About NTPC
NTPC, India's largest power company, was set up in 1975
to accelerate power development in India. It is emerging as
an' Integrated Power Major’, with a significant presence
in the entire value chain of power generation business.
With a current generating capacity of 34,854 MW, NTPC
has embarked on plans to become a 75,000 MW company
by 2017.
Presently, NTPC generates power from Coal and Gas.
With an installed capacity of 34,854 MW, NTPC is
the largest power generating major in the country.
POWER GENRATION
• INTRODUCTION
• HISTORY
• THEORY
• PROCEDURE
• FIGURE
• APPLICATION
• ADVANTAGES
• DISADVANTAGES
• CONCLUSION
UNIT NUMBER INSTALLED
CAPACITY(MW)
1 95 MW
2 95 MW
3 95 MW
4 210 MW
5 210 MW
Summer training report on

More Related Content

What's hot

A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPCRanjeet1501
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALMilind Punj
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC SimhadriAshish Uppu
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarRishikesh .
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingAbhitendra Singh
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauliDevanshu Yadav
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadriVirat Shishodia
 
NTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTNTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTAnubhav Ghosh
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAtul Kumar Singh
 
Ntpc information
Ntpc informationNtpc information
Ntpc informationNTPC
 
NTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHARNTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHARAnkit Kumar
 

What's hot (20)

NTPC PROJECT..
NTPC PROJECT..NTPC PROJECT..
NTPC PROJECT..
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPC
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Ntpc.ppt
Ntpc.pptNtpc.ppt
Ntpc.ppt
 
NTPC Report
NTPC ReportNTPC Report
NTPC Report
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
ntpc
ntpcntpc
ntpc
 
Reports ntpc
Reports ntpcReports ntpc
Reports ntpc
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial Training
 
Ntpc simhadri
Ntpc simhadriNtpc simhadri
Ntpc simhadri
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauli
 
Ntpc
NtpcNtpc
Ntpc
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
 
NTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTNTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORT
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYA
 
Ntpc information
Ntpc informationNtpc information
Ntpc information
 
NTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHARNTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHAR
 

Summer training report on

  • 2. About NTPC NTPC, India's largest power company, was set up in 1975 to accelerate power development in India. It is emerging as an' Integrated Power Major’, with a significant presence in the entire value chain of power generation business. With a current generating capacity of 34,854 MW, NTPC has embarked on plans to become a 75,000 MW company by 2017. Presently, NTPC generates power from Coal and Gas. With an installed capacity of 34,854 MW, NTPC is the largest power generating major in the country.
  • 3. POWER GENRATION • INTRODUCTION • HISTORY • THEORY • PROCEDURE • FIGURE • APPLICATION • ADVANTAGES • DISADVANTAGES • CONCLUSION
  • 4. UNIT NUMBER INSTALLED CAPACITY(MW) 1 95 MW 2 95 MW 3 95 MW 4 210 MW 5 210 MW