SlideShare a Scribd company logo
1 of 5
Download to read offline
MUKESH H. JAISINGHANI
OBJECTIVE:
To work efficiently and effectively and grow with desire for increased responsibility and professional
growth while leveraging extensive man-management, business development, personnel leadership and
entrepreneurial successes in the performance-based environment of a growing organization. Where I can utilize
my skills and expertise to the utmost extent, in a globally competitive and challenging environment, so as to
achieve self-realization and accomplishment of organizational goals.
PROFILE ATTRIBUTES:-
 Extensive & Enriched E&I project management experience.
 Hands-on-experience with multifaceted projects including mechanical, structure & piping.
 Familiar with various aspects of tendering, planning & engineering, local & overseas procurement
among others.
 Senior member of critical tendering committee, procurement advisory board, engineering group.
 Managed onshore/offshore multi-site projects with over 500+ work heads simultaneously.
 Practice project execution with sentiment of ownership for financial & operational prudence.
 Proactively lead from front especially at offshore.
 Strong network with clients & vendors pan India.
SPECIAL ACHIEVEMENTS:-
 Single handily conceptualised, developed & set up the first ever 100 member E&I department in
Dolphin Offshore which helped elevate bidding competency of the company into EPC contracts. Being
able to bid for small E&I contracts, the department has evolved into an independent profit making
centre.
 Bagged the ‘Most Valued Member of Staff Award’ for the year 2006. The award was conferred in
recognition of acute techno-commercial acumen which resulted in company posting a net saving of US$
1.1 Million both from NQD and ICP project.
 Demonstrated management of the largest project ever executed by the company (US$ 33.5 Million )
including but not limited to tendering, engineering, installation, commissioning. Was at the center of
affairs in concluding a smooth & timely handover for 12 well head platform, 3 process platform & 54
km of subsea composite cabling.
 Reflecting personal commitment to operational excellence; planned, executed & handed over 24
wellhead platform of ONGC vis-à-vis Fire & Gas Detection project full 90 days before the contractual
date. This was further complimented by zero punch lists which resulted in ONGC issuing an excellent
Letter of Appreciation personally recognizing this effort.
 Directed & controlled the first ever activity not only in India but the Asian continent of extremely high
pressure hook-up tubing followed by testing at 1760 Bar.
 Successfully managed the start-up & commissioning of critical of two phase cyclonic separator & three
phase separator along with other relevant systems passing the crucial benchmark of 72 hours of nonstop
operation; all this without the qualified & approved vendor support who could be present for some
reason.
 Was handpicked for my first international assignment for Tanzania as Project in-charge for Songo:
Songo Gas Development project. The stint lasted 11 months and profile was holistic with several
responsibilities. The execution bagged several appreciations & rewards including a special mention of
appreciation by the chairman of Larson & Toubro.
EXPERIENCE SUMMARY:
Current
Organization
Dolphin Offshore Enterprise (I) Ltd.
Location Navi Mumbai, India.
Designation General Manager (E&I) (Projects Division)
Duration 03rd Jan 2005 to Till Date
Company Profile:
Dolphin Offshore Enterprises (India) Limited (DOEIL) is an ISO 14001:2004 (IAF), IMCA and ABS
Quality evaluations certified leading provider of deep water services to the Indian Oil & Gas industry
and has a diversified portfolio for undertaking turnkey projects involving sub-sea, marine services and
offshore services as an EPC contractor which includes LSTK Contractor which is having an added
advantage and got both responsibilities of Operations and projects.
Roles & Responsibilities:
 Estimation & costing for tender work, Pre-bid survey, preparation of RFQ , floating enquiry, review and
acceptance of techno-commercial offer, preparation of comparison, compilation of various offers &
submit to marketing department .
 On award , preparation for kick of meeting, preparation of overall project schedule , pre-engineering
survey , vendor co-ordination inputs for design engineering , floating the enquiry for procurement ,
Technical & commercial evaluation of offers , vendor negotiation , placement of orders with
consideration of cash flow , monitoring the vendor progress , co-ordination for inspection , follow up
for release note ,receipt of material , dispatch to offshore site with the consideration of vessel moment .
 Co-ordination for preparation of micro schedule , planning package , co-ordination for job cards ,co-
ordination for preparation of installation QA & QC formats ,interaction with Third party & certification
authority , internal meetings with all concerned departments for project planning & monitoring.
 Progress monitoring as per plan schedule & highlights the concern to client , monitoring the material
moment , co-ordinating the material requirement from site, preparation of weekly & monthly report
with highlights & concerns, preparation of progress milestones for payments , preparation of extra work
summary as per contract, frequent visit at site for better controlling the project & interaction with end
users, co-ordination for obtaining the mechanical completion, commissioning & handing over
certificates .
Project Summary in a role of Electrical & Instrumentation Head:
Sr.nos Project Name Duration Client
1 OGIP Power to ESP Project – EPC Project 01/05/2012 to till
date
M/s. ONGC
2 GSPC Deen Dayal Field (DDW1) Project-
Sub-Contract
01/03/2012 to till
date
M/s. Larson & Turbo
Ltd
3 C2 CAMPAIGN for British Gas – SUB
CONTRACT
01/03/2012 to till
date
M/s. Larson & Turbo
Ltd
4 Hook-up and commissioning of 05 WELL
HEAD PLATFORM FOR B-193 (B-23A, B-
28A, B-172A, B-178A, B-179A) - SUB
CONTRACT
01/11/2010 to
20/12/2012
M/s. SIME DARBY
Malaysia
5 NQD Revamp Project (Mumbai High) - EPC
PROJECT
05/09/2008 to
06/09/2010
M/s. ONGC Mumbai
High–North field
offshore.
6 ICP Enhancement Project - EPC PROJECT 05/09/2008 to
08/06/2010
M/s. ONGC Mumbai
High– South field
Offshore
7 6 Clamp on Project (EPC on consortium basis
with L&T)
5.04.2007 to
31.03.2008
M/s. ONGC Mumbai
High
8 (PRP –I) Project for 71 unmanned platform -
SUB CONTRACT
17/10/2005 to
15/05/2006
M/s. ONGC Mumbai
High
9 Zero Flaring Project at ICP & SCA Platform
Project - EPC PROJECT
16.09.05 to
19.05.06
M/s. ONGC Mumbai
High.
10 Revamping at SH Complex Project - EPC
PROJECT
19.07.04 to
26.03.06
M/s. ONGC Mumbai
High
11 Electrical lighting jobs at BB, BD & BE
unmanned platform – EPC PROJECT
21.10.04 to
22.06.06
M/s. ONGC Mumbai
High
12 BPA Reconstruction unmanned Project - SUB
CONTRACT
23.02.04 to
26.02.05
M/s. ONGC Mumbai
High
Past
Organization
Aarkay Instruments Pvt. Ltd
Location Lower Parel, Mumbai, India.
Designation Sr. Project Engineer
Duration 6th Apr 1999 To December 2004
Company Profile:
The Company is synonymous with offshore Electrical & Instrumentation works. It has participated in the
Construction of most of the indigenously fabricated platforms. Their span of experience covers, Engineering,
Planning, Procurement, Construction and Commissioning etc. The Company has confidence based on their
Past Experience to carry out Turn-Key Projects. They have not only undertaken construction but
Instrumentation and Electrical works are their FORTE. The Company has reorganized itself to carry out
Piping, erection of Equipment, Vessels etc. which are the form part of the plant.
Sr.nos Project Name Duration Client
1 SONGAS LTD -TANZANIA. (Power Gas
Development Project– Onshore & Offshore.
02/01/2004 to
02/12/2004
M/s. L& T
SKILLS:
Computer Skills Personal Skills Communication Skills: Languages Known
Proficiency in handling
Microsoft Office (2003 &
2007).
Excellent team
management skills and
can work
independently as and
when required
Excellent Verbal and
Written communication
skills
Sindhi,
Intermediate in MS projects Ability to work under
pressure and achieve
targets within deadlines
Strong Presentation and
demonstration skills
English,
Strong Analytical and
problem Solving Skills
Good Interpersonal Skills
and ability to build
rapport with other
members of the
Organization.
Hindi, Marathi
QUALIFICATION:
B. Tech –Electronics & Tele Communication
Diploma – Instrumentation
Management Trainings
 Project Management of LSTK Contract –Management Programme
 Effective personal Productivity (Leadership Management International -Paul J Meyer)
TRAINING PROGRAMS ATTENDED:
Title Organized by Duration
Control Valve & Accessories MIL, ALUA 3 Days
Introduction to Primavera DOEIL 3 Days
Standards of Training, Certification and Watch keeping
(STCW-95) course
 Personal Survival Technique.
 Fire Prevention and Fire Fighting.
 Elementary First Aid.
 Helicopter Underwater Escape Technique.
10 days
Quality Management System - Awareness Program DOEIL 1 Day
Insurance clauses, terms and conditions for Hired and
Owned equipments
DOEIL 1 Day
Hazard Identification and Risk Assessment
(Aspect/Impact)
DOEIL 2 Day
PERSONAL DETAILS:
Date of birth : 19TH JULY, 1979
Marital Status : Married
Languages known : Sindhi, English, Hindi, Marathi.
Passport No : H-3433514
Place of Issue : Mumbai
Date of Issue : 19/02/2009
Date of Expiry : 18/02/2019
CONTACT NO. :M +91-9819319583
Email ID : mukh2@rediffmail.com, Jaisinghani.mukesh1@gmail.com
Permanent address : 1502, Tycoon Sapphire, opposite D-mart, godrej hill road, Kalyan west 04.
ADDITIONAL INFORMATION:
Hobbies and Interests: Travelling, Driving, Socialising.
I hereby declare that the above information provided by me is true and correct to the best of my knowledge.
S/d
MUKESH HOTCHAND JAISINGHANI.

More Related Content

What's hot (20)

CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
 
Resume
ResumeResume
Resume
 
Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineer
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019
 
2015 CV
2015 CV 2015 CV
2015 CV
 
Topside
TopsideTopside
Topside
 
chesbro resume
chesbro resumechesbro resume
chesbro resume
 
Gangopadhaya Shekhar CV
Gangopadhaya Shekhar CVGangopadhaya Shekhar CV
Gangopadhaya Shekhar CV
 
Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
balaji cv
balaji cvbalaji cv
balaji cv
 
Cv phaniraz
Cv   phanirazCv   phaniraz
Cv phaniraz
 
CV - Azwyn Abd Aziz
CV - Azwyn Abd AzizCV - Azwyn Abd Aziz
CV - Azwyn Abd Aziz
 
Samih.CV docx
Samih.CV docxSamih.CV docx
Samih.CV docx
 
CV Henrique Wu ENG Updated
CV Henrique Wu ENG UpdatedCV Henrique Wu ENG Updated
CV Henrique Wu ENG Updated
 

Similar to Final Mukesh Resume

Similar to Final Mukesh Resume (20)

Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
 
CV-VA- March2016
CV-VA- March2016CV-VA- March2016
CV-VA- March2016
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Sarmad CV_Oct'16
Sarmad CV_Oct'16Sarmad CV_Oct'16
Sarmad CV_Oct'16
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
 
Cv project manager
Cv project managerCv project manager
Cv project manager
 
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 
CV_Ken Loh_external
CV_Ken Loh_externalCV_Ken Loh_external
CV_Ken Loh_external
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)
 
Resume of SSK
Resume of SSKResume of SSK
Resume of SSK
 

Final Mukesh Resume

  • 1. MUKESH H. JAISINGHANI OBJECTIVE: To work efficiently and effectively and grow with desire for increased responsibility and professional growth while leveraging extensive man-management, business development, personnel leadership and entrepreneurial successes in the performance-based environment of a growing organization. Where I can utilize my skills and expertise to the utmost extent, in a globally competitive and challenging environment, so as to achieve self-realization and accomplishment of organizational goals. PROFILE ATTRIBUTES:-  Extensive & Enriched E&I project management experience.  Hands-on-experience with multifaceted projects including mechanical, structure & piping.  Familiar with various aspects of tendering, planning & engineering, local & overseas procurement among others.  Senior member of critical tendering committee, procurement advisory board, engineering group.  Managed onshore/offshore multi-site projects with over 500+ work heads simultaneously.  Practice project execution with sentiment of ownership for financial & operational prudence.  Proactively lead from front especially at offshore.  Strong network with clients & vendors pan India. SPECIAL ACHIEVEMENTS:-  Single handily conceptualised, developed & set up the first ever 100 member E&I department in Dolphin Offshore which helped elevate bidding competency of the company into EPC contracts. Being able to bid for small E&I contracts, the department has evolved into an independent profit making centre.  Bagged the ‘Most Valued Member of Staff Award’ for the year 2006. The award was conferred in recognition of acute techno-commercial acumen which resulted in company posting a net saving of US$ 1.1 Million both from NQD and ICP project.  Demonstrated management of the largest project ever executed by the company (US$ 33.5 Million ) including but not limited to tendering, engineering, installation, commissioning. Was at the center of affairs in concluding a smooth & timely handover for 12 well head platform, 3 process platform & 54 km of subsea composite cabling.  Reflecting personal commitment to operational excellence; planned, executed & handed over 24 wellhead platform of ONGC vis-à-vis Fire & Gas Detection project full 90 days before the contractual date. This was further complimented by zero punch lists which resulted in ONGC issuing an excellent Letter of Appreciation personally recognizing this effort.  Directed & controlled the first ever activity not only in India but the Asian continent of extremely high pressure hook-up tubing followed by testing at 1760 Bar.  Successfully managed the start-up & commissioning of critical of two phase cyclonic separator & three phase separator along with other relevant systems passing the crucial benchmark of 72 hours of nonstop operation; all this without the qualified & approved vendor support who could be present for some reason.
  • 2.  Was handpicked for my first international assignment for Tanzania as Project in-charge for Songo: Songo Gas Development project. The stint lasted 11 months and profile was holistic with several responsibilities. The execution bagged several appreciations & rewards including a special mention of appreciation by the chairman of Larson & Toubro. EXPERIENCE SUMMARY: Current Organization Dolphin Offshore Enterprise (I) Ltd. Location Navi Mumbai, India. Designation General Manager (E&I) (Projects Division) Duration 03rd Jan 2005 to Till Date Company Profile: Dolphin Offshore Enterprises (India) Limited (DOEIL) is an ISO 14001:2004 (IAF), IMCA and ABS Quality evaluations certified leading provider of deep water services to the Indian Oil & Gas industry and has a diversified portfolio for undertaking turnkey projects involving sub-sea, marine services and offshore services as an EPC contractor which includes LSTK Contractor which is having an added advantage and got both responsibilities of Operations and projects. Roles & Responsibilities:  Estimation & costing for tender work, Pre-bid survey, preparation of RFQ , floating enquiry, review and acceptance of techno-commercial offer, preparation of comparison, compilation of various offers & submit to marketing department .  On award , preparation for kick of meeting, preparation of overall project schedule , pre-engineering survey , vendor co-ordination inputs for design engineering , floating the enquiry for procurement , Technical & commercial evaluation of offers , vendor negotiation , placement of orders with consideration of cash flow , monitoring the vendor progress , co-ordination for inspection , follow up for release note ,receipt of material , dispatch to offshore site with the consideration of vessel moment .  Co-ordination for preparation of micro schedule , planning package , co-ordination for job cards ,co- ordination for preparation of installation QA & QC formats ,interaction with Third party & certification authority , internal meetings with all concerned departments for project planning & monitoring.  Progress monitoring as per plan schedule & highlights the concern to client , monitoring the material moment , co-ordinating the material requirement from site, preparation of weekly & monthly report with highlights & concerns, preparation of progress milestones for payments , preparation of extra work summary as per contract, frequent visit at site for better controlling the project & interaction with end users, co-ordination for obtaining the mechanical completion, commissioning & handing over certificates .
  • 3. Project Summary in a role of Electrical & Instrumentation Head: Sr.nos Project Name Duration Client 1 OGIP Power to ESP Project – EPC Project 01/05/2012 to till date M/s. ONGC 2 GSPC Deen Dayal Field (DDW1) Project- Sub-Contract 01/03/2012 to till date M/s. Larson & Turbo Ltd 3 C2 CAMPAIGN for British Gas – SUB CONTRACT 01/03/2012 to till date M/s. Larson & Turbo Ltd 4 Hook-up and commissioning of 05 WELL HEAD PLATFORM FOR B-193 (B-23A, B- 28A, B-172A, B-178A, B-179A) - SUB CONTRACT 01/11/2010 to 20/12/2012 M/s. SIME DARBY Malaysia 5 NQD Revamp Project (Mumbai High) - EPC PROJECT 05/09/2008 to 06/09/2010 M/s. ONGC Mumbai High–North field offshore. 6 ICP Enhancement Project - EPC PROJECT 05/09/2008 to 08/06/2010 M/s. ONGC Mumbai High– South field Offshore 7 6 Clamp on Project (EPC on consortium basis with L&T) 5.04.2007 to 31.03.2008 M/s. ONGC Mumbai High 8 (PRP –I) Project for 71 unmanned platform - SUB CONTRACT 17/10/2005 to 15/05/2006 M/s. ONGC Mumbai High 9 Zero Flaring Project at ICP & SCA Platform Project - EPC PROJECT 16.09.05 to 19.05.06 M/s. ONGC Mumbai High. 10 Revamping at SH Complex Project - EPC PROJECT 19.07.04 to 26.03.06 M/s. ONGC Mumbai High 11 Electrical lighting jobs at BB, BD & BE unmanned platform – EPC PROJECT 21.10.04 to 22.06.06 M/s. ONGC Mumbai High 12 BPA Reconstruction unmanned Project - SUB CONTRACT 23.02.04 to 26.02.05 M/s. ONGC Mumbai High Past Organization Aarkay Instruments Pvt. Ltd Location Lower Parel, Mumbai, India. Designation Sr. Project Engineer Duration 6th Apr 1999 To December 2004
  • 4. Company Profile: The Company is synonymous with offshore Electrical & Instrumentation works. It has participated in the Construction of most of the indigenously fabricated platforms. Their span of experience covers, Engineering, Planning, Procurement, Construction and Commissioning etc. The Company has confidence based on their Past Experience to carry out Turn-Key Projects. They have not only undertaken construction but Instrumentation and Electrical works are their FORTE. The Company has reorganized itself to carry out Piping, erection of Equipment, Vessels etc. which are the form part of the plant. Sr.nos Project Name Duration Client 1 SONGAS LTD -TANZANIA. (Power Gas Development Project– Onshore & Offshore. 02/01/2004 to 02/12/2004 M/s. L& T SKILLS: Computer Skills Personal Skills Communication Skills: Languages Known Proficiency in handling Microsoft Office (2003 & 2007). Excellent team management skills and can work independently as and when required Excellent Verbal and Written communication skills Sindhi, Intermediate in MS projects Ability to work under pressure and achieve targets within deadlines Strong Presentation and demonstration skills English, Strong Analytical and problem Solving Skills Good Interpersonal Skills and ability to build rapport with other members of the Organization. Hindi, Marathi QUALIFICATION: B. Tech –Electronics & Tele Communication Diploma – Instrumentation Management Trainings  Project Management of LSTK Contract –Management Programme  Effective personal Productivity (Leadership Management International -Paul J Meyer)
  • 5. TRAINING PROGRAMS ATTENDED: Title Organized by Duration Control Valve & Accessories MIL, ALUA 3 Days Introduction to Primavera DOEIL 3 Days Standards of Training, Certification and Watch keeping (STCW-95) course  Personal Survival Technique.  Fire Prevention and Fire Fighting.  Elementary First Aid.  Helicopter Underwater Escape Technique. 10 days Quality Management System - Awareness Program DOEIL 1 Day Insurance clauses, terms and conditions for Hired and Owned equipments DOEIL 1 Day Hazard Identification and Risk Assessment (Aspect/Impact) DOEIL 2 Day PERSONAL DETAILS: Date of birth : 19TH JULY, 1979 Marital Status : Married Languages known : Sindhi, English, Hindi, Marathi. Passport No : H-3433514 Place of Issue : Mumbai Date of Issue : 19/02/2009 Date of Expiry : 18/02/2019 CONTACT NO. :M +91-9819319583 Email ID : mukh2@rediffmail.com, Jaisinghani.mukesh1@gmail.com Permanent address : 1502, Tycoon Sapphire, opposite D-mart, godrej hill road, Kalyan west 04. ADDITIONAL INFORMATION: Hobbies and Interests: Travelling, Driving, Socialising. I hereby declare that the above information provided by me is true and correct to the best of my knowledge. S/d MUKESH HOTCHAND JAISINGHANI.