1. GURINDERJIT SINGH
Core Competencies
• Project Management
• Project Planning
• Project Budgeting
• Client Management
• Coordination
• Strategic Planning
• Team Management
• Assertive
• Relationship Building & Management
• Proactive/Industrious
Career Highlights
• Instrumental in project planning and management
• Effectively managed the implementation and execution of Power Plant & Steel Plant (Electrical).
• Developed and maintained excellent working relationships with colleagues and customers.
• Effectively and productively analyzed all the tasks undertaken.
• Successful in interfacing with upper level decision makers; resolving critical problem area and
delivering on client commitments.
Site Experience
• Erection and commissioning of Electrical equipment like PCC & MCC Panels, Motors, Transformers,
Earthing, Lightning etc.
Professional Experience
PREDOMINANT ENGINEERS, Gurgaon (May ’07 - Present)
Key Deliverables:
• Involved in the implementation, execution, and construction of Power Plant & Steel Plant
(Electrical).
• Responsible for preparing Project Schedule and Project Plan.
• Liaising with Clients / Consultants for project execution.
• Organize and chair project review meetings with Clients / Consultants.
• Monitoring the project execution at various sites.
• To make Coordination with Supplier & Site Personal to expedite the Job Fast.
• Responsible for the Project Monitoring & Follow up with updating progress depending on critically on
daily, weekly & monthly basis.
• Collaborating with other departments for regular Project Review/Control/Monitoring.
• Preparing Time and Cost Budgets of projects.
• Preparation the comparison sheet of technical and commercial for equipments.
• Techno commercial Discussion with different equipment suppliers for finalization of different orders.
• Have been involved in changes and modifications in designs as per sight conditions.
• Responsible for Approval of various Electrical Equipments Drawing related to Sponge Iron Plant &
Captive Power Plant as per process using various design applications.
• Designing of Electrical Single line Diagram for PCC & MCC panels.
• Preparing Electrical Documents Like Technical specifications, BOM of Electrical Erection Material,
Conduit Drawing of Buildings & Size Calculation of Conduits, Cable Routing & Schedule
• Preparation of Electrical Equipment Layout, Equipment layout of Control Rooms.
• Handling of electrical techno-commercial matters related to project execution.
• Approval of various electrical drawings related to Sponge Iron Plant & Captive Power Plant.
• Preparing I/O list for PLC/DCS.
• Preparing the Termination schedule for field interface modules.
Page 1 of 5
2. KEY PROJECT HANDING
Project Title: DR Plant (1X300 TPD DR Plant) (EPC Basis)
Client: Super Smelter Limited, Jamuria, West Bengal
Employment Type: Full-Time Duration: Jun 2014 – June 2016
Project Location: Jamuria- West Bengal Site: Onsite
Role: Other Team Size: 15
Skill Used: 1) Project Management2) Project Planning3) Project Budgeting4) Client Management5) Coordination6)Designing
Role Description: 1) Involved in the Implementation, Execution & Construction of Sponge Iron Plant.
2) Design SLD, PCC & MCC Panels & HT Panels SLD.
3) Prepare specifications & BOQ for Electrical items like Transformers, Motors, Cables, Erection Material etc.
Project Details: 1 X 350 TPD DR PLANT (SPONGE IRON PLANT)
including
1) DR Kiln & Cooler (with After Burning Chamber)
3) Waste Heat System (including ID Fan & Chimney)
2) Raw Material Handling System
3) Pollution Control System & Utilities
4) Balance of Plant
5) Electrical Items Like Transformers, HT Panels, LT Panels, Drives, DCS System, Instrumentation Package.
Role in:-
Electrical Design, Designing Electrical Panel & Control Room
Procurement of Electrical Transformers, Panels, Cables & etc.
Erection & Commissioning of Electrical Equipment & Utilities
Project Title: Renovation of DR Rotary Kiln-1 (EPC Basis)
Client: Tata Sponge Iron Limited, Joda, Odisha
Employment Type: Full-Time Duration: Sep 2013 – Jan 2016
Project Location: Joda-Odisha Site: Offsite
Role: Other Team Size: 10
Skill Used: 1) Project Management2) Project Planning3) Project Budgeting4) Client Management5) Coordination
Role Description: 1) Involved in the Design, Implementation, Execution & Construction.
2) Design & preparing electrical drawings & documents.
3) Prepare specifications & BOQ for Electrical items
Project Details: Replacement of DR Kiln Shell
Dismantling & Erection of Kiln shell including related Electrical & mechanical Items,
also modification of Electrical old panels as per new requirement
Project Title: DR Plant (2X350 TPD DR Plant) (EPC Basis)
Client: Usha Martin Limited, Jamshedpur, Jharkhand
Employment Type: Contractual Duration: Oct 2010 - Sep 2012
Project Location: Jamshedpur (TATA NAGAR) Site: Onsite
Role: Other Team Size: 20
Skill Used: 1) Project Management2) Project Planning3) Project Budgeting4) Client Management5) Coordination
Role Description: 1) Involved in the Implementation, Execution & Construction of Sponge Iron Plant.
2) Design SLD, PCC & MCC Panels & HT Panels SLD.
3) Prepare specifications for electrical items like Transformers, Motors, Cables etc.
4) BOQ
Project Details: 2 X 350 TPD DR PLANT (SPONGE IRON PLANT)
Page 2 of 5
3. including
1) DR Kiln & Cooler
2) Raw Material Handling System
3) Pollution Control System & Utilities
4) Balance of Plant
5) Electrical Items Like Transformers, HT Panels, LT Panels, Drives, DCS System, Instrumentation Package.
Role in:-
Electrical Design, Designing Electrical Panel & Control Room
Procurement of Electrical Transformers, Panels, Cables & etc.
Erection & Commissioning of Electrical Equipment & Utilities
Project Title: 38.5 MW Power Plant (EPC)
Client: Trimula Industries Limited, Singrauli, Madhya Pradesh
Employment Type: Full-Time Duration: May 2009 – April 2015
Project Location: Singrauli, Madhya Pradesh Site: Offsite
Role: Other Team Size: 10
Skill Used: 1) Project Management2) Project Planning3) Project Budgeting4) Client Management5) Coordination
Role Description: 1) Involved in the Implementation, Execution & Construction of Power Plant.
2) Design the Electrical Main SLD, PCC & MCC Panels SLD, HT Panels SLD.
3) Prepare the specifications for Electrical Items like Transformers, Motors, Cables Etc.
4) BOQ Preparation
Project Details: 38.5 MW POWER PLANT Including
1) 1X12MW TG Set & 1X26.5MW TG Set
2) 1X84 TPH AFBC
3) 2X38 TPH WHRB
4) Balance of Plant Etc.
Project Title: DR Plant & Captive Power Plant (Engineering & Supervision of Erection)
Client: OCL Steel & Power Limited, Rajgangpur, Odisha
Employment Type: Full-Time Duration: Oct 2008 - Apr 2013
Project Location: Rajgangpur-Odisha Site: Offsite
Role: Other Team Size: 10
Skill Used: 1) Project Management2) Project Planning3) Project Budgeting4) Client Management5) Coordination
Role Description: 1) Involved in the Implementation, Execution & Construction
2) Design the Electrical Main SLD, PCC & MCC Panels SLD, HT Panels SLD
3) Preparing I-O List of DCS
4) Preparation of Tag & termination Schedule.
Project Details: DR PLANT (SPONGE IRON PLANT) including
1) 2X350TPD DR Kiln & Cooler
2) Raw Material Handling System
3) Pollution Control System & Utilities
4) Balance of Plant
5) Electrical Items Like Transformers, HT Panels, LT Panels, Drives, DCS System, Instrumentation Package.
POWER PLANT including:-
1) 2X35 MW TG Set
2) Waste Heat Recovery Boiler
3) AFBC Boiler
4) Pollution Control System & Utilities
5) Balance of Plant
6) Electrical Items Like Transformers, HT Panels, LT Panels, Drives, DCS System, Instrumentation Package.
Page 3 of 5
4. Project Title: 2X350TPD DR Plant & 8+20 MW Power Plant (Engineering & Supervision of Erection)
Client: Viraj Steel & Energy Lmited, Sambalpur, Odisha
Employment Type: Full-Time Duration: Aug 2007 - Oct 2009
Project Location: Sambalpur-Odisha Site: Offsite
Role: Other Team Size: 15
Skill Used: 1) Project Management2) Project Planning3) Project Budgeting4) Client Management5) Coordination
Role Description: 1) Involved in the Implementation, Execution & Construction under my Senior.
2) Design the Electrical Main SLD, PCC & MCC Panels SLD, HT Panels SLD under my Senior.
3) Preparation technical documents like i/o list, cable schedule etc
Project Details: 2 X 350 TPD DRPlant with 8+20 MW Captive Power Plant including Waste Heat Recovery Boiler & AFBC Boilers
Project Title: Steel Complex With Captive Power Plant (2X350TPD DR Plant & 20MW CPP)
(Engineering & Supervision of Erection)
Client: Jain Steel & Power Limited, Jharsuguda, Odisha
Employment Type: Full-Time Duration: Aug 2007 - Dec 2010
Project Location: Jharsuguda-Odisha Site: Offsite
Role: Other Team Size: 20
Skill Used: 1) Project Management2) Project Planning3) Project Budgeting4) Client Management5) Coordination
Role Description: Preparation of Techincal Documents like specification of electrical equipment, SLD of various Panels, I/o List for
DCS, HT & LT cable schedule & Erection material BOQ etc...
Project Details: 1X350 TPD DR Plant including Balance of Plant
8 MW Captive Power Plant using Waste Heat Recovery Boiler
50,000 TPA Sleet Melt Shop using Induction Furnace
Project Title: DR Plant (1X350 TPD DR Plant) (Engineering & Supervision of Erection)
Client: Samridhi Sponge Private Limited- Jamshedpur, Jharkhand
Employment Type: Full-Time Duration: Jul 2007 - Jun 2008
Project Location: Jamshedpur Site: Offsite
Role: Other Team Size: 10
Skill Used: 1) Project Management2) Project Planning3) Project Budgeting4) Client Management5) Coordination
Role Description: Preparation of Techincal Documents like specification of electrical equipment, SLD of various Panels, I/o List for
DCS, HT & LT cable schedule & Erection material BOQ etc...
Project Details: 1X100 TPD DR Plant with Balance of Plant
Page 4 of 5
5. Project Title: 1X 350 TPD DR Plant & 8 MW Power Plant (Engineering & Supervision of Erection)
Client: IST Steel & Power Limited, Bellary, Karnataka
Employment Type: Full-Time Duration: May 2007 - Aug 2008
Project Location: Bellary-Karnataka Site: Onsite
Role: Other Team Size: 15
Skill Used: 1) Project Management2) Project Planning3) Project Budgeting4) Client Management5) Coordination
Role Description: 1) Involved in the Implementation, Execution & Construction under my Senior.
2) Design the Electrical Main SLD, PCC & MCC Panels SLD, HT Panels SLD under my Senior.
3) Preparing I-O List of DCS
4) Preparation of Tag & termination Schedule.
Project Details: DR PLANT (SPONGE IRON PLANT) including
1) 1X350TPD DR Kiln & Cooler
2) Raw Material Handling System
3) Pollution Control System & Utilities
4) Balance of Plant
5) Electrical Items Like Transformers, HT Panels, LT Panels, Drives, DCS System, Instrumentation Package.
POWER PLANT including:-
1) 1X8 MW TG Set
2) Waste Heat Recovery Boiler
3) Pollution Control System & Utilities
4) Balance of Plant
5) Electrical Items Like Transformers, HT Panels, LT Panels, Drives, DCS System, Instrumentation Package.
PLANT COMISSIONED
1) IST Steel & Power Limited, Bellary-Karnataka
2) Samridhi Sponge Private Limited, Jamshedpur
3) Jain Steel & Power Limited, Jharsuguda-Odisha
4) Viraj Steel & Energy Limited, Sambalpur-Odisha
5) OCL Steel & Power Limited, Rajgangpur-Odisha
6) Usha Martin Limited, Jamshedpur (TATA NAGAR)
PLANT RECENTLY COMPLETED IN (2015-2016)
1) Tata Sponge Iron Limited, Joda- Odisha
2) Super Smelter Limited, Jamuria- West Bengal
Page 5 of 5
6. Project Title: 1X 350 TPD DR Plant & 8 MW Power Plant (Engineering & Supervision of Erection)
Client: IST Steel & Power Limited, Bellary, Karnataka
Employment Type: Full-Time Duration: May 2007 - Aug 2008
Project Location: Bellary-Karnataka Site: Onsite
Role: Other Team Size: 15
Skill Used: 1) Project Management2) Project Planning3) Project Budgeting4) Client Management5) Coordination
Role Description: 1) Involved in the Implementation, Execution & Construction under my Senior.
2) Design the Electrical Main SLD, PCC & MCC Panels SLD, HT Panels SLD under my Senior.
3) Preparing I-O List of DCS
4) Preparation of Tag & termination Schedule.
Project Details: DR PLANT (SPONGE IRON PLANT) including
1) 1X350TPD DR Kiln & Cooler
2) Raw Material Handling System
3) Pollution Control System & Utilities
4) Balance of Plant
5) Electrical Items Like Transformers, HT Panels, LT Panels, Drives, DCS System, Instrumentation Package.
POWER PLANT including:-
1) 1X8 MW TG Set
2) Waste Heat Recovery Boiler
3) Pollution Control System & Utilities
4) Balance of Plant
5) Electrical Items Like Transformers, HT Panels, LT Panels, Drives, DCS System, Instrumentation Package.
PLANT COMISSIONED
1) IST Steel & Power Limited, Bellary-Karnataka
2) Samridhi Sponge Private Limited, Jamshedpur
3) Jain Steel & Power Limited, Jharsuguda-Odisha
4) Viraj Steel & Energy Limited, Sambalpur-Odisha
5) OCL Steel & Power Limited, Rajgangpur-Odisha
6) Usha Martin Limited, Jamshedpur (TATA NAGAR)
PLANT RECENTLY COMPLETED IN (2015-2016)
1) Tata Sponge Iron Limited, Joda- Odisha
2) Super Smelter Limited, Jamuria- West Bengal
Page 5 of 5