SlideShare a Scribd company logo
1 of 7
CURRICULUM VITAE
Of
Ibrahim Nabawy Mousa Mostafa
Band 12 ( Piping & Mechanical )
Address : 8, Akher Abu El - Khear, Qwesna, Menoufia.
E-Mail : Ibrahim_nmm1@yahoo.com
Telephone No. : +20100 1676 519, +20100 5050 410, +2 048 2577 248
Date of Birth : June 12, 1965
Nationality : Egyptian
Marital Status : Married
Languages : Arabic, English
Education :
• BSc. Second Marine Engineer (Mechanical Engineer) – March1989.
With Merit 2.49
• BSc. in Marine Technology, Arab Maritime Transport Academy, Faculty
of Engineering, April.1993.
With Merit 2.38
Current Employ m e n t
From August, 2015 LEEDS (Leaders in Energy & Electrom e c h a nical
Develop m e n t s & Service s ),
Project: Burullus Combined cycle Pow er Plant Project
(4*120 0MW).
Title: Project Manag er
Scop e of work: Whole One Combined Cycle (1*120 0MW) Mechanical &
Electrical.
Value in USD: $550 Million.
Work Experienc e
From August, 2015 Consolidat e d Contractors Company (CCC)
Project: Jazan Refinery Utility Packag e & Comm en Area (JRUP)
Saudi Arab.
Title: Construction Manag er (Piping & Mechanical)
Scop e of work: Piping Fabrication, Erection & Piping Testing, Pipe
Supports, Painting, Insulation, Equipm en t Erection
and Steel Structure.
Value in USD: $400 Million.
************************************
From June 2014 to Feb 2015 Offshore Design Engine erin g Limited
Through DANA Petroleu m
Project: South Octob er Nefertiti Develop m e n t
Title: Construction Manag er
Scop e of work: Pipeline Work, Piping Fabrication & Piping Testing,
Pipe Supports, Painting, Insulation, E&I Works,
Equipm en t Erection, Civil Works and Pre- com and
commis sionin g.
The project compris e s the New well flow Line (two
wells ) with design flow rate of 3,000 BFPD,
connectin g to X-tree with wells area manifolds by
hook up line equipp e d with production chook valve,
Pipeline 8” * 6.8 Km Length
Crude oil receiving facilities including: 2- Phas e
production separator.
And Two crude oil centrifugal pumps
************************************
From 28 May 2010 Consolidated Contractors Company (CCC)
Title: Construction Manager (D Island & R Island )
Project: Hook-up, Pre-Commissioning & Commissioning Project, North
Caspian Sea, Kazakhstan
Scope of work:
Piping Works, Piping Testing, Pipe Supports, Steel Structure,
Painting, Insulation, E&I Cables, E&I Trays and Equipment
Erection.
The project comprises the hook-up construction works, Pre-com and
commissioning assistance at Kashagan Field in the two artificial
islands D&R Located in the North Caspian Sea. Island D consists of
20 wellheads and 6 Pig traps which connect via pipelines to D island
in which the oil and gas separation & gas dehydration will take
place. Separated oil & non-re-injected gas will be transported to
onshore in dedicated pipelines for processing, treatment and export.
Value in USD: $400 Million.
************************************
Feb. 2009 to Mar. 2010 PSP Power System Project
Title: Site Manag er
Project: MDPEC (Middle Delta Electricity Production Company) for Nubarria
Power Station-III
750 MW (Nominal) Combined Cycle Project,
Through PGESCO (Power Generation Engineering and Service Company)
Scope of work:
Installation of Two Boilers with Piping Fabrication, Installation (Alloy
Steel, Stainless Steel and Carbon Steel) Fire Fighting Erection, Steel
Structure Erection, LP,IP and HP Drums Erection, Harps Erection, and
Electrical & Instrumentation, Painting and Insulation, During Start-up,
Commissioning and Testing.
************************************
Aug. 2006 to Jan. 2009 Consolidated Contractors Company (CCC SA)
Project: Khursaniyah Gas Plant Project (KGPP)
Scope of Work: Building two trains for Gas Conditioning and Ethane and Natural Gas
Liquids (NGL) recovery with total capacity of 1,000 million cubic feet a
day. Scope involves, Piping Fabrication and Erection, Equipment Erection,
Civil Works, Steel Structure Erection, Electrical & Instrumentation,
Painting, Insulation and EPC portion for Buildings consisting of around 24
Buildings.
Duration in Months: 40 Months
Value in USD$: 750 Million US$
Title Project Engineer – Bechtel area (50% from KGP Project),
Duties Manage, controlled and coordinated the execution of the work package,
ensuring that work was carried out in accordance with time schedule,
specifications and craft standards specifying working methods and
interpreting specifications and formal drawings as necessary.
******************
Consolidated Contractors Company (CCC SA)
Project Steam and Power Project (IWSP) for Rabigh Arabian water and
Electricity Company (RAWEC)
Scope of Work: Construction and Pre-Commissioning work for a Power Plant of max
capacity 560MW and a reverse Osmosis Plant of capacity 7,000 on field
with in the premises,
of Rabigh Complex. The Project outputs are Power, Steam
and water that will be supplied to the refinery through SEC.
The Plant mainly consists of:- 1-Five Steam Turbines/Gen. of 130 MW each
2-Nine Fired Boilers of 540 TPH each
3-Three Stacks
4-Five Boiler Feed Water Pumps.
5-Three Deaerators
6-Sixteen RO plant of 500 TPD each.
7-Three Fuel Gas Desulphurization units
8-Nine Electrostatic Precipitators
9-Five Condensers
10-Cooling Tower (Fourteen Cells)
Civil and Mechanical works, incorporating pipe prefabrication, installation
of equipment and piping systems, steel work,
painting,insulation,fireproofing,
electrical, instrumentation
Duration in Months : 27 Months (August -2005 to November-2007)
Value in US $ : 250 Million US$
Title Section Engineer
Duties Manage, Controlled and coordinated the Scope of work package,
ensuring that work was carried out in accordance with specifications
and craft standards specifying working methods and interpreting
specifications and formal drawings as necessary. Estimate the
performance of all activity in site .deal with client work project
tasks, progress and plan.
************************************
Consolidated Contractors Company (CCC SA)
Project: Khursaniyah Gas Plant Project (KGPP)
Scope of Work: Building two trains for Gas Conditioning and Ethane and Natural Gas
Liquids (NGL) recovery with total capacity of 1,000 million cubic feet a
day. Scope involves, Piping Fabrication and Erection, Equipment Erection,
Civil Works, Steel Structure Erection, Electrical & Instrumentation,
Painting, Insulation and EPC portion for Buildings consisting of around 24
Buildings.
Duration in Months: 40 Months (Aug.2006 to Jan. 2009)
Value in USD$: 750 Million US$
Title Section Engineer ,
Duties Manage, controlled and coordinated the execution of the work package,
ensuring that work was carried out in accordance with time schedule,
specifications and craft standards specifying working methods and
interpreting specifications and formal drawings as necessary.
******************
From .May. '2006 Uhde Germany Petrochemical Company(Main Contactor)
Working on Helwan Fertilizer Plant (NH3/UREA Plant) as a Specialist for
Boiler, Steam Generation & Ammonia Static Equipment.
Value in US $: 500 Million US$
******************
From .Dec. '2004 Uhde Germany Petrochemical Company (Main Contactor)
Working on ALEXFERT (NH3/UREA Plant) as a Specialist for Boiler,
Steam Generation & Ammonia Static Equipment
Value in US $: 500 Million US$
*******************
From Jul. '2003 Bechtel Overseas Corporation
Working on IDKU Egyptian LNG Project (Liquefied Natural Gas) as a
Senior Piping Engineer for Train 1, outside piping, all underground piping
activity and 3 KM pipe lines on the Jetty.
Value in US $: 1,800 Million US$
From Feb. '2003 Adyard Abu Dhabi U.A.E.
Working on Adyard Shipyard through National Drilling
Company as a Project Engineer, the Main Work Was Rig Delma
Maintenance, Repairs, Inspections, Welding,
Sandblasting & Painting Works.
******************
From Feb. '2002 National Steel Fabrication Co. (N.S.F.)
Working on East Port Said Power Plant through (DEC) as a Site Manager
the Main work was Main Steel Structure of Turbine Hole, Pipe Racks Small
Building
******************
From Mar. '2000 ESACO Manufacturing Engineering & Contracting
Working on S.O.P.C. (Suez Oil Processing Company) Refinery for the New
Hydrogen Plant through KTI (Technip Group) as a Site Manager Main
Work was a Piping Fabrication and Installation (Alloy Steel, Stainless Steel,
Carbon Steel) Fire Fighting,
Underground Pipe, Steel Structure) For the Entire Project During Start-up,
Commissioning and Testing.
******************
From Jan. '99 Kobe Steel Ltd.
Working on the Third Direct Reduction Plant for Alexandria National Iron
and Steel, as a Senior Piping Engineer. With Japanese Project Engineer
Main Work was a Modify the Line DWG Control of Supply Material
Supervision Fabrication and Installation all Piping Work for the Entire
Project during Start-up, Commissioning and testing
*******************
1998 -1999 El Taiseer Petroleum Service Company
Employed as a Senior Piping Engineer Supervisor for a Natural Gas Station
at Khalda El Salam, Main Work Was a Supervision Pre-fabrication and
Installation Piping Work (Low Temperature Steel, Stainless Steel, Carbon
Steel)
******************
1997 -1998 IEMSA.(Italy Company)
Employed as a Site Supervisor Engineer for the installation of a Boiler,
Reformer, Convection Bank, Process Gas Waste Heat Recovery, Start-up
Heater and Piping for the Abu Quir III Fertilizer Plant during start - up and
testing. Also responsible for storage of delivered materials.
********************
1997 -1997 Hitachi Plant Engineering Co. Ltd.
Working on a Direct Reduction Steel Making Plant, (client: Alexandria
National Iron and Steel), as a Senior Piping Engineer. The project consisted
of pre-fabrication and installations of gas piping for the entire project during
start - up, commissioning and testing.
1996 -1997 Niigata Engineering Co. Ltd.
Working on a Production Rationalization and Expansion Project, involving
utilities expansion and modification for the client Alexandria National Iron
and Steel, as a Mechanical Supervisor Engineer. The activity consisted of
installation during start-up, commissioning and testing.
********************
1995 -1996 Kobe Steel Ltd.
Working on the Second Direct Reduction steel making Plant for the client
Alexandria National Iron and Steel, as a Design Engineer Piping &.
Mechanical with the Japanese Project Engineer. Duties included the
preparation and review of mechanical detail drawings, Piping Iso., Piping
Support and the preparation of
Equipment Status Lists for all the equipment in the plant project.
*******************
1992 –1995 CWC - Cairo Waste Water Consortium
Working as a Mechanical and Operations Engineer responsible for the
control of tunnel air pressures using the Air Compressors, and for the
maintenance and operation of diesel engines. Work also included the
installation of the Air decks for the shafts.
*******************
1989 -1992 With Heliopolis Shipping and Aida - III, working as a Maintenance and
Operations Engineer carrying out the operation and maintenance of the
10,000-5,000 HP diesel engines; also responsible for the operation and
maintenance of various types of pumps, coolers, boilers, oil / water
separators, purifiers, air compressors and filters.
*****************
Training Course s
• First Aid cours e, during the Guided Sea Training program m e d
in Novem b er 1988
• Fire Fighting cours e during January 1988
• Person al Survival cours e during Novem b er 1989
• Team Work March 2007 in CCC GROUP
Basic Offshore Safety Induction and Emergen c y Training
( BOSIET )

More Related Content

What's hot

CV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec EngCV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec Engyoseph prakosa S
 
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-201548. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015Sandeep Bhowmick
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016Ali Issa
 
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith
 
Piping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CVPiping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CVMuhammad Kashif
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3fawzey mukhtar
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaMichaelUberti
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 

What's hot (20)

Francis' CV
Francis' CVFrancis' CV
Francis' CV
 
Electromech
Electromech Electromech
Electromech
 
projects
projectsprojects
projects
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Graves
 
CV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec EngCV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec Eng
 
BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-201548. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-history
 
Piping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CVPiping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CV
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3
 
GEC presentation
GEC  presentationGEC  presentation
GEC presentation
 
Curriculum Vitae.DOC
Curriculum Vitae.DOCCurriculum Vitae.DOC
Curriculum Vitae.DOC
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Page6 Pembroke
Page6 PembrokePage6 Pembroke
Page6 Pembroke
 

Viewers also liked

Tendencia de moda vernano 2017
Tendencia de moda vernano 2017Tendencia de moda vernano 2017
Tendencia de moda vernano 2017Natasha Sanchez
 
Prateek Wadhwani updated resume
Prateek Wadhwani updated resumePrateek Wadhwani updated resume
Prateek Wadhwani updated resumePrateek Insomniac
 
Peter Arpag Resume 2-2017
Peter Arpag Resume 2-2017Peter Arpag Resume 2-2017
Peter Arpag Resume 2-2017Peter Arpag
 
Apendicitisaguda 110725220005-phpapp02
Apendicitisaguda 110725220005-phpapp02Apendicitisaguda 110725220005-phpapp02
Apendicitisaguda 110725220005-phpapp02Jair Vasquez Bentura
 
SWAMI VIVEKANANDA'S EDUCATION
SWAMI VIVEKANANDA'S EDUCATIONSWAMI VIVEKANANDA'S EDUCATION
SWAMI VIVEKANANDA'S EDUCATIONDevinder Kansal
 
Membresia diferenc entre iglesia local e iglesia universal by eliud gamez
Membresia diferenc entre iglesia local e iglesia universal by eliud gamezMembresia diferenc entre iglesia local e iglesia universal by eliud gamez
Membresia diferenc entre iglesia local e iglesia universal by eliud gamezEliud Gamez Gomez
 
Venture capital
Venture capitalVenture capital
Venture capitalarathy V
 
슬로스클라임 사업계획서
슬로스클라임 사업계획서슬로스클라임 사업계획서
슬로스클라임 사업계획서문석 정
 
Production management
Production managementProduction management
Production managementSimran Kaur
 
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...Shubham Dhaneshree
 

Viewers also liked (20)

Habilidades
HabilidadesHabilidades
Habilidades
 
Tendencia de moda vernano 2017
Tendencia de moda vernano 2017Tendencia de moda vernano 2017
Tendencia de moda vernano 2017
 
Power point
Power point Power point
Power point
 
Prateek Wadhwani updated resume
Prateek Wadhwani updated resumePrateek Wadhwani updated resume
Prateek Wadhwani updated resume
 
Peter Arpag Resume 2-2017
Peter Arpag Resume 2-2017Peter Arpag Resume 2-2017
Peter Arpag Resume 2-2017
 
Apendicitisaguda 110725220005-phpapp02
Apendicitisaguda 110725220005-phpapp02Apendicitisaguda 110725220005-phpapp02
Apendicitisaguda 110725220005-phpapp02
 
Color certificates
Color certificatesColor certificates
Color certificates
 
SWAMI VIVEKANANDA'S EDUCATION
SWAMI VIVEKANANDA'S EDUCATIONSWAMI VIVEKANANDA'S EDUCATION
SWAMI VIVEKANANDA'S EDUCATION
 
Membresia diferenc entre iglesia local e iglesia universal by eliud gamez
Membresia diferenc entre iglesia local e iglesia universal by eliud gamezMembresia diferenc entre iglesia local e iglesia universal by eliud gamez
Membresia diferenc entre iglesia local e iglesia universal by eliud gamez
 
Tipos de personalidad
Tipos de personalidadTipos de personalidad
Tipos de personalidad
 
Venture capital
Venture capitalVenture capital
Venture capital
 
Presentacion politicas-04-02-17
Presentacion politicas-04-02-17Presentacion politicas-04-02-17
Presentacion politicas-04-02-17
 
Mi aula ideal
Mi aula idealMi aula ideal
Mi aula ideal
 
Portfolio1
Portfolio1Portfolio1
Portfolio1
 
Maize Architecture
Maize ArchitectureMaize Architecture
Maize Architecture
 
슬로스클라임 사업계획서
슬로스클라임 사업계획서슬로스클라임 사업계획서
슬로스클라임 사업계획서
 
Gardroid_pp
Gardroid_ppGardroid_pp
Gardroid_pp
 
Production management
Production managementProduction management
Production management
 
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...
Minor project Report on DESIGN OF HYDRAULIC SHEET METAL PUNCHING MACHINE USIN...
 
Ignis Final Book
Ignis Final BookIgnis Final Book
Ignis Final Book
 

Similar to Ibrahim Nabawy CV 3 .2017

C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2 Alaa Ammar
 
السير الذاتية-4
السير الذاتية-4السير الذاتية-4
السير الذاتية-4Nagi Abdalla
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELkrishna kumar
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newvasanth morais
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015Ahmed Yehia
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.TOM VAN WYK
 
SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016Simon Baarde
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_MastDoug Mast
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)Hassan Halhoul
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 

Similar to Ibrahim Nabawy CV 3 .2017 (20)

C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
السير الذاتية-4
السير الذاتية-4السير الذاتية-4
السير الذاتية-4
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_EL
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
CVAQ5
CVAQ5CVAQ5
CVAQ5
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
jamespickering
jamespickeringjamespickering
jamespickering
 
NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
 
SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_Mast
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 

Ibrahim Nabawy CV 3 .2017

  • 1. CURRICULUM VITAE Of Ibrahim Nabawy Mousa Mostafa Band 12 ( Piping & Mechanical ) Address : 8, Akher Abu El - Khear, Qwesna, Menoufia. E-Mail : Ibrahim_nmm1@yahoo.com Telephone No. : +20100 1676 519, +20100 5050 410, +2 048 2577 248 Date of Birth : June 12, 1965 Nationality : Egyptian Marital Status : Married Languages : Arabic, English Education : • BSc. Second Marine Engineer (Mechanical Engineer) – March1989. With Merit 2.49 • BSc. in Marine Technology, Arab Maritime Transport Academy, Faculty of Engineering, April.1993. With Merit 2.38 Current Employ m e n t From August, 2015 LEEDS (Leaders in Energy & Electrom e c h a nical Develop m e n t s & Service s ), Project: Burullus Combined cycle Pow er Plant Project (4*120 0MW). Title: Project Manag er Scop e of work: Whole One Combined Cycle (1*120 0MW) Mechanical & Electrical. Value in USD: $550 Million.
  • 2. Work Experienc e From August, 2015 Consolidat e d Contractors Company (CCC) Project: Jazan Refinery Utility Packag e & Comm en Area (JRUP) Saudi Arab. Title: Construction Manag er (Piping & Mechanical) Scop e of work: Piping Fabrication, Erection & Piping Testing, Pipe Supports, Painting, Insulation, Equipm en t Erection and Steel Structure. Value in USD: $400 Million. ************************************ From June 2014 to Feb 2015 Offshore Design Engine erin g Limited Through DANA Petroleu m Project: South Octob er Nefertiti Develop m e n t Title: Construction Manag er Scop e of work: Pipeline Work, Piping Fabrication & Piping Testing, Pipe Supports, Painting, Insulation, E&I Works, Equipm en t Erection, Civil Works and Pre- com and commis sionin g. The project compris e s the New well flow Line (two wells ) with design flow rate of 3,000 BFPD, connectin g to X-tree with wells area manifolds by hook up line equipp e d with production chook valve, Pipeline 8” * 6.8 Km Length Crude oil receiving facilities including: 2- Phas e production separator. And Two crude oil centrifugal pumps ************************************ From 28 May 2010 Consolidated Contractors Company (CCC) Title: Construction Manager (D Island & R Island )
  • 3. Project: Hook-up, Pre-Commissioning & Commissioning Project, North Caspian Sea, Kazakhstan Scope of work: Piping Works, Piping Testing, Pipe Supports, Steel Structure, Painting, Insulation, E&I Cables, E&I Trays and Equipment Erection. The project comprises the hook-up construction works, Pre-com and commissioning assistance at Kashagan Field in the two artificial islands D&R Located in the North Caspian Sea. Island D consists of 20 wellheads and 6 Pig traps which connect via pipelines to D island in which the oil and gas separation & gas dehydration will take place. Separated oil & non-re-injected gas will be transported to onshore in dedicated pipelines for processing, treatment and export. Value in USD: $400 Million. ************************************ Feb. 2009 to Mar. 2010 PSP Power System Project Title: Site Manag er Project: MDPEC (Middle Delta Electricity Production Company) for Nubarria Power Station-III 750 MW (Nominal) Combined Cycle Project, Through PGESCO (Power Generation Engineering and Service Company) Scope of work: Installation of Two Boilers with Piping Fabrication, Installation (Alloy Steel, Stainless Steel and Carbon Steel) Fire Fighting Erection, Steel Structure Erection, LP,IP and HP Drums Erection, Harps Erection, and Electrical & Instrumentation, Painting and Insulation, During Start-up, Commissioning and Testing. ************************************ Aug. 2006 to Jan. 2009 Consolidated Contractors Company (CCC SA) Project: Khursaniyah Gas Plant Project (KGPP) Scope of Work: Building two trains for Gas Conditioning and Ethane and Natural Gas Liquids (NGL) recovery with total capacity of 1,000 million cubic feet a day. Scope involves, Piping Fabrication and Erection, Equipment Erection, Civil Works, Steel Structure Erection, Electrical & Instrumentation, Painting, Insulation and EPC portion for Buildings consisting of around 24 Buildings. Duration in Months: 40 Months Value in USD$: 750 Million US$ Title Project Engineer – Bechtel area (50% from KGP Project), Duties Manage, controlled and coordinated the execution of the work package, ensuring that work was carried out in accordance with time schedule, specifications and craft standards specifying working methods and interpreting specifications and formal drawings as necessary.
  • 4. ****************** Consolidated Contractors Company (CCC SA) Project Steam and Power Project (IWSP) for Rabigh Arabian water and Electricity Company (RAWEC) Scope of Work: Construction and Pre-Commissioning work for a Power Plant of max capacity 560MW and a reverse Osmosis Plant of capacity 7,000 on field with in the premises, of Rabigh Complex. The Project outputs are Power, Steam and water that will be supplied to the refinery through SEC. The Plant mainly consists of:- 1-Five Steam Turbines/Gen. of 130 MW each 2-Nine Fired Boilers of 540 TPH each 3-Three Stacks 4-Five Boiler Feed Water Pumps. 5-Three Deaerators 6-Sixteen RO plant of 500 TPD each. 7-Three Fuel Gas Desulphurization units 8-Nine Electrostatic Precipitators 9-Five Condensers 10-Cooling Tower (Fourteen Cells) Civil and Mechanical works, incorporating pipe prefabrication, installation of equipment and piping systems, steel work, painting,insulation,fireproofing, electrical, instrumentation Duration in Months : 27 Months (August -2005 to November-2007) Value in US $ : 250 Million US$ Title Section Engineer Duties Manage, Controlled and coordinated the Scope of work package, ensuring that work was carried out in accordance with specifications and craft standards specifying working methods and interpreting specifications and formal drawings as necessary. Estimate the performance of all activity in site .deal with client work project tasks, progress and plan. ************************************ Consolidated Contractors Company (CCC SA) Project: Khursaniyah Gas Plant Project (KGPP) Scope of Work: Building two trains for Gas Conditioning and Ethane and Natural Gas Liquids (NGL) recovery with total capacity of 1,000 million cubic feet a day. Scope involves, Piping Fabrication and Erection, Equipment Erection, Civil Works, Steel Structure Erection, Electrical & Instrumentation, Painting, Insulation and EPC portion for Buildings consisting of around 24 Buildings. Duration in Months: 40 Months (Aug.2006 to Jan. 2009) Value in USD$: 750 Million US$
  • 5. Title Section Engineer , Duties Manage, controlled and coordinated the execution of the work package, ensuring that work was carried out in accordance with time schedule, specifications and craft standards specifying working methods and interpreting specifications and formal drawings as necessary. ****************** From .May. '2006 Uhde Germany Petrochemical Company(Main Contactor) Working on Helwan Fertilizer Plant (NH3/UREA Plant) as a Specialist for Boiler, Steam Generation & Ammonia Static Equipment. Value in US $: 500 Million US$ ****************** From .Dec. '2004 Uhde Germany Petrochemical Company (Main Contactor) Working on ALEXFERT (NH3/UREA Plant) as a Specialist for Boiler, Steam Generation & Ammonia Static Equipment Value in US $: 500 Million US$ ******************* From Jul. '2003 Bechtel Overseas Corporation Working on IDKU Egyptian LNG Project (Liquefied Natural Gas) as a Senior Piping Engineer for Train 1, outside piping, all underground piping activity and 3 KM pipe lines on the Jetty. Value in US $: 1,800 Million US$ From Feb. '2003 Adyard Abu Dhabi U.A.E. Working on Adyard Shipyard through National Drilling Company as a Project Engineer, the Main Work Was Rig Delma Maintenance, Repairs, Inspections, Welding, Sandblasting & Painting Works. ****************** From Feb. '2002 National Steel Fabrication Co. (N.S.F.) Working on East Port Said Power Plant through (DEC) as a Site Manager the Main work was Main Steel Structure of Turbine Hole, Pipe Racks Small Building ****************** From Mar. '2000 ESACO Manufacturing Engineering & Contracting Working on S.O.P.C. (Suez Oil Processing Company) Refinery for the New Hydrogen Plant through KTI (Technip Group) as a Site Manager Main Work was a Piping Fabrication and Installation (Alloy Steel, Stainless Steel, Carbon Steel) Fire Fighting, Underground Pipe, Steel Structure) For the Entire Project During Start-up, Commissioning and Testing.
  • 6. ****************** From Jan. '99 Kobe Steel Ltd. Working on the Third Direct Reduction Plant for Alexandria National Iron and Steel, as a Senior Piping Engineer. With Japanese Project Engineer Main Work was a Modify the Line DWG Control of Supply Material Supervision Fabrication and Installation all Piping Work for the Entire Project during Start-up, Commissioning and testing ******************* 1998 -1999 El Taiseer Petroleum Service Company Employed as a Senior Piping Engineer Supervisor for a Natural Gas Station at Khalda El Salam, Main Work Was a Supervision Pre-fabrication and Installation Piping Work (Low Temperature Steel, Stainless Steel, Carbon Steel) ****************** 1997 -1998 IEMSA.(Italy Company) Employed as a Site Supervisor Engineer for the installation of a Boiler, Reformer, Convection Bank, Process Gas Waste Heat Recovery, Start-up Heater and Piping for the Abu Quir III Fertilizer Plant during start - up and testing. Also responsible for storage of delivered materials. ******************** 1997 -1997 Hitachi Plant Engineering Co. Ltd. Working on a Direct Reduction Steel Making Plant, (client: Alexandria National Iron and Steel), as a Senior Piping Engineer. The project consisted of pre-fabrication and installations of gas piping for the entire project during start - up, commissioning and testing. 1996 -1997 Niigata Engineering Co. Ltd. Working on a Production Rationalization and Expansion Project, involving utilities expansion and modification for the client Alexandria National Iron and Steel, as a Mechanical Supervisor Engineer. The activity consisted of installation during start-up, commissioning and testing. ******************** 1995 -1996 Kobe Steel Ltd. Working on the Second Direct Reduction steel making Plant for the client Alexandria National Iron and Steel, as a Design Engineer Piping &. Mechanical with the Japanese Project Engineer. Duties included the preparation and review of mechanical detail drawings, Piping Iso., Piping Support and the preparation of Equipment Status Lists for all the equipment in the plant project. ******************* 1992 –1995 CWC - Cairo Waste Water Consortium Working as a Mechanical and Operations Engineer responsible for the control of tunnel air pressures using the Air Compressors, and for the maintenance and operation of diesel engines. Work also included the installation of the Air decks for the shafts. *******************
  • 7. 1989 -1992 With Heliopolis Shipping and Aida - III, working as a Maintenance and Operations Engineer carrying out the operation and maintenance of the 10,000-5,000 HP diesel engines; also responsible for the operation and maintenance of various types of pumps, coolers, boilers, oil / water separators, purifiers, air compressors and filters. ***************** Training Course s • First Aid cours e, during the Guided Sea Training program m e d in Novem b er 1988 • Fire Fighting cours e during January 1988 • Person al Survival cours e during Novem b er 1989 • Team Work March 2007 in CCC GROUP Basic Offshore Safety Induction and Emergen c y Training ( BOSIET )