Sanjeev Kumar has over 14 years of experience in various roles in the construction industry, including as a project manager. He has expertise in electrical construction, testing, commissioning, and design work for power plants and oil refineries. Currently he is the engineer-in-charge for the electrical site works on a 660 MW power project in Uttar Pradesh. He has strong skills in planning, project execution, SAP, and managing overall project coordination.
1. SANJEEV KUMAR
Mobile: 9793444886/9125383775
Mail: sanjeev.bok@gmail.com
sanjeevkumar@petronengineering.com
Present Address: Permanent Address:
Petron Engg. Constn Ltd., H.No.-292T, ST.-2, SEC. - IX A.
C/o.Prayagraj Power Generation Co. Ltd., Bokaro Steel City. (JHARKHAND)
(Jay Pee Group)
Bara, Alladabad,
Uttar Pradesh.
Summary:
Being technologically adept, having approx 14 years of experience in a variety of field exposed me to technical and
administrative aspects of an organization, infusing sufficient confidence to take on any challenging career path with a
clear vision.
I have experience in construction, testing-commissioning and design. My skill sets include overall project execution,
planning and SAP, apart from the Project Manager responsibility.
Professional Qualification:
B.E. in Electrical Engineering from RCERT, Chandrapur, in 2002 with first class.
Computer skill:
Operating System : Window 98/2000, XP,Win7
Programming languages : C, C++, Java
AutoCAD : R14, 2000, 2004
Bliss-06 : (Lighting Calculation)
SAP
Technical Experience:
1. Presently working as Engineer-In-Charge (Project Manager) of Electrical Site with M/s Petron
Engineering Construction Ltd. From JAN 2005 to till date.
Company Profile:
Sectors Served: Cement sector, Refinery & Petrochemical, Pipeline (Oil Sector) and Power Sector.
Services Offered: Electrical works of Sub-Station and Unit. Erection, testing & commissioning of electrical
equipments like Transformer, Motor and Switchgear.
Job Profile:
As an Engineer-In-Charge (Project Manager) make co-ordination between company’s staff member,
Client representatives for run the site smoothly till the end of the project, overall Project co-ordination. Our electrical
work is in both BOP & BTG area in power plant. Mostly BTG area comes under BHEL scope. Hence we know the
systems & working style of BHEL very well.
Erection of electrical equipment.
Supervision in testing and commissioning of Transformer, Motor, & Switchgears.
Earthing & Lightning Protection.
Cable and Tray work.
Structural Steel work.
Planning.
Site- Execution.
Billing.
Inventory Management.
2. SAP (PR, PO)
Current Project: Power Sector (Prayagraj Power Generation Co. Ltd., 3x660 MW)
Title: Electrical works for Boiler & Common Area.
Client: Jai Prakash Associate Ltd.
Main Consultant: TCEL (Tata Consulting Engineers Ltd.)
Duration: Jan 2013 to till date.
Project: Power Sector (UPRVUNL-PTPP Expansion Project, 2x250 MW)
Title: Electrical works for BOP & BTG.
Client: UPVUNL, PTPP.
Main Consultant: NTPC
Main Contractor: Reliance Infrastructure Ltd.
Duration: July 2009 to Jan 2013.
Project: Oil Sector (Jamnagar Export Refinery Project)
Title: Electrical works for Sulphur Complex
Client: Reliance Petroleum Ltd.
Main Consultant: Bechtel (France)
Duration: April 2007 to July 2009.
Project : Oil Sector (Panipat Refinery)
Title: NSU – 1, ELECTRICAL
Client: Indian Oil Corporation Ltd.
Main Consultant: Engineers India Ltd.
Duration: Nov 2006 to April 2007
Project : Oil Sector (Panipat Refinery)
Title: CDU/VDU & SRU, ELECTRICAL
Client: Indian Oil Corporation Ltd.
Main Consultant: Engineers India Ltd.
Duration: Jan 2005 to Nov 2006.
2. worked with JCE Engineering & Management Service Pvt. Ltd. Kanishka Complex, Kalkaji,
New Delhi-110019, from Oct 2003 to Dec 2004.
Sectors Served: Crude Oil & Gas Gathering Stations, Natural Gas Processing, Refining/ Oil terminals, Petrochemical
& Chemical Sector, Cross Country Pipeline, Fire Fighting System.
Services Offered: Feasibility Studies, Process Design, Basic Engineering, Detailed Engineering, Procurement
Services, Project Management, Planning & Scheduling, Project Estimates, Expediting & Inspection, Construction
Management, Commissioning Assistance. Construction of Sub-Station and Unit. Erection, commissioning & testing of
HT & LT Panels.
Job Profile:
Development of Electrical single line diagram.
Working on Cathodic Protection System.
Sizing calculation of DG Set, UPS and Transformer.
Overall cable and earthing layout.
Review of Vendor drawing / calculation for approval.
Cable sizing calculation.
Overall Project Co-ordination.
Final year project:
Short term load forecasting by using Neural-Network
3. Artificial Neural network first started in Texas in 1992. Load forecasting occupies central Role in the
operation and planning of electrical power system. In the operation of power System there are variation in
demand through the day and from day to day. Hence it is necessary to plan in advance, the startup & shut
down schedule of the power plant especially the large steam driven generating unit. Now it is mostly used in
USA & CANADA.
Vocational Training
Organization : Bokaro steel plant (SAIL), Jharkhand.
This was my first exposure to the working of an industry. Built by integrating indigenous as well as foreign
technologies the industry is designed to produce a wide range of steel.
In the section of thermal power plant, I learnt about the working process of the different units such as thermal
power plant, distribution network, electrical lab, electrical repair shop. And I had opportunity to learn about the
working of various equipments of an industry.
Personal details :
Father’s name : Mr. R. K. L. Das
Date of Birth : 12.10.1975
Sex : Male
Nationality : Indian
Language Known : English, Hindi
(SANJEEV KUMAR)