENT AND SUPERVISORY SKILLS:
• Marine & Mechanical Engineering
• Complete understanding of topside process systems
• Integration & Hook up of FPSO’s modules
• Experienced with Construction of Top Side Modules
• Highly competent team working abilities
• Extensive knowledge of Proposal and ProjectExecution
• Ship surveys statutory & certificates,
• Topsideand hull systemacceptanceprocedure
• Well versed with international standardsand class
• Computer literate – competent with MS Office
• AutoCAD, MicrosoftProject, Navis works for 3 D Model
Viewing
• Participatefor the 3D review model and give the
suggestion for the pipingrouting,access for the equipment
& Instruments
• As a squad check team for the every project
implementation drawings such as P & ID, GA and other
drawings
• Project coordination & Site management
• Resource planning and budgeting
• Scheduling and co-ordinating work to tight deadlines
• Management of change
• Influencing& Negotiations
• Deliveringresults on time and to impeccable standards
• Managingvendors, sub-contractors and human resources
• Extremely focused in high-pressuresituations
• Strong presentation and leadership skills
• Initiativeto acteffectively to avoid potential problems
• Successfully executing action plans for construction
activities fromfabrication until mechanical completion
• New Yard development in BATAM
• Implement the “5 S” system to improve the fabrication
area
• Develop the Flow chart, and prepare the in house
procedure, work instruction to develop an high
performance sections ( Department )I ok;
QUALIFICATIONS AND CERTIFICATES:
• Diploma in Mechanical
• ProjectManagement
• Confined spacetraining
• Ship Yard safety course
• Certified in Reciprocatingcompressor and Gas Engine
• Condition monitoringfor Rotatingequipment
• 5 S courses
EMPLOYMENT HISTORY:
VME Process – Top Side Module Package Engineer Sep 2009 – Present
KEY Project experiences
OCTP FPSO Top Side modules for ENI Ghana ( YINSON GINISES FPSO )
Working as the EPC for Topside module PackageManager Worth of USD 80 Million in a team of over 150.
Analysing task priorities to scheduled construction activities in logical steps and accomplished scopecompletion in the
required budget and time.
Involved in project management such as schedulepreparation,WBS preparation,Sub contractor selection
Overseeing installation, GE , Dresser Rand Packages , pipingand mechanical completion of equipment accordingto
NORSOK Z-007, System ID Z-001/ 002, instruments LCR 003, HSE S-002, flushingand testingLR-004.
To manage heavy liftworks for Structure pan cake, compressor package, and Heavy equipment.
Planning,organisingand executing activities to ensure a scheduled Load out of Modules.
2. Page 2 of 3
In the Ship Yard Solvingtie In point issues between Hull and topside duringintegration and hook up scope.
Coordinatingclass approval for documents, key equipment and pipingsystemto meet DNV requirements.
Singlefocal pointfor ship yard module completion acceptance of essential & non-essential marinesystems and sub-
systems.
Resolvingassociateto client construction issues related to Keppel Shipyard.
Identifying,resolvingand developing weekly punch closingreports for Construction manager and QA/ QC
Bringing up the projectprogress growth by over 8%, saving nearly 5%through budget control from allotted financial
resources by negotiation and bargainingto successfully achievegiven milestones in the set time.
PROJECT EXPERIENCE CONTINUED:
MV 24 Mangratiba Zul FPSO 6 Nos of Compressor Packaging / Testing Manager
Working on the EPC Compressor project, in collaboration with Mitsubishi 40 Million USD. in a team of 80
Successfully controlling daily management of site construction activities related to Compressor installation,Pipingand E & I
works. .
Conferringwith Mitsubishi personnel to establish theTestingprocedures and arrangement of 24 Megawatt temporary power
set up using soft starter, sea water cooling system , Nitrogen and helium gas Handling, associated refrigeration equipment,
piping, and other functional equipment.
Effectively managing installation and mechanical completion of 10 MW Motor and compressor, piping system, trial and
testing.
Conducting onsite verification of commissioning checklist and administering dossiers for handover and ABS sign off.
Successfully completing assigned scope in given time parameters and increasing progress growth by over 9%.
PROJECT EXPERIENCE CONTINUED:
P61 and P74 4 Nos of E house / Project manager
Working on the Engineering and Construction TLP / FPSO project worth 40 Million USD, in a team of 85.
Prepare the commercial proposal for the E house including budget.
Assist to prepare cost sheet with Budgeted Margin
Involved in project management such as schedule preparation, WBS preparation, and Subcontractor selection.
Prepare the detail Project execution plan for the E house.
And fully involved through construction phase and assist for the yard, heavy equipment’s, Job planning and implement.
As special task , Architecture , HVAC Installation, Electrical load testing
Lead a team for the E & I which is involved 96 KMcableinstallation and integration with MV/LV Pa nel , transformer , Lighting
system , Telecomm
Receiving the Employee Excellence Award for overall performance during the project.
PROJECT EXPERIENCE CONTINUED:
BWO/TSB Topside modules
As a Package Engineer
Working on the Involved in project management such as schedule preparation, WBS preparation, and Sub contractor
selection.
Prepare the detail Installation execution plan for the Solar 2 x Mars 100 – C61 Compressor Sets.
To assist the construction manager for the yard, heavy equipment’s, Job planning and implement.
Assign as special task for the pressure vessel fabrication 33 Nos for the topside module.
Structure Fabrication Approx. 1300 Ton, Piping fabrication, equipment installation
Identifying, resolving and developing weekly punch closing reports for Construction manager and QA/ QC.
3. Page 3 of 3
PREVIOUS PROJECT EXPERIENCE
HS Compression & Process Pte Ltd - Production Superintendent Sep 2005 to Sep 2009
Subcontract management from prepare the scope of work for the Sub contract Negotiation & finalizing subcontractor for
such as Skid, Vessel, Piping, E&I, Chemical cleaning & testing.
Experience of working in multi-vendor environment.
Monitoring project from the engineering, construction and Commissioning stages with proper reporting method.
Excellent reporting skill for the project, good conflict management and prioritization skills.
Good coordination for the Project documentation and Prepare and Implement work Instruction such as Vessel,Piping,Skid,
E & I, FAT Testing.
PREVIOUS PROJECT EXPERIENCE - KUWAIT
Kuwait National Petroleum Company (KNPC) MAB Refinery, Kuwait through TECHNIP/ Gulf Spic July 2002 to Feb 2005
Subcontract management from prepare the scope of work for the Sub contract Negotiation & finalizing subcontractor for
such as Skid, Vessel, Piping, E&I, Chemical cleaning & testing.
Experience of working in multi-vendor environment. To complete the VACUM RE RUN REVAMP Project.
Process Package 6 Nos & Compression Package 2 Nos
structure Fabrication approx 700 Ton
Pressure Vessel 30 Nos Highest thickness 32 mm, internal epoxy coating, SS chemical tanks.
Piping system for the chemical injection module
Process piping , SS , CS ,
Equipment Installation
Vessels 12 Nos, maximum 30 Tons
Heater 6 Tons
Re boiler 4 Tons ( Installed on 2nd Tier )
Structure 40 Tons (for flipping Tandem Lifting)
EDUCATIONAL DEVELOPMENT:
Diploma in Mechanical Engineering Ngee Ann Polytechnic Singapore
MS Project Management
Certified PMP Course
Condition Monitoring Program
Shipyard Safety Training
REFERENCES:
C . Srinivas General Manager, VME Process srinivas.c@vmeprocess.com
Peter Loh Topside construction manager peter.loh@yinsonproduction.com