1. URRICULUM
ITAE
PERSONAL PARTICULARS
Name AZAM RAZA
Father’s name RAZA MUHAMMAD
Date of Birth 30-09-1987
Address
E-mail
Basti Moeen Purra ,Lal Baghali, Post Office Kahror
Pacca Tehsil Kahror Pacca District Lodhran.
azam.raza86@yahoo.com
Telephone: Cell: +923447867655
Passport No: CW 9896321
N.I.C #: 36202-3312632-5
Skype ID: azamraza86
CAREER OBJECTIVE
To ensure that the work I do exceeds expectations, lead to an overall improvement in Quality Assurance &
Quality Control practices and performance, and enables a building of in-house QA/QC competence and
skills. Committed to maintain high quality Inspection standard and skill.
PROFESSIONAL QUALIFICATIONS
EXPERIENCE
10 Years in Quality Control of Tanks, Penstock, Piping and Draft
tube gates, Gantry Crane Fabrication, Erection, Welding,
Sandblasting painting, Coating as per codes & specifications.
Degree Year Grade institute
DAE Mechanical 2003 to 2006 “A”
Punjab Board Of Technical Education
Lahore
Metric 2003 “A”
Board of intermediate and secondary
education Multan
CODES & STANDARDS KNOWLEDGE
Well versed with ASME IX, B31.1. B31.3, ,ASME II Part A, ASME II Part C,ASME V
ASME VIII Div. I, ASME IX, AWS D1.1. API 650, API 653, API 570, DIN Standard,
Chinese Standard DL/T 5017.
Page | 1/6
2. URRICULUM
ITAE
CAREER PROFILE
Highly professional and extensive experience in mechanical construction of piping,
Equipment’s, Steel Structure, Tanks, Penstock, Draft tube gates, Gantry Crane as well as in
Maintenance & Construction of Oil & Gas onshore sectors and Hydro power projects as per
international standards. Ability to learn quickly, follow the procedure exactly, solve
problems independently and always willing to accept significant responsibility and
involvement. I am an imaginative, innovative and dedicated Quality Assurance, Quality
Control and execution professional. I have in hand total professional experience of 09 years.
Throughout these years I have acquired extensive experience in establishing, maintaining,
implementing & improving QHSE Management System.
I have in-depth knowledge of construction & maintenance code standards. I am a creative
individual and a self motivated achiever. I enjoy a challenging career, work well under
pressure, prioritize tasks accordingly and respond confidently in both emergency and non-
emergency situations. I consider myself an empathetic and effective listener and use my
strong interpersonal skills to communicate through different levels effectively.
PROFESSIONAL EXPERIENCE (Recently completed and ongoing projects)
Professional Experience
Working Recently now:
Project
Pakistan Patrind Hydro
Power Project
Establishment Daek Wang E&C
Duration March 2016 to Continue City
Muzaffarabad
(Pakistan)
Client DAEWOO E&C Consultant Sky hydro, PES.
Position Mechanical Engineer Country Pakistan
Professional Experience
Working Previous:
Project ARL Up gradation Project Establishment
Ravi Green
Engineering (Pvt.)
Ltd.
Duration
November 2015 to
February 2016
City
Rawalpindi
(Pakistan)
Client
Hyundai Engineering
Pakistan (Pvt) Ltd.
Consultant Attock Oil Refinery.
Position QA/QC Inspector Country Pakistan
MAJOR RESPONSIBILITIES
Supervision of Quality Inspectors for different Inspection activities
Inspection of welding for fabrication of Piping, Tanks, Penstock and Steel Structure.
Preparation of all QA/QC documentation.
Interaction with Client for clearance and starting of activities.
Follow up of NDT (PT, RT)
To prepare daily progress report, offering joints for Carry out Repairs as Per Company
Recommendation.
Page | 2/6
3. URRICULUM
ITAE
To monitor Hydro Test, Leak test, Pneumatic test, Flushing/Air Blowing, Holiday Test, diesel test,
vacuum box test, Ultrasonic test.
To check the Inspection of Tanks; It’s peaking, bending, plumpness, roundness and nozzle orientation
as per IFC Drawing/ API 650.
Checking for consistency with P & I.D, Piping and Isometric Drawing as to size, rating and material.
Progress monitoring and reporting to the Clients
Permit to Work co-ordination as authorized signatory PTW.
Monitoring daily progress and reporting to Construction Manager.
Preparation of Quality Inspection Plans after study of drawings, technical specifications, client
requirements.
Inspections according to Quality Inspection Plans.
To Maintain Record for Equipment installation, Steel Structure & Piping work.
Preparation and Verification of punch list after rectification.
Have a hand on Experience to prepare TEST PACKS and RFI, s Control System.
To prepare the welder qualification record & Issuing of welders qualification card.
Execute regular checks in order to produce concise and hall mark quality production for site activities.
Coordination with the third party inspections, Destructive & Non Destructive Testing; the
interpretation of RT Films.
Responsible for the Inspection of steel structure & piping fabrication with erection.
To conduct the inspection of Sandblasting, Painting, insulation of equipments, steel structure and Pipe
as well as chemical cleaning.
AREA OF EXPERTISE
Fabrications & Erection (Piping/Structure/Tanks/Penstock)
1 Material inspection as per project specification and material test certificates.
2 Inspection of pipe spool marking, pipe cutting, and joint fit-up as per approved construction drawings,
WPS joint details.
3 Dimensional Inspection prior to welding and after welding.
4 NDT control as per specification requirements.
5 PWHT control for Low Alloy Steel Materials.
6 Control of blasting and painting activities.
7 Review of test packages and RFI, s.
8 Line check prior to hydro testing and preparation of punch listing for piping test package and verification
as well.
9 Witnessing piping hydro testing, Penstocks, Tanks flushing as per procedure.
10 Inspection of steel structural marking, cutting and fabrication per approved construction drawing.
Welding
1 Inspection of welding consumable as per approved WPS.
2 To verify the required equipment for welding, like welding machine, baking equipment, welding torch
or holder, clamping, etc.
3 To inspect backing of low hydrogen electrodes and handling of consumables.
4 Witness of joint preheating, post heating and purging as required.
5 Witness the welding activities.
6 Visual inspection of completed weld joints.
7 Issuance of inspection reports and arranging client inspection and NDT as required.
Page | 3/6
4. URRICULUM
ITAE
Non-Destructive Testing
1 Performing and witnessing the RT, UT, DPT and Leak Testing as per ASME SEC V and project
specifications.
2 Witness the hydro testing for piping tanks and Penstocks.
3 Preparation and review of NDT reports.
PROFESSIONAL TRAINING
Test Pack & Spool Tracking System.
Quality Control
Piping/Tanks/Penstock Inspection Module
Welding Inspection Module
NDT Module
Sandblasting & Painting Inspection Module
SKILLS & STRENGTHS
Stable work history, effective communicator, willing to accept extra assignments, dedication, ability to work
with various levels from field personnel to corporate staff, self-motivated, pleasant, out-going personality.
Highly analytical and good problem-solving / negotiation skills with entrepreneurial spirit
Excellent judgment with unquestionable ethics and integrity with outstanding leadership and strong mentoring
and couching skills, and a team player who is dynamic, self-motivated and results-orientated
PROJECTS & PROFESSIONAL TENURE
Project ZUBAIR IPF
Establishmen
t
Ravi Green Engineering
(Pvt.) Ltd.
Duration February 2014 to September 2015 City Basra(Zubair) Iraq
Client HLG Consultant Weatherford, ENI.
Position QA/QC Supervisor Country IRAQ
Project
First commercial Production (FCP) Graff
field Development Project
Establishmen
t
Ravi Green Engineering
(Pvt.) Ltd.
Duration August 2012 to December 2014 City AL-Nasiriya(Iraq)
Client Lakeshore Toltest Corporation Consultant
Weatherford,
PETRONAS
Position QA/QC Inspector Country IRAQ
Project
Repair of Oil Storage Tanks
Tank # 154,311
Establishment
Ravi Green Engineering
(Pvt.) Ltd.
Duration August 2011to July 2012 City Rawalpindi
Client Attock Refinery Limited. Consultant SGS Services, Jiacco.
Position QA/QC Inspector Country Pakistan
Page | 4/6
5. URRICULUM
ITAE
Project Repair of NGL Storage Tanks 101A,101C Establishment
Ravi Green Engineering
(Pvt.) Ltd.
Duration Feb 2011to August 2011 City Gojar Khan (Punjab)
Client Pakistan Petroleum Ltd. Consultant
SGS Services, Applied
Engineering.
Position QA/QC Inspector Country Pakistan
Project Expansion Project Of Enven 1.3 Establishment
Moody International
(Pvt.) Ltd.
Duration Jun 2010 to November 2010. City Dehrki(Sindh)
Client ENGRO Fertilizer (Pvt.) Ltd. Consultant
DESCON Engineering
(Pvt.) Ltd.
Position QA/QC Inspector Country Pakistan
Project Hubco Narowal Project 225 MW .Narowal Establishment Engineering Kinetics
(Pvt) Ltd.
Duration Oct 2009 to Jun2010 City Narowal
Client Hubco (Pvt)Ltd. Consultant Mott Macdonald (Pvt)
Ltd. Man Diesel.
Position QA/QC Inspector Country Pakistan
Project Erection & External Piping of HRSG for
234 MW CCPP Muridkay
Establishment Ravi Green Engineering
(Pvt.) Ltd.
Duration Feb 2009 to Oct 2009 City Muridkey
(Sheikhupura)
Client Albario Engineering (Pvt.) Ltd Consultant CKD Export
Position QC Inspector Country Pakistan
Project Repairing & Installation of HRSG Modules
for 234 MW CCPP Muridkay
Establishment Ravi Green Engineering
(Pvt.) Ltd.
Duration Sep 2008 to Jan 2009 City Lahore
Client Sapphire Electric (Pvt.) Ltd Consultant CKD Export, Albario
Engineering (Pvt.) Ltd.
Position QA/QC Inspector, Country Pakistan
Project Repairing & Manufacturing Oil Storage
Tanks#17,03,333
Establishment Ravi Green Engineering
(Pvt.) Ltd.
Duration May2008 to October 2008 City Rawalpindi
Client Attok Refinery (Pvt.) Ltd Consultant .
Position QA/QC Supervisor, Country Pakistan
Page | 5/6
6. URRICULUM
ITAE
Project Manufacturing of LPG Storage Tanks. Establishment Ravi Green Engineering
(Pvt.) Ltd.
Duration Sep 2007to May 2008 City Lahore
Client Cress Gas (Pvt.) Ltd Consultant TUV NORD. Jiacco.
Position QA/QC Inspector Country Pakistan
Project Manufacturing of LPG Storage Tanks Establishment Hammed &Sons
Engineering Company.
Duration Jully2006 to August 2007 City Lahore
Client Ravi Gas (Pvt.) Ltd Consultant
Position Q.C Inspector Country Pakistan
Languages Fluent Well Fair
First Language Urdu √
0ther English √
Punjabi √
Saraiki √
Reference:
Will be provided at the time of interview or later as and when demanded.
Page | 6/6
7. URRICULUM
ITAE
Project Manufacturing of LPG Storage Tanks. Establishment Ravi Green Engineering
(Pvt.) Ltd.
Duration Sep 2007to May 2008 City Lahore
Client Cress Gas (Pvt.) Ltd Consultant TUV NORD. Jiacco.
Position QA/QC Inspector Country Pakistan
Project Manufacturing of LPG Storage Tanks Establishment Hammed &Sons
Engineering Company.
Duration Jully2006 to August 2007 City Lahore
Client Ravi Gas (Pvt.) Ltd Consultant
Position Q.C Inspector Country Pakistan
Languages Fluent Well Fair
First Language Urdu √
0ther English √
Punjabi √
Saraiki √
Reference:
Will be provided at the time of interview or later as and when demanded.
Page | 6/6