1. CURRICULUM VITAE
BHASKAR JYOTI BHATTACHARJEE
25, Neogi Para Road, Baranagar
Kolkata – 700036, West Bengal, India
Ph No: +91-33-25780044(Res),
Mob: + 91-0- 8763678744/ 9437595327(Res)
Mail: bhaskarjbhatta@yahoo.co.in/
bhaskarjbhatta@gmail.com
Objectives: Seeking a position in the esteem organization and looking forward an
opportunity for handling the given assignment to excel my true potential and ability on
technical field application towards fulfilling the target of organization to grow with its true
vision.
Chronological Experience Summary:
Over 22 years in electrical field , Thermal Power Plant, Oil & Gas Sector, Steel Sector , Power
Distribution & Transmission Sector including Project’s, Operation & Maintenance in
India & Abroad.
A) Presently working in Jindal Steel & Power Limited (JSPL) as DY.Manager (E&I),Angul
Odissa .
Responsibilities
Monitoring the Project of Complete Electrical Package like Erection, Testing,
commissioning of Transformers,H.V panels with complete Cable packaging include all
related Equipments as per Projects schedule Centrally Including Operation &
Maintenance total power distribution (33KV)& transmission(400/220KV) system.
B)Mukand Engineers Limited(EPC group of Mukand Steel Limited) as PROJECT
MANAGER at I.O.C.L Paradip Refinery 366 MW C.P.P(3X102MW+2X30MW) Gas Power
Plant Project under B.H.E.L) Odisha (April 2012 - December 2012.)
Responsibilities
Monitoring the Project of Complete Electrical Package like Erection, Testing,
commissioning of Transformers (GT, UT, & all related Transformers), H.V, LV
panels &Motors with complete Cable packaging include all related Equipments as
per Projects schedule.
C)Feedback Infrastructure Services Private Limited (ENERGY DIVISION) as PROJECT
2. Manager at Jabalpur Division,MP ( August 2011- March 2012).
Responsibilities
α) Develop Power distribution Modification & rectification of existing systems
including Cable line, Transfomer, Switch Board Panel & OHL with GPS Survey.
β) Assurance of Quality, & Quantity as technical point of view.
χ) Supervise & Monitoring of Erection, Testing, and commission as a consultant
point of view.
δ) Processing of measurement, Bill & Material reconciliation.
e) Power auditing (reducing of voltage & power losses) of distribution system
D) Asst, Manager (E&I) in Bhushan Steel Ltd (Nine million ton integrated steel plant) at
Dhenkanal Odisha as (In- Charge) of 33KV/6.6KV/415V Sub-Station’s with Looking over
H.V.Power distribution system of D.R.I, R.M.H.S PH#1 & PH#2 Projects (April 2007 - July 2011).
Responsibilities:
Projects
a) Develop Power & control Cable schedule as per matching with our systems.
b) Indent processing for requires material & assurance of quality & quantity as
Technical point view with erection, testing & commission.
c) Processing of measurement, Bill & Material reconciliation.
During this period I have successfully erection & commissioned.
• 33/6.6/415 Sub-station up to 31.5MVA, 33/6.6KV Transformer with OLTC &
AVR, 33kv & 6.6kv (ABB) SF6 & Vacuum Switch Board,
• Erection and commissioning of 4X 500TPD Kiln & approx. 7.4 km conveyors
(PLC operated system with all Protection system like pull cord, Belt sowed &
ZSS) in RMHS.
• 6.6KV/415V Compact Secondary Sub-Station (ABB), PCC (Adlec) & MCC
(Tricolite) 415V Panels.
• Erection, Modification, & Commissioning of 6.6KV/ 415V Transformer Bus
Duct.
• 33KV & 6.6 KV Cable laying with testing & commissioning throughout the plant
like DRI, Housing Colony, S.M.S, Blast Furnace, R.M.H.S, Power Plant
(77&150MW), SMS & M.R.S.S.(Phase I & PhaseII).
Operation Maintenance:
• 33/6.6/415 Sub Station (Housing Colony, Coal Washary, RMHS, & DRI.
• 33KV &6.6KV (ABB) SF6 & Vacuum Switch Board.
• 31.5&16MVA (Comptrón Greaves) 8MVA & 2MVA (kirloskor) Transformar
• PCC&MCC (415V) Panels, AMF (for DG) Panel, Battery Charger Panel.
• Central AC Distribution Board & STP Control Station. HT (6.6KV) & LT
Motors (DRI, RMHS & Coal Washary).
• 1000&250KVA Aquatics DG (Jackson)
3. E) Supervisor (Electrical) HV in Arabian Industries under Petroleum
Development of Oman (South), Sultanate of Oman (2006 – 2007).
Responsibilities:
Projects:
During this period I have successfully commissioned.
• 30MVA 132/33KV (ABB) Transformer with OLTC.
Erection, testing commissioning & rectification with modification.
• Erection, Rectification with modification of 33KV & 11KV cable lines, Switch
Board & 33KV/415V Compact Sub-Station.
• HT & LT Motors (for Oil lifting Beam pumps at Oil Field) & Radio mortem
control panel.
Operation & Maintenance:
• 30MVA 132/33KV & 33/11KV 10MVA & 8 MVA Transformer with OLTC,
• 33KV & 11KVcable lines, Switch Board section & 33KV/415V Compact
Secondary Sub-Station.
• HT& LT Motors (for Oil lifting Beam pumps, ScrwePump at Oil Field) & Radio
mortem control panel.
F) Tech. Supervisor in Raychem RPG Ltd (EPD – Eastern) 1999 –2006.
Projects Executed:
• Thermal power Stations:
WBSEB – Santaldih, Bandel &Bakreswar Thermal Power Station
Haldia Petrochemicals & Captive Power Plant
DVC Bokaro and Durgapur Thermal Power Station
• NTPC Farakka, Kahalgaon & Talcher STPP
• TATA Iron & Steel Company (MRSS, G-BF,HSM & CRM Project),Tata Power,
Tata Timken, Tata Cement & TELCO at Jamshedpur.
G) Supervisor H.T. in KEC International Ltd, Under WED, Abu Dhabi, UAE
(1996-1998).
• Cable laying, Jointing and Termination & Testing with Commissioning works of
construction, modification Extension sites 33KV (UE) Over 200KM.
.● 33KV & 11KV GIS, Vacuum, SF6 & ACB Switch Gear (Siemens, ABB)
• Modification and Extension of 33 KV OHL’s and cables in Abu Dhabi &
Al Ain Areas in U.A.E. (Contact Ref: WED/PD/OHL-c/825).
4. H) Tech. Supervisor in Raychem RPG Ltd (EPD – Eastern) 1989 - 1996.
Projects Executed:
• Maithon Hydro Power Plant,( West Bengal) & Upper Kolab Hydro Power
Plant(Orissa)
• IOCL Barauni, Haldia & Noonmati Refinery.
• Steel Authority of India in Durgapur, Bokaro and Rourkela Plants.
• TATA Iron & Steel Company, Jamshedpur.
• Metro Railway Kolkata , Eastern & South Eastern Railway etc
I) M/s. TECHNO Electric & Engg. Co. Ltd., Vindhyachal S.T.P.P. of N.T.P.C.
(2 x 210MW) As a Supervisor (1986 – 1989).
Works Executed
• High Voltage, Low Voltage Power & Control cables Lying, Jointing,
Termination, and testing Commissioning.
• Erection commissioning 6.6KV/415V up to 4 MVA Transformer & 6.6kv
(ACB, Russian )Switch Board & 6.6KV/415V Dry type Transformer(BHEL)
• Testing & Commissioning of HV (6.6kv) Motors (ID Fan, FD Fan, BFP, CEP,
Ball Mill, PA Fan & Conveyor Motor (Russian & BHEL).
Educational & Professional Training
a) Diploma in Electrical Engineering 1984
b) Secondary Examination( 10th
) 1980
c) Appeared H.S (10+2 with Science) 1982
d) Computer Literate.
e) Trained 140KV Cable laying Termination and Jointing from Tyco Electronics,
Munich, Germany (2005).
Personal Details:
Father’s Name Late Prasanta Kumar Bhattacharjee
Date of Birth 28th
August, 1964
Nationality Indian
Passport Detail M3010341, Valid up to 26.10.2024
Marital Status Married
Present salary (CTC) 9.7 Lacks