Energy Profile
Introduction
Sinosteel Equipment & Engineering Co., Ltd (hereinafter referred to as Sinosteel MECC), formerly
known as Equipment Supply Company of the past Ministry of Metallurgical Industry, was established
with approval by the former State Planning Commission in 1972. Through restructuring and merger,
Sinosteel MECC is now the wholly-owned subsidiary of Sinosteel Corporation. Sinosteel MECC is
an internationally operated professional engineering company, with business scope covering EPC
contracting, complete set of equipment & spare parts supply, project management, project and
equipment supervision, and mechanical and electrical product design & manufacture for domestic
and overseas customers of metallurgical industry, mining, electric power and construction material
fields.
Sinosteel MECC has attained several qualifications including National Mechanical and Electrical
Complete Set of Equipment Supply Qualification Class A, National Equipment Supervision Qualifica-
tion Class A and Foreign Economic & Technical Cooperation Qualification. It has also passed the
authentication of ISO9001, ISO14001 and OHSAS18001. In April 2012, Sinosteel MECC acquired
100% share of Sinosteel Engineering Design & Research Institute Co., Ltd (hereinafter referred to
as Sinosteel Design Institute) and so took over its Engineering Design and Consultation Qualification
Class-A in metallurgical industry, construction, electronic communication, radio, film and television
field.
Through several years of actively international operation, Sinosteel MECC has transformed into an
influential engineering company in international metallurgical engineering field, enjoying sound repu-
tation in overseas markets. In recent years, it has accomplished several important international engi-
neering projects including the construction of the largest blast furnace, sinter plant, and coke oven
that have ever been contracted by Chinese enterprises in overseas market so far, and has fully dem-
onstrated its comprehensive competence in the field of international engineering construction. It has
been ranked in Top 225 International Contractors by US "Engineering News Record (ENR)” for four
straight years.
Relying on its good reputation in the field of international metallurgical engineering and the overall
advancement of its international operation ability, Sinosteel MECC actively expands its general
contracting business in some fields other than metallurgical industry. It has successfully undertaken
and completed series of mining and power station projects including Australian CUDECO’s copper
project and Turkish ICDAS’s 600MW coal-fired power plant project, which laid a solid foundation for
its transformation from a metallurgical engineering company to a large scale international engineer-
ing contractor.
By now, Sinosteel MECC has ever accomplished over 500 state and over 100 global large EPC projects Since 2006,
Sinosteel MECC has been approved as Grade AAA Credit Enterprise for foreign projects contracting as well as for
mechanical and electrical import and export (including large scale complete sets of equipment).
Sinosteel MECC has gradually transformed into a world famous first class engineering contractor in China, by empha-
sizing technical advance and relying on main business of engineering contracting and integration supply of mechani-
cal and electrical equipments & spare parts, with strong capacity in technical process, design and engineering man-
agement together with its international operation. It is also an engineering company with outstanding performances
in metallurgical industry and well developed capacities in mining, electric power and other non-steel fields.
Qualification CertificatesOrganization Structure
Business Departments
Marketing Department
Coke Oven & By-Product Engineering Department
Mining & Pelletizing Engineering Department
Iron Making Engineering Department
Steel Making Engineering Department
Steel Rolling Engineering Department
Equipment & Spare Parts Department
Quality Control Department
Companies Controlled or
Invested by Sinosteel MECC
Sinosteel Engineering Design & Research Institute Co., Ltd.
China Metallurgical Engineering Co., Ltd.
Beijing Bestpower Electrical Technology Ltd.
Beijing Chinatop Tech. Co., Ltd.
Sinosteel Tendering Co., Ltd.
Administration Department
Financial Department
Risk Management Department
Chief Engineer Office
Function Departments
Board of Supervisors
General Meeting of Shareholders
Board of Directors
Board Office
Managers
Strategy Committee
Audit Committee
Compensation & Appraisal
Committee
Coal fired power plant
New boiler combustion technology and flue gas desulfurization and denitration
technology make use of following as fuels:
Sinosteel MECC could provide solutions to meet the different requirements of the users.
pulverized coal
coal slack
coal water slurry
oil shale
petrol coke
05-06
Business Scope &
Reference Highlights
50MW, 100MW, 200MW, 300MW, 600MW and 1000MW coal based generating units,
in series, can meet the needs of different users.
Mode:
CFB (50~600MW)
High temperature high pressure (50~150MW)
Subcritical (100~600MW)
Supercritical (300~600MW)
Ultra supercritical (600~1000MW)
Function:
Straight condensing
Steam extraction
Cooling method:
Water cooled
Air cooled
•
•
•
•
•
•
•
•
•
GuangxiFangchenggang2X600MWPowerPlant
OperationEscortingService&Training
Procurement Manufacturing&
Supervision
noitcurtsnoC
&gnizinagrO
tnemeganaM
gnireenignE
Equipment&
SparePartsSupply
EnvironmentProtection&
EnergySaving
Raw
Material
Preparing
Steel
Rolling
Iron
Making
Steel
Making&
Continuous
Casting
Mining Energy
Infra-
structure
Sinosteel MECC provides all-in-one solution for mining, iron & steel,
energe industries and infrastructure construction.
07-08
ShanxiRuiguang2X300MWHenanShouyangshanSupercritical2X600MW
Turkey ICDAS 2x600MW
Supercritical Power Plant 2nd Phase
ZhejiangBeilun2X1000MWUltraSupercriticalPowerPlant
Inner Mongolia Dengkou 2x350MW
InnerMongoliaDanchangSubcritical4X300MWShandongLiaocheng2x300MW GuangdongBaolihua2X300MWSubcriticalCFBPowerPlant
IndonesiaLampung2X7MWCFSPPunderconstruction ShanxiXuanguangSupercritical2X600MW
09-10
Gas fired power plant
Nanning 150MW Gas Fired Power Plant
Shenzhen Yueliangwan 1×36.6 MW +1× 15.5 MW Main power house under construction for 260t
Boiler Chengde 60MW Gas Fired Power Plant
M701F4 (315MW)Gas Turbine and Combined Cycle Unit under assembly
2X139MW Combined Cycle Units of
Baosteel Thermal Power Plant
4 Units of 9F-class Vertical Gas-Steam Combined Cycle
put into operation in Fujian Gas Power Co.
Boiler steel structure under construction for
Chengde 60MW gas fired PP
Sinosteel MECC provides the whole solutions to meet the client requirements.
11-12
Hydro power
Sinosteel MECC provides the all-in-one solutions according to the conditions of the
water head and flow, and choose the most practicable proposal, to supply the
turbine in the model of Francis, Kaplan, Pelton, Turgo, Crossflow, etc
Xiaqiao 50MW Hydropower Station 2006 Changzhou 630mw Hydropower-complex 2009Xiaqiao 50MW Hydropower Station 2006
The Erection of Runner in Pingban
405MW Hydropower Station
Bailongtan 6X32MW Hydropower Station
Letan 600MW Hydropower Station
Overview of Powerhouse of the Changzhou
Hydropower-complex under construction
13-14
ShipLockofQiaogong8x57MWHydropowerStation
Dongba72mwHydropowerStation 2007 Qiaogong8x57MWHydropowerStation
Yantan1810MWHydropowerStation
FloodDischargingThroughtheOverflow
DamofYantanHydropowerStation
GeneratorFloorinPowerhouseofYantan
HydropowerStation 4×302.5MWFrancisTurbinenits
Changzhou630mwHydropower-complex
Construction of Large-sized Penstocks Embedded in Dam of Yantan Hydropower Station
15-16
Wind Power
Wind power generating unit, in series, 0.6MW, 0.75MW, 1MW, 1.5MW, 2MW, 3MW,
6MW, direct driven permanent magnet technology or double-fed induction generating
technology, applicable to the climate condition:
Offshore
Intertidal
High level
Low wind speed
Cold environment
Sandy
Liaoning Kangping Aoliyingzi
Wind Power Station
Wind generation uint of Jiangsu
Rudong Innertidal Wind
Power Station
Main casing of wind power unit Assembly workshop of wind generating unit
Wind blade is ready for delivery
Liaoning Weichang Wind
Power Station
Hebei Qilinshan Wind
Power Station
3MW wind generating uint under assembly in workshop
Jilin Shuanglong Wind Power Station
17-18
Solar module frame loading Solar module storage
Jiangxi Tianli 500KW Photovoltaic Power Station
Qinghai 100KW solar photovoltaic generation system
Solar power generating system,were developed fast in China.Whole industry chain
production technology for Power Generation equipment is localized, and succeeded
put into use in China.
Solar Energy
Jiangsu Siyang 3MW solar photovoltaic power generating units putting into operation
Solar tracking system of Hebei
Tangshan 10KW unit
Jiangsu Fengbang 2MW amorphous
silicon thin film solar project
19-20
Guangxi Zhanjiang 2X50MW Biomass (bagasse & leaf & bark) Power Plant
Guangxi Funan biological energy limited 30MW biomass (bagasse) power generation project
Biomass
Recycle Energy
2X500t/d waste incineration furnace and 2X15MW condensing turbine generator;
700t / d waste incinerator and a 15MW extraction condensing steam turbine generator for Jilin shuangjia
Linxi Zhonghuang 2X300t/d waste incinerator;12MW condensing turbine generator &
6MW extraction condensing steam turbine generator
Chongqing Tongxing 2X600t/d Waste Incineration Power Plant Fuzhou Hongmiaoling 2X600t/d Waste Incineration Power Plant
Waste Incineration Power Generation
Liucheng 2X15MW Biomass (Sugarcane leaf & Cotton Stem) Power Project
Sinosteel MECC have contributed to the renewable energy and green enviromental protection, plenty
of experience taking use of the city waste garbage, waste sugar bagasse, tree leaf, crops stem,
animal livings manure, industry waste heat & pressure and steam to generate energy.
21-22
Low-pressure Waste Heat Steam Power Project for 3X435m2
sinter plant for Wuhan Iron & Steel Co.
28MW power plant for Tangshan Rongxin Steel Co. TRT Equipment for 4x450m3 Blast Furnace for
Tangshan Guofeng Iron & Steel Co., ltd
Waste Heat & Waste Pressure Power Generation
Wusteel steam power plant for 150t/h、160t/h、2 X 110t/h dry quenching coke plant
Low-pressure waste Heat Steam Power Project
for 2 X 360m2
Sinter plant for Chengde Iron & Steel Co.
Heibei Cangzhou 2 X 15MW High tempreture high pressure steam
power plant for 2 X 14t/h dry quenching coke plant
Pingxiang TRT Project for 1080 m3
Blast Furnace
3D Drawing of 30MW Power Plant (EP) for TUBASTE, South Africa
23-24
Power Transmission
500kV Tower of Four Circuits
500kV Dongshanqiao Substation Project
500kV Tonghui-Nanguo Transmission Project
Gezhouba-Shanghai Double Circuit Transmission Project
±500kV Three Gorges-Shanghai HVDC Project
Shanghai Nanhui-Sanlin 500kV AC
Transmission Project
500kVShanghai Shunlu Substation Project
25-26
±800kV Xiang-Shang Transmission Project——angle tower
±800kV Xiang-Shang Transmission
Project——tangent tower
±800kV Yun-Guang Transmission Project
1000kV split type angle tower
1000kV Jindongnan-Nanyang Transmission Project
±500kV Zhengping Converter Station
1000kV angle tower jumper connection
27-28
Reference highlights
Item Project Name Installed Capacity Production Time Scope Item Project Name Installed Capacity Production Time Scope
Coal Fired Power Plant
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
Henan Meng city
Jinzhou Ferror Steel Corporation
Panzhihua Iron & Steel Corporation
Jiuquan Iron & Steel Corporation
Liuzhou thermal power plant
Guangzhou Power plant
Guilin Yongfu
Taicang Power Plant
Guangdong Pyroelectricity Co.,Ltd
Huaneng Qinbei Power Plant
Heshan Power plant
Taicang Power Plant
Henan Luoyang Thermal Power Plant
Henan Xinxiang Yuxin Power generation Co., Ltd
Guizhou Huadian Dalong Power generation Co., Ltd
Shanxi Ruiguang Thermal Power Plant
Datang San Menxia Generation Co, Ltd.
Neimenggu Dengkou Power Plant
Guohua Taicang Power Plant
Henan Xinmi Power Plant
2X6MW
12.5MW
2x100MW
2x50MW
400(2×200)MW
225(4×50+25)MW
2×135MW
3×220t/h+2×50MW
2*135MW
2*135MW
2×600MW
2×300MW
2×300MW
2×300MW
2×300MW
2×300MW
2×300MW
2×600MW
2×350MW
2×600MW
2×300MW
1988-1990
1990-1994
1990-1995
1990-1995
1995
1997
1998
1999
2003
2005
2004
2004
2004
2005
2006
2006
2006
2006
2006
2006
2007
EP
EP
EP
EP
EPC
EPC
EPC
EP
EP
EPC
EPC
EP
EP
EPC
EPC
EP
EP
EPC
EPC
EP
EPC
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Neimenggu Dachang Power Plant
Shandong Liaocheng Power Plant
Laibing Power Plant
Shanxi Xuanguang Power Plant
Henan Shouyanshan Power Plant
Hebi Power Plant
Datang Anyang thermoelectric Co., Ltd
Guangxi Fangchenggang Power Plant
Huaneng Qinbei Power Plant
Nanyang Tianyi Generation Co, Ltd.
Nanjing Chemical Industrial park
Yuzhou Power Plant
Kaifeng Thermal Power Plant
Zhejiang Beilun Power plant
PT. PP(Persero), Indonesia
ICDAS BIGA Fired Power Plant Project 2nd Phase, Turkey
4×300MW
2×300MW
2×300MW
2×600MW
2×600MW
2×600MW
2×300MW
2×600MW
2×600MW
2×600MW
2×300MW
2×660MW
2×600MW
2X1000MW
2X7MW
2x600MW
2007
2007
2007
2007
2007
2007
2008
2008
2008
2008
2009
2009
2009
2010
2013
2014
EP
EPC
EPC
EPC
EPC
EPC
EP
EPC
EPC
EPC
EPC
EPC
EPC
EP
EPC
EP
Guangzhou paper mill high pressure
thermal power plant
38 Xinjiang Guotai Xinhua Power Plant 2x350MW 2017 EPC
29-30
Item Project Name Installed Capacity Production Time Scope
Gas fired Power Plant
01
02
03
04
05
06
07
08
09
10
11
Shenzhen Yueliangwan Gas Turbine Power Plant
Guangdong Huizhou LNG Generating project
Masteel CCPP Power Plant (mixed gas)
Fujian Putian LNG Power Plant
Nanning Gas Power Plant
Baosteel Thermal Power Plant
Fujian Gas Power Plant
Jiangsu Qishuyan NG Generating project
Wusteel Group Ersteel Plant
Chengde Steel Co.
Esteel Co.
15.5MW+36.6MW
350MW
1×100MW+1×50MW
350MW
1×100MW+1×50MW
2X92MW+2X46MW
4X256MW+4X135MW
2×220MW
2X30MW Gas fired
35MW Coal Gas fired
2001
2006.9
2006.12
2008.12
2009.7
2010.4
2010.10
2011.12
2010.10
2012.12
2012.7
EP
EP
EPC
EP
EP
EPC
EP
EP
EPC
EPC
EPC
Item Project Name Installed Capacity Production Time Scope
Item Project Name Installed Capacity Production Time Scope
Wind Power Plant
01
02
03
04
05
06
Jilin Changling Shuanglong Wind Power Station
Liaoning Kangping Aoliyingzi Wind Power Station
Jiangsu Rudong Innertidal Wind Power Station
Hebei Qilinshan Win Power Station
Heibei Weichang Wind Power Station
Shandong Weifang Wind Power Station
66X1.5MW
33X1.5MW
2X1.5MW
67X1.5MW
33X1.5MW
10X3MW
2009.2
2009.10
2010.3
2010.11
2011.1
2012.5
EPC
EPC
EP
EPC
EP
EP
Item Project Name Installed Capacity Production Time Scope
Solar Engery Power Plant
01
02
03
04
Jiangxi Tianli Solar Power Station
Jiangsu Siyang Solar Photovoltaic Power Station
Jiangsu Fengbang Solar Power Station
Qinghai Solar Power Station
500kW photovoltaic
3MW photovoltaic
100kW Photovoltaic
2008.10
2009.09
2010.3
2010.10
EP
PC
EP
EP
Item Project Name Installed Capacity Production Time Scope
Hydro Power Plant
01
02
03
04
05
Yantan Hydropower Station phase I
Bailongtan Hydropower Station
Letan Hydropower Station
Pingban Hydropower Station
1210MW
6×32MW
4×150MW
405MW
1992
1996
2005
2005
EP
EP
EP
EP
260t Boiler 60MW
Coal gas fired
2MW amorphous
silicon thin film
Yantan Hydropower Station phase II 600MW 1995 EP
06
07
08
Dongba Hydropower Station
Qiaogong Hydropower Station
72MW
8×57MW
2007
2008
EP
EP
Xiaqiao Hydropower Station 50MW 2006 EP
12
13
Changzhou Hydropower-complex 630MW 2009 EP09
Turkey Garzan-1 hydropower station
Turkey Binek hydropower project
2×21MW
2×2,753kW
2011
2011
PC
PC
Yalnizca Hydropower Plant 3X5100kW 2009 EP
Turkey ICTAS Kemerçayir hydropower project 2×6,435kW+1×3,015kW 2012 EPC
14
15
Turkey ICTAS Üçhanlar hydropower project
Turkey ICTAS Üçharmanlar hydropower project
EPC
EPC
2×4950 kW+1×2250kW
2×7380kW+1×2430kW
2013
2014
10
11
31-32
Item Project Name Installed Capacity Production Time Scope Item Project Name Installed Capacity Production Time Scope
Waste Incineration Power Generation
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
1000 t/d garbage furnace
1600 t/d garbage furnace
3×250T/D Garbage Furnace
1999-2001
2004.03
2005
2005
2005
2005
2005
2006
2006
2007
2007
2007
2007
2008
2008
2009
2010
2011
2012
EP
EP
EP
BOT
EPC
EP
EPC
EPC
EP
EP
EP
EPC
EPC
EPC
EPC
EPC
EPC
20
21
22
Shanghai Pufa Group
Beijing Guozhong Biomass technology
Jiaxing Bu Yun thermal power plant
Anhui Huaibei District Solid Waste Treatment Project
Chongqing Tongxing Waste Incineration Power Plant
Anhui Wuhu Garbage furnace technical transformation project
Yuhang Jinjiang Power Plant Renovation Project Ⅱ
Fuzhou Hongmiaoling Waste Incineration Power Plant
Henan Xingyang 4# Construction plans expansion
Chengdu Jiujiang Waste Incineration Power Plant
Jiangsu Taixing Waste Incineration Power Plant
Hangzhou Xiaoshan District Solid waste
incineration power generation projects
2×130t/h pulverized coal tail
technological transformation,
2×130t/h Fluidized bed coal stove,
1×25MW Condensate
pumping machine
Jiaxing Jin Jiang thermal power plant
3×400T/D Garbage Furnace
2×12MW Condenser,
1×150T/D Furnace waste
leachate
2×400T/D Garbage Furnace
2 x 600 t/d Garbage Furnace
Anhui Wuhu Lvzhou Power Plant Technical Renovation Project Ⅱ 1×75t/h Fluidized bed+1×C15
3×350T/D Garbage Furnace
3×300T/D Garbage Furnace,
1×C6MW+1×N6MW
Yunan Kunming Wuhua Municipal solid waste
incineration power generation projects
3×400T/D Garbage Furnace
+2×N15MW Condenser
preliminary design
construction drawings
Hubei Hnakou solid live waste incineration
power generation projects
6×400T/D Garbage Furnace
+2×C25MW
2 x 600 t/d Garbage Furnace
Hubei Wuchang Municipal solid waste
incineration power generation projects
3×650T/D Garbage Furnace
+2×N12MW Condenser
preliminary design
construction drawings
Anhui Wuhu Shanjiang Chemical-owned
thermal power plant project
1×75t/h Fluidized bed+1×C15
1×400T/D Garbage Furnace
1×350T/D Garbage Furnace
3 x 600 t/d
1 x 300 t/d
Chongqing Fengsheng Waste Incineration Power Plant
4 x 600 t/d, 2 x 18 MW
+ 1 x 12 MW
2013 EPC
Under construction EPC
Under construction EPC
Chongqing Fengsheng Waste Incineration Power Plant 4 x 600 t/d Garbage Furnace
Chongqing Wanzhou Waste Incineration Power Plant 2 x 350 t/d Garbage Furnace
Kunming Airport Waste Incineration Power Plant 3 x 350 t/d Garbage Furnace
Item Project Name Installed Capacity Production Time Scope
01
02
03
04
05
06
07
08
09
10
11
12
13
2012
2013
Under construction
Biomass Power Plant
EPC
EPC
EP
EPC
EPC
EP
EP
EP
EP
EPC
EPC
EPC
EPC
Changzhou Hutang Cogeneration Co., Ltd. Engineering
Changzhou Xindong Cogeneration Project
Jiangsu Guoxin Huaian Biomass power generation project
Chizhou 235 Power Company Limited biomass boiler project
Datang Anqing Biomass Power Biomass Power Project
Jiangsu Guoxin Siyang Biomass power generation projects
Jiangsu Guoxin Yancheng Biomass power generation projects
Liuzhou Xinneng Biomass Power Project
Guangxi Funan Biomass Power Project
Taida Zunhua Biomass power generation projects
Guodian Changyuan Biomass power
Jiangsu Sanmu Group Co., Ltd. Thermal Power Plant Expansion Project
Ethiopia METEC Bagasse Power Plant
33MW
2×75t/h
2×75t/h
30MW
30MW
2X15MW
30MW
1×130t/h
2006
2007
2007.12
2008.06
2008.03
2009.03
2009.01
2010.03
2010.12
4×75t/h Fluidized bed
+ 1×6MW + 1×2MW
2×75t/h Fluidized bed
+ 1×12MW Exhaust heating unit
1X170t/h sugarcrane bagasse
boiler + 1X30MW TG
2×75t/h Pulverized coal
+ 1×25MW + 1×30MW Generators
45MW Under construction
33-34
Waste Heat / Waste Pressure Recovery Power Plant
Transmission Line & Substation Project
SL No Name of Project Customer Commissioning
22
23
24
25
26
27
28
29
2010.09
2010.12
2010.12
2011.03
2011.03
2011.05
35MW steam power plant (EPC)
15MW / 75t boiler steam power plant (EPC)
TRT Project for 1080 M3 BF (EPC)
Wusteel Group Liusteel Plant
Chengde Iron & Steel Corporation
Pingxiang Iron & Steel Corporation
Pingxiang Iron & Steel Corporation
Chengde Iron & Steel Corporation
Low-pressure Waste Heat Steam Power
Project for 2X360m2 sinter plant (EPC)
75t High tempreture high pressure steam power plant
for 5# 150t/h dry quenching coke plant (EPC)
3 x 25MW / 3 x 130T/h Low-pressure Waste
Heat Steam Power Project boilers (EPC)
Tangshan Great Wall Iron & Steel
Group, Rongxin Steel Limited
SL No Name of Project Specification Commissioning Scope
01
02
03
04
05
06
07
Jiangsu Nanhui-Sanlin 500kV Transmission Project
Wanxian Kangle-Dongjia 220KV Power Transmission Line
Shanghai Ligang to Xidongnan Four Circuits, 500kV Transmission Line
Guangxi Guizhou Duyun-Fuquan 220KV Power Transmission Line
Ya’an Daxing 110KV Substation
500kV, 2X41.5+4X3.5 km
110kV, 185km
220kV, 120km
500kV, 80 km
220kV, 70km
110kV, 240MVA
220kV, 75km, 2X180MVA
2005.5
2006.4
2006.8
2006.10
2006.11
2007.2
2007.5
EP
EP
EPC
EP
EPC
EPC
EPC
Sichuan Xichang-Yanyuan / Xichuan-Dechang
110KV Power Transmission Line
Sichuan Sinopec Puguang Qitian 220KV Power
Transmission Line and Substation
SL No Name of Project Customer Commissioning
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
2002.06
2003.01
2004.05
2004.08
2005.06
2006.01
2006.12
2007.01
2007.05
2007.11
2008.01
2008.01
2008.05
2008.11
2008.12
2009.05
2009.06
2009.08
2010.07
2010.08
2010.08
TRT Project for 450m3 BF (EPC)
TRT Projects for 1350m3 BF (EPC)
TRT Projects for 1800m3 BF (EPC)
TRT Projects for 1800m3 BF (EPC)
TRT Projects for 2800m3 BF (EPC)
TRT Projects for 4500m3 BF (EPC)
TRT Projects for 2X450m3 BF (EPC)
TRT Projects for 4X450m3 BF (EPC)
Common TRT Project for 4×450m3BF (EPC)
TRT Projects for 3X450m3BF (EPC)
1x33MW Waste heat Power Project for 3x435 m2 Sinter Plant (EPC)
TRT Project for 2X600 M3 BF (EPC)
2X15MW Steam power plant for 2X140t/hdry quenching coke plant (EPC)
TRT Project for 600 M3 BF (EPC)
TRT Project for 1X450 M3 BF and 2X1780 M3 BFs(EPC)
TRT Project for 3 ×2350 M3 BFs (EPC)
Saturated Steam Power Plant for N8.7-0.55 heating furnace (EPC)
Low-pressure Waste Heat Steam Power Project for 360m2 sinter plant (EPC)
Xuanhua Iron & Steel Corporation
Xuanhua Iron & Steel Corporation
Baotou Iron & Steel Corporation
Xuanhua Iron & Steel Corporation
Baotou Iron & Steel Corporation
Pingxiang Steel Co., LTD
Pingxiang Steel Co., LTD
Tangshan Guofeng Iron & Steel Corporation
Minmetals Yingkou Plate Plant
Tangshan Jianlong Iorn & Steel Corporation
Wuhan Iron & Steel Corporation
KuanChen Dacheng Casting Co. LTD (EPC)
Baosteel Group, Bayi Steel plant
Fushun Xin Iron & Steel Corporation
JiuJiang Steel Plant
Cangzhou Zongheng Industries Limited
Shougang Iron & Steel Mine Corporation
Wusteel Group Liusteel Plant
Cangzhou Zongheng Industries Limited
China Minmetal Corporation
2X15MW Waste Heat Steam Power Project
for Ferrochrome steel plant (EP)
Low-pressure Waste Heat Steam Power Project
for 6X198m2, 1X360m2 Sinter Plant (EP)
Steam power plant for 150t/h、160t/h、
2×110t/hdry quenching coke plant (EPC)
TRT Project for 1080 M3 BF (EPC) Pingxiang Iron& Steel Corporation
Tubatse, South Africa
2012.08
2014.06
2X15MW High tempreture high pressure steam power
plant for 2X140t/h dry quenching coke plant (EPC)
Tangshan Great Wall Iron & Steel
Group, Rongxin Steel Limited
35-36
SL No Name of Project Specification Commissioning Scope
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Tonggui-Ninguo Double Circuit Transmission Line Project
Yunnan Dali-Baoshan 220KV Power Transmission Line
Yunnan Diqing-Lijiang 220KV Power Transmission Line
Kangding Longxing 110KV Substation
Hunan Minfeng-Xiangtan 500KV Line
Chongqing Cuiyun 220KV Substation
Hunan Liyujiang Power Plant-Shaoguan 500KV Dual-loop Line
Shanghai Fengxian Tingda 220kV Substation
Jindongnan-Nanyang-Jingmen UHVAC Nanyang Substation
Ge-Hu Line Double-Circuit Transmission Line Project
500kv Dongshanqiao Substation Project
Three Gorges-Shanghai HVDC Project Huaxin Converter Station
Guizhou Zhengning 220KV Substation
Yun-Guang Transmission Line Project
500kV AC, 2X130.5km
220kV, 133km
220kV, 80km
110kV, 2X31.5MVA
500kV, 82km
220kV, 2×240MVA
500kV, 90km
220kV, 360MVA
1000kV, 2X3000MVA
±500kV DC, 220km
500kv, 1000MVA
±500kV, 3,000MW
220kV, 2×180MVA
± 800kV DC, 90km
2007.5
2007.7
2007.9
2007.9
2008.2
2008.6
2008.10
2008.10
2009.1
2009.2
2009.8
2010.3
2010.9
2011.4
2012.5
EPC
EPC
EPC
EPC
EPC
EPC
EP
BT
EPC
EP
EP
EPC
EPC
EP
EPC
EPC
EPC
EPC
EPC
Xiangjiaba-Shanghai UHVDC Transmission
Project Fengxian Converter Station
±800kV, 6,400MW
distance of 2,000kM
Pakistan GEPCO Siranwali 132KV Substation Project 132KV, 2x26MVA Under construction
Pakistan GEPCO HeadMrala 132KV Substation Project 132KV, 2x26MVA Under construction
Pakistan GEPCO Malikwal 132KV Substation Project 132KV, 2x26MVA Under construction
Pakistan GEPCO Dask 132KV Substation Project 132KV, 3x26MVA Under construction

More Related Content

What's hot

2010 deep research report on china wind power converter industry
2010 deep research report on china wind power converter industry2010 deep research report on china wind power converter industry
2010 deep research report on china wind power converter industryqyresearch
 
2012 deep research report on global and china pv inverter industry
2012 deep research report on global and china pv inverter industry2012 deep research report on global and china pv inverter industry
2012 deep research report on global and china pv inverter industrysmarter2011
 
Qingdao Jieneng Power Station Engineering Co., Ltd.
Qingdao Jieneng Power Station Engineering Co., Ltd.Qingdao Jieneng Power Station Engineering Co., Ltd.
Qingdao Jieneng Power Station Engineering Co., Ltd.tigernyh
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyIceland Geothermal
 
A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.Saurabh Biswas
 
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...Umer Azeem
 
WHY VIKRAM SOLAR FOR YOUR SOLAR NEEDS?
WHY VIKRAM SOLAR FOR YOUR SOLAR NEEDS?WHY VIKRAM SOLAR FOR YOUR SOLAR NEEDS?
WHY VIKRAM SOLAR FOR YOUR SOLAR NEEDS?vikram solar
 
Rajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist GreenRajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist Greenfirstgreen
 
China CSP Demonstration Projects
China CSP Demonstration ProjectsChina CSP Demonstration Projects
China CSP Demonstration ProjectsKlaus Pottler
 
Stationary/Transportation Heat-to-Power Applications with CN300 ORC Technololgy
Stationary/Transportation Heat-to-Power Applications with CN300 ORC TechnololgyStationary/Transportation Heat-to-Power Applications with CN300 ORC Technololgy
Stationary/Transportation Heat-to-Power Applications with CN300 ORC TechnololgyKeith D. Patch
 
CN300: A 300 kWe Turbogenerator for Heat to Power Applications; Generate Ren...
 CN300: A 300 kWe Turbogenerator for Heat to Power Applications; Generate Ren... CN300: A 300 kWe Turbogenerator for Heat to Power Applications; Generate Ren...
CN300: A 300 kWe Turbogenerator for Heat to Power Applications; Generate Ren...Keith D. Patch
 

What's hot (13)

339 solar power plant deepak
339 solar power plant deepak339 solar power plant deepak
339 solar power plant deepak
 
2010 deep research report on china wind power converter industry
2010 deep research report on china wind power converter industry2010 deep research report on china wind power converter industry
2010 deep research report on china wind power converter industry
 
2012 deep research report on global and china pv inverter industry
2012 deep research report on global and china pv inverter industry2012 deep research report on global and china pv inverter industry
2012 deep research report on global and china pv inverter industry
 
Rooftop pro
Rooftop proRooftop pro
Rooftop pro
 
Qingdao Jieneng Power Station Engineering Co., Ltd.
Qingdao Jieneng Power Station Engineering Co., Ltd.Qingdao Jieneng Power Station Engineering Co., Ltd.
Qingdao Jieneng Power Station Engineering Co., Ltd.
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
 
A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.
 
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
 
WHY VIKRAM SOLAR FOR YOUR SOLAR NEEDS?
WHY VIKRAM SOLAR FOR YOUR SOLAR NEEDS?WHY VIKRAM SOLAR FOR YOUR SOLAR NEEDS?
WHY VIKRAM SOLAR FOR YOUR SOLAR NEEDS?
 
Rajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist GreenRajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist Green
 
China CSP Demonstration Projects
China CSP Demonstration ProjectsChina CSP Demonstration Projects
China CSP Demonstration Projects
 
Stationary/Transportation Heat-to-Power Applications with CN300 ORC Technololgy
Stationary/Transportation Heat-to-Power Applications with CN300 ORC TechnololgyStationary/Transportation Heat-to-Power Applications with CN300 ORC Technololgy
Stationary/Transportation Heat-to-Power Applications with CN300 ORC Technololgy
 
CN300: A 300 kWe Turbogenerator for Heat to Power Applications; Generate Ren...
 CN300: A 300 kWe Turbogenerator for Heat to Power Applications; Generate Ren... CN300: A 300 kWe Turbogenerator for Heat to Power Applications; Generate Ren...
CN300: A 300 kWe Turbogenerator for Heat to Power Applications; Generate Ren...
 

Similar to Energy and Power Brochure

2011 deep research report on china wind turbine tower industry
2011 deep research report on china wind turbine tower industry2011 deep research report on china wind turbine tower industry
2011 deep research report on china wind turbine tower industrysmarter2011
 
2011 deep research report on china wind turbine tower industry
2011 deep research report on china wind turbine tower industry2011 deep research report on china wind turbine tower industry
2011 deep research report on china wind turbine tower industryqyresearch
 
Resume jakson 2
Resume jakson 2Resume jakson 2
Resume jakson 2sapanpatro
 
Itco english catalog (1)
Itco english catalog  (1)Itco english catalog  (1)
Itco english catalog (1)ahmad khadem
 
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........yogeshpokharkar
 
Bhel haridwar new turbine shop
Bhel haridwar   new turbine shop Bhel haridwar   new turbine shop
Bhel haridwar new turbine shop Anuj Gupta
 
Company Profile - ATTEC Engineering FZC LLC.pptx
Company Profile - ATTEC Engineering FZC LLC.pptxCompany Profile - ATTEC Engineering FZC LLC.pptx
Company Profile - ATTEC Engineering FZC LLC.pptxSenuthNaotunna
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13Moore Sarah
 
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA Jatin Tiwari
 
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...Global CCS Institute
 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profileJanakbhatt
 
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Global CCS Institute
 
Importance of Solar Energy in India | Solar Energy PDF
Importance of Solar Energy in India | Solar Energy PDFImportance of Solar Energy in India | Solar Energy PDF
Importance of Solar Energy in India | Solar Energy PDFurjarathi
 
project file on diesel loco
project file on diesel loco project file on diesel loco
project file on diesel loco kamalkant rajpoot
 

Similar to Energy and Power Brochure (20)

Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016
 
2011 deep research report on china wind turbine tower industry
2011 deep research report on china wind turbine tower industry2011 deep research report on china wind turbine tower industry
2011 deep research report on china wind turbine tower industry
 
2011 deep research report on china wind turbine tower industry
2011 deep research report on china wind turbine tower industry2011 deep research report on china wind turbine tower industry
2011 deep research report on china wind turbine tower industry
 
Micks CV_10_07_16
Micks CV_10_07_16Micks CV_10_07_16
Micks CV_10_07_16
 
Resume jakson 2
Resume jakson 2Resume jakson 2
Resume jakson 2
 
Itco english catalog (1)
Itco english catalog  (1)Itco english catalog  (1)
Itco english catalog (1)
 
TBEA Solar panels
TBEA Solar panels TBEA Solar panels
TBEA Solar panels
 
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
 
Bhel haridwar new turbine shop
Bhel haridwar   new turbine shop Bhel haridwar   new turbine shop
Bhel haridwar new turbine shop
 
NTPC LTD.
NTPC LTD.NTPC LTD.
NTPC LTD.
 
Company Profile - ATTEC Engineering FZC LLC.pptx
Company Profile - ATTEC Engineering FZC LLC.pptxCompany Profile - ATTEC Engineering FZC LLC.pptx
Company Profile - ATTEC Engineering FZC LLC.pptx
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13
 
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
 
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profile
 
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
Wichai B_CV_2016
Wichai B_CV_2016Wichai B_CV_2016
Wichai B_CV_2016
 
Importance of Solar Energy in India | Solar Energy PDF
Importance of Solar Energy in India | Solar Energy PDFImportance of Solar Energy in India | Solar Energy PDF
Importance of Solar Energy in India | Solar Energy PDF
 
project file on diesel loco
project file on diesel loco project file on diesel loco
project file on diesel loco
 

Energy and Power Brochure

  • 2. Introduction Sinosteel Equipment & Engineering Co., Ltd (hereinafter referred to as Sinosteel MECC), formerly known as Equipment Supply Company of the past Ministry of Metallurgical Industry, was established with approval by the former State Planning Commission in 1972. Through restructuring and merger, Sinosteel MECC is now the wholly-owned subsidiary of Sinosteel Corporation. Sinosteel MECC is an internationally operated professional engineering company, with business scope covering EPC contracting, complete set of equipment & spare parts supply, project management, project and equipment supervision, and mechanical and electrical product design & manufacture for domestic and overseas customers of metallurgical industry, mining, electric power and construction material fields. Sinosteel MECC has attained several qualifications including National Mechanical and Electrical Complete Set of Equipment Supply Qualification Class A, National Equipment Supervision Qualifica- tion Class A and Foreign Economic & Technical Cooperation Qualification. It has also passed the authentication of ISO9001, ISO14001 and OHSAS18001. In April 2012, Sinosteel MECC acquired 100% share of Sinosteel Engineering Design & Research Institute Co., Ltd (hereinafter referred to as Sinosteel Design Institute) and so took over its Engineering Design and Consultation Qualification Class-A in metallurgical industry, construction, electronic communication, radio, film and television field. Through several years of actively international operation, Sinosteel MECC has transformed into an influential engineering company in international metallurgical engineering field, enjoying sound repu- tation in overseas markets. In recent years, it has accomplished several important international engi- neering projects including the construction of the largest blast furnace, sinter plant, and coke oven that have ever been contracted by Chinese enterprises in overseas market so far, and has fully dem- onstrated its comprehensive competence in the field of international engineering construction. It has been ranked in Top 225 International Contractors by US "Engineering News Record (ENR)” for four straight years. Relying on its good reputation in the field of international metallurgical engineering and the overall advancement of its international operation ability, Sinosteel MECC actively expands its general contracting business in some fields other than metallurgical industry. It has successfully undertaken and completed series of mining and power station projects including Australian CUDECO’s copper project and Turkish ICDAS’s 600MW coal-fired power plant project, which laid a solid foundation for its transformation from a metallurgical engineering company to a large scale international engineer- ing contractor. By now, Sinosteel MECC has ever accomplished over 500 state and over 100 global large EPC projects Since 2006, Sinosteel MECC has been approved as Grade AAA Credit Enterprise for foreign projects contracting as well as for mechanical and electrical import and export (including large scale complete sets of equipment). Sinosteel MECC has gradually transformed into a world famous first class engineering contractor in China, by empha- sizing technical advance and relying on main business of engineering contracting and integration supply of mechani- cal and electrical equipments & spare parts, with strong capacity in technical process, design and engineering man- agement together with its international operation. It is also an engineering company with outstanding performances in metallurgical industry and well developed capacities in mining, electric power and other non-steel fields.
  • 3. Qualification CertificatesOrganization Structure Business Departments Marketing Department Coke Oven & By-Product Engineering Department Mining & Pelletizing Engineering Department Iron Making Engineering Department Steel Making Engineering Department Steel Rolling Engineering Department Equipment & Spare Parts Department Quality Control Department Companies Controlled or Invested by Sinosteel MECC Sinosteel Engineering Design & Research Institute Co., Ltd. China Metallurgical Engineering Co., Ltd. Beijing Bestpower Electrical Technology Ltd. Beijing Chinatop Tech. Co., Ltd. Sinosteel Tendering Co., Ltd. Administration Department Financial Department Risk Management Department Chief Engineer Office Function Departments Board of Supervisors General Meeting of Shareholders Board of Directors Board Office Managers Strategy Committee Audit Committee Compensation & Appraisal Committee
  • 4. Coal fired power plant New boiler combustion technology and flue gas desulfurization and denitration technology make use of following as fuels: Sinosteel MECC could provide solutions to meet the different requirements of the users. pulverized coal coal slack coal water slurry oil shale petrol coke 05-06 Business Scope & Reference Highlights 50MW, 100MW, 200MW, 300MW, 600MW and 1000MW coal based generating units, in series, can meet the needs of different users. Mode: CFB (50~600MW) High temperature high pressure (50~150MW) Subcritical (100~600MW) Supercritical (300~600MW) Ultra supercritical (600~1000MW) Function: Straight condensing Steam extraction Cooling method: Water cooled Air cooled • • • • • • • • • GuangxiFangchenggang2X600MWPowerPlant OperationEscortingService&Training Procurement Manufacturing& Supervision noitcurtsnoC &gnizinagrO tnemeganaM gnireenignE Equipment& SparePartsSupply EnvironmentProtection& EnergySaving Raw Material Preparing Steel Rolling Iron Making Steel Making& Continuous Casting Mining Energy Infra- structure Sinosteel MECC provides all-in-one solution for mining, iron & steel, energe industries and infrastructure construction.
  • 5. 07-08 ShanxiRuiguang2X300MWHenanShouyangshanSupercritical2X600MW Turkey ICDAS 2x600MW Supercritical Power Plant 2nd Phase ZhejiangBeilun2X1000MWUltraSupercriticalPowerPlant Inner Mongolia Dengkou 2x350MW InnerMongoliaDanchangSubcritical4X300MWShandongLiaocheng2x300MW GuangdongBaolihua2X300MWSubcriticalCFBPowerPlant IndonesiaLampung2X7MWCFSPPunderconstruction ShanxiXuanguangSupercritical2X600MW
  • 6. 09-10 Gas fired power plant Nanning 150MW Gas Fired Power Plant Shenzhen Yueliangwan 1×36.6 MW +1× 15.5 MW Main power house under construction for 260t Boiler Chengde 60MW Gas Fired Power Plant M701F4 (315MW)Gas Turbine and Combined Cycle Unit under assembly 2X139MW Combined Cycle Units of Baosteel Thermal Power Plant 4 Units of 9F-class Vertical Gas-Steam Combined Cycle put into operation in Fujian Gas Power Co. Boiler steel structure under construction for Chengde 60MW gas fired PP Sinosteel MECC provides the whole solutions to meet the client requirements.
  • 7. 11-12 Hydro power Sinosteel MECC provides the all-in-one solutions according to the conditions of the water head and flow, and choose the most practicable proposal, to supply the turbine in the model of Francis, Kaplan, Pelton, Turgo, Crossflow, etc Xiaqiao 50MW Hydropower Station 2006 Changzhou 630mw Hydropower-complex 2009Xiaqiao 50MW Hydropower Station 2006 The Erection of Runner in Pingban 405MW Hydropower Station Bailongtan 6X32MW Hydropower Station Letan 600MW Hydropower Station Overview of Powerhouse of the Changzhou Hydropower-complex under construction
  • 9. 15-16 Wind Power Wind power generating unit, in series, 0.6MW, 0.75MW, 1MW, 1.5MW, 2MW, 3MW, 6MW, direct driven permanent magnet technology or double-fed induction generating technology, applicable to the climate condition: Offshore Intertidal High level Low wind speed Cold environment Sandy Liaoning Kangping Aoliyingzi Wind Power Station Wind generation uint of Jiangsu Rudong Innertidal Wind Power Station Main casing of wind power unit Assembly workshop of wind generating unit Wind blade is ready for delivery Liaoning Weichang Wind Power Station Hebei Qilinshan Wind Power Station 3MW wind generating uint under assembly in workshop Jilin Shuanglong Wind Power Station
  • 10. 17-18 Solar module frame loading Solar module storage Jiangxi Tianli 500KW Photovoltaic Power Station Qinghai 100KW solar photovoltaic generation system Solar power generating system,were developed fast in China.Whole industry chain production technology for Power Generation equipment is localized, and succeeded put into use in China. Solar Energy Jiangsu Siyang 3MW solar photovoltaic power generating units putting into operation Solar tracking system of Hebei Tangshan 10KW unit Jiangsu Fengbang 2MW amorphous silicon thin film solar project
  • 11. 19-20 Guangxi Zhanjiang 2X50MW Biomass (bagasse & leaf & bark) Power Plant Guangxi Funan biological energy limited 30MW biomass (bagasse) power generation project Biomass Recycle Energy 2X500t/d waste incineration furnace and 2X15MW condensing turbine generator; 700t / d waste incinerator and a 15MW extraction condensing steam turbine generator for Jilin shuangjia Linxi Zhonghuang 2X300t/d waste incinerator;12MW condensing turbine generator & 6MW extraction condensing steam turbine generator Chongqing Tongxing 2X600t/d Waste Incineration Power Plant Fuzhou Hongmiaoling 2X600t/d Waste Incineration Power Plant Waste Incineration Power Generation Liucheng 2X15MW Biomass (Sugarcane leaf & Cotton Stem) Power Project Sinosteel MECC have contributed to the renewable energy and green enviromental protection, plenty of experience taking use of the city waste garbage, waste sugar bagasse, tree leaf, crops stem, animal livings manure, industry waste heat & pressure and steam to generate energy.
  • 12. 21-22 Low-pressure Waste Heat Steam Power Project for 3X435m2 sinter plant for Wuhan Iron & Steel Co. 28MW power plant for Tangshan Rongxin Steel Co. TRT Equipment for 4x450m3 Blast Furnace for Tangshan Guofeng Iron & Steel Co., ltd Waste Heat & Waste Pressure Power Generation Wusteel steam power plant for 150t/h、160t/h、2 X 110t/h dry quenching coke plant Low-pressure waste Heat Steam Power Project for 2 X 360m2 Sinter plant for Chengde Iron & Steel Co. Heibei Cangzhou 2 X 15MW High tempreture high pressure steam power plant for 2 X 14t/h dry quenching coke plant Pingxiang TRT Project for 1080 m3 Blast Furnace 3D Drawing of 30MW Power Plant (EP) for TUBASTE, South Africa
  • 13. 23-24 Power Transmission 500kV Tower of Four Circuits 500kV Dongshanqiao Substation Project 500kV Tonghui-Nanguo Transmission Project Gezhouba-Shanghai Double Circuit Transmission Project ±500kV Three Gorges-Shanghai HVDC Project Shanghai Nanhui-Sanlin 500kV AC Transmission Project 500kVShanghai Shunlu Substation Project
  • 14. 25-26 ±800kV Xiang-Shang Transmission Project——angle tower ±800kV Xiang-Shang Transmission Project——tangent tower ±800kV Yun-Guang Transmission Project 1000kV split type angle tower 1000kV Jindongnan-Nanyang Transmission Project ±500kV Zhengping Converter Station 1000kV angle tower jumper connection
  • 15. 27-28 Reference highlights Item Project Name Installed Capacity Production Time Scope Item Project Name Installed Capacity Production Time Scope Coal Fired Power Plant 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 Henan Meng city Jinzhou Ferror Steel Corporation Panzhihua Iron & Steel Corporation Jiuquan Iron & Steel Corporation Liuzhou thermal power plant Guangzhou Power plant Guilin Yongfu Taicang Power Plant Guangdong Pyroelectricity Co.,Ltd Huaneng Qinbei Power Plant Heshan Power plant Taicang Power Plant Henan Luoyang Thermal Power Plant Henan Xinxiang Yuxin Power generation Co., Ltd Guizhou Huadian Dalong Power generation Co., Ltd Shanxi Ruiguang Thermal Power Plant Datang San Menxia Generation Co, Ltd. Neimenggu Dengkou Power Plant Guohua Taicang Power Plant Henan Xinmi Power Plant 2X6MW 12.5MW 2x100MW 2x50MW 400(2×200)MW 225(4×50+25)MW 2×135MW 3×220t/h+2×50MW 2*135MW 2*135MW 2×600MW 2×300MW 2×300MW 2×300MW 2×300MW 2×300MW 2×300MW 2×600MW 2×350MW 2×600MW 2×300MW 1988-1990 1990-1994 1990-1995 1990-1995 1995 1997 1998 1999 2003 2005 2004 2004 2004 2005 2006 2006 2006 2006 2006 2006 2007 EP EP EP EP EPC EPC EPC EP EP EPC EPC EP EP EPC EPC EP EP EPC EPC EP EPC 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Neimenggu Dachang Power Plant Shandong Liaocheng Power Plant Laibing Power Plant Shanxi Xuanguang Power Plant Henan Shouyanshan Power Plant Hebi Power Plant Datang Anyang thermoelectric Co., Ltd Guangxi Fangchenggang Power Plant Huaneng Qinbei Power Plant Nanyang Tianyi Generation Co, Ltd. Nanjing Chemical Industrial park Yuzhou Power Plant Kaifeng Thermal Power Plant Zhejiang Beilun Power plant PT. PP(Persero), Indonesia ICDAS BIGA Fired Power Plant Project 2nd Phase, Turkey 4×300MW 2×300MW 2×300MW 2×600MW 2×600MW 2×600MW 2×300MW 2×600MW 2×600MW 2×600MW 2×300MW 2×660MW 2×600MW 2X1000MW 2X7MW 2x600MW 2007 2007 2007 2007 2007 2007 2008 2008 2008 2008 2009 2009 2009 2010 2013 2014 EP EPC EPC EPC EPC EPC EP EPC EPC EPC EPC EPC EPC EP EPC EP Guangzhou paper mill high pressure thermal power plant 38 Xinjiang Guotai Xinhua Power Plant 2x350MW 2017 EPC
  • 16. 29-30 Item Project Name Installed Capacity Production Time Scope Gas fired Power Plant 01 02 03 04 05 06 07 08 09 10 11 Shenzhen Yueliangwan Gas Turbine Power Plant Guangdong Huizhou LNG Generating project Masteel CCPP Power Plant (mixed gas) Fujian Putian LNG Power Plant Nanning Gas Power Plant Baosteel Thermal Power Plant Fujian Gas Power Plant Jiangsu Qishuyan NG Generating project Wusteel Group Ersteel Plant Chengde Steel Co. Esteel Co. 15.5MW+36.6MW 350MW 1×100MW+1×50MW 350MW 1×100MW+1×50MW 2X92MW+2X46MW 4X256MW+4X135MW 2×220MW 2X30MW Gas fired 35MW Coal Gas fired 2001 2006.9 2006.12 2008.12 2009.7 2010.4 2010.10 2011.12 2010.10 2012.12 2012.7 EP EP EPC EP EP EPC EP EP EPC EPC EPC Item Project Name Installed Capacity Production Time Scope Item Project Name Installed Capacity Production Time Scope Wind Power Plant 01 02 03 04 05 06 Jilin Changling Shuanglong Wind Power Station Liaoning Kangping Aoliyingzi Wind Power Station Jiangsu Rudong Innertidal Wind Power Station Hebei Qilinshan Win Power Station Heibei Weichang Wind Power Station Shandong Weifang Wind Power Station 66X1.5MW 33X1.5MW 2X1.5MW 67X1.5MW 33X1.5MW 10X3MW 2009.2 2009.10 2010.3 2010.11 2011.1 2012.5 EPC EPC EP EPC EP EP Item Project Name Installed Capacity Production Time Scope Solar Engery Power Plant 01 02 03 04 Jiangxi Tianli Solar Power Station Jiangsu Siyang Solar Photovoltaic Power Station Jiangsu Fengbang Solar Power Station Qinghai Solar Power Station 500kW photovoltaic 3MW photovoltaic 100kW Photovoltaic 2008.10 2009.09 2010.3 2010.10 EP PC EP EP Item Project Name Installed Capacity Production Time Scope Hydro Power Plant 01 02 03 04 05 Yantan Hydropower Station phase I Bailongtan Hydropower Station Letan Hydropower Station Pingban Hydropower Station 1210MW 6×32MW 4×150MW 405MW 1992 1996 2005 2005 EP EP EP EP 260t Boiler 60MW Coal gas fired 2MW amorphous silicon thin film Yantan Hydropower Station phase II 600MW 1995 EP 06 07 08 Dongba Hydropower Station Qiaogong Hydropower Station 72MW 8×57MW 2007 2008 EP EP Xiaqiao Hydropower Station 50MW 2006 EP 12 13 Changzhou Hydropower-complex 630MW 2009 EP09 Turkey Garzan-1 hydropower station Turkey Binek hydropower project 2×21MW 2×2,753kW 2011 2011 PC PC Yalnizca Hydropower Plant 3X5100kW 2009 EP Turkey ICTAS Kemerçayir hydropower project 2×6,435kW+1×3,015kW 2012 EPC 14 15 Turkey ICTAS Üçhanlar hydropower project Turkey ICTAS Üçharmanlar hydropower project EPC EPC 2×4950 kW+1×2250kW 2×7380kW+1×2430kW 2013 2014 10 11
  • 17. 31-32 Item Project Name Installed Capacity Production Time Scope Item Project Name Installed Capacity Production Time Scope Waste Incineration Power Generation 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 1000 t/d garbage furnace 1600 t/d garbage furnace 3×250T/D Garbage Furnace 1999-2001 2004.03 2005 2005 2005 2005 2005 2006 2006 2007 2007 2007 2007 2008 2008 2009 2010 2011 2012 EP EP EP BOT EPC EP EPC EPC EP EP EP EPC EPC EPC EPC EPC EPC 20 21 22 Shanghai Pufa Group Beijing Guozhong Biomass technology Jiaxing Bu Yun thermal power plant Anhui Huaibei District Solid Waste Treatment Project Chongqing Tongxing Waste Incineration Power Plant Anhui Wuhu Garbage furnace technical transformation project Yuhang Jinjiang Power Plant Renovation Project Ⅱ Fuzhou Hongmiaoling Waste Incineration Power Plant Henan Xingyang 4# Construction plans expansion Chengdu Jiujiang Waste Incineration Power Plant Jiangsu Taixing Waste Incineration Power Plant Hangzhou Xiaoshan District Solid waste incineration power generation projects 2×130t/h pulverized coal tail technological transformation, 2×130t/h Fluidized bed coal stove, 1×25MW Condensate pumping machine Jiaxing Jin Jiang thermal power plant 3×400T/D Garbage Furnace 2×12MW Condenser, 1×150T/D Furnace waste leachate 2×400T/D Garbage Furnace 2 x 600 t/d Garbage Furnace Anhui Wuhu Lvzhou Power Plant Technical Renovation Project Ⅱ 1×75t/h Fluidized bed+1×C15 3×350T/D Garbage Furnace 3×300T/D Garbage Furnace, 1×C6MW+1×N6MW Yunan Kunming Wuhua Municipal solid waste incineration power generation projects 3×400T/D Garbage Furnace +2×N15MW Condenser preliminary design construction drawings Hubei Hnakou solid live waste incineration power generation projects 6×400T/D Garbage Furnace +2×C25MW 2 x 600 t/d Garbage Furnace Hubei Wuchang Municipal solid waste incineration power generation projects 3×650T/D Garbage Furnace +2×N12MW Condenser preliminary design construction drawings Anhui Wuhu Shanjiang Chemical-owned thermal power plant project 1×75t/h Fluidized bed+1×C15 1×400T/D Garbage Furnace 1×350T/D Garbage Furnace 3 x 600 t/d 1 x 300 t/d Chongqing Fengsheng Waste Incineration Power Plant 4 x 600 t/d, 2 x 18 MW + 1 x 12 MW 2013 EPC Under construction EPC Under construction EPC Chongqing Fengsheng Waste Incineration Power Plant 4 x 600 t/d Garbage Furnace Chongqing Wanzhou Waste Incineration Power Plant 2 x 350 t/d Garbage Furnace Kunming Airport Waste Incineration Power Plant 3 x 350 t/d Garbage Furnace Item Project Name Installed Capacity Production Time Scope 01 02 03 04 05 06 07 08 09 10 11 12 13 2012 2013 Under construction Biomass Power Plant EPC EPC EP EPC EPC EP EP EP EP EPC EPC EPC EPC Changzhou Hutang Cogeneration Co., Ltd. Engineering Changzhou Xindong Cogeneration Project Jiangsu Guoxin Huaian Biomass power generation project Chizhou 235 Power Company Limited biomass boiler project Datang Anqing Biomass Power Biomass Power Project Jiangsu Guoxin Siyang Biomass power generation projects Jiangsu Guoxin Yancheng Biomass power generation projects Liuzhou Xinneng Biomass Power Project Guangxi Funan Biomass Power Project Taida Zunhua Biomass power generation projects Guodian Changyuan Biomass power Jiangsu Sanmu Group Co., Ltd. Thermal Power Plant Expansion Project Ethiopia METEC Bagasse Power Plant 33MW 2×75t/h 2×75t/h 30MW 30MW 2X15MW 30MW 1×130t/h 2006 2007 2007.12 2008.06 2008.03 2009.03 2009.01 2010.03 2010.12 4×75t/h Fluidized bed + 1×6MW + 1×2MW 2×75t/h Fluidized bed + 1×12MW Exhaust heating unit 1X170t/h sugarcrane bagasse boiler + 1X30MW TG 2×75t/h Pulverized coal + 1×25MW + 1×30MW Generators 45MW Under construction
  • 18. 33-34 Waste Heat / Waste Pressure Recovery Power Plant Transmission Line & Substation Project SL No Name of Project Customer Commissioning 22 23 24 25 26 27 28 29 2010.09 2010.12 2010.12 2011.03 2011.03 2011.05 35MW steam power plant (EPC) 15MW / 75t boiler steam power plant (EPC) TRT Project for 1080 M3 BF (EPC) Wusteel Group Liusteel Plant Chengde Iron & Steel Corporation Pingxiang Iron & Steel Corporation Pingxiang Iron & Steel Corporation Chengde Iron & Steel Corporation Low-pressure Waste Heat Steam Power Project for 2X360m2 sinter plant (EPC) 75t High tempreture high pressure steam power plant for 5# 150t/h dry quenching coke plant (EPC) 3 x 25MW / 3 x 130T/h Low-pressure Waste Heat Steam Power Project boilers (EPC) Tangshan Great Wall Iron & Steel Group, Rongxin Steel Limited SL No Name of Project Specification Commissioning Scope 01 02 03 04 05 06 07 Jiangsu Nanhui-Sanlin 500kV Transmission Project Wanxian Kangle-Dongjia 220KV Power Transmission Line Shanghai Ligang to Xidongnan Four Circuits, 500kV Transmission Line Guangxi Guizhou Duyun-Fuquan 220KV Power Transmission Line Ya’an Daxing 110KV Substation 500kV, 2X41.5+4X3.5 km 110kV, 185km 220kV, 120km 500kV, 80 km 220kV, 70km 110kV, 240MVA 220kV, 75km, 2X180MVA 2005.5 2006.4 2006.8 2006.10 2006.11 2007.2 2007.5 EP EP EPC EP EPC EPC EPC Sichuan Xichang-Yanyuan / Xichuan-Dechang 110KV Power Transmission Line Sichuan Sinopec Puguang Qitian 220KV Power Transmission Line and Substation SL No Name of Project Customer Commissioning 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 2002.06 2003.01 2004.05 2004.08 2005.06 2006.01 2006.12 2007.01 2007.05 2007.11 2008.01 2008.01 2008.05 2008.11 2008.12 2009.05 2009.06 2009.08 2010.07 2010.08 2010.08 TRT Project for 450m3 BF (EPC) TRT Projects for 1350m3 BF (EPC) TRT Projects for 1800m3 BF (EPC) TRT Projects for 1800m3 BF (EPC) TRT Projects for 2800m3 BF (EPC) TRT Projects for 4500m3 BF (EPC) TRT Projects for 2X450m3 BF (EPC) TRT Projects for 4X450m3 BF (EPC) Common TRT Project for 4×450m3BF (EPC) TRT Projects for 3X450m3BF (EPC) 1x33MW Waste heat Power Project for 3x435 m2 Sinter Plant (EPC) TRT Project for 2X600 M3 BF (EPC) 2X15MW Steam power plant for 2X140t/hdry quenching coke plant (EPC) TRT Project for 600 M3 BF (EPC) TRT Project for 1X450 M3 BF and 2X1780 M3 BFs(EPC) TRT Project for 3 ×2350 M3 BFs (EPC) Saturated Steam Power Plant for N8.7-0.55 heating furnace (EPC) Low-pressure Waste Heat Steam Power Project for 360m2 sinter plant (EPC) Xuanhua Iron & Steel Corporation Xuanhua Iron & Steel Corporation Baotou Iron & Steel Corporation Xuanhua Iron & Steel Corporation Baotou Iron & Steel Corporation Pingxiang Steel Co., LTD Pingxiang Steel Co., LTD Tangshan Guofeng Iron & Steel Corporation Minmetals Yingkou Plate Plant Tangshan Jianlong Iorn & Steel Corporation Wuhan Iron & Steel Corporation KuanChen Dacheng Casting Co. LTD (EPC) Baosteel Group, Bayi Steel plant Fushun Xin Iron & Steel Corporation JiuJiang Steel Plant Cangzhou Zongheng Industries Limited Shougang Iron & Steel Mine Corporation Wusteel Group Liusteel Plant Cangzhou Zongheng Industries Limited China Minmetal Corporation 2X15MW Waste Heat Steam Power Project for Ferrochrome steel plant (EP) Low-pressure Waste Heat Steam Power Project for 6X198m2, 1X360m2 Sinter Plant (EP) Steam power plant for 150t/h、160t/h、 2×110t/hdry quenching coke plant (EPC) TRT Project for 1080 M3 BF (EPC) Pingxiang Iron& Steel Corporation Tubatse, South Africa 2012.08 2014.06 2X15MW High tempreture high pressure steam power plant for 2X140t/h dry quenching coke plant (EPC) Tangshan Great Wall Iron & Steel Group, Rongxin Steel Limited
  • 19. 35-36 SL No Name of Project Specification Commissioning Scope 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Tonggui-Ninguo Double Circuit Transmission Line Project Yunnan Dali-Baoshan 220KV Power Transmission Line Yunnan Diqing-Lijiang 220KV Power Transmission Line Kangding Longxing 110KV Substation Hunan Minfeng-Xiangtan 500KV Line Chongqing Cuiyun 220KV Substation Hunan Liyujiang Power Plant-Shaoguan 500KV Dual-loop Line Shanghai Fengxian Tingda 220kV Substation Jindongnan-Nanyang-Jingmen UHVAC Nanyang Substation Ge-Hu Line Double-Circuit Transmission Line Project 500kv Dongshanqiao Substation Project Three Gorges-Shanghai HVDC Project Huaxin Converter Station Guizhou Zhengning 220KV Substation Yun-Guang Transmission Line Project 500kV AC, 2X130.5km 220kV, 133km 220kV, 80km 110kV, 2X31.5MVA 500kV, 82km 220kV, 2×240MVA 500kV, 90km 220kV, 360MVA 1000kV, 2X3000MVA ±500kV DC, 220km 500kv, 1000MVA ±500kV, 3,000MW 220kV, 2×180MVA ± 800kV DC, 90km 2007.5 2007.7 2007.9 2007.9 2008.2 2008.6 2008.10 2008.10 2009.1 2009.2 2009.8 2010.3 2010.9 2011.4 2012.5 EPC EPC EPC EPC EPC EPC EP BT EPC EP EP EPC EPC EP EPC EPC EPC EPC EPC Xiangjiaba-Shanghai UHVDC Transmission Project Fengxian Converter Station ±800kV, 6,400MW distance of 2,000kM Pakistan GEPCO Siranwali 132KV Substation Project 132KV, 2x26MVA Under construction Pakistan GEPCO HeadMrala 132KV Substation Project 132KV, 2x26MVA Under construction Pakistan GEPCO Malikwal 132KV Substation Project 132KV, 2x26MVA Under construction Pakistan GEPCO Dask 132KV Substation Project 132KV, 3x26MVA Under construction