1. Sujit Pramanik
(Third party inspector professional in Vendor, FAT & Project site inspection)
Mobile No: +971-567112650(UAE)
Mobile No: +91-8670391237/+91-9874433136 (India)
Village: Akhuabari, PO: BrajalalChak, PS: Chandipur,
Pin No: 721659
District: East Mindnapore, West Bengal, India. E-mail: sujitpramanik_81@yahoo.co.in
UAE VALID DRIVING LICENSE NO: 742540 sujitpramanik@hotmail.com
PERSONAL PROFILE
Date of Birth : 24th
March 1981
Nationality : Indian
Passport No : K4922308 Validity up to August 2022
Proposed Position : Sr.QA/QC-Engineer & Project coordinator.
Total Experience : 12 Years
EDUCATIONAL QUALFICATIONS
Bachelor of Mechanical Engineering
PROFESSIONAL COMPETENCE
NACE CIP-Level-II coating & Painting inspector (Cert no.22992)
Certified senior Welding Inspector (CSWIP) 3.1 (Cert no.74189)
AWS /CWI—(CERTIFIED WELDING INSPECTOR)
ISO 9001:2008 LEAD AUDITOR COURSE
American Society of Non Destructive Testing (ASNT) Level II certified in
the following NDT methods.
1.Ultrasonic Test (UT)
2.Dye Penetration Test (DPT)
3.Magnetic Particle Inspection (MPI)
4.Radiographic Test (RT)
Software Skills
Good amount of experience with MS office Tools and familiarization with MS
access data base
WORK EXPERIENCE
QAQC-Engineer & Project Coordinator
1) Lindenberg Emirates LLC, Abu Dhabi, UAE.
Duration: From April 2014 till date.
Company Profile : Lindenberg is specialized in EPC projects and
its aspect of contracting is including Water, power
related activities, civil & Electro-mechanical
general contracting, Oil & Gas related activities
and Repair & Maintenance works Etc.,
Position : QA/QC Engineer/Coordinator.
2. SCOPE OF WORK : Supply and Laying the CS pipes
including PE coating and cement mortar
lining for 110 km and construction of high
point reservoir TANK 2 x 5MIG
Responsibilities :
A) Preparing the ITP for welding, coating and carrying inspection for
pipeline and coating.
B) Preparing WPS and conducting PQR, WQT for welding. Conducting PQT for coating
Heat shrinkage sleeve etc.,
C) Preparing Pipe book, monitoring RFI, reviewing Drawing, maintaining RFI log,
Project weld status Control of As-Built Drawing etc.,
D)Monitoring mitre joint and verifying degree deflection and carrying inspection for
the field coating FBE and HSS and performing the peel test.
E) Monitoring the welding for normal joint and tie in joints and coating and reviewing
the RT film
F) Coordinating with client and sub-contractor work sequence in order to comply the
quality in trench excavation, bedding, lowering, padding, backfilling and field CML
etc.
Overall Responsibilities:
Preparing forecast weekly and monthly quality monitoring plan & follow up
inspection all stage of work and Attending minutes draft meeting with client and
consultant every week
Assist the TPI and Source Inspection Quality Lead in the preparation of the
Procurement QC Surveillance Plans.
Assist the QA/QC team to review Vendor QA/QC Documentation, e.g. Quality Plan,
ITP, QA/QC Procedures, etc.
Review the technical requirements and specifications included in the PO to ensure
that Project inspection and testing requirements are met.
Participate meeting between the project QAQC, Construction and subcontractor
with the consultant/client weekly meetings, pre-award manufacturing surveys and
kick-off meetings before start the construction work.
Prepare the action plan of previous minutes of meeting.
Prepare and/or review/validate the Quality Control Surveillance reports resulting
from shop surveillance activities.
Review and approve Vendor's Inspection and Test Plans.
Prepare and issue TPI Work Assignment Packages.
Co-ordinate the implementation of TPI Work Assignment Packages.
Ensure regular co-ordination and QAQC team meetings are held with TPI
representatives.
Ensure inspection activities are closely monitored to ensure that inspection
schedule is maintained.
Conduct frequent surveillance visits to ensure that the inspection activities are
implemented in accordance with the approved Quality Plan and ITP's.
Coordinating with Contractor Inspection Team for carrying out the required NDT
as per the project scope of work.
Reviewing Contractor NDT / Weld Maps for classification of structural items.
Monitoring quality trends including supervision of interior inspection, surveillance
personnel and assist fabrication heads in the areas of quality.
Overseeing Welding Procedure Qualification, Welder Qualification Tests and
Destructive Testing of Specimens.
3. Administering Radiographic Interpretation and performing signing of NDT &
Release Inspection Reports further activities.
Supervising Non-Destructive Testing of equipment and piping encompassing
review of preliminary interpretations carried out by NDT Technicians.
Ensuring the quality system is regularly maintained and recorded.
Coordinate with other departments to relay some important report regarding
Quality control & Assurance. Monitoring and ensuring with QC inspectors to
inspect as per ITP and specifications.
Responsible to guide technical evaluation, analysis and related data acquisition
processes to ensure plant quality objectives are achieved.
Monitoring the each stage of activity and controlling to prevent its unintended
process, and control by NCR, CPAR.
Developing, modifying, applying and maintains quality standards for product &
process. Ensuring the FAT & SAT report prepared by suppliers and will be verified
Conducting internal audit and doing external Audit with the sub-Contractor.
Preparation of ITP and Technical work instruction related to various welding job.
Participating in failure analysis and corrective action investigations and supporting
to corrective action request program.
Well conversant with welding processes of SMAW, GTAW, GMAW, FCAW
and SAW
Conversant with various industry codes such as ASME SEC IX, ASME SEC
VIII Div 1, AWS D 1.1, API 650, API 1104,ASME B 16.34, ASME B 31.1, ASME B
31.3, API 6A, API 598, NACE MR 01 75, BS EN 970, BS EN 15614-1, BS EN 1461,
BS EN 1714, BSEN 1712, BS EN 1290 and BS EN 571-1.
2) Intertek Moody International, Abu Dhabi, UAE.
Duration : From December-2012 to December-2013.
Company Profile: TPI service agency
Position : Multi Discipline Inspector & Vendor inspection
Overall Responsibilities:
PROJECTS
I. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : GASCO
SCOPE OF WORK : Inspection of new construction liquid sulphur storage
tank, oil storage tank, water storage tank, above ground liquid sulphur
transportation pipeline, rail track welding, installation of conveyor and structure.
Responsibilities
Carrying the work as per approved drawing and ITP
Inspecting the visual and dimensional of the inward material Pipe, fittings, flanges,
valves, studs, bolts and nuts & review MTCs
Confirming welding accordance with WPS, PQR and approved welder. Carrying
weld visual inspection and witnessing NDT and reviewing RT film
Ensuring safety measures and excavation stability, back re-filling, material
handling, fabrication, insulation, installation, painting, pressure testing and
commissioning
Inspecting the SKID and witnessing hydro test, functional test (PTSH 1440 psi).
Doing the inspection and witnessing for the construction of the tank for Plate
inspection, layout, rolling, nozzle fit up and monitoring welding, NDT, Pneumatic
test, PWHT, Hardness etc. as per drawing and ITP.
4. II. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : Perma Pipe middle east, FZC, Fujairah.
RESPONSIBILITY : FAT inspection of pipe dimension check, length,
Thickness, Inspection of Factory coating.
III. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : Gulf steel works.
RESPONSIBILITY : witnessed of PQT, WPQT and mechanical lab test.
IV. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : DESCON ENGINEERING, FZE, SHARJAH.
RESPONSIBILITY : FAT inspection of Surge vessel, final dimensional
Inspection, orientation check, final weld visual
Inspection.
V. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : TROUVAY & CAUVIN GULF, Jebel Ali.
RESPONSIBILITY : Review MTC, pipe dimension check, length,
Thickness, sample lab test.
VI. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : FBM KMN FZ Company, Jebel Ali.
RESPONSIBILITY : FAT inspection of pressure vessel, dimensional,
Orientation, final painting inspection.
VII. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : FLOWSERVE GULF FZ, DUBAI.
RESPONSIBILITY : FAT inspection of Globe valve, Ball valve.
Orientation, functional test, pneumatic test, final
Painting inspection.
VIII. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : FAM INTERNATIONAL FZE, AJMAN.
RESPONSIBILITY : Stage inspection of stacker re-claimer assembly,
Portal unit. Final inspection as per project
Approved drawing.
IX. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : ENVIROPOL ENGINEERING PVT LTD, NOIDA, INDIA.
RESPONSIBILITY : FAT inspection of wet scrubber system.
Multi Discipline Inspector (TPI)
3) Velosi Certification Services.LLC, Abu Dhabi, UAE.
Duration : From August-2010 to July-2012
Company Profile: TPI service agency
Position : Multi Discipline Inspector in Vendor &
Project site.
Overall Responsibilities:
I. PROJECT FOR : Bab Gas compression project-I & II
5. CLIENT : ADCO, Habshan-2, Abu Dhabi, UAE.
RESPONSIBILITY :
Reviewing and approved method statement, material submittal, inspection test
plan on behalf of client.
Inspecting the visual and dimensional of the inward material Pipe, fittings, flanges,
valves, studs, bolts and nuts & review MTCs
Confirming welding accordance with WPS, PQR and approved welder. Carrying
weld visual inspection and witnessing NDT and reviewing RT film
Ensuring safety measures and excavation stability, back re-filling, material
handling, fabrication, insulation, installation, painting, pressure testing and
commissioning
Inspecting the SKID, motor, pump, vessel, scrubber duct, boiler, hopper, and
conveyor.
Witnessing hydro test, functional test of valve at vendor workshop.
Doing the inspection and witnessing for the construction of the tank for Plate
inspection, layout, rolling, nozzle fit up and monitoring welding, NDT, Pneumatic
test, PWHT, Hardness etc. as per drawing and ITP.
II. PROJECT FOR : Habshan-5, GASCO, Abu Dhabi, UAE
CLIENT : OGASCO-construction Company, Mussafah, Abu
Dhabi.
RESPONSIBILITY : Witnessed of PQR, WPQR, material inspection,
Witnessed of pneumatic test, hydrostatic test of
Piping spools at workshop. Witnessing HIC, IGC
For inconel, SS test loading and unloading and test
III. PROJECT FOR : Khurais Central Processing Facilities –Gas
Package, Saudi Aramco project.
CLIENT : McDermott, Jebel Ali FZC.
RESPONSIBILITY : Witnessed of WPQT, weld visual inspection of
Piping spools, packaging inspection of offshore
Skids, final inspection of painting and coating.
IV. PROJECT FOR : Sohar-2 power station, Sultanate of Oman. Workshop in RALCO
Industries, Hamriyah free zone, Sharjah.
CLIENT : GS ENGINEERING & CONSTRUCTION.
RESPONSIBILITY : Witnessed of WPQT, Fabrication and weld visual
Inspection of Piping spools, Structural steel works
And painting inspection and review and insure
Shipment release note.
V. PROJECT FOR : Ruwais NGL-4 refinery expansion project, GASCO.
CLIENT : CB&I.
RESPONSIBILITY : Reinstatement of above ground gas storage Tanks,
Piping line, pre-hydrostatic test line walk down and
Issuing punch list, test package review. Attend
Pre-Commissioning activities of each lot before
Final Commissioning taking place by client.
6. 4) M/S SEO KWANG Electric Co. Ltd. Al-Khobar, Saudi Arabia
Duration : November 2006 to December-2009
Company Profile: TPI service agency/construction &
Maintenances
Position : Multi Discipline Inspector/Vendor
Inspection.
Overall Responsibilities:
PROJECTS
I. PROJECT FOR : Berri Gas plant, Al-Jubail, KSA.
CLIENT : AL-SUWAIDI INDUSTRIAL SERVICES CO. LTD
Responsibilities
Incoming material inspection.
Review of material certificates for traceability verification.
Witnessed of positive material identification test (PMI).
Witness of PQT, WPQT for each required process.
Witnessed of mechanical lab test.
Stage inspection as per approved ITP for piping spools.
Witnessed of Pneumatic test, hydrostatic pressure test.
Witnessed of PQT for painting systems, Pull off testing, holiday test.
II. PROJECT FOR : RAS TANURA Refinery expansion project,
Ras Tanura, KSA.
CLIENT : MOHAMMAD AL MOJIL GROUP (MMG), DAMMAM,
KSA, WORKSHOP.
Responsibilities
Incoming material inspection.
Review of material certificates for traceability verification.
Witnessed of positive material identification test (PMI).
Witness of PQT, WPQT for each required process.
Witnessed of mechanical lab test.
Stage inspection as per approved ITP for piping spools.
Witnessed of Pneumatic test, hydrostatic pressure test.
Witnessed of PQT for painting systems, Pull off testing, holiday test.
III. PROJECT FOR : Saudi Kayan Polycarbonate Project ,
Al-Jubail-2,KSA.
CLIENT : MOHAMMAD AL MOJIL GROUP (MMG), DAMMAM,
KSA, WORKSHOP.
Responsibilities
Incoming material inspection.
Review of material certificates for traceability verification.
7. Witnessed of positive material identification test (PMI).
Witness of PQT, WPQT for each required process.
Witnessed of mechanical lab test.
Stage inspection as per approved ITP for piping spools.
Witnessed of Pneumatic test, hydrostatic pressure test.
IV. PROJECT FOR : Petro Rabigh, Saudi ARAMCO Project,
Rabigh,KSA.
CLIENT : AL-SUWAIDI INDUSTRIAL SERVICES CO. LTD,
Rabigh,KSA, WORKSHOP.
Responsibilities
Witness of PQT, WPQT for each required process.
Witnessed of mechanical lab test.
Incoming material inspection.
Witnessing HIC, IGC for inconel 625, SS test loading and unloading and test
Review of material certificates for traceability verification.
Witnessed of positive material identification test (PMI).
Stage inspection as per approved ITP for piping spools.
Witnessed of Pneumatic test, hydrostatic pressure test.
V. PROJECT FOR : ABQAIQ refinery & cross country pipeline, ARAMCO
Project,
CLIENT : FMQ SONS CO,
ABQAIQ,KSA, (WORKSHOP).
Responsibilities
Witness of PQT, WPQT for each required process.
Witnessed of mechanical lab test.
Incoming material inspection.
Review of material certificates for traceability verification.
Witnessed of positive material identification test (PMI).
Witnessing HIC, IGC for inconel 625, SS test loading and unloading and test
Pre/Post heating, Post Weld Heat Treatment,
Witnessing of NDT and Report Review, Hardness verification as per Code/ Standards,
Project Specifications.
Stage inspection as per approved ITP for piping spools.
Witnessed of Pneumatic test, hydrostatic pressure test.
VI. PROJECT FOR : RAS TANURA Refinery expansion project, Al-Jubail,
KSA.
CLIENT : CB&I, DAMMAM,KSA (WORKSHOP).
RESPONSIBILITY : witnessed of PQR, WPQT, Mechanical testing,
8. Inspection of pressure vessel like, weld visual, NDT,
Hardness test, PMI, PWHT, Pressure test, final
Dimensional Inspection, orientation check,
VII. PROJECT FOR : SAUDI CHEVRON PHILLIPS COMPANY, JUBAIL,KSA.
CLIENT : AYTB Industrial Construction Company.
Al-Jubail,KSA, (WORKSHOP).
Responsibilities
Witness of PQT, WPQT for each required process.
Witnessed of mechanical lab test.
Incoming material inspection.
Review of material certificates for traceability verification.
Witnessed of positive material identification test (PMI).
Pre/Post heating, Post Weld Heat Treatment,
Witnessing of NDT and Report Review, Hardness verification as per Code/ Standards,
Project Specifications.
Witnessing HIC, IGC for inconel 625, SS test loading and unloading and test
Stage inspection as per approved ITP for piping spools.
Witnessed of Pneumatic test, hydrostatic pressure test.
VIII. PROJECT FOR : MARAFIQ WIPP HYDRO POWER PLANT,
JUBAIL,KSA.
CLIENT : DONG SUNG AL-SUWAIDI GROUP Company.
Al-Jubail, KSA, (WORKSHOP & PLANT).
CLIENT : MOHAMMED AL-GHAMDI PARTNERS.
Al-Jubail, KSA, (WORKSHOP & PLANT).
Responsibilities
Witness of PQT, WPQT for each required process.
Witnessed of mechanical lab test.
Incoming material inspection.
Review of material certificates for traceability verification.
Witnessed of positive material identification test (PMI).
Pre/Post heating, Post Weld Heat Treatment,
Witnessing of NDT and Report Review, Hardness verification as per Code/ Standards,
Project Specifications.
Stage inspection as per approved ITP for piping spools.
Witnessed of Pneumatic test, hydrostatic pressure test. Verifying calibration records for
9. testing and inspection equipment’s. Line checking, Punch listing and cleaning.
Above ground storage tanks and vessels Final weld Visual, Dimensional, Hydro testing
Inspection of piping as per approved test packs
Review pre-hydrostatic test packages.
Issuing punch list and categories as requirements.
Attend pre-hydrostatic test meeting along with contractor & client.
Witness of Erection of piping system as per approved isometric drawings; Installation,
Witnessed of Hydro static pressure test of pipeline, piping, storage tank and
pressure vassals.
5) M/S SIEVERT INDIA PVT. Ltd. MUMBAI, INDIA
Duration : November 2002 to September-2006
Company Profile : NDT-Inspection service agency.
Position : Multidiscipline NDT Technician, Site
Supervisor.
PROJECT FOR : ESSER OIL, BPCL, HPCL, IOCL, RELIENCE, ONGC.
CLIENT : DODSAL, PUNJLLOYED, L&T LIMITED, ESSER, JAI
HIND CONSTRUCTION,
Overall Responsibilities:
I. Radiography carried out by X-ray crawler (IPSI & ICM X-ray unit) on
pipe Line, station piping joint. Many cross country pipeline in all over
India.
II. Gamma radiography Ir192 source use on butt welds of pressure vessels,
pipes, boilers, pipe coils, shell & structural welding and casting.
III. Film interpretation relating to pipe line offshore structures, as per API &
ASME standards etc. Interpretation of Radiographs.
IV. Dye Penetrate testing of: Different type of joints such as Butt joints,
Fillet joints, ‘T’- joints, Supporting Pads Root and final welding of piping
joints also performed on Forging, Castings, Weld edge preparations,
Fittings by Visible Dye color contrast & Fluorescent method.
V. Magnetic particle testing of: Root and final welding of piping joints,
Vessel joints, Fillet joints, Supporting pads & Boxes by Yoke (longitudinal
magnetization) and Prod (circular magnetization) by Dry powder and Wet.
VI. Ultrasonic Flaw Detection (UFD) of butt welds and lamination of plates.
Thickness Gauging, Corrosion monitoring of Vessels, Storage Tank bottom &
annular plates, Pipelines etc.
Overall Responsibilities:
• Above ground storage tank inspection as per API650 &
ASME Section. IX,
10. • fabrication, erection, fit-up, weld visual, peaking & banding,
plumbness,
• Nozzle orientation, roundness, floating level.
• Vacuum box test of bottom plate lap & shell to annular plate
corner joints.
• NDT Inspection such as RT, UT, MPI, PT, Film interpretation,
• Final walk down before hydro test, reviewing test package.
• Tank base settlement inspection during water filling for hydro
static testing inspection.
• Air leak test, nozzle pneumatic test, drying,
• internal lining & external painting, coating inspection.
• Inspection of pressure vessel & Heat Exchanger
• Construction code ASME section-VIII, Division-1, welding code-
ASME Sec.IX, heat exchanger-“TEMA”
• Shell preparation: plates marking & cutting, pressing (pre-
pinching), rolling,
• long seam fit-up and welding, radiography testing and other NDT
inspection as ITP requirement.
• Circumferences-seam fit-up and welding, radiography testing.
• Nozzle opening marking, cutting, fit-up, welding, final dimension,
preparing test pack,
• Reviewing and ensuring requirement with GA drawing and hydro
testing.
Painting inspection in Piping:
Inspection of surface preparation from abrasives like coal slag, Garnet
etc. prior to painting.
Ensure the environmental conditions like Relative humidity, Dew point
and Steel surface temperature etc.
Ensuring the surface profile as per project specification.
Ensuring the allowed salt contamination by Salt Contamination Meter
as per project specification.
Inspection of Inorganic Zinc silicate by MEK solvent rub test according
to International standards.
Inspection of mixing, thinning and application of painting as per
Inspection and Test Plan of the project.
Ensure the dry film thickness and over coating interval before
subsequent scheme painting.
Reviewing daily painting reports.
Coating inspection in Pipeline:
Inspection of surface preparation from abrasives like coal slag, Garnet
etc. prior to painting.
Ensure the environmental conditions like Relative humidity, Dew point
and Steel surface temperature etc.
Ensuring the surface profile as per project specification.
Ensuring the allowed salt contamination by Salt Contamination Meter
11. as per project specification.
Inspection of pre heating, post heating and application of Fusion Bond
Epoxy (FBE) on field joint by force curing.
Inspection of installation of Poly propylene (3LPP) Heat Shrink Sleeves
of Canusa-CPS (GTS-PP-Wrapid sleeve) on girth-welded joints of Main
Oil transfer lines & Production Transfer Line and CanusaTube on Gas
injection pipelines.
Inspection of the coating integrity by portable High voltage DC holiday
detector (SPY-Model 790).
Inspection of coating adhesion by peel strength test.
Inspection of the encapsulation integrity of the Cathodic Protected area
by portable High voltage DC holiday detector (SPY-Model 790).
Inspection of the coating integrity of mainline and field joint coating
before lowering the pipelines to the trench.
Reviewing daily coating reports, Holiday detection report, Adhesion
test report etc.
Coating and lining inspection in Storage tanks:
Inspection of surface preparation from abrasives like coal slag, Garnet
etc. prior to painting.
Ensure the environmental conditions like Relative humidity, Dew point
and Steel surface temperature etc.
Ensuring the surface profile as per project specification.
Ensuring the allowed salt contamination by Salt Contamination Meter
as per project specification.
Inspection of Inorganic Zinc silicate by MEK solvent rub test according
to International standards.
Inspection of mixing, thinning and application of painting as per
Inspection and Test Plan of the project.
Ensure the dry film thickness and over coating interval before
subsequent scheme painting.
Declaration
I hereby declare that those information have given by me are correct and
true to the best of my knowledge.It I were places in your esteemed concern.
I will discharge my duties with at most sincerity and to your full satisfaction
(SUJIT PRAMANIK) DATE: 24th
January 2015