SlideShare a Scribd company logo
1 of 2
Download to read offline
ELAMURUGU.S elamurugu3@gmail.com
+919688848887
OBJECTIVE:
A chance in Electrical field that combines my creative ability and hard work to reach a
level of excellence through academic skills, management methodologies and experience to create
a betterment of the organization and myself.
EDUCATION:
B.E (Electrical & Electronics Engineering)
 Government College of Engineering, Tirunelveli.
 Overall percentage :80.3%(1st
Class with distinction )
 2007-2011
TOATL EXPERIENCE: 4 yrs and 4 months
FIELD OF EXPERIENCE:
1) Experienced in Erection, Testing & Commissioning of HT Switchgears ,LT Panels,
MCC, PCC ,Intelligent MCC,PCC,HT Motors ,LT drives, Power Transformers and
PMCC.
2) Erection, Testing Commissioning of Power transformers. Distribution Transformers,
Lighting Transformers, Control Transformers.
3) Earned a experience in Commissioning of 33kV GIS system from CAPL project, TATA
Steel, Jamshedpur.
4) Commissioning, Programming of Numerical Relays for Transformer protection, Motor
protection and Feeder protection.
5) Acquired knowledge in reading any Electrical scheme drawings and its specifications and
in understanding of project plan and its objectives.
6) Hands on experience in PLC programming especially in SIEMENS make PLC and
Capable to read any PLC program logic for all Material handling operation and
Electrical power system
7) Constructed a design at site for Intelligent MCC and simulated a control system without
hardwiring to PLC using Modbus protocol.
8) Experienced in Designing interconnections between PLC panels &Field,MCC panels
9) Commissioning of material Handling conveyors includes 2.3Km long belt conveyors,
Pipe Conveyors, Shuttle conveyors, Steep angle conveyors, Hydraulic Conveyors .Scoop
coupled HT conveyors.
10) Commissioning and Maintenance of Material handling equipment such as Paddle feeder,
Stacker cum Reclaimer, Wagon Tippler, Lifts, EOT cranes
10) Calibrated and Commissioned Equipment like Metal Detector, Belt Weighing scale
,Magnetic Separators.
11) Administered a team in all my electrical activities including Labor management and also
played a outstanding team player in all aspects.
TIME LINE:
EMPLOYER: LARSEN & TOURO CONSTRUCTION,MMH-IC
FROM TO DESIGNATION PROJECT CLIENT
July 2011 June 2102 GET 3.0mtpa EXPANSION
RMHS project
TATA STEEL
,JAMSEDHPUR
June 2012 Feb 2013 Sr.Engineer 3.0mtpa EXPANSION
RMHS project
TATA STEEL
,JAMSEDHPUR
Feb 2013 Mar 2014 Sr.Engineer CAPL project TATA STEEL
JAMSEDHPUR,NIPPON
STEEL ,JAPAN
Mar 2014 Dec 2014 Sr.Engineer 2*500MW NTPL ,CHP
project
Neyveli Lignite
Corporation,Tuticorin
Jan 2015 present Asst.Construction
Manager
2*500MW NTPL ,CHP
project
Neyveli Lignite
Corporation,Tuticorin
KEY SKILLS:
 Commissioning & erection of electrical ,instrumentation ,control systems
 PLC programming (having certificate from SITRAIN)
 Troubleshooting& Maintenance
 Enthusiastic Hard Worker
 Adaptive in nature
 Languages known: Tamil,Hindi,English
ACADEMIC & LEADERSHIP ACTIVITIES:
 Placement Representative and achieved a placement record for year 2010-11
 Organized Various College, department functions.
 Got internship training from NLC power plant- Neyveli.
 Got Bronze Medal in Ball Badminton game in Zonal Level

More Related Content

What's hot

Design, analysis and development of special purpose machine to carry heavy lo...
Design, analysis and development of special purpose machine to carry heavy lo...Design, analysis and development of special purpose machine to carry heavy lo...
Design, analysis and development of special purpose machine to carry heavy lo...eSAT Journals
 
Design of hub motor phase i introduction
Design of hub motor phase i introductionDesign of hub motor phase i introduction
Design of hub motor phase i introductionHemang Joshi
 
IRJET- A Fuzzy Logic Control Method for MPPT to Improve Solar System Efficiency
IRJET- A Fuzzy Logic Control Method for MPPT to Improve Solar System EfficiencyIRJET- A Fuzzy Logic Control Method for MPPT to Improve Solar System Efficiency
IRJET- A Fuzzy Logic Control Method for MPPT to Improve Solar System EfficiencyIRJET Journal
 
Free Energy Magnet Motor
Free Energy Magnet MotorFree Energy Magnet Motor
Free Energy Magnet Motor8141245710
 
Stability enhancement of wind power system by using energy capacitor system
Stability enhancement of wind power system by using energy capacitor systemStability enhancement of wind power system by using energy capacitor system
Stability enhancement of wind power system by using energy capacitor systemAsoka Technologies
 
Electricity through Train
Electricity through TrainElectricity through Train
Electricity through TrainIOSR Journals
 
Report on the IMPROVING THE EFFICIENCY OF SOLAR PHOTOVOLTAIC POWER GENERATION...
Report on the IMPROVING THE EFFICIENCY OF SOLAR PHOTOVOLTAIC POWER GENERATION...Report on the IMPROVING THE EFFICIENCY OF SOLAR PHOTOVOLTAIC POWER GENERATION...
Report on the IMPROVING THE EFFICIENCY OF SOLAR PHOTOVOLTAIC POWER GENERATION...Yuvraj Singh
 
iirdem Design of Efficient Solar Energy Collector using MPPT Algorithm
iirdem Design of Efficient Solar Energy Collector using MPPT Algorithmiirdem Design of Efficient Solar Energy Collector using MPPT Algorithm
iirdem Design of Efficient Solar Energy Collector using MPPT AlgorithmIaetsd Iaetsd
 
Project repoart
Project repoartProject repoart
Project repoartOmar Osman
 
A 500-W Wireless Charging System with Lightweight Pick-Up for Unmanned Aerial...
A 500-W Wireless Charging System with Lightweight Pick-Up for Unmanned Aerial...A 500-W Wireless Charging System with Lightweight Pick-Up for Unmanned Aerial...
A 500-W Wireless Charging System with Lightweight Pick-Up for Unmanned Aerial...Asoka Technologies
 
Design a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic ApplicationsDesign a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic ApplicationsEklavya Sharma
 
Design of hub motor phase ii introduction
Design of hub motor phase ii introductionDesign of hub motor phase ii introduction
Design of hub motor phase ii introductionHemang Joshi
 
Technical reclamation for electricity generation
Technical reclamation for electricity generationTechnical reclamation for electricity generation
Technical reclamation for electricity generationinventy
 
A Bibliometric Analysis of Different Maximum Power Point Tracking Methods for...
A Bibliometric Analysis of Different Maximum Power Point Tracking Methods for...A Bibliometric Analysis of Different Maximum Power Point Tracking Methods for...
A Bibliometric Analysis of Different Maximum Power Point Tracking Methods for...ijtsrd
 
Integration of Supercapacitor in Photovoltaic Energy Storage: Modelling and C...
Integration of Supercapacitor in Photovoltaic Energy Storage: Modelling and C...Integration of Supercapacitor in Photovoltaic Energy Storage: Modelling and C...
Integration of Supercapacitor in Photovoltaic Energy Storage: Modelling and C...Asoka Technologies
 

What's hot (19)

Design, analysis and development of special purpose machine to carry heavy lo...
Design, analysis and development of special purpose machine to carry heavy lo...Design, analysis and development of special purpose machine to carry heavy lo...
Design, analysis and development of special purpose machine to carry heavy lo...
 
Design of hub motor phase i introduction
Design of hub motor phase i introductionDesign of hub motor phase i introduction
Design of hub motor phase i introduction
 
IRJET- A Fuzzy Logic Control Method for MPPT to Improve Solar System Efficiency
IRJET- A Fuzzy Logic Control Method for MPPT to Improve Solar System EfficiencyIRJET- A Fuzzy Logic Control Method for MPPT to Improve Solar System Efficiency
IRJET- A Fuzzy Logic Control Method for MPPT to Improve Solar System Efficiency
 
Free Energy Magnet Motor
Free Energy Magnet MotorFree Energy Magnet Motor
Free Energy Magnet Motor
 
Stability enhancement of wind power system by using energy capacitor system
Stability enhancement of wind power system by using energy capacitor systemStability enhancement of wind power system by using energy capacitor system
Stability enhancement of wind power system by using energy capacitor system
 
Electricity through Train
Electricity through TrainElectricity through Train
Electricity through Train
 
Must ppt
Must pptMust ppt
Must ppt
 
My icece2010paper(1)
My icece2010paper(1)My icece2010paper(1)
My icece2010paper(1)
 
Report on the IMPROVING THE EFFICIENCY OF SOLAR PHOTOVOLTAIC POWER GENERATION...
Report on the IMPROVING THE EFFICIENCY OF SOLAR PHOTOVOLTAIC POWER GENERATION...Report on the IMPROVING THE EFFICIENCY OF SOLAR PHOTOVOLTAIC POWER GENERATION...
Report on the IMPROVING THE EFFICIENCY OF SOLAR PHOTOVOLTAIC POWER GENERATION...
 
iirdem Design of Efficient Solar Energy Collector using MPPT Algorithm
iirdem Design of Efficient Solar Energy Collector using MPPT Algorithmiirdem Design of Efficient Solar Energy Collector using MPPT Algorithm
iirdem Design of Efficient Solar Energy Collector using MPPT Algorithm
 
Project repoart
Project repoartProject repoart
Project repoart
 
A 500-W Wireless Charging System with Lightweight Pick-Up for Unmanned Aerial...
A 500-W Wireless Charging System with Lightweight Pick-Up for Unmanned Aerial...A 500-W Wireless Charging System with Lightweight Pick-Up for Unmanned Aerial...
A 500-W Wireless Charging System with Lightweight Pick-Up for Unmanned Aerial...
 
Design a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic ApplicationsDesign a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic Applications
 
Design of hub motor phase ii introduction
Design of hub motor phase ii introductionDesign of hub motor phase ii introduction
Design of hub motor phase ii introduction
 
Technical reclamation for electricity generation
Technical reclamation for electricity generationTechnical reclamation for electricity generation
Technical reclamation for electricity generation
 
The way to off grid power
The way to off grid powerThe way to off grid power
The way to off grid power
 
A Bibliometric Analysis of Different Maximum Power Point Tracking Methods for...
A Bibliometric Analysis of Different Maximum Power Point Tracking Methods for...A Bibliometric Analysis of Different Maximum Power Point Tracking Methods for...
A Bibliometric Analysis of Different Maximum Power Point Tracking Methods for...
 
FOOT STEP POWER GENERATION
FOOT STEP POWER GENERATIONFOOT STEP POWER GENERATION
FOOT STEP POWER GENERATION
 
Integration of Supercapacitor in Photovoltaic Energy Storage: Modelling and C...
Integration of Supercapacitor in Photovoltaic Energy Storage: Modelling and C...Integration of Supercapacitor in Photovoltaic Energy Storage: Modelling and C...
Integration of Supercapacitor in Photovoltaic Energy Storage: Modelling and C...
 

Similar to ELAMURUGU15_10 (20)

jey new resume
jey new resumejey new resume
jey new resume
 
subho resume
subho resumesubho resume
subho resume
 
SRIDHARAN.R RESUME
SRIDHARAN.R RESUMESRIDHARAN.R RESUME
SRIDHARAN.R RESUME
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
Brief Profile_Aug-15
Brief Profile_Aug-15Brief Profile_Aug-15
Brief Profile_Aug-15
 
Poulomi_Chaudhuri-CV.PDF
Poulomi_Chaudhuri-CV.PDFPoulomi_Chaudhuri-CV.PDF
Poulomi_Chaudhuri-CV.PDF
 
JOVIN RESUME
JOVIN RESUMEJOVIN RESUME
JOVIN RESUME
 
Ali update CV-18-05-2016
Ali update CV-18-05-2016Ali update CV-18-05-2016
Ali update CV-18-05-2016
 
Saran Resume
Saran ResumeSaran Resume
Saran Resume
 
M.Atif's CV
M.Atif's CVM.Atif's CV
M.Atif's CV
 
My resume updated
My resume updatedMy resume updated
My resume updated
 
GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
SOUMEN-RESUME
SOUMEN-RESUMESOUMEN-RESUME
SOUMEN-RESUME
 
Resume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YResume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna Y
 
Resume_ thajir
Resume_ thajirResume_ thajir
Resume_ thajir
 
Resume_ thajir
Resume_ thajirResume_ thajir
Resume_ thajir
 
Resume -
Resume -Resume -
Resume -
 
Resume -
Resume -Resume -
Resume -
 

ELAMURUGU15_10

  • 1. ELAMURUGU.S elamurugu3@gmail.com +919688848887 OBJECTIVE: A chance in Electrical field that combines my creative ability and hard work to reach a level of excellence through academic skills, management methodologies and experience to create a betterment of the organization and myself. EDUCATION: B.E (Electrical & Electronics Engineering)  Government College of Engineering, Tirunelveli.  Overall percentage :80.3%(1st Class with distinction )  2007-2011 TOATL EXPERIENCE: 4 yrs and 4 months FIELD OF EXPERIENCE: 1) Experienced in Erection, Testing & Commissioning of HT Switchgears ,LT Panels, MCC, PCC ,Intelligent MCC,PCC,HT Motors ,LT drives, Power Transformers and PMCC. 2) Erection, Testing Commissioning of Power transformers. Distribution Transformers, Lighting Transformers, Control Transformers. 3) Earned a experience in Commissioning of 33kV GIS system from CAPL project, TATA Steel, Jamshedpur. 4) Commissioning, Programming of Numerical Relays for Transformer protection, Motor protection and Feeder protection. 5) Acquired knowledge in reading any Electrical scheme drawings and its specifications and in understanding of project plan and its objectives. 6) Hands on experience in PLC programming especially in SIEMENS make PLC and Capable to read any PLC program logic for all Material handling operation and Electrical power system 7) Constructed a design at site for Intelligent MCC and simulated a control system without hardwiring to PLC using Modbus protocol. 8) Experienced in Designing interconnections between PLC panels &Field,MCC panels 9) Commissioning of material Handling conveyors includes 2.3Km long belt conveyors, Pipe Conveyors, Shuttle conveyors, Steep angle conveyors, Hydraulic Conveyors .Scoop coupled HT conveyors. 10) Commissioning and Maintenance of Material handling equipment such as Paddle feeder, Stacker cum Reclaimer, Wagon Tippler, Lifts, EOT cranes
  • 2. 10) Calibrated and Commissioned Equipment like Metal Detector, Belt Weighing scale ,Magnetic Separators. 11) Administered a team in all my electrical activities including Labor management and also played a outstanding team player in all aspects. TIME LINE: EMPLOYER: LARSEN & TOURO CONSTRUCTION,MMH-IC FROM TO DESIGNATION PROJECT CLIENT July 2011 June 2102 GET 3.0mtpa EXPANSION RMHS project TATA STEEL ,JAMSEDHPUR June 2012 Feb 2013 Sr.Engineer 3.0mtpa EXPANSION RMHS project TATA STEEL ,JAMSEDHPUR Feb 2013 Mar 2014 Sr.Engineer CAPL project TATA STEEL JAMSEDHPUR,NIPPON STEEL ,JAPAN Mar 2014 Dec 2014 Sr.Engineer 2*500MW NTPL ,CHP project Neyveli Lignite Corporation,Tuticorin Jan 2015 present Asst.Construction Manager 2*500MW NTPL ,CHP project Neyveli Lignite Corporation,Tuticorin KEY SKILLS:  Commissioning & erection of electrical ,instrumentation ,control systems  PLC programming (having certificate from SITRAIN)  Troubleshooting& Maintenance  Enthusiastic Hard Worker  Adaptive in nature  Languages known: Tamil,Hindi,English ACADEMIC & LEADERSHIP ACTIVITIES:  Placement Representative and achieved a placement record for year 2010-11  Organized Various College, department functions.  Got internship training from NLC power plant- Neyveli.  Got Bronze Medal in Ball Badminton game in Zonal Level