Attachment A – EPC Contract Power Plant Project Kaeng Khoi, Thailand
SCOPEOFPROJECT
TYPE OF CONTRACT Full turnkey Engineering, Procurement & Construction (EPC).
TYPE OF
CONFIGURATION
2 x KA26B – 2 (Multi Shaft) Output : 1,468 MW (2 blocks of ~760MW each)
COUNTRY Thailand, Saraburi Province
CUSTOMER Gulf Power Generation Client:Mitsui & Co
SUB-
CONTRACTORS
Civil Works – Sino-Thai Engineering & Construction PCL (STECON), McConnell Dowell
Mechanical Works – STECON MECHANICAL, Thailand.
Electrical Works – ALSTOM Power Thailand.
• The Power Plant constitutes of 2 Blocks of 2 GT combined cycle.
• The owner is Gulf Power Generation Company Limited.
• The scope is fully EPC and the NTP was awarded on 3rd December 2004.
• The civil works started 25 April 2005.
• PAC Block 1 was 01 March 07 with L/D 250,000 Euro/Day.
• PAC Block 1 includes all the common plant buildings and facilities.
• CONCRETE – 86500 m3 done against Original budget of 59000 m3, 150% on budget
• STEEL REINFORCEMENT – 8520 T against 4530 T , 188% on original budget
• UNDERGROUND [ PIPE WORK ALONE] - executed is 2.4 times the original budget . cost over run is 117,532914
THB against 48,218501 THB budget.
• STEEL STRUCTURE – 5340 T against 3440 T original budget, 155% on original budget
• CLADDING- 33000 m2 against 27000 m2 original budget , 122% on original budget.
My duration of service in this project
5 Months

More Related Content

What's hot (18)

Projects Involved
Projects InvolvedProjects Involved
Projects Involved
 
Summer training report on
Summer training report onSummer training report on
Summer training report on
 
Bio-data -MSK
Bio-data -MSKBio-data -MSK
Bio-data -MSK
 
Pln cng
Pln cngPln cng
Pln cng
 
PatnowII
PatnowIIPatnowII
PatnowII
 
Indonesia current gas market 2015 s
Indonesia current gas market 2015 sIndonesia current gas market 2015 s
Indonesia current gas market 2015 s
 
Neelum Jhelum Hydropower Project (NJHP)
Neelum Jhelum Hydropower Project (NJHP)Neelum Jhelum Hydropower Project (NJHP)
Neelum Jhelum Hydropower Project (NJHP)
 
Aecon nuclear capabilities and experience
Aecon nuclear capabilities and experienceAecon nuclear capabilities and experience
Aecon nuclear capabilities and experience
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT
 
underground mining
underground miningunderground mining
underground mining
 
Curriculum vitae 2015
Curriculum vitae 2015Curriculum vitae 2015
Curriculum vitae 2015
 
Emdrive
EmdriveEmdrive
Emdrive
 
Vikas
VikasVikas
Vikas
 
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power Station
 
Richard Parker
Richard ParkerRichard Parker
Richard Parker
 
1AB-CV5
1AB-CV51AB-CV5
1AB-CV5
 
Progress on the SKYLON Reusable Spaceplane
Progress on the SKYLON Reusable SpaceplaneProgress on the SKYLON Reusable Spaceplane
Progress on the SKYLON Reusable Spaceplane
 

Viewers also liked

Exercicio intermitente de aula virtual
Exercicio intermitente de aula virtualExercicio intermitente de aula virtual
Exercicio intermitente de aula virtualestefania2406
 
Biljana lajovic unapredjivanje_kompetencija_zaposlenih_u_oblasti_vaspitnog_rada
Biljana lajovic unapredjivanje_kompetencija_zaposlenih_u_oblasti_vaspitnog_radaBiljana lajovic unapredjivanje_kompetencija_zaposlenih_u_oblasti_vaspitnog_rada
Biljana lajovic unapredjivanje_kompetencija_zaposlenih_u_oblasti_vaspitnog_radaDanica Matic
 
Atanasiu note de curs comunicare
Atanasiu note de curs comunicareAtanasiu note de curs comunicare
Atanasiu note de curs comunicareBianka Yulia
 
Jose Galan Resume
Jose Galan ResumeJose Galan Resume
Jose Galan Resumejose galan
 
Communications Resume 5-17-15
Communications Resume 5-17-15Communications Resume 5-17-15
Communications Resume 5-17-15Eric Manuel
 
Solidarna Klopica at New Leaders Conference
Solidarna Klopica at New Leaders ConferenceSolidarna Klopica at New Leaders Conference
Solidarna Klopica at New Leaders ConferenceNina Ninaa
 
Edwards, Nicole_Resume_Comm_Dec_2015_Final
Edwards, Nicole_Resume_Comm_Dec_2015_FinalEdwards, Nicole_Resume_Comm_Dec_2015_Final
Edwards, Nicole_Resume_Comm_Dec_2015_FinalNickicole40
 
Persian life on persian carpet
Persian life on persian carpetPersian life on persian carpet
Persian life on persian carpetARASH IZADI
 
A difusão do gosto e da prática pelas viagens
A difusão do gosto e da prática pelas viagensA difusão do gosto e da prática pelas viagens
A difusão do gosto e da prática pelas viagensRaQuel Oliveira
 
Role of women in Agriculture a Lecture at Islamabad to Workshop on WID by All...
Role of women in Agriculture a Lecture at Islamabad to Workshop on WID by All...Role of women in Agriculture a Lecture at Islamabad to Workshop on WID by All...
Role of women in Agriculture a Lecture at Islamabad to Workshop on WID by All...Mr.Allah Dad Khan
 
152391920 persuasiune-seductie-si-manipulare
152391920 persuasiune-seductie-si-manipulare152391920 persuasiune-seductie-si-manipulare
152391920 persuasiune-seductie-si-manipulareBianka Yulia
 

Viewers also liked (18)

Exercicio intermitente de aula virtual
Exercicio intermitente de aula virtualExercicio intermitente de aula virtual
Exercicio intermitente de aula virtual
 
Biljana lajovic unapredjivanje_kompetencija_zaposlenih_u_oblasti_vaspitnog_rada
Biljana lajovic unapredjivanje_kompetencija_zaposlenih_u_oblasti_vaspitnog_radaBiljana lajovic unapredjivanje_kompetencija_zaposlenih_u_oblasti_vaspitnog_rada
Biljana lajovic unapredjivanje_kompetencija_zaposlenih_u_oblasti_vaspitnog_rada
 
Atanasiu note de curs comunicare
Atanasiu note de curs comunicareAtanasiu note de curs comunicare
Atanasiu note de curs comunicare
 
James Martin-CV
James Martin-CVJames Martin-CV
James Martin-CV
 
Infiorata
InfiorataInfiorata
Infiorata
 
Śniadanie Daje Moc
Śniadanie Daje MocŚniadanie Daje Moc
Śniadanie Daje Moc
 
Jose Galan Resume
Jose Galan ResumeJose Galan Resume
Jose Galan Resume
 
Communications Resume 5-17-15
Communications Resume 5-17-15Communications Resume 5-17-15
Communications Resume 5-17-15
 
Solidarna Klopica at New Leaders Conference
Solidarna Klopica at New Leaders ConferenceSolidarna Klopica at New Leaders Conference
Solidarna Klopica at New Leaders Conference
 
Tv sunu
Tv sunuTv sunu
Tv sunu
 
Reforma católica
Reforma católica Reforma católica
Reforma católica
 
Edwards, Nicole_Resume_Comm_Dec_2015_Final
Edwards, Nicole_Resume_Comm_Dec_2015_FinalEdwards, Nicole_Resume_Comm_Dec_2015_Final
Edwards, Nicole_Resume_Comm_Dec_2015_Final
 
Persian life on persian carpet
Persian life on persian carpetPersian life on persian carpet
Persian life on persian carpet
 
A difusão do gosto e da prática pelas viagens
A difusão do gosto e da prática pelas viagensA difusão do gosto e da prática pelas viagens
A difusão do gosto e da prática pelas viagens
 
DSS. Nov 21 2013. Eduardo Espinoza
DSS. Nov 21 2013. Eduardo EspinozaDSS. Nov 21 2013. Eduardo Espinoza
DSS. Nov 21 2013. Eduardo Espinoza
 
Role of women in Agriculture a Lecture at Islamabad to Workshop on WID by All...
Role of women in Agriculture a Lecture at Islamabad to Workshop on WID by All...Role of women in Agriculture a Lecture at Islamabad to Workshop on WID by All...
Role of women in Agriculture a Lecture at Islamabad to Workshop on WID by All...
 
Diagnostic agents
Diagnostic agentsDiagnostic agents
Diagnostic agents
 
152391920 persuasiune-seductie-si-manipulare
152391920 persuasiune-seductie-si-manipulare152391920 persuasiune-seductie-si-manipulare
152391920 persuasiune-seductie-si-manipulare
 

Similar to Page4 KK2

Complete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric ProjectComplete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric ProjectEngr_Emad Khan
 
2017 irao export presentation eng
2017 irao export presentation eng2017 irao export presentation eng
2017 irao export presentation engViacheslav Leonov
 
KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016sfact
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanIBRAR AHMAD
 
01.05.2014 Examining the potential for successful renewable energy projects i...
01.05.2014 Examining the potential for successful renewable energy projects i...01.05.2014 Examining the potential for successful renewable energy projects i...
01.05.2014 Examining the potential for successful renewable energy projects i...The Business Council of Mongolia
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEvijayabaskar v
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyIceland Geothermal
 
Muhammad Babar, CV 2015
Muhammad Babar, CV 2015Muhammad Babar, CV 2015
Muhammad Babar, CV 2015Muhammad Babar
 
Ali update CV-18-05-2016
Ali update CV-18-05-2016Ali update CV-18-05-2016
Ali update CV-18-05-2016NAZAKATH ALI
 

Similar to Page4 KK2 (20)

Wichai B_CV_2016
Wichai B_CV_2016Wichai B_CV_2016
Wichai B_CV_2016
 
Final Year Review
Final Year ReviewFinal Year Review
Final Year Review
 
presentation vsv.ppt
presentation vsv.pptpresentation vsv.ppt
presentation vsv.ppt
 
Complete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric ProjectComplete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric Project
 
jamespickering
jamespickeringjamespickering
jamespickering
 
selfcv NEw
selfcv NEwselfcv NEw
selfcv NEw
 
PECL PROJECTS
PECL PROJECTSPECL PROJECTS
PECL PROJECTS
 
SANJEEV KUMAR
SANJEEV KUMARSANJEEV KUMAR
SANJEEV KUMAR
 
2017 irao export presentation eng
2017 irao export presentation eng2017 irao export presentation eng
2017 irao export presentation eng
 
ELAMURUGU15_10
ELAMURUGU15_10ELAMURUGU15_10
ELAMURUGU15_10
 
CV Didit Kurniawan 2016
CV Didit Kurniawan 2016CV Didit Kurniawan 2016
CV Didit Kurniawan 2016
 
KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistan
 
Energy and Power Brochure
Energy and Power BrochureEnergy and Power Brochure
Energy and Power Brochure
 
WQ-2
WQ-2WQ-2
WQ-2
 
01.05.2014 Examining the potential for successful renewable energy projects i...
01.05.2014 Examining the potential for successful renewable energy projects i...01.05.2014 Examining the potential for successful renewable energy projects i...
01.05.2014 Examining the potential for successful renewable energy projects i...
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
 
Muhammad Babar, CV 2015
Muhammad Babar, CV 2015Muhammad Babar, CV 2015
Muhammad Babar, CV 2015
 
Ali update CV-18-05-2016
Ali update CV-18-05-2016Ali update CV-18-05-2016
Ali update CV-18-05-2016
 

Page4 KK2

  • 1. 4 | P a g e Attachment A – EPC Contract Power Plant Project Kaeng Khoi, Thailand SCOPEOFPROJECT TYPE OF CONTRACT Full turnkey Engineering, Procurement & Construction (EPC). TYPE OF CONFIGURATION 2 x KA26B – 2 (Multi Shaft) Output : 1,468 MW (2 blocks of ~760MW each) COUNTRY Thailand, Saraburi Province CUSTOMER Gulf Power Generation Client:Mitsui & Co SUB- CONTRACTORS Civil Works – Sino-Thai Engineering & Construction PCL (STECON), McConnell Dowell Mechanical Works – STECON MECHANICAL, Thailand. Electrical Works – ALSTOM Power Thailand. • The Power Plant constitutes of 2 Blocks of 2 GT combined cycle. • The owner is Gulf Power Generation Company Limited. • The scope is fully EPC and the NTP was awarded on 3rd December 2004. • The civil works started 25 April 2005. • PAC Block 1 was 01 March 07 with L/D 250,000 Euro/Day. • PAC Block 1 includes all the common plant buildings and facilities. • CONCRETE – 86500 m3 done against Original budget of 59000 m3, 150% on budget • STEEL REINFORCEMENT – 8520 T against 4530 T , 188% on original budget • UNDERGROUND [ PIPE WORK ALONE] - executed is 2.4 times the original budget . cost over run is 117,532914 THB against 48,218501 THB budget. • STEEL STRUCTURE – 5340 T against 3440 T original budget, 155% on original budget • CLADDING- 33000 m2 against 27000 m2 original budget , 122% on original budget. My duration of service in this project 5 Months