1. NEELKANTH R.GAVHANKAR
E-Mail: neel0359@gmail.com ; neel.gavhankar@gmail.com.com
Cell: UAE: +971 508248316. India: +91 9869 700142, +91 9969 444978.
To pursue a career in a competitive and challenging environment where I can
utilize my potential and expand my knowledge to the best of my abilities.
ACADEMIC CREDENTIALS
NACE Coating Inspector Level 1—Certified , CIP CERT. # 19687
Also NACE INDIA SECTION INTERNATIONAL ,Certified Course in Painting & Coating
Inspection.
Well Experience in Inspection of Insulation & Cladding.
NDT ASNT LEVEL II IN (UT, RT, PT, MPT)
Certificate course in Welding Inspector from Adore Institute of welding Technology.
Diploma (Mechanical) from B.T.E. Mumbai , 1997-98
Over 13 years and 10 months of experience in Quality Control & Assurance Department &
Construction as well as Team Management with various organizations.
SAFETEY Skills ; H2S GAS LEAK & CONFINED SPACE CONDUCTED BY RAS GAS IN
QATAR
PERSONAL DETAIL
Date of Birth : 22nd October 1975
Languages Known : English, Hindi, and Marathi.
Marital Status : Married
Passport Details : J1660330, Expiry Date : 04 /07 /2020
UAE Driving License : 2096022, Expired Date: 07 / 01 / 2023,(Auto. Gear-
LV)
Hobbies : Cricket, Reading, Swimming and Fitness Exercise.
2. PROFESSIONAL SNAPSHOT
ORGANIZATIONAL DETAILS:
[A] SAMSUNG ENGINEERING.
(A-02) As a Painting Supervisor, From 16-June-2014 to till date.
Project: Takreer, Carbon Black & Delayed Coker Project.
Location: Ruwais, United Arab Emirates.
(A-01) As a Painting Supervisor, From Jan-2012 to till 15-June-2014.
Project: Shah Gas Development Project.
Location: Abu Dhabi, United Arab Emirates.
General Description of Responsibilities / Task Performed:
Plans and develops work schedules, equipment usage schedules, priority of painting
expenditures and procedures for equipment maintenance.
Updating data in FMC.
Maintains time, payroll and material records and submits reports as required.
Monitors the acquisition and use of materials.
Trains or informs employees of new work methods or procedures, changes in safety
regulations and work policies.
Knowledge, Skills and Abilities:
Knowledge of supervisory principles, practices and techniques.
Knowledge of the tools, equipment and materials common to the painting trade.
Skill in the preparation and application of paints to different types of surfaces.
Skill in estimating time and material requirements of work projects assigned.
Ability to effectively communicate.
[B] Saudi Specialize Cont. & Industrial Services.
As a Business Coordinator, From Oct-2011 to Dec-2011.
Location: Al Jubail, Kingdom of Saudi Arabia
3. [C] Valentine and Maritime Saudi Limited Co.
As a Site Supervisor, From June-2011 To Sept. 2011.
Project: Manifa Offshore Crude & Water Injection Pipeline and Power &
Communication Cables Project.
Location: Manifa, Kingdom Of Saudi Arabia.
[D] DODSAL Engineering & Construction Pte. Limited, Doha, State of
Qatar.
As a QC Inspector – Painting & Coating, From, Dec-2008 to Nov-2009.
Project: Ras Gas Onshore Expansion Project Phase- II (Train -6/7).
Location: Ras Laffan, Doha, Qatar.
[E] FOSTER AND WHEELER, Kingdom Of Saudi Arabia.
As a QC Inspector – Painting & Coating, Also making Inspection of Insulation
(Hot & Cold) with Cladding., From, May-2007 to Nov-2008.
Project: HASSAD Project, JANA, Al Jubail, Kingdom of Saudi Arabia.
Location: Al Jubail, Kingdom of Saudi Arabia
General Description of Responsibilities / Task Performed.
To performed QC inspection activities in accordance with the Project Quality Plan ,The
Project Schedule , and all Applicable Standards , Codes & Specification.
To ensure that Coating work is carried out as per the standard.
To ensure that only calibrated Equipments / Instruments are used on the project and
proper calibration record maintained.
To report directly to QA / QC Senior on matters for consultation on Quality concerns and
issues.
Description of TYPE OF Work / Task Performed
Review scope of work for the project, Specification Procedures and Requirements.
Check tools Calibration Certificate Validation.
As per Inspection Test Plan (ITP) follow the Inspection.
Check / Witness Steel Temperature, Relative Humidity, Dew Point, Wind Velocity Airborne
Contaminants using various test Instruments like Surface-contact Thermometer, Sling
Psychrometer (whirling hygrometer), and Psychometric.
Check / Witness mixing ratio of paint, cure & thinner is as per manufacture specification.
4. Witness / Check Coating works applied using Elcometer.
Check / Witness Holiday Test Detection.
[F] SGS India Pvt .Ltd. (Mumbai).
As a Mech. Inspector
From, Jan-2007 to Apr-2007.
SGS is a global leader and innovator in INSPECTION, TESTING, VERIFICATION,
CERTIFICATION services.
Completed a Certified Course of Painting & Coating Inspection in February 2007, organized by
NACE INDIA SECTION INTERNATIONAL.
Description of TYPE OF Work / Task Performed
Inspection of three layer of Polypropylene Epoxy Coating (FBE) on 36’’ LSAW Pipes at M/s.
MAN SAW Ind. Anjar, Gujarat.
Witnessing Mechanical Testing operations at Metallurgical Services.
Inspection done like Crane inspection (HOT, EOT), Flanges, ERW & SEAMLESS Pipes.
An effective communicator with excellent relationship management skills and strong
analytical,
CORE COMPETENCIES
Managing the workmen for achieving the periodic production targets.
Preparing Standard ISO Operating Procedures, manuals & work instructions for Q.C. & A
operations facilitating decision making by the management.
Planning of day-to-day activities like Inspection schedules, Various Testing (NDT, UT) and
allocating work for achieving daily targets.
Handling operations for improvement in quality of production for the smooth flow of operations.
Team Management
Leading, motivating and training the team to improve their operational efficiency.
Imparting training to supervisors and operators on basic process, quality improvements.
[G] Lloyds Metals & Engineers Ltd., Murbad, Mumbai.
As a Ass. Engineer (QA/QC)
From, June-2000 to Dec-2006.
The Company is involved in manufacturing of MS pipes of size range from 15 mm NB to 350
mm NB including API and ASTM grade pipes. Such as IS: 1239, IS: 3589, IS: 4270, IS: 1161,
BS: 1387, ASTM-A53 (Gr-A, Gr-B) API 5L, (PSL-1, PSL-2) the system have been integrated and
approved under ISO: 9002 Certification. The product approved by number of reputed third
party inspection agencies such as SGS, CEIL (Inspection wing of EIL), RITES, MECON, Lloyds
Register, PDIL & DNV.
Responsibilities Handled:
To work on a system for review of customer requirements.
5. To maintain a system for control of quality records for ensuring their irretrievability.
Receiving in process and final inspection and testing
Co-Ordination with logistics department for the status of dispatch material
Co-Ordination with third party inspection agencies.
Making on line inspection on tube mill.
[H] Mega Drives Pvt. Ltd.
As a Supervisor,
From, June-1998 to May-2000.
Project: Boeing 747-400 hanger project
Location: Air India, Mumbai.
Manufacturing EOT Crane; HOT Crane, Grab Buckets, and Hoists, Coupling & various types of
Gearboxes.
Responsibilities
Worked as Supervisor in Air-India site for Boeing 747-400 hanger project.
In project erection of 4- EOT Cranes (10 ton -2 Nos., 3ton -2 Nos.)
Material handling. Manpower handling.
NEELKANTH R.GAVHANKAR.
6. To maintain a system for control of quality records for ensuring their irretrievability.
Receiving in process and final inspection and testing
Co-Ordination with logistics department for the status of dispatch material
Co-Ordination with third party inspection agencies.
Making on line inspection on tube mill.
[H] Mega Drives Pvt. Ltd.
As a Supervisor,
From, June-1998 to May-2000.
Project: Boeing 747-400 hanger project
Location: Air India, Mumbai.
Manufacturing EOT Crane; HOT Crane, Grab Buckets, and Hoists, Coupling & various types of
Gearboxes.
Responsibilities
Worked as Supervisor in Air-India site for Boeing 747-400 hanger project.
In project erection of 4- EOT Cranes (10 ton -2 Nos., 3ton -2 Nos.)
Material handling. Manpower handling.
NEELKANTH R.GAVHANKAR.