1. PRANESH KUMAR V (Pranesh), B.E.,
QC Supervisor
India HP # +91-9894030700
E-Mail address: pranesh.visu@gmail.com
Nationality: Indian
Current Location: India
SUMMARY:
• 10 years of experience in Oil & Gas industry – 4 years in Onshore and 5 years In Offshore
Fabrication & Installation Projects.
• Involved in Jacket Fabrication & Installation, Riser & Spool Fabrication, Topside Module
Installation and Offshore Pipeline Construction Project as QA/QC Supervisor.
• Involved in various Onshore fabrication projects – Pressure Vessels, Heat Exchanger,
Reactors, Distillation Columns, Pipelines, Risers & Spools as TPI inspector and QA/QC
Inspector
• Handled PQR and WQT for Various projects
• Strong Knowledge in NDT, Piping and Structural Inspection
• Good Knowledge in Coating & Painting for offshore structure & pipeline projects.
• Codes familiar with: ASME, ASTM, API, AWS, DNV & NACE.
ACADEMIC QUALIFICATIONS:
• Bachelor of Mechanical Engineering ( Full Time)
College: Bannari Amman Institute of Technology, Coimbatore
University: Anna University
• Diploma in Mechanical Engineering (Full Time)
College: PSG College of Technology, Coimbatore
PROFESSIONAL QUALIFICATIONS:
• CSWIP 3.2.2–Senior Welding Inspector certified by TWI-UK (Certificate No: 83020)
• ASNT Level II in PT, MT, RT, UT & UT TKY
SAFETY COURSE: BOSIET (OPITO APPROVED). Valid till - 28/05/2019
1 of 7
2. PROFESSIONAL EXPERIENCE:
KREUZ SUBSEA PTE LTD
Designation : QC SUPERVISOR
Period : FEB 2016 to Present
PROJECTS HANDLED
• ONGC – MHNRD III RISER & SPOOL INSTALLATION PROJECT,INDIA-2016
• ONGC – MHSRD III RISER & SPOOL INSTALLATION PROJECT,INDIA-2016
Responsibilities:
• Qualifying the welders and welding operators to the applicable standards and procedures
• Checking of weld joint preparation before welding as per Clients specification.
• Check fit-up, bevel edge, root gap, root face, dimensional tolerance etc. as per the drawings
and WPS
• Ensure welding process, preheat and inter-pass temperature are in accordance to approved
specification.
• Inspection of welding activities according to Standards & Codes.
• Ensure that essential variables are in accordance to approved specifications..Verification of
repair work and repair weld test.
• Maintaining the records of weld rejection rate & welder repair rate.
• Verify that the joint geometry meet the requirements of the welding procedure and drawings.
• Visual inspection and dimensional of completed weld against the specification requirements
and drawings
• Full fill the NDT Requirements according to specification
• NDT reports reviewing and film evaluations
• Inspection of coatings (Heat shrink wraparound sleeves)
• Inspection of High density Polyurethane Foam coatings
• Holiday detection of field joints
2 of 7
3. • Co-ordinate the QC & NDT team.
DNV- GL OFFSHORE & INDUSTRIAL SERVICES (B) Sdn.Bhd
Designation : QCS ENGINEER
Period : APR 2015 to OCT 2015
PROJECTS HANDLED
• CHAMPION INTERMEDIATE DEEP PROJECT -2015
• EAST MOL PIPELINE PROJECT -2015
• EGRET PIPELINE REPLACEMENT PROJECT-2015
Responsibilities:
• Review of QA documents such as QAP/ITP, Procedures
• Review of material test certificate.
• Witness of Mechanical Test (Destructive Test at Independent Lab)
• Witness the welders and welding operators to the applicable standards and procedures
• Witness of weld joint preparation before welding.
• Witness fit-up, bevel edge, root gap, root face, dimensional tolerance etc. as per the drawings
and WPS
• Ensure welding process, preheat and inter-pass temperature are in accordance to approved
specification.
• Monitor of welding activities according to Standards & Codes.
• Ensure that essential variables are in accordance to approved specifications..Verification of
repair work and repair weld test.
• Witness storage and handling of welding consumables.
• Ensure that the overall handling of consumables is in accordance with the approved Handling
of Welding Consumables Procedure.
• Witness the hydro testing of Pressure Vessels
• NDT reports reviewing and film evaluations
• Witness of coatings (Heat shrink wraparound sleeves)
• Witness of High density Polyurethane Foam coatings
• Witness Holiday detection of field joints
3 of 7
4. SWIBER HOLDINGS PTE LTD, SINGAPORE
Designation : QC SUPERVISOR
Period : AUG 2010 to MAR 2015
PROJECTS HANDLED
• TOTAL - SMK3 PIPELINE & JACKET INSTALLATION PROJECT,INDONESIA-2014
• PERTAMINA ONWJ – EA-EJ PIPELINE REPLACEMENT PROJECT,INDONESIA -2014
• TOTAL AUSTRAL – PQR FOR VEGA PLEYADE OFFSHORE PROJECT, ARGENTINA-
2014
• PERTAMINA ONWJ-GGNEW FIELD DEVELOPMENT PIPELINE PROJECT,INDONESIA
-2014
• CONOCO PHILIPS SUBSEA SPOOL INSTALLATION PROJECT, INDONESIA - 2014
• TOTAL SISI NUBI PHASE 2B & PECIKO PHASE 7B PIPELINE PROJECT, INDONESIA-
2013
• PRP-2 PIPELINE REPLACEMENT & RISER INSTALLTION PROJECT,BRUNEI-2013
• CONOCO PHILIPS PIPELINE PROJECT, INDONESIA- 2013
• CLUSTER -7 RISER, J- TUBE, SPOOL INSTALLATION PROJECT, INDIA-2013
• ZWATIKA PIPELINE DEVELOPMENT PROJECT, MYANMAR -2013
• RUBY PIPELINE FIELD DEVELOPMENT PROJECT,INDONESIA-2012
• B193 SPOOL FABRICATION, BASSEIN FIELD, MUMABI-2012
• B193 SUB SEA PIPELINE ,BASSEIN FIELD, MUMABI-2012
• B193PP –JACKET INSTALLATTION,BASSEIN FIELD,MUMABI-2012
• LF 13 -2 PIPE LINE REPLACEMENT ,SOUTH CHINA SEA, CHINA-2011
• MHNRD – PH II PROJECT MUMBAI-2011 (onshore Fabrication)-2010
• SWP JACKET INSPECTION AT PIPAVA PORT, GUJARAT.-2010
Responsibilities:
• Verification to ensure the applicable welding procedure specifications, Drawings, and welding
related documents are approved by the authorities prior to start welding activities. Ensure that
the approved welding procedures are utilized for the production and process activities
• Review of Quality Plan (ITP), procedures.
4 of 7
5. • Interpret drawings and other documents.
• Review of material test certificate, consumable test certificate and calibration certificate of
equipments
• Qualifying the welders and welding operators to the applicable standards and procedures
• Checking of weld joint preparation before welding as per Clients specification.
• Check fit-up, bevel edge, root gap, root face, dimensional tolerance etc. as per the drawings
and WPS
• Ensure welding process, preheat and inter-pass temperature are in accordance to approved
specification.
• Inspection of welding activities according to Standards & Codes.
• Ensure that essential variables are in accordance to approved specifications..Verification of
repair work and repair weld test.
• Maintaining the records of weld rejection rate & welder repair rate.
• Verify that the joint geometry meet the requirements of the welding procedure and drawings.
• Visual inspection and dimensional of completed weld against the specification requirements
and drawings
• Full fill the NDT Requirements according to specification
• NDT reports reviewing and film evaluations
• Inspection of coatings (Heat shrink wraparound sleeves)
• Inspection of High density Polyurethane Foam coatings
• Holiday detection of field joints
• Co-ordinate the QC & NDT team.
SMART TECHNOCRATS CONSULTANCY SERVICES PVT.LTD,MUMBAI
Designation : TPI Inspector
Period : FEB 2008 to JUL 2010
Projects : Involved in various onshore fabrication projects – Pressure Vessels, Heat
Exchanger, Reactors, Distillation Columns, Pipelines, Spools and Risers.
Responsibilities:
• Review of QA documents such as QAP/ITP, Procedures
• Review of material test certificate.
• Witness of Mechanical Test (Destructive Test at Independent Lab)
5 of 7
6. • Witness storage and handling of welding consumables.
• Ensure that the overall handling of consumables is in accordance with the approved Handling
of Welding Consumables Procedure.
• Witness the hydro testing of Pressure Vessels
• Inspection of Fabrication and erection of piping systems and Pressure vessels, Weld
Summary, NDE reports and Final dimensions.
• Inspection of weldments, dimensional checks, pneumatic tests, Hydro tests in piping and
equipment
• Inspection of weldments in piping, vessels, tanks, exchangers and compressors & static
equipments.
• Checking AS-Built drawings
• Carrying out inspection at vendors place for plates, pipes, structural sections etc
M/S PREMIER ALLOYS, COIMBATORE
Designation : Quality Control Engineer
Period : JUN 2006 TO JAN 2008
Responsibilities:
• Test Bath samples for chemical composition addition
• Witness of Mechanical Test for test bar (Destructive Test at Independent Lab)
• Final visual inspection of Castings. (Check Heat no., Material Test Certificate, visual
inspection and numbering)
• Dimensional inspection.
• Maintaining Quality Records as required by company and specified in the Documented
Procedures/Plans.
• NDT reports reviewing and final QC release activities.
• Preparation of Daily Report
6 of 7
7. • Daily production plan
• Co-ordinate with the client for developing new patterns.
• First Stage Witness / Coordinate for NDT/Heat Treatment requirements with subcontractors.
COMPUTER KNOWLEDGE
Tools: Microsoft Word, Microsoft Excel and Power Point.
Operating Systems: Windows 98, 2000, XP, Vista& 2007.
PERSONAL PARTICULARS
Sex: Male
Marital Status: Married
Date of Birth: 14.02.1985
Languages Known: English, Hindi, & Tamil
DECELARATION
I hereby declare that the above information is true and correct to the best of my knowledge and
belief.
PRANESH KUMAR V
7 of 7