- 1. CoE Underground Mining 2009
Introducing Underground Mining
© ABB AB/Mining, 3BSE058623
March 7, 2014 | Slide 1
- 2. CoE Underground Mining
What we offer
We offer customized solutions for:
Complete mine hoists - both mechanical and electrical
Leading edge control and drive systems
Electric trucks, mine automation and mine electrification
Consultancy and expert services
© ABB Group
More than 60 years of experience in mining industry
March 7, 2014 | Slide
2
- 3. CoE Underground Mining
Complete mine hoists
Complete mine hoist solutions
Advanced control systems
State-of-the-art drive systems
Robust mechanical solutions
Reliable brake systems
After sales services
© ABB Group
March 7, 2014 | Slide
3
- 4. CoE Underground Mining
Advanced control systems
Seventy years of experience
>600 hoist delivered to >30 countries
State of the art control system based on ABB industrial controller
AC800M
Efficient functionality for safe and reliable operation of hoist
Dual safety circuit connected with safety relays controlling safety
brake and drive converter
HSI ( Human – Machine Interface)
Multi Language
•
•
Russian
•
Chinese
•
English
Can be changed in run-time
First Fault Functionality
© ABB Group
Extensive Error Handling
March 7, 2014 | Slide
4
- 5. CoE Underground Mining
State-of-the-art drive systems
Unique and well-proven drive technology
>50 modern MV drive systems sold for mine hoists – more than 20
in operation
Network friendly, high efficiency power train
Low harmonic generation
No reactive power consumption
Low voltage drop
Ability to operate on weak network
© ABB Group
March 7, 2014 | Slide
5
- 6. CoE Underground Mining
Robust mechanical solutions
Well proven design philosophy
Infinite life time
Dedicated strength and brake calculation for each hoist
FE support for development and special investigations
V1
C1
G2
27.23
25.54
23.85
22.15
20.46
18.77
17.07
15.38
13.69
11.99
10.3
8.607
6.913
Y
© ABB Group
March 7, 2014 | Slide
6
Z
X
Output Set: SAP4 Case 1
Deformed(2.289): Total Translation
Contour: Plate Bot VonMises Stress
5.22
3.527
1.834
0.14
- 7. CoE Underground Mining
Reliable brake systems
Safety what ever happens
Safety through redundancy:
Two brake discs
Brake units are spring applied, hydraulic released
Multiple brake units
Two hydraulic stations
Each station has two hydraulic circuits
Electric control has two independent cicuits
© ABB Group
March 7, 2014 | Slide
7
- 8. CoE Underground Mining
After sales services
Competence from Center of Excellence
Remote diagnosis from the headquarters
Service agreements
Upgrades, spare parts, consultancy and training
Worldwide network with local service engineers
© ABB Group
March 7, 2014 | Slide
8
- 9. CoE Underground Mining
R&D: Hoist laboratory
The only lab of its kind in the world
Research & development
Training facilities
Show room
© ABB Group
March 7, 2014 | Slide
9
- 10. CoE Underground Mining
References: LKAB Kiruna, Sweden
LKAB Kiruna new transport level at 1345 m
Production 26.5=>33 Milj ton/year
Two-stage hoisting 705+ 804 m
Four new 5600 kW DTC Drives
One New hoist
Totally 5+7= 12 production hoist.
Fully automatic production from train loading pocket to unloading
pocket in the head frame
© ABB Group
March 7, 2014 | Slide
10
- 11. CoE Underground Mining
References: LKAB Kiruna, Sweden
Overview of project and ABB’s delivery
Rebuild of 4 mine hoists from DC-technology to
AC-technology plus 1 optional new hoist with
same AC-technology, all at sub-vertical level
(underground 740 – level)
Energy efficiency impact
Motor and drive operating at power factor = 1
Low Voltage drop, so that hoists can be started at
same time
Less transformer power required
Low level of harmonics
Higher efficiency
Customer benefits
© ABB Group Less energy consumption
Less space required
March 7, 2014 | Slide
11
- 12. CoE Underground Mining
References: Mosaic K2 Production Hoist: Canada
Old mechanics and drive system are replaced with
new systems from ABB
© ABB Group
March 7, 2014 | Slide
12
- 13. CoE Underground Mining
References: Mosaic K2 Production Hoist: Canada
Main data
Pulley 5.95 m
2 x 45 ton payload
8 640 kW motor
1760 tph, 18.3 m/s
DTC
Potash
1009m hoisiting distance
© ABB Group
March 7, 2014 | Slide
13
- 14. CoE Underground Mining
References: Newcrest Telfer Gold Mine, Australia
Turn key mine including skips and other shaft equipment
Main data :
Rope Speed 16.25/ 19 m/s
1100/1450 m
5600/2x5600kW
Skip/Skip
Motor power 5600/ 2x5600
kW
Payload 34.5/ 45 Ton
© ABB Group
March 7, 2014 | Slide
14
DTC- converter
- 15. CoE Underground Mining
References: Newcrest Telfer Gold Mine, Australia
Telfer installation initial stage single motor
5 600 kW
© ABB Group
March 7, 2014 | Slide
15
5 600 kW
- 16. CoE Underground Mining
References: Tunliu service hoist
Main data
Hoisting distance: 559
Rope speed:
8.8m/s
Cage/cage
Power:
1300 kW
Pulley diameter:
4.0m
DTC converter
Payload:
10.7 ton
© ABB Group
March 7, 2014 | Slide
16
- 17. CoE Underground Mining
References: Tunliu service hoist
Main features with DTC
No DC-Breakers required
Low Harmonic Generation
No Fuses required
No Reactive Power Consumption
Fewer transformers required
Low Voltage Drops
Less transformer power required
Ability to operate on weaker
network
Fewer power cables required
Faster and more accurate control
Smaller footprint - Lower cost for
head frame/winder house
No filters required for power
factor correction & harmonic
suppression
© ABB Group
March 7, 2014 | Slide
17
Editor's Notes
- <number>
New hoist is built on a new level above the old hoist while it was still running. Change over to new hoist was quick.