SlideShare a Scribd company logo
1 of 5
Download to read offline
Didit Kurniawan
Citizenship : Indonesia ▪ Date of birth : 17 March 1982
Address
Kota Wisata Cibubur, Cluster West Covina II SH8/15, Gunung Putri, Kab. Bogor, Jawa Barat 16968.
Contact
Tel : +62-813-2711-6551
e-mail : didit@rekayasa.co.id
Profile
Description Electrical engineer with more than 10 years of experience in oil & gas, mining, fertilizer,
power plant projects. Excel in and effectively manage engineering, procurement,
construction and commissioning business process.
Key Skills
Standards/Codes IEC, IEEE, API RP 500, NEC, NEMA MG-1, ISO 8528-1
Area of expertise a. Power System Analysis using ETAP
b. Electrical Power Generation
c. Indoor & Outdoor Lighting Design
d. EPC Business Process
Computer Literacy
Proficient or familiar with engineering software, including:
ETAP AutoCAD DiaLUX MS Office
Education
2000 to 2005 Bachelor in Electrical Engineering – Power System (GPA: 3.36/4.00)
Gadjah Mada University, Jogjakarta.
Training
2006 Lightning Protection Tutorial by STEI – ITB, Bandung
2007 Lead Engineer Acceleration Training by PT Rekayasa Industri, Jakarta
2007 Procurement for Project Engineer Training by PT Rekayasa Industri, Jakarta
2007 Trainer for PT Perusahaan Gas Negara Operator, Jakarta
2008 ETAP Basic by ETAP Inc., Bandung
2009 Aveva Net Training by Aveva, Jakarta
Professional Experience
PT Rekayasa Industri, Jakarta.
Full-time Job
Project Client Year
1. 2,000 MTPD NH3 & 2,750 Urea Pusri-IIB Project PT Pupuk Sriwidjaja 2013
Position: Lead Electrical Engineer Project Value : USD ±561 M
1) Developing proposal for tender execution both technically and commercially. Also performing technical
clarification with prior to contract award.
2) Developing with KBR Inc. USA and Toyo Engineering Corporation Japan as licensor basic engineering package
i.e. Power System Analysis using ETAP (Short Circuit, Load Flow & Voltage Drop, Transient Analysis and
Protection Coordination Study), Single Line Diagram, Illumination Level Calculation, Technical Specification,
Data Sheet, Technical Bid Evaluation and Hazardous Area Classification.
3) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment Layout,
Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout.
4) Interfacing engineering works between licensor’s supplied equipment documents and detail engineering
subcontractor.
2. Coal Boiler Plant Project 2×220 MTPH PT. Pupuk Kalimantan TImur 2012
Position: Lead Electrical Engineer (Consultant) Project Value : USD ±110 M
Key Responsibilities:
1) Assisting client for reviewing engineering documents and boiler package documents.
2) Assisting client for expediting of electrical material to ensure receiving material on time.
3) Assisting client for managing subcontractor manpower, tools and material.
4) Assisting client for managing quality control documents/reports for improving MC documentation.
5) Assisting client for improving pre-commissioning system definition.
6) Assisting client for improving electrical safety at construction work area.
3. Ammonia Tie-in – Bontang PT. Kaltim Pacific Ammonia 2012
Position: Lead Electrical Engineer Project Value: USD ±5 M
Key Responsibilities:
1) Reviewing basic engineering work i.e. Power System Analysis using ETAP, Hazardous Area Classification,
Single Line Diagram, Schematic Diagram, Specification, Data Sheet and Technical Bid Evaluation.
2) Reviewing detail engineering work i.e. Equipment Layout, Power Wiring & Cable Tray Layout, Lighting Layout
and Grounding Layout.
3) Developing Power Tie-In Procedure, Testing & Commissioning Procedure and Working Method Statement.
4) Reviewing vendor technical and commercial documents.
5) Managing subcontractor for electrical installation work.
4. 300.000 T/Y Ammonium Nitrate Plant Project – Bontang PT. Kaltim Nitrat Indonesia 2009-2012
Position: Lead Electrical Project Engineer Project Value: USD ±173 M
Key Responsibilities:
1) Developing proposal for tender execution both technically and commercially. Also performing technical
clarification with prior to contract award.
2) Developing with UHDE Shedden Australia as licensor basic engineering package i.e. Power System Analysis
using ETAP (Short Circuit, Load Flow & Voltage Drop, Transient Analysis and Protection Coordination Study),
Single Line Diagram, Illumination Level Calculation, Technical Specification, Data Sheet, Technical Bid
Evaluation and Hazardous Area Classification.
3) Developing with UHDE Shedden Australia Technical Review for Dynamic Behavior of MAN Turbo
Asynchronous Motor Generator integration with existing power utility company including transient study,
protection coordination and short circuit study.
4) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment Layout,
Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout.
5) Interfacing engineering works between licensor’s supplied equipment documents and detail engineering
subcontractor.
6) Managing electrical work subcontractor and coordinate with other discipline subcontractor during construction
stage.
7) Developing construction method of statement, working procedure and hazard study for electrical construction
work.
8) Supervising pre-commissioning work for Asynchronous Generator, CAT Diesel Engine Generator, ABB MV
Switchgear, ABB MV Capasitor Banks, Siemens LV Switchgear & MCC, Unindo Transformer, ABB VSD,
Thomas & Bett UPS, Alacatel Lucent PABX, Industronic PAGA and Motorola Radio System.
5. Singa Gas Development Project PT. Medco E & P Lematang 2007
Position : Electrical Lead Engineer Project Value : USD ±30 M
Key Responsibilities:
1) Developing basic engineering work i.e. Power System Analysis using ETAP, Hazardous Area Classification,
Single Line Diagram, Schematic Diagram, Specification, Data Sheet and Technical Bid Evaluation.
2) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment
Layout, Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout.
3) Interfacing engineering works for 5 MW Vericor Gas Turbine Generator i.e. control & protection system,
synchronizing system and auxiliaries.
6. LPG Plant Project – Lembak South Sumatera PT. Surya Esa Perkasa 2006
Position: Electrical Lead Engineer Project Values: USD ±20 M
Key Responsibilities:
1) Developing basic engineering work i.e. Power System Analysis using ETAP, Hazardous Area Classification,
Single Line Diagram, Schematic Diagram, Specification, Data Sheet and Technical Bid Evaluation.
2) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment
Layout, Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout.
3) Interfacing engineering works for 2×1 MVA Caterpillar Gas Engine Generator and 250 kVA Komatsu Diesel
Engine Generator i.e. DEIF Denmark control & protection system and synchronizing system.
4) Designing Smart Load Banks System with Sephco Australia for maintaining genenerator minimum load.
5) Managing electrical work subcontractor and coordinate with other discipline subcontractor during construction
stage.
7. SSWJ II – Onshore / Station Facilities PT. Perusahaan Gas Negara 2006
Position: Electrical System Engineer Project Value: USD ±30 M
Key Responsibilities:
1) Developing basic engineering work i.e. Power System Analysis using ETAP, Hazardous Area Classification,
Single Line Diagram, Schematic Diagram, Specification, Data Sheet and Technical Bid Evaluation.
2) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment
Layout, Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout.
3) Interfacing engineering works for 2×60 kVA Caterpillar Gas Engine Generator and 2×90 kVA Waukesha Gas
Engine Generator i.e. Enercon Singapore control & protection system.
8. SSWJ I CP 5 - Pagardewa Gas Compressor Station PT. Perusahaan Gas Negara 2006
Position: Electrical System Engineer Project Value: USD ±25 M
Key Responsibilities:
1) Developing basic engineering work with Nippon Steel Construction Japan as main contractor i.e. Power System
Analysis using ETAP, Hazardous Area Classification, Single Line Diagram, Schematic Diagram, Specification,
Data Sheet and Technical Bid Evaluation.
2) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment
Layout, Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout.
3) Interfacing engineering works for 2×1 MVA Caterpillar Gas Engine Generator i.e. Enercon Singapore control &
protection system.
9. Proyek Pembangunan Fasilitas Pengumpul Gas Musi Barat PT. Pertamina (Persero) 2005
Position: Junior Electrical System Engineer Project Value: USD ±33 M
Key Responsibilities:
1) Developing basic engineering work i.e. Power System Analysis using ETAP, Hazardous Area Classification,
Single Line Diagram, Schematic Diagram, Specification, Data Sheet and Technical Bid Evaluation.
Overseas Assignments
2009 Orica - Uhde Shedden Australia Pty. Ltd., Melbourne, Victoria, AUSTRALIA.
Basic Engineering for 300.000 T/Y Ammonium Nitrate Plant Project
2010 ABB Australia Pty. Ltd., Lilydale, Victoria, AUSTRALIA.
Factory Acceptance Test for 2 x 1500 kVAR Capacitor Bank 11 kV
2010 ABB Malaysia Sdn. Bhd., Subang Jaya, MALAYSIA.
Factory Acceptance Test for MV Switchgear 11 kV
2010 Mollers Gmbh., Braunschweig, GERMANY.
Factory Acceptance Test for Roller Conveyor System
2010 Librawerk Gmbh., Beckum, GERMANY.
Factory Acceptance Test for Big Bag Filling System MCC
2013 KBR Inc., Houston, Texas, USA.
Basic Engineering Design for Ammonia
Languages
Indonesia (native) English (good, TOEFL 580)

More Related Content

What's hot

EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limitedHimanshu9974
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016subhankar saha
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesPuneet Jaggi
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEvijayabaskar v
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Mohammed Fazaluddin
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15Santosh Singh
 
Vignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh V
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)Reddy Premnath
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedSANDEEP KUMAR
 

What's hot (20)

EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Michael%20Weir-3
Michael%20Weir-3Michael%20Weir-3
Michael%20Weir-3
 
EJP CV_January2016
EJP CV_January2016EJP CV_January2016
EJP CV_January2016
 
osama dwedar ..
osama dwedar ..osama dwedar ..
osama dwedar ..
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
Curriculam Vitae
Curriculam VitaeCurriculam Vitae
Curriculam Vitae
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
Resume
ResumeResume
Resume
 
Vignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh_Sr.Elec Designer
Vignesh_Sr.Elec Designer
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
Gensol Permits Procurement Services
Gensol Permits Procurement ServicesGensol Permits Procurement Services
Gensol Permits Procurement Services
 
G K M Jafar_UAE
G K M Jafar_UAEG K M Jafar_UAE
G K M Jafar_UAE
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
WHY CHOOSE US
WHY CHOOSE USWHY CHOOSE US
WHY CHOOSE US
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
CV - VAC-JUL 2015
CV - VAC-JUL 2015CV - VAC-JUL 2015
CV - VAC-JUL 2015
 

Similar to CV Didit Kurniawan 2016

Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland
 
resume_GAUTAM_03112016
resume_GAUTAM_03112016resume_GAUTAM_03112016
resume_GAUTAM_03112016GAUTAM DEKA
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalSAYANTAN GHOSH
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineerNISHITKUMAR JOSHI
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSuthar Vinu
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
Girish BG - CV
Girish BG - CVGirish BG - CV
Girish BG - CVGirish BG
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapatiSuvendu Senapati
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBShiva Y Cmath
 
CURRICULUM VITAE-(Electrical Engg.)-1
CURRICULUM VITAE-(Electrical   Engg.)-1CURRICULUM VITAE-(Electrical   Engg.)-1
CURRICULUM VITAE-(Electrical Engg.)-1Nitin Rathore
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerSatish Tumbare
 

Similar to CV Didit Kurniawan 2016 (20)

Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum Vitae
 
resume_GAUTAM_03112016
resume_GAUTAM_03112016resume_GAUTAM_03112016
resume_GAUTAM_03112016
 
CV-JAYA MISHRA
CV-JAYA MISHRACV-JAYA MISHRA
CV-JAYA MISHRA
 
noorCV
noorCVnoorCV
noorCV
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 
VikramShete_New-1
VikramShete_New-1VikramShete_New-1
VikramShete_New-1
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
 
SANJEEV KUMAR
SANJEEV KUMARSANJEEV KUMAR
SANJEEV KUMAR
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineer
 
Govind-CVC5
Govind-CVC5Govind-CVC5
Govind-CVC5
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 
abmcv Dec 2016
abmcv Dec 2016abmcv Dec 2016
abmcv Dec 2016
 
Sudarsang electrical designer
Sudarsang electrical designerSudarsang electrical designer
Sudarsang electrical designer
 
Girish BG - CV
Girish BG - CVGirish BG - CV
Girish BG - CV
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapati
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
CURRICULUM VITAE-(Electrical Engg.)-1
CURRICULUM VITAE-(Electrical   Engg.)-1CURRICULUM VITAE-(Electrical   Engg.)-1
CURRICULUM VITAE-(Electrical Engg.)-1
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 

CV Didit Kurniawan 2016

  • 1. Didit Kurniawan Citizenship : Indonesia ▪ Date of birth : 17 March 1982 Address Kota Wisata Cibubur, Cluster West Covina II SH8/15, Gunung Putri, Kab. Bogor, Jawa Barat 16968. Contact Tel : +62-813-2711-6551 e-mail : didit@rekayasa.co.id Profile Description Electrical engineer with more than 10 years of experience in oil & gas, mining, fertilizer, power plant projects. Excel in and effectively manage engineering, procurement, construction and commissioning business process. Key Skills Standards/Codes IEC, IEEE, API RP 500, NEC, NEMA MG-1, ISO 8528-1 Area of expertise a. Power System Analysis using ETAP b. Electrical Power Generation c. Indoor & Outdoor Lighting Design d. EPC Business Process Computer Literacy Proficient or familiar with engineering software, including: ETAP AutoCAD DiaLUX MS Office Education 2000 to 2005 Bachelor in Electrical Engineering – Power System (GPA: 3.36/4.00) Gadjah Mada University, Jogjakarta. Training 2006 Lightning Protection Tutorial by STEI – ITB, Bandung 2007 Lead Engineer Acceleration Training by PT Rekayasa Industri, Jakarta 2007 Procurement for Project Engineer Training by PT Rekayasa Industri, Jakarta 2007 Trainer for PT Perusahaan Gas Negara Operator, Jakarta
  • 2. 2008 ETAP Basic by ETAP Inc., Bandung 2009 Aveva Net Training by Aveva, Jakarta Professional Experience PT Rekayasa Industri, Jakarta. Full-time Job Project Client Year 1. 2,000 MTPD NH3 & 2,750 Urea Pusri-IIB Project PT Pupuk Sriwidjaja 2013 Position: Lead Electrical Engineer Project Value : USD ±561 M 1) Developing proposal for tender execution both technically and commercially. Also performing technical clarification with prior to contract award. 2) Developing with KBR Inc. USA and Toyo Engineering Corporation Japan as licensor basic engineering package i.e. Power System Analysis using ETAP (Short Circuit, Load Flow & Voltage Drop, Transient Analysis and Protection Coordination Study), Single Line Diagram, Illumination Level Calculation, Technical Specification, Data Sheet, Technical Bid Evaluation and Hazardous Area Classification. 3) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment Layout, Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout. 4) Interfacing engineering works between licensor’s supplied equipment documents and detail engineering subcontractor. 2. Coal Boiler Plant Project 2×220 MTPH PT. Pupuk Kalimantan TImur 2012 Position: Lead Electrical Engineer (Consultant) Project Value : USD ±110 M Key Responsibilities: 1) Assisting client for reviewing engineering documents and boiler package documents. 2) Assisting client for expediting of electrical material to ensure receiving material on time. 3) Assisting client for managing subcontractor manpower, tools and material. 4) Assisting client for managing quality control documents/reports for improving MC documentation. 5) Assisting client for improving pre-commissioning system definition. 6) Assisting client for improving electrical safety at construction work area.
  • 3. 3. Ammonia Tie-in – Bontang PT. Kaltim Pacific Ammonia 2012 Position: Lead Electrical Engineer Project Value: USD ±5 M Key Responsibilities: 1) Reviewing basic engineering work i.e. Power System Analysis using ETAP, Hazardous Area Classification, Single Line Diagram, Schematic Diagram, Specification, Data Sheet and Technical Bid Evaluation. 2) Reviewing detail engineering work i.e. Equipment Layout, Power Wiring & Cable Tray Layout, Lighting Layout and Grounding Layout. 3) Developing Power Tie-In Procedure, Testing & Commissioning Procedure and Working Method Statement. 4) Reviewing vendor technical and commercial documents. 5) Managing subcontractor for electrical installation work. 4. 300.000 T/Y Ammonium Nitrate Plant Project – Bontang PT. Kaltim Nitrat Indonesia 2009-2012 Position: Lead Electrical Project Engineer Project Value: USD ±173 M Key Responsibilities: 1) Developing proposal for tender execution both technically and commercially. Also performing technical clarification with prior to contract award. 2) Developing with UHDE Shedden Australia as licensor basic engineering package i.e. Power System Analysis using ETAP (Short Circuit, Load Flow & Voltage Drop, Transient Analysis and Protection Coordination Study), Single Line Diagram, Illumination Level Calculation, Technical Specification, Data Sheet, Technical Bid Evaluation and Hazardous Area Classification. 3) Developing with UHDE Shedden Australia Technical Review for Dynamic Behavior of MAN Turbo Asynchronous Motor Generator integration with existing power utility company including transient study, protection coordination and short circuit study. 4) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment Layout, Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout. 5) Interfacing engineering works between licensor’s supplied equipment documents and detail engineering subcontractor. 6) Managing electrical work subcontractor and coordinate with other discipline subcontractor during construction stage. 7) Developing construction method of statement, working procedure and hazard study for electrical construction work. 8) Supervising pre-commissioning work for Asynchronous Generator, CAT Diesel Engine Generator, ABB MV Switchgear, ABB MV Capasitor Banks, Siemens LV Switchgear & MCC, Unindo Transformer, ABB VSD, Thomas & Bett UPS, Alacatel Lucent PABX, Industronic PAGA and Motorola Radio System.
  • 4. 5. Singa Gas Development Project PT. Medco E & P Lematang 2007 Position : Electrical Lead Engineer Project Value : USD ±30 M Key Responsibilities: 1) Developing basic engineering work i.e. Power System Analysis using ETAP, Hazardous Area Classification, Single Line Diagram, Schematic Diagram, Specification, Data Sheet and Technical Bid Evaluation. 2) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment Layout, Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout. 3) Interfacing engineering works for 5 MW Vericor Gas Turbine Generator i.e. control & protection system, synchronizing system and auxiliaries. 6. LPG Plant Project – Lembak South Sumatera PT. Surya Esa Perkasa 2006 Position: Electrical Lead Engineer Project Values: USD ±20 M Key Responsibilities: 1) Developing basic engineering work i.e. Power System Analysis using ETAP, Hazardous Area Classification, Single Line Diagram, Schematic Diagram, Specification, Data Sheet and Technical Bid Evaluation. 2) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment Layout, Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout. 3) Interfacing engineering works for 2×1 MVA Caterpillar Gas Engine Generator and 250 kVA Komatsu Diesel Engine Generator i.e. DEIF Denmark control & protection system and synchronizing system. 4) Designing Smart Load Banks System with Sephco Australia for maintaining genenerator minimum load. 5) Managing electrical work subcontractor and coordinate with other discipline subcontractor during construction stage. 7. SSWJ II – Onshore / Station Facilities PT. Perusahaan Gas Negara 2006 Position: Electrical System Engineer Project Value: USD ±30 M Key Responsibilities: 1) Developing basic engineering work i.e. Power System Analysis using ETAP, Hazardous Area Classification, Single Line Diagram, Schematic Diagram, Specification, Data Sheet and Technical Bid Evaluation. 2) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment Layout, Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout. 3) Interfacing engineering works for 2×60 kVA Caterpillar Gas Engine Generator and 2×90 kVA Waukesha Gas Engine Generator i.e. Enercon Singapore control & protection system.
  • 5. 8. SSWJ I CP 5 - Pagardewa Gas Compressor Station PT. Perusahaan Gas Negara 2006 Position: Electrical System Engineer Project Value: USD ±25 M Key Responsibilities: 1) Developing basic engineering work with Nippon Steel Construction Japan as main contractor i.e. Power System Analysis using ETAP, Hazardous Area Classification, Single Line Diagram, Schematic Diagram, Specification, Data Sheet and Technical Bid Evaluation. 2) Reviewing detail engineering package developed by engineering subcontractor i.e. Electrical Equipment Layout, Power Wiring & Cable Tray Layout, Grounding Layout, Telecommunication Layout and Lighting Layout. 3) Interfacing engineering works for 2×1 MVA Caterpillar Gas Engine Generator i.e. Enercon Singapore control & protection system. 9. Proyek Pembangunan Fasilitas Pengumpul Gas Musi Barat PT. Pertamina (Persero) 2005 Position: Junior Electrical System Engineer Project Value: USD ±33 M Key Responsibilities: 1) Developing basic engineering work i.e. Power System Analysis using ETAP, Hazardous Area Classification, Single Line Diagram, Schematic Diagram, Specification, Data Sheet and Technical Bid Evaluation. Overseas Assignments 2009 Orica - Uhde Shedden Australia Pty. Ltd., Melbourne, Victoria, AUSTRALIA. Basic Engineering for 300.000 T/Y Ammonium Nitrate Plant Project 2010 ABB Australia Pty. Ltd., Lilydale, Victoria, AUSTRALIA. Factory Acceptance Test for 2 x 1500 kVAR Capacitor Bank 11 kV 2010 ABB Malaysia Sdn. Bhd., Subang Jaya, MALAYSIA. Factory Acceptance Test for MV Switchgear 11 kV 2010 Mollers Gmbh., Braunschweig, GERMANY. Factory Acceptance Test for Roller Conveyor System 2010 Librawerk Gmbh., Beckum, GERMANY. Factory Acceptance Test for Big Bag Filling System MCC 2013 KBR Inc., Houston, Texas, USA. Basic Engineering Design for Ammonia Languages Indonesia (native) English (good, TOEFL 580)