SlideShare a Scribd company logo
1 of 11
Sujit Pramanik
(Third party inspector professional in Vendor, FAT & Project site inspection)
Mobile No: +971-567112650(UAE)
Mobile No: +91-8670391237/+91-9874433136 (India)
Village: Akhuabari, PO: BrajalalChak, PS: Chandipur,
Pin No: 721659
District: East Mindnapore, West Bengal, India. E-mail: sujitpramanik_81@yahoo.co.in
UAE VALID DRIVING LICENSE NO: 742540 sujitpramanik@hotmail.com
PERSONAL PROFILE
Date of Birth : 24th
March 1981
Nationality : Indian
Passport No : K4922308 Validity up to August 2022
Proposed Position : Sr.QA/QC-Engineer & Project coordinator.
Total Experience : 12 Years
EDUCATIONAL QUALFICATIONS
 Bachelor of Mechanical Engineering
PROFESSIONAL COMPETENCE
 NACE CIP-Level-II coating & Painting inspector (Cert no.22992)
 Certified senior Welding Inspector (CSWIP) 3.1 (Cert no.74189)
 AWS /CWI—(CERTIFIED WELDING INSPECTOR)
 ISO 9001:2008 LEAD AUDITOR COURSE
 American Society of Non Destructive Testing (ASNT) Level II certified in
the following NDT methods.
1.Ultrasonic Test (UT)
2.Dye Penetration Test (DPT)
3.Magnetic Particle Inspection (MPI)
4.Radiographic Test (RT)
Software Skills
 Good amount of experience with MS office Tools and familiarization with MS
access data base
WORK EXPERIENCE
QAQC-Engineer & Project Coordinator
1) Lindenberg Emirates LLC, Abu Dhabi, UAE.
Duration: From April 2014 till date.
Company Profile : Lindenberg is specialized in EPC projects and
its aspect of contracting is including Water, power
related activities, civil & Electro-mechanical
general contracting, Oil & Gas related activities
and Repair & Maintenance works Etc.,
Position : QA/QC Engineer/Coordinator.
SCOPE OF WORK : Supply and Laying the CS pipes
including PE coating and cement mortar
lining for 110 km and construction of high
point reservoir TANK 2 x 5MIG
Responsibilities :
A) Preparing the ITP for welding, coating and carrying inspection for
pipeline and coating.
B) Preparing WPS and conducting PQR, WQT for welding. Conducting PQT for coating
Heat shrinkage sleeve etc.,
C) Preparing Pipe book, monitoring RFI, reviewing Drawing, maintaining RFI log,
Project weld status Control of As-Built Drawing etc.,
D)Monitoring mitre joint and verifying degree deflection and carrying inspection for
the field coating FBE and HSS and performing the peel test.
E) Monitoring the welding for normal joint and tie in joints and coating and reviewing
the RT film
F) Coordinating with client and sub-contractor work sequence in order to comply the
quality in trench excavation, bedding, lowering, padding, backfilling and field CML
etc.
Overall Responsibilities:
 Preparing forecast weekly and monthly quality monitoring plan & follow up
inspection all stage of work and Attending minutes draft meeting with client and
consultant every week
 Assist the TPI and Source Inspection Quality Lead in the preparation of the
Procurement QC Surveillance Plans.
 Assist the QA/QC team to review Vendor QA/QC Documentation, e.g. Quality Plan,
ITP, QA/QC Procedures, etc.
 Review the technical requirements and specifications included in the PO to ensure
that Project inspection and testing requirements are met.
 Participate meeting between the project QAQC, Construction and subcontractor
with the consultant/client weekly meetings, pre-award manufacturing surveys and
kick-off meetings before start the construction work.
 Prepare the action plan of previous minutes of meeting.
 Prepare and/or review/validate the Quality Control Surveillance reports resulting
from shop surveillance activities.
 Review and approve Vendor's Inspection and Test Plans.
 Prepare and issue TPI Work Assignment Packages.
 Co-ordinate the implementation of TPI Work Assignment Packages.
 Ensure regular co-ordination and QAQC team meetings are held with TPI
representatives.
 Ensure inspection activities are closely monitored to ensure that inspection
schedule is maintained.
 Conduct frequent surveillance visits to ensure that the inspection activities are
implemented in accordance with the approved Quality Plan and ITP's.
 Coordinating with Contractor Inspection Team for carrying out the required NDT
as per the project scope of work.
 Reviewing Contractor NDT / Weld Maps for classification of structural items.
 Monitoring quality trends including supervision of interior inspection, surveillance
personnel and assist fabrication heads in the areas of quality.
 Overseeing Welding Procedure Qualification, Welder Qualification Tests and
Destructive Testing of Specimens.
 Administering Radiographic Interpretation and performing signing of NDT &
Release Inspection Reports further activities.
 Supervising Non-Destructive Testing of equipment and piping encompassing
review of preliminary interpretations carried out by NDT Technicians.
 Ensuring the quality system is regularly maintained and recorded.
 Coordinate with other departments to relay some important report regarding
Quality control & Assurance. Monitoring and ensuring with QC inspectors to
inspect as per ITP and specifications.
 Responsible to guide technical evaluation, analysis and related data acquisition
processes to ensure plant quality objectives are achieved.
 Monitoring the each stage of activity and controlling to prevent its unintended
process, and control by NCR, CPAR.
 Developing, modifying, applying and maintains quality standards for product &
process. Ensuring the FAT & SAT report prepared by suppliers and will be verified
 Conducting internal audit and doing external Audit with the sub-Contractor.
 Preparation of ITP and Technical work instruction related to various welding job.
 Participating in failure analysis and corrective action investigations and supporting
to corrective action request program.
 Well conversant with welding processes of SMAW, GTAW, GMAW, FCAW
and SAW
 Conversant with various industry codes such as ASME SEC IX, ASME SEC
VIII Div 1, AWS D 1.1, API 650, API 1104,ASME B 16.34, ASME B 31.1, ASME B
31.3, API 6A, API 598, NACE MR 01 75, BS EN 970, BS EN 15614-1, BS EN 1461,
BS EN 1714, BSEN 1712, BS EN 1290 and BS EN 571-1.
2) Intertek Moody International, Abu Dhabi, UAE.
Duration : From December-2012 to December-2013.
Company Profile: TPI service agency
Position : Multi Discipline Inspector & Vendor inspection
Overall Responsibilities:
PROJECTS
I. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : GASCO
SCOPE OF WORK : Inspection of new construction liquid sulphur storage
tank, oil storage tank, water storage tank, above ground liquid sulphur
transportation pipeline, rail track welding, installation of conveyor and structure.
Responsibilities
 Carrying the work as per approved drawing and ITP
 Inspecting the visual and dimensional of the inward material Pipe, fittings, flanges,
valves, studs, bolts and nuts & review MTCs
 Confirming welding accordance with WPS, PQR and approved welder. Carrying
weld visual inspection and witnessing NDT and reviewing RT film
 Ensuring safety measures and excavation stability, back re-filling, material
handling, fabrication, insulation, installation, painting, pressure testing and
commissioning
 Inspecting the SKID and witnessing hydro test, functional test (PTSH 1440 psi).
 Doing the inspection and witnessing for the construction of the tank for Plate
inspection, layout, rolling, nozzle fit up and monitoring welding, NDT, Pneumatic
test, PWHT, Hardness etc. as per drawing and ITP.
II. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : Perma Pipe middle east, FZC, Fujairah.
RESPONSIBILITY : FAT inspection of pipe dimension check, length,
Thickness, Inspection of Factory coating.
III. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : Gulf steel works.
RESPONSIBILITY : witnessed of PQT, WPQT and mechanical lab test.
IV. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : DESCON ENGINEERING, FZE, SHARJAH.
RESPONSIBILITY : FAT inspection of Surge vessel, final dimensional
Inspection, orientation check, final weld visual
Inspection.
V. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : TROUVAY & CAUVIN GULF, Jebel Ali.
RESPONSIBILITY : Review MTC, pipe dimension check, length,
Thickness, sample lab test.
VI. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : FBM KMN FZ Company, Jebel Ali.
RESPONSIBILITY : FAT inspection of pressure vessel, dimensional,
Orientation, final painting inspection.
VII. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : FLOWSERVE GULF FZ, DUBAI.
RESPONSIBILITY : FAT inspection of Globe valve, Ball valve.
Orientation, functional test, pneumatic test, final
Painting inspection.
VIII. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : FAM INTERNATIONAL FZE, AJMAN.
RESPONSIBILITY : Stage inspection of stacker re-claimer assembly,
Portal unit. Final inspection as per project
Approved drawing.
IX. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE
CLIENT : ENVIROPOL ENGINEERING PVT LTD, NOIDA, INDIA.
RESPONSIBILITY : FAT inspection of wet scrubber system.
Multi Discipline Inspector (TPI)
3) Velosi Certification Services.LLC, Abu Dhabi, UAE.
Duration : From August-2010 to July-2012
Company Profile: TPI service agency
Position : Multi Discipline Inspector in Vendor &
Project site.
Overall Responsibilities:
I. PROJECT FOR : Bab Gas compression project-I & II
CLIENT : ADCO, Habshan-2, Abu Dhabi, UAE.
RESPONSIBILITY :
 Reviewing and approved method statement, material submittal, inspection test
plan on behalf of client.
 Inspecting the visual and dimensional of the inward material Pipe, fittings, flanges,
valves, studs, bolts and nuts & review MTCs
 Confirming welding accordance with WPS, PQR and approved welder. Carrying
weld visual inspection and witnessing NDT and reviewing RT film
 Ensuring safety measures and excavation stability, back re-filling, material
handling, fabrication, insulation, installation, painting, pressure testing and
commissioning
 Inspecting the SKID, motor, pump, vessel, scrubber duct, boiler, hopper, and
conveyor.
 Witnessing hydro test, functional test of valve at vendor workshop.
 Doing the inspection and witnessing for the construction of the tank for Plate
inspection, layout, rolling, nozzle fit up and monitoring welding, NDT, Pneumatic
test, PWHT, Hardness etc. as per drawing and ITP.
II. PROJECT FOR : Habshan-5, GASCO, Abu Dhabi, UAE
CLIENT : OGASCO-construction Company, Mussafah, Abu
Dhabi.
RESPONSIBILITY : Witnessed of PQR, WPQR, material inspection,
Witnessed of pneumatic test, hydrostatic test of
Piping spools at workshop. Witnessing HIC, IGC
For inconel, SS test loading and unloading and test
III. PROJECT FOR : Khurais Central Processing Facilities –Gas
Package, Saudi Aramco project.
CLIENT : McDermott, Jebel Ali FZC.
RESPONSIBILITY : Witnessed of WPQT, weld visual inspection of
Piping spools, packaging inspection of offshore
Skids, final inspection of painting and coating.
IV. PROJECT FOR : Sohar-2 power station, Sultanate of Oman. Workshop in RALCO
Industries, Hamriyah free zone, Sharjah.
CLIENT : GS ENGINEERING & CONSTRUCTION.
RESPONSIBILITY : Witnessed of WPQT, Fabrication and weld visual
Inspection of Piping spools, Structural steel works
And painting inspection and review and insure
Shipment release note.
V. PROJECT FOR : Ruwais NGL-4 refinery expansion project, GASCO.
CLIENT : CB&I.
RESPONSIBILITY : Reinstatement of above ground gas storage Tanks,
Piping line, pre-hydrostatic test line walk down and
Issuing punch list, test package review. Attend
Pre-Commissioning activities of each lot before
Final Commissioning taking place by client.
4) M/S SEO KWANG Electric Co. Ltd. Al-Khobar, Saudi Arabia
Duration : November 2006 to December-2009
Company Profile: TPI service agency/construction &
Maintenances
Position : Multi Discipline Inspector/Vendor
Inspection.
Overall Responsibilities:
PROJECTS
I. PROJECT FOR : Berri Gas plant, Al-Jubail, KSA.
CLIENT : AL-SUWAIDI INDUSTRIAL SERVICES CO. LTD
Responsibilities
 Incoming material inspection.
 Review of material certificates for traceability verification.
 Witnessed of positive material identification test (PMI).
 Witness of PQT, WPQT for each required process.
 Witnessed of mechanical lab test.
 Stage inspection as per approved ITP for piping spools.
 Witnessed of Pneumatic test, hydrostatic pressure test.
 Witnessed of PQT for painting systems, Pull off testing, holiday test.
II. PROJECT FOR : RAS TANURA Refinery expansion project,
Ras Tanura, KSA.
CLIENT : MOHAMMAD AL MOJIL GROUP (MMG), DAMMAM,
KSA, WORKSHOP.
Responsibilities
 Incoming material inspection.
 Review of material certificates for traceability verification.
 Witnessed of positive material identification test (PMI).
 Witness of PQT, WPQT for each required process.
 Witnessed of mechanical lab test.
 Stage inspection as per approved ITP for piping spools.
 Witnessed of Pneumatic test, hydrostatic pressure test.
 Witnessed of PQT for painting systems, Pull off testing, holiday test.
III. PROJECT FOR : Saudi Kayan Polycarbonate Project ,
Al-Jubail-2,KSA.
CLIENT : MOHAMMAD AL MOJIL GROUP (MMG), DAMMAM,
KSA, WORKSHOP.
Responsibilities
 Incoming material inspection.
 Review of material certificates for traceability verification.
 Witnessed of positive material identification test (PMI).
 Witness of PQT, WPQT for each required process.
 Witnessed of mechanical lab test.
 Stage inspection as per approved ITP for piping spools.
 Witnessed of Pneumatic test, hydrostatic pressure test.
IV. PROJECT FOR : Petro Rabigh, Saudi ARAMCO Project,
Rabigh,KSA.
CLIENT : AL-SUWAIDI INDUSTRIAL SERVICES CO. LTD,
Rabigh,KSA, WORKSHOP.
Responsibilities
 Witness of PQT, WPQT for each required process.
 Witnessed of mechanical lab test.
 Incoming material inspection.
 Witnessing HIC, IGC for inconel 625, SS test loading and unloading and test
 Review of material certificates for traceability verification.
 Witnessed of positive material identification test (PMI).
 Stage inspection as per approved ITP for piping spools.
 Witnessed of Pneumatic test, hydrostatic pressure test.
V. PROJECT FOR : ABQAIQ refinery & cross country pipeline, ARAMCO
Project,
CLIENT : FMQ SONS CO,
ABQAIQ,KSA, (WORKSHOP).
Responsibilities
 Witness of PQT, WPQT for each required process.
 Witnessed of mechanical lab test.
 Incoming material inspection.
 Review of material certificates for traceability verification.
 Witnessed of positive material identification test (PMI).
 Witnessing HIC, IGC for inconel 625, SS test loading and unloading and test
 Pre/Post heating, Post Weld Heat Treatment,
 Witnessing of NDT and Report Review, Hardness verification as per Code/ Standards,
Project Specifications.
 Stage inspection as per approved ITP for piping spools.
 Witnessed of Pneumatic test, hydrostatic pressure test.
VI. PROJECT FOR : RAS TANURA Refinery expansion project, Al-Jubail,
KSA.
CLIENT : CB&I, DAMMAM,KSA (WORKSHOP).
RESPONSIBILITY : witnessed of PQR, WPQT, Mechanical testing,
Inspection of pressure vessel like, weld visual, NDT,
Hardness test, PMI, PWHT, Pressure test, final
Dimensional Inspection, orientation check,
VII. PROJECT FOR : SAUDI CHEVRON PHILLIPS COMPANY, JUBAIL,KSA.
CLIENT : AYTB Industrial Construction Company.
Al-Jubail,KSA, (WORKSHOP).
Responsibilities
 Witness of PQT, WPQT for each required process.
 Witnessed of mechanical lab test.
 Incoming material inspection.
 Review of material certificates for traceability verification.
 Witnessed of positive material identification test (PMI).
 Pre/Post heating, Post Weld Heat Treatment,
 Witnessing of NDT and Report Review, Hardness verification as per Code/ Standards,
Project Specifications.
 Witnessing HIC, IGC for inconel 625, SS test loading and unloading and test
 Stage inspection as per approved ITP for piping spools.
 Witnessed of Pneumatic test, hydrostatic pressure test.
VIII. PROJECT FOR : MARAFIQ WIPP HYDRO POWER PLANT,
JUBAIL,KSA.
CLIENT : DONG SUNG AL-SUWAIDI GROUP Company.
Al-Jubail, KSA, (WORKSHOP & PLANT).
CLIENT : MOHAMMED AL-GHAMDI PARTNERS.
Al-Jubail, KSA, (WORKSHOP & PLANT).
Responsibilities
 Witness of PQT, WPQT for each required process.
 Witnessed of mechanical lab test.
 Incoming material inspection.
 Review of material certificates for traceability verification.
 Witnessed of positive material identification test (PMI).
 Pre/Post heating, Post Weld Heat Treatment,
 Witnessing of NDT and Report Review, Hardness verification as per Code/ Standards,
Project Specifications.
 Stage inspection as per approved ITP for piping spools.
 Witnessed of Pneumatic test, hydrostatic pressure test. Verifying calibration records for
testing and inspection equipment’s. Line checking, Punch listing and cleaning.
 Above ground storage tanks and vessels Final weld Visual, Dimensional, Hydro testing
Inspection of piping as per approved test packs
 Review pre-hydrostatic test packages.
 Issuing punch list and categories as requirements.
 Attend pre-hydrostatic test meeting along with contractor & client.
 Witness of Erection of piping system as per approved isometric drawings; Installation,
 Witnessed of Hydro static pressure test of pipeline, piping, storage tank and
pressure vassals.
5) M/S SIEVERT INDIA PVT. Ltd. MUMBAI, INDIA
Duration : November 2002 to September-2006
Company Profile : NDT-Inspection service agency.
Position : Multidiscipline NDT Technician, Site
Supervisor.
PROJECT FOR : ESSER OIL, BPCL, HPCL, IOCL, RELIENCE, ONGC.
CLIENT : DODSAL, PUNJLLOYED, L&T LIMITED, ESSER, JAI
HIND CONSTRUCTION,
Overall Responsibilities:
I. Radiography carried out by X-ray crawler (IPSI & ICM X-ray unit) on
pipe Line, station piping joint. Many cross country pipeline in all over
India.
II. Gamma radiography Ir192 source use on butt welds of pressure vessels,
pipes, boilers, pipe coils, shell & structural welding and casting.
III. Film interpretation relating to pipe line offshore structures, as per API &
ASME standards etc. Interpretation of Radiographs.
IV. Dye Penetrate testing of: Different type of joints such as Butt joints,
Fillet joints, ‘T’- joints, Supporting Pads Root and final welding of piping
joints also performed on Forging, Castings, Weld edge preparations,
Fittings by Visible Dye color contrast & Fluorescent method.
V. Magnetic particle testing of: Root and final welding of piping joints,
Vessel joints, Fillet joints, Supporting pads & Boxes by Yoke (longitudinal
magnetization) and Prod (circular magnetization) by Dry powder and Wet.
VI. Ultrasonic Flaw Detection (UFD) of butt welds and lamination of plates.
Thickness Gauging, Corrosion monitoring of Vessels, Storage Tank bottom &
annular plates, Pipelines etc.
Overall Responsibilities:
• Above ground storage tank inspection as per API650 &
ASME Section. IX,
• fabrication, erection, fit-up, weld visual, peaking & banding,
plumbness,
• Nozzle orientation, roundness, floating level.
• Vacuum box test of bottom plate lap & shell to annular plate
corner joints.
• NDT Inspection such as RT, UT, MPI, PT, Film interpretation,
• Final walk down before hydro test, reviewing test package.
• Tank base settlement inspection during water filling for hydro
static testing inspection.
• Air leak test, nozzle pneumatic test, drying,
• internal lining & external painting, coating inspection.
• Inspection of pressure vessel & Heat Exchanger
• Construction code ASME section-VIII, Division-1, welding code-
ASME Sec.IX, heat exchanger-“TEMA”
• Shell preparation: plates marking & cutting, pressing (pre-
pinching), rolling,
• long seam fit-up and welding, radiography testing and other NDT
inspection as ITP requirement.
• Circumferences-seam fit-up and welding, radiography testing.
• Nozzle opening marking, cutting, fit-up, welding, final dimension,
preparing test pack,
• Reviewing and ensuring requirement with GA drawing and hydro
testing.
Painting inspection in Piping:
 Inspection of surface preparation from abrasives like coal slag, Garnet
etc. prior to painting.
 Ensure the environmental conditions like Relative humidity, Dew point
and Steel surface temperature etc.
 Ensuring the surface profile as per project specification.
 Ensuring the allowed salt contamination by Salt Contamination Meter
as per project specification.
 Inspection of Inorganic Zinc silicate by MEK solvent rub test according
to International standards.
 Inspection of mixing, thinning and application of painting as per
Inspection and Test Plan of the project.
 Ensure the dry film thickness and over coating interval before
subsequent scheme painting.
 Reviewing daily painting reports.
Coating inspection in Pipeline:
 Inspection of surface preparation from abrasives like coal slag, Garnet
etc. prior to painting.
 Ensure the environmental conditions like Relative humidity, Dew point
and Steel surface temperature etc.
 Ensuring the surface profile as per project specification.
 Ensuring the allowed salt contamination by Salt Contamination Meter
as per project specification.
 Inspection of pre heating, post heating and application of Fusion Bond
Epoxy (FBE) on field joint by force curing.
 Inspection of installation of Poly propylene (3LPP) Heat Shrink Sleeves
of Canusa-CPS (GTS-PP-Wrapid sleeve) on girth-welded joints of Main
Oil transfer lines & Production Transfer Line and CanusaTube on Gas
injection pipelines.
 Inspection of the coating integrity by portable High voltage DC holiday
detector (SPY-Model 790).
 Inspection of coating adhesion by peel strength test.
 Inspection of the encapsulation integrity of the Cathodic Protected area
by portable High voltage DC holiday detector (SPY-Model 790).
 Inspection of the coating integrity of mainline and field joint coating
before lowering the pipelines to the trench.
 Reviewing daily coating reports, Holiday detection report, Adhesion
test report etc.
Coating and lining inspection in Storage tanks:
 Inspection of surface preparation from abrasives like coal slag, Garnet
etc. prior to painting.
 Ensure the environmental conditions like Relative humidity, Dew point
and Steel surface temperature etc.
 Ensuring the surface profile as per project specification.
 Ensuring the allowed salt contamination by Salt Contamination Meter
as per project specification.
 Inspection of Inorganic Zinc silicate by MEK solvent rub test according
to International standards.
 Inspection of mixing, thinning and application of painting as per
Inspection and Test Plan of the project.
 Ensure the dry film thickness and over coating interval before
subsequent scheme painting.
Declaration
I hereby declare that those information have given by me are correct and
true to the best of my knowledge.It I were places in your esteemed concern.
I will discharge my duties with at most sincerity and to your full satisfaction
(SUJIT PRAMANIK) DATE: 24th
January 2015

More Related Content

What's hot

00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERMOHAMMED ZUBAIR
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineerashwin mahale
 
AKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalAKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalMohammad Akram Mian
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFChandra Battu
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspectorLatchanna Akula
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSanad Samir
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerMujeebuddin Mohammad
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated ResumeMurugan murugan
 

What's hot (20)

00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineer
 
AKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalAKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor Mechanical
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
QC. CV
QC. CVQC. CV
QC. CV
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
Updated cv
Updated cvUpdated cv
Updated cv
 

Similar to Sujit TPI CV

Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish Murugesan
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1karuppa samy
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanShabin Shajahan
 
Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016Bupathy Vidyapathy
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMadan Kumar
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_originalSaif Ali
 
Varun Resume
Varun Resume Varun Resume
Varun Resume varun k
 
Gopi Resume March 2015 Updated
Gopi Resume March 2015 UpdatedGopi Resume March 2015 Updated
Gopi Resume March 2015 UpdatedGopi Chinta
 
vinu new cv p wp
vinu new cv p wpvinu new cv p wp
vinu new cv p wpVinu K S
 
Resume Tariq QA
Resume Tariq QAResume Tariq QA
Resume Tariq QATariq mohd
 
INSPECTION COORDINATOR
INSPECTION COORDINATORINSPECTION COORDINATOR
INSPECTION COORDINATORJobby Abraham
 
Muhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIPMuhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIPMuhammad Imran
 

Similar to Sujit TPI CV (20)

Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
Piping Engineer
Piping EngineerPiping Engineer
Piping Engineer
 
JIMJITH QC INSPECTOR
JIMJITH QC INSPECTORJIMJITH QC INSPECTOR
JIMJITH QC INSPECTOR
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
CV-Tamilmaran-B.E (Mechanical)
CV-Tamilmaran-B.E (Mechanical)CV-Tamilmaran-B.E (Mechanical)
CV-Tamilmaran-B.E (Mechanical)
 
Varun Resume
Varun Resume Varun Resume
Varun Resume
 
A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)
 
Gopi Resume March 2015 Updated
Gopi Resume March 2015 UpdatedGopi Resume March 2015 Updated
Gopi Resume March 2015 Updated
 
vinu new cv p wp
vinu new cv p wpvinu new cv p wp
vinu new cv p wp
 
Resume Tariq QA
Resume Tariq QAResume Tariq QA
Resume Tariq QA
 
Govindaswamy-cv
Govindaswamy-cvGovindaswamy-cv
Govindaswamy-cv
 
INSPECTION COORDINATOR
INSPECTION COORDINATORINSPECTION COORDINATOR
INSPECTION COORDINATOR
 
Muhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIPMuhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIP
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 

Sujit TPI CV

  • 1. Sujit Pramanik (Third party inspector professional in Vendor, FAT & Project site inspection) Mobile No: +971-567112650(UAE) Mobile No: +91-8670391237/+91-9874433136 (India) Village: Akhuabari, PO: BrajalalChak, PS: Chandipur, Pin No: 721659 District: East Mindnapore, West Bengal, India. E-mail: sujitpramanik_81@yahoo.co.in UAE VALID DRIVING LICENSE NO: 742540 sujitpramanik@hotmail.com PERSONAL PROFILE Date of Birth : 24th March 1981 Nationality : Indian Passport No : K4922308 Validity up to August 2022 Proposed Position : Sr.QA/QC-Engineer & Project coordinator. Total Experience : 12 Years EDUCATIONAL QUALFICATIONS  Bachelor of Mechanical Engineering PROFESSIONAL COMPETENCE  NACE CIP-Level-II coating & Painting inspector (Cert no.22992)  Certified senior Welding Inspector (CSWIP) 3.1 (Cert no.74189)  AWS /CWI—(CERTIFIED WELDING INSPECTOR)  ISO 9001:2008 LEAD AUDITOR COURSE  American Society of Non Destructive Testing (ASNT) Level II certified in the following NDT methods. 1.Ultrasonic Test (UT) 2.Dye Penetration Test (DPT) 3.Magnetic Particle Inspection (MPI) 4.Radiographic Test (RT) Software Skills  Good amount of experience with MS office Tools and familiarization with MS access data base WORK EXPERIENCE QAQC-Engineer & Project Coordinator 1) Lindenberg Emirates LLC, Abu Dhabi, UAE. Duration: From April 2014 till date. Company Profile : Lindenberg is specialized in EPC projects and its aspect of contracting is including Water, power related activities, civil & Electro-mechanical general contracting, Oil & Gas related activities and Repair & Maintenance works Etc., Position : QA/QC Engineer/Coordinator.
  • 2. SCOPE OF WORK : Supply and Laying the CS pipes including PE coating and cement mortar lining for 110 km and construction of high point reservoir TANK 2 x 5MIG Responsibilities : A) Preparing the ITP for welding, coating and carrying inspection for pipeline and coating. B) Preparing WPS and conducting PQR, WQT for welding. Conducting PQT for coating Heat shrinkage sleeve etc., C) Preparing Pipe book, monitoring RFI, reviewing Drawing, maintaining RFI log, Project weld status Control of As-Built Drawing etc., D)Monitoring mitre joint and verifying degree deflection and carrying inspection for the field coating FBE and HSS and performing the peel test. E) Monitoring the welding for normal joint and tie in joints and coating and reviewing the RT film F) Coordinating with client and sub-contractor work sequence in order to comply the quality in trench excavation, bedding, lowering, padding, backfilling and field CML etc. Overall Responsibilities:  Preparing forecast weekly and monthly quality monitoring plan & follow up inspection all stage of work and Attending minutes draft meeting with client and consultant every week  Assist the TPI and Source Inspection Quality Lead in the preparation of the Procurement QC Surveillance Plans.  Assist the QA/QC team to review Vendor QA/QC Documentation, e.g. Quality Plan, ITP, QA/QC Procedures, etc.  Review the technical requirements and specifications included in the PO to ensure that Project inspection and testing requirements are met.  Participate meeting between the project QAQC, Construction and subcontractor with the consultant/client weekly meetings, pre-award manufacturing surveys and kick-off meetings before start the construction work.  Prepare the action plan of previous minutes of meeting.  Prepare and/or review/validate the Quality Control Surveillance reports resulting from shop surveillance activities.  Review and approve Vendor's Inspection and Test Plans.  Prepare and issue TPI Work Assignment Packages.  Co-ordinate the implementation of TPI Work Assignment Packages.  Ensure regular co-ordination and QAQC team meetings are held with TPI representatives.  Ensure inspection activities are closely monitored to ensure that inspection schedule is maintained.  Conduct frequent surveillance visits to ensure that the inspection activities are implemented in accordance with the approved Quality Plan and ITP's.  Coordinating with Contractor Inspection Team for carrying out the required NDT as per the project scope of work.  Reviewing Contractor NDT / Weld Maps for classification of structural items.  Monitoring quality trends including supervision of interior inspection, surveillance personnel and assist fabrication heads in the areas of quality.  Overseeing Welding Procedure Qualification, Welder Qualification Tests and Destructive Testing of Specimens.
  • 3.  Administering Radiographic Interpretation and performing signing of NDT & Release Inspection Reports further activities.  Supervising Non-Destructive Testing of equipment and piping encompassing review of preliminary interpretations carried out by NDT Technicians.  Ensuring the quality system is regularly maintained and recorded.  Coordinate with other departments to relay some important report regarding Quality control & Assurance. Monitoring and ensuring with QC inspectors to inspect as per ITP and specifications.  Responsible to guide technical evaluation, analysis and related data acquisition processes to ensure plant quality objectives are achieved.  Monitoring the each stage of activity and controlling to prevent its unintended process, and control by NCR, CPAR.  Developing, modifying, applying and maintains quality standards for product & process. Ensuring the FAT & SAT report prepared by suppliers and will be verified  Conducting internal audit and doing external Audit with the sub-Contractor.  Preparation of ITP and Technical work instruction related to various welding job.  Participating in failure analysis and corrective action investigations and supporting to corrective action request program.  Well conversant with welding processes of SMAW, GTAW, GMAW, FCAW and SAW  Conversant with various industry codes such as ASME SEC IX, ASME SEC VIII Div 1, AWS D 1.1, API 650, API 1104,ASME B 16.34, ASME B 31.1, ASME B 31.3, API 6A, API 598, NACE MR 01 75, BS EN 970, BS EN 15614-1, BS EN 1461, BS EN 1714, BSEN 1712, BS EN 1290 and BS EN 571-1. 2) Intertek Moody International, Abu Dhabi, UAE. Duration : From December-2012 to December-2013. Company Profile: TPI service agency Position : Multi Discipline Inspector & Vendor inspection Overall Responsibilities: PROJECTS I. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE CLIENT : GASCO SCOPE OF WORK : Inspection of new construction liquid sulphur storage tank, oil storage tank, water storage tank, above ground liquid sulphur transportation pipeline, rail track welding, installation of conveyor and structure. Responsibilities  Carrying the work as per approved drawing and ITP  Inspecting the visual and dimensional of the inward material Pipe, fittings, flanges, valves, studs, bolts and nuts & review MTCs  Confirming welding accordance with WPS, PQR and approved welder. Carrying weld visual inspection and witnessing NDT and reviewing RT film  Ensuring safety measures and excavation stability, back re-filling, material handling, fabrication, insulation, installation, painting, pressure testing and commissioning  Inspecting the SKID and witnessing hydro test, functional test (PTSH 1440 psi).  Doing the inspection and witnessing for the construction of the tank for Plate inspection, layout, rolling, nozzle fit up and monitoring welding, NDT, Pneumatic test, PWHT, Hardness etc. as per drawing and ITP.
  • 4. II. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE CLIENT : Perma Pipe middle east, FZC, Fujairah. RESPONSIBILITY : FAT inspection of pipe dimension check, length, Thickness, Inspection of Factory coating. III. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE CLIENT : Gulf steel works. RESPONSIBILITY : witnessed of PQT, WPQT and mechanical lab test. IV. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE CLIENT : DESCON ENGINEERING, FZE, SHARJAH. RESPONSIBILITY : FAT inspection of Surge vessel, final dimensional Inspection, orientation check, final weld visual Inspection. V. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE CLIENT : TROUVAY & CAUVIN GULF, Jebel Ali. RESPONSIBILITY : Review MTC, pipe dimension check, length, Thickness, sample lab test. VI. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE CLIENT : FBM KMN FZ Company, Jebel Ali. RESPONSIBILITY : FAT inspection of pressure vessel, dimensional, Orientation, final painting inspection. VII. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE CLIENT : FLOWSERVE GULF FZ, DUBAI. RESPONSIBILITY : FAT inspection of Globe valve, Ball valve. Orientation, functional test, pneumatic test, final Painting inspection. VIII. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE CLIENT : FAM INTERNATIONAL FZE, AJMAN. RESPONSIBILITY : Stage inspection of stacker re-claimer assembly, Portal unit. Final inspection as per project Approved drawing. IX. PROJECT FOR : Habshan Sulphur Granulation Project -GASCO, Abu Dhabi, UAE CLIENT : ENVIROPOL ENGINEERING PVT LTD, NOIDA, INDIA. RESPONSIBILITY : FAT inspection of wet scrubber system. Multi Discipline Inspector (TPI) 3) Velosi Certification Services.LLC, Abu Dhabi, UAE. Duration : From August-2010 to July-2012 Company Profile: TPI service agency Position : Multi Discipline Inspector in Vendor & Project site. Overall Responsibilities: I. PROJECT FOR : Bab Gas compression project-I & II
  • 5. CLIENT : ADCO, Habshan-2, Abu Dhabi, UAE. RESPONSIBILITY :  Reviewing and approved method statement, material submittal, inspection test plan on behalf of client.  Inspecting the visual and dimensional of the inward material Pipe, fittings, flanges, valves, studs, bolts and nuts & review MTCs  Confirming welding accordance with WPS, PQR and approved welder. Carrying weld visual inspection and witnessing NDT and reviewing RT film  Ensuring safety measures and excavation stability, back re-filling, material handling, fabrication, insulation, installation, painting, pressure testing and commissioning  Inspecting the SKID, motor, pump, vessel, scrubber duct, boiler, hopper, and conveyor.  Witnessing hydro test, functional test of valve at vendor workshop.  Doing the inspection and witnessing for the construction of the tank for Plate inspection, layout, rolling, nozzle fit up and monitoring welding, NDT, Pneumatic test, PWHT, Hardness etc. as per drawing and ITP. II. PROJECT FOR : Habshan-5, GASCO, Abu Dhabi, UAE CLIENT : OGASCO-construction Company, Mussafah, Abu Dhabi. RESPONSIBILITY : Witnessed of PQR, WPQR, material inspection, Witnessed of pneumatic test, hydrostatic test of Piping spools at workshop. Witnessing HIC, IGC For inconel, SS test loading and unloading and test III. PROJECT FOR : Khurais Central Processing Facilities –Gas Package, Saudi Aramco project. CLIENT : McDermott, Jebel Ali FZC. RESPONSIBILITY : Witnessed of WPQT, weld visual inspection of Piping spools, packaging inspection of offshore Skids, final inspection of painting and coating. IV. PROJECT FOR : Sohar-2 power station, Sultanate of Oman. Workshop in RALCO Industries, Hamriyah free zone, Sharjah. CLIENT : GS ENGINEERING & CONSTRUCTION. RESPONSIBILITY : Witnessed of WPQT, Fabrication and weld visual Inspection of Piping spools, Structural steel works And painting inspection and review and insure Shipment release note. V. PROJECT FOR : Ruwais NGL-4 refinery expansion project, GASCO. CLIENT : CB&I. RESPONSIBILITY : Reinstatement of above ground gas storage Tanks, Piping line, pre-hydrostatic test line walk down and Issuing punch list, test package review. Attend Pre-Commissioning activities of each lot before Final Commissioning taking place by client.
  • 6. 4) M/S SEO KWANG Electric Co. Ltd. Al-Khobar, Saudi Arabia Duration : November 2006 to December-2009 Company Profile: TPI service agency/construction & Maintenances Position : Multi Discipline Inspector/Vendor Inspection. Overall Responsibilities: PROJECTS I. PROJECT FOR : Berri Gas plant, Al-Jubail, KSA. CLIENT : AL-SUWAIDI INDUSTRIAL SERVICES CO. LTD Responsibilities  Incoming material inspection.  Review of material certificates for traceability verification.  Witnessed of positive material identification test (PMI).  Witness of PQT, WPQT for each required process.  Witnessed of mechanical lab test.  Stage inspection as per approved ITP for piping spools.  Witnessed of Pneumatic test, hydrostatic pressure test.  Witnessed of PQT for painting systems, Pull off testing, holiday test. II. PROJECT FOR : RAS TANURA Refinery expansion project, Ras Tanura, KSA. CLIENT : MOHAMMAD AL MOJIL GROUP (MMG), DAMMAM, KSA, WORKSHOP. Responsibilities  Incoming material inspection.  Review of material certificates for traceability verification.  Witnessed of positive material identification test (PMI).  Witness of PQT, WPQT for each required process.  Witnessed of mechanical lab test.  Stage inspection as per approved ITP for piping spools.  Witnessed of Pneumatic test, hydrostatic pressure test.  Witnessed of PQT for painting systems, Pull off testing, holiday test. III. PROJECT FOR : Saudi Kayan Polycarbonate Project , Al-Jubail-2,KSA. CLIENT : MOHAMMAD AL MOJIL GROUP (MMG), DAMMAM, KSA, WORKSHOP. Responsibilities  Incoming material inspection.  Review of material certificates for traceability verification.
  • 7.  Witnessed of positive material identification test (PMI).  Witness of PQT, WPQT for each required process.  Witnessed of mechanical lab test.  Stage inspection as per approved ITP for piping spools.  Witnessed of Pneumatic test, hydrostatic pressure test. IV. PROJECT FOR : Petro Rabigh, Saudi ARAMCO Project, Rabigh,KSA. CLIENT : AL-SUWAIDI INDUSTRIAL SERVICES CO. LTD, Rabigh,KSA, WORKSHOP. Responsibilities  Witness of PQT, WPQT for each required process.  Witnessed of mechanical lab test.  Incoming material inspection.  Witnessing HIC, IGC for inconel 625, SS test loading and unloading and test  Review of material certificates for traceability verification.  Witnessed of positive material identification test (PMI).  Stage inspection as per approved ITP for piping spools.  Witnessed of Pneumatic test, hydrostatic pressure test. V. PROJECT FOR : ABQAIQ refinery & cross country pipeline, ARAMCO Project, CLIENT : FMQ SONS CO, ABQAIQ,KSA, (WORKSHOP). Responsibilities  Witness of PQT, WPQT for each required process.  Witnessed of mechanical lab test.  Incoming material inspection.  Review of material certificates for traceability verification.  Witnessed of positive material identification test (PMI).  Witnessing HIC, IGC for inconel 625, SS test loading and unloading and test  Pre/Post heating, Post Weld Heat Treatment,  Witnessing of NDT and Report Review, Hardness verification as per Code/ Standards, Project Specifications.  Stage inspection as per approved ITP for piping spools.  Witnessed of Pneumatic test, hydrostatic pressure test. VI. PROJECT FOR : RAS TANURA Refinery expansion project, Al-Jubail, KSA. CLIENT : CB&I, DAMMAM,KSA (WORKSHOP). RESPONSIBILITY : witnessed of PQR, WPQT, Mechanical testing,
  • 8. Inspection of pressure vessel like, weld visual, NDT, Hardness test, PMI, PWHT, Pressure test, final Dimensional Inspection, orientation check, VII. PROJECT FOR : SAUDI CHEVRON PHILLIPS COMPANY, JUBAIL,KSA. CLIENT : AYTB Industrial Construction Company. Al-Jubail,KSA, (WORKSHOP). Responsibilities  Witness of PQT, WPQT for each required process.  Witnessed of mechanical lab test.  Incoming material inspection.  Review of material certificates for traceability verification.  Witnessed of positive material identification test (PMI).  Pre/Post heating, Post Weld Heat Treatment,  Witnessing of NDT and Report Review, Hardness verification as per Code/ Standards, Project Specifications.  Witnessing HIC, IGC for inconel 625, SS test loading and unloading and test  Stage inspection as per approved ITP for piping spools.  Witnessed of Pneumatic test, hydrostatic pressure test. VIII. PROJECT FOR : MARAFIQ WIPP HYDRO POWER PLANT, JUBAIL,KSA. CLIENT : DONG SUNG AL-SUWAIDI GROUP Company. Al-Jubail, KSA, (WORKSHOP & PLANT). CLIENT : MOHAMMED AL-GHAMDI PARTNERS. Al-Jubail, KSA, (WORKSHOP & PLANT). Responsibilities  Witness of PQT, WPQT for each required process.  Witnessed of mechanical lab test.  Incoming material inspection.  Review of material certificates for traceability verification.  Witnessed of positive material identification test (PMI).  Pre/Post heating, Post Weld Heat Treatment,  Witnessing of NDT and Report Review, Hardness verification as per Code/ Standards, Project Specifications.  Stage inspection as per approved ITP for piping spools.  Witnessed of Pneumatic test, hydrostatic pressure test. Verifying calibration records for
  • 9. testing and inspection equipment’s. Line checking, Punch listing and cleaning.  Above ground storage tanks and vessels Final weld Visual, Dimensional, Hydro testing Inspection of piping as per approved test packs  Review pre-hydrostatic test packages.  Issuing punch list and categories as requirements.  Attend pre-hydrostatic test meeting along with contractor & client.  Witness of Erection of piping system as per approved isometric drawings; Installation,  Witnessed of Hydro static pressure test of pipeline, piping, storage tank and pressure vassals. 5) M/S SIEVERT INDIA PVT. Ltd. MUMBAI, INDIA Duration : November 2002 to September-2006 Company Profile : NDT-Inspection service agency. Position : Multidiscipline NDT Technician, Site Supervisor. PROJECT FOR : ESSER OIL, BPCL, HPCL, IOCL, RELIENCE, ONGC. CLIENT : DODSAL, PUNJLLOYED, L&T LIMITED, ESSER, JAI HIND CONSTRUCTION, Overall Responsibilities: I. Radiography carried out by X-ray crawler (IPSI & ICM X-ray unit) on pipe Line, station piping joint. Many cross country pipeline in all over India. II. Gamma radiography Ir192 source use on butt welds of pressure vessels, pipes, boilers, pipe coils, shell & structural welding and casting. III. Film interpretation relating to pipe line offshore structures, as per API & ASME standards etc. Interpretation of Radiographs. IV. Dye Penetrate testing of: Different type of joints such as Butt joints, Fillet joints, ‘T’- joints, Supporting Pads Root and final welding of piping joints also performed on Forging, Castings, Weld edge preparations, Fittings by Visible Dye color contrast & Fluorescent method. V. Magnetic particle testing of: Root and final welding of piping joints, Vessel joints, Fillet joints, Supporting pads & Boxes by Yoke (longitudinal magnetization) and Prod (circular magnetization) by Dry powder and Wet. VI. Ultrasonic Flaw Detection (UFD) of butt welds and lamination of plates. Thickness Gauging, Corrosion monitoring of Vessels, Storage Tank bottom & annular plates, Pipelines etc. Overall Responsibilities: • Above ground storage tank inspection as per API650 & ASME Section. IX,
  • 10. • fabrication, erection, fit-up, weld visual, peaking & banding, plumbness, • Nozzle orientation, roundness, floating level. • Vacuum box test of bottom plate lap & shell to annular plate corner joints. • NDT Inspection such as RT, UT, MPI, PT, Film interpretation, • Final walk down before hydro test, reviewing test package. • Tank base settlement inspection during water filling for hydro static testing inspection. • Air leak test, nozzle pneumatic test, drying, • internal lining & external painting, coating inspection. • Inspection of pressure vessel & Heat Exchanger • Construction code ASME section-VIII, Division-1, welding code- ASME Sec.IX, heat exchanger-“TEMA” • Shell preparation: plates marking & cutting, pressing (pre- pinching), rolling, • long seam fit-up and welding, radiography testing and other NDT inspection as ITP requirement. • Circumferences-seam fit-up and welding, radiography testing. • Nozzle opening marking, cutting, fit-up, welding, final dimension, preparing test pack, • Reviewing and ensuring requirement with GA drawing and hydro testing. Painting inspection in Piping:  Inspection of surface preparation from abrasives like coal slag, Garnet etc. prior to painting.  Ensure the environmental conditions like Relative humidity, Dew point and Steel surface temperature etc.  Ensuring the surface profile as per project specification.  Ensuring the allowed salt contamination by Salt Contamination Meter as per project specification.  Inspection of Inorganic Zinc silicate by MEK solvent rub test according to International standards.  Inspection of mixing, thinning and application of painting as per Inspection and Test Plan of the project.  Ensure the dry film thickness and over coating interval before subsequent scheme painting.  Reviewing daily painting reports. Coating inspection in Pipeline:  Inspection of surface preparation from abrasives like coal slag, Garnet etc. prior to painting.  Ensure the environmental conditions like Relative humidity, Dew point and Steel surface temperature etc.  Ensuring the surface profile as per project specification.  Ensuring the allowed salt contamination by Salt Contamination Meter
  • 11. as per project specification.  Inspection of pre heating, post heating and application of Fusion Bond Epoxy (FBE) on field joint by force curing.  Inspection of installation of Poly propylene (3LPP) Heat Shrink Sleeves of Canusa-CPS (GTS-PP-Wrapid sleeve) on girth-welded joints of Main Oil transfer lines & Production Transfer Line and CanusaTube on Gas injection pipelines.  Inspection of the coating integrity by portable High voltage DC holiday detector (SPY-Model 790).  Inspection of coating adhesion by peel strength test.  Inspection of the encapsulation integrity of the Cathodic Protected area by portable High voltage DC holiday detector (SPY-Model 790).  Inspection of the coating integrity of mainline and field joint coating before lowering the pipelines to the trench.  Reviewing daily coating reports, Holiday detection report, Adhesion test report etc. Coating and lining inspection in Storage tanks:  Inspection of surface preparation from abrasives like coal slag, Garnet etc. prior to painting.  Ensure the environmental conditions like Relative humidity, Dew point and Steel surface temperature etc.  Ensuring the surface profile as per project specification.  Ensuring the allowed salt contamination by Salt Contamination Meter as per project specification.  Inspection of Inorganic Zinc silicate by MEK solvent rub test according to International standards.  Inspection of mixing, thinning and application of painting as per Inspection and Test Plan of the project.  Ensure the dry film thickness and over coating interval before subsequent scheme painting. Declaration I hereby declare that those information have given by me are correct and true to the best of my knowledge.It I were places in your esteemed concern. I will discharge my duties with at most sincerity and to your full satisfaction (SUJIT PRAMANIK) DATE: 24th January 2015