Major Completed Projects
Designation HSE Engineer
Project location Byco Petroleum
Project scope EPC project
Project cost 280 Million PKR
Designation HSE Engineer
Project location OMV
Project scope Development of well head facility
Project cost 44.2 Million PKR
Designation HSE Engineer
Project location Pro-Energy Naudero Larkana Sindh (Power sector)
Project scope Construction services for its 50 MW Power plant including civil
works, Electro-Mechanical services
Project cost 65.1 Million PKR
Designation Sr. HSE Engineer
Project location OGDCL (Oil and Gas sector)
Project scope Annual turn around (ATA)-2010 for UCH plant, Balochistan
Project cost 25.4 Million PKR
Designation Sr. Engineer/ Site HSE Incharge
Project location OGDCL (Oil and Gas sector)
Project scope Procurement, construction, installation/ erection, pre
commissioning, startup & commissioning, Assistance of sulfur
recovery unit (SRU) at Dakhni gas plant
Project cost 297.4 Million PKR
Designation Sr. Engineer/ Site HSE Incharge
Project location Schlumberger Seaco Incorporation (Oil and Gas sector)
Project scope Installation and Integration of Equipment and Packages requiring
Piping, Civil and Mechanical works" for Makori early production
facility
Project cost 70 Million PKR
Designation Sr. Engineer/ Site HSE Incharge
Project location ICI Khewra (civil and mechanical projects)
Project scope Civil construction work for coal fired boiler project at soda ash
works Khewra. Mechanical construction works Khewra.
Project cost 120+130 Million PKR

More Related Content

What's hot

DHEERAJ SHARMA RESUME(1)(1)
DHEERAJ SHARMA RESUME(1)(1)DHEERAJ SHARMA RESUME(1)(1)
DHEERAJ SHARMA RESUME(1)(1)
Dheeraj Sharma
 
Akhil Resume 10.06.2015new
Akhil Resume 10.06.2015newAkhil Resume 10.06.2015new
Akhil Resume 10.06.2015new
AKHIL MISHRA
 
Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12
Graeme Donaldson
 

What's hot (20)

Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017
 
Steam Engine Revolution presentation
Steam Engine Revolution presentationSteam Engine Revolution presentation
Steam Engine Revolution presentation
 
Project management in thermal power plants
Project management in thermal power plantsProject management in thermal power plants
Project management in thermal power plants
 
SUA presentation of the Power Generation Station Project
SUA presentation of the Power Generation Station ProjectSUA presentation of the Power Generation Station Project
SUA presentation of the Power Generation Station Project
 
Cng marine for gas distribution in indonesia 2012 s
Cng marine for gas distribution in indonesia 2012 sCng marine for gas distribution in indonesia 2012 s
Cng marine for gas distribution in indonesia 2012 s
 
Summer training report on
Summer training report onSummer training report on
Summer training report on
 
MK BANSAL- Resume (1) - Copy
MK BANSAL- Resume (1) - CopyMK BANSAL- Resume (1) - Copy
MK BANSAL- Resume (1) - Copy
 
Ntpc report
Ntpc reportNtpc report
Ntpc report
 
ntpc
ntpcntpc
ntpc
 
Power plant part 1
Power plant part 1Power plant part 1
Power plant part 1
 
151111 csp today seville 2015
151111 csp today seville 2015151111 csp today seville 2015
151111 csp today seville 2015
 
CBI NI energy conference: Harry McGrath
CBI NI energy conference: Harry McGrathCBI NI energy conference: Harry McGrath
CBI NI energy conference: Harry McGrath
 
Ntpc badarpur training ppt
Ntpc badarpur training pptNtpc badarpur training ppt
Ntpc badarpur training ppt
 
Part 2 PDi Business Plan Part 2 DRAFT
Part 2 PDi Business Plan Part 2 DRAFTPart 2 PDi Business Plan Part 2 DRAFT
Part 2 PDi Business Plan Part 2 DRAFT
 
DHEERAJ SHARMA RESUME(1)(1)
DHEERAJ SHARMA RESUME(1)(1)DHEERAJ SHARMA RESUME(1)(1)
DHEERAJ SHARMA RESUME(1)(1)
 
China CSP Demonstration Projects
China CSP Demonstration ProjectsChina CSP Demonstration Projects
China CSP Demonstration Projects
 
Akhil Resume 10.06.2015new
Akhil Resume 10.06.2015newAkhil Resume 10.06.2015new
Akhil Resume 10.06.2015new
 
Ntpc(btps) report
Ntpc(btps) reportNtpc(btps) report
Ntpc(btps) report
 
A case study in offshore wind farm project management
A case study in offshore wind farm project managementA case study in offshore wind farm project management
A case study in offshore wind farm project management
 
Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12
 

Viewers also liked

Syed Ghouse Job covering letter
Syed Ghouse Job covering letterSyed Ghouse Job covering letter
Syed Ghouse Job covering letter
Syed Ghouse
 
Ahmed Ali CV
Ahmed Ali CVAhmed Ali CV
Ahmed Ali CV
Ahmed Ali
 
2016Civic50_Report_FINAL
2016Civic50_Report_FINAL2016Civic50_Report_FINAL
2016Civic50_Report_FINAL
Yvonne Turner
 

Viewers also liked (12)

PERFIL DEL DOCENTE MAESTRIA EN EDUCACION SUPERIOR
PERFIL DEL DOCENTE MAESTRIA EN EDUCACION SUPERIORPERFIL DEL DOCENTE MAESTRIA EN EDUCACION SUPERIOR
PERFIL DEL DOCENTE MAESTRIA EN EDUCACION SUPERIOR
 
Syed Ghouse Job covering letter
Syed Ghouse Job covering letterSyed Ghouse Job covering letter
Syed Ghouse Job covering letter
 
Digital review november 2016
Digital review november 2016Digital review november 2016
Digital review november 2016
 
Basic Electrical Technology Questions with Answers
Basic Electrical Technology Questions with AnswersBasic Electrical Technology Questions with Answers
Basic Electrical Technology Questions with Answers
 
Pau Gasol
Pau GasolPau Gasol
Pau Gasol
 
思想史たん|公開読書会オフ
思想史たん|公開読書会オフ思想史たん|公開読書会オフ
思想史たん|公開読書会オフ
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
Zapilennya kvitiv
Zapilennya kvitivZapilennya kvitiv
Zapilennya kvitiv
 
1614 New Directions for the System of Rice Intensification (SRI) in Nepal: ...
1614   New Directions for the System of Rice Intensification (SRI) in Nepal: ...1614   New Directions for the System of Rice Intensification (SRI) in Nepal: ...
1614 New Directions for the System of Rice Intensification (SRI) in Nepal: ...
 
Traducciones
TraduccionesTraducciones
Traducciones
 
Ahmed Ali CV
Ahmed Ali CVAhmed Ali CV
Ahmed Ali CV
 
2016Civic50_Report_FINAL
2016Civic50_Report_FINAL2016Civic50_Report_FINAL
2016Civic50_Report_FINAL
 

Similar to Major Completed projects

Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
vasanth morais
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
muhammad jamil
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
vijayabaskar v
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
Vhen Atienza
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
SHYAM NIKESH
 
Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2
Sameh Aly
 

Similar to Major Completed projects (20)

CV Inesh
CV IneshCV Inesh
CV Inesh
 
CV2015
CV2015CV2015
CV2015
 
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
 
Commitment of professional team provides you a complete product line for Micr...
Commitment of professional team provides you a complete product line for Micr...Commitment of professional team provides you a complete product line for Micr...
Commitment of professional team provides you a complete product line for Micr...
 
Venkat CV
Venkat CVVenkat CV
Venkat CV
 
New CV of VRB
New CV of VRBNew CV of VRB
New CV of VRB
 
SSG_RESUME_DEC2015.R0
SSG_RESUME_DEC2015.R0SSG_RESUME_DEC2015.R0
SSG_RESUME_DEC2015.R0
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Arun Kumar
Arun KumarArun Kumar
Arun Kumar
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
Hassby's CV 2015
Hassby's CV 2015Hassby's CV 2015
Hassby's CV 2015
 
RTrongco Resume
RTrongco ResumeRTrongco Resume
RTrongco Resume
 
Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2
 

Major Completed projects

  • 1. Major Completed Projects Designation HSE Engineer Project location Byco Petroleum Project scope EPC project Project cost 280 Million PKR Designation HSE Engineer Project location OMV Project scope Development of well head facility Project cost 44.2 Million PKR Designation HSE Engineer Project location Pro-Energy Naudero Larkana Sindh (Power sector) Project scope Construction services for its 50 MW Power plant including civil works, Electro-Mechanical services Project cost 65.1 Million PKR Designation Sr. HSE Engineer Project location OGDCL (Oil and Gas sector) Project scope Annual turn around (ATA)-2010 for UCH plant, Balochistan Project cost 25.4 Million PKR Designation Sr. Engineer/ Site HSE Incharge Project location OGDCL (Oil and Gas sector) Project scope Procurement, construction, installation/ erection, pre commissioning, startup & commissioning, Assistance of sulfur recovery unit (SRU) at Dakhni gas plant Project cost 297.4 Million PKR Designation Sr. Engineer/ Site HSE Incharge Project location Schlumberger Seaco Incorporation (Oil and Gas sector) Project scope Installation and Integration of Equipment and Packages requiring Piping, Civil and Mechanical works" for Makori early production facility Project cost 70 Million PKR Designation Sr. Engineer/ Site HSE Incharge Project location ICI Khewra (civil and mechanical projects) Project scope Civil construction work for coal fired boiler project at soda ash works Khewra. Mechanical construction works Khewra. Project cost 120+130 Million PKR