SlideShare a Scribd company logo
1 of 7
BABBU JAKIR HUSSAIN
Structural and Piping QA/QC inspector
CV updated on 13//11/2015
Page 1 of 7
RESUME
BABBU JAKIR HUSSAIN.
Nationality-Singaporean
Avenue 5, Blk 483, Cho Chu Kang Ave 5 #06 – 166,
Singapore – 680483.
Mobile +65-90085319 and 90024786
jakirsuryaa@yahoo.com.sg
linkedin-babbujakir hussain
-------------------------------------------------------------------------------------------------------------------
Introduction: More than 18 years’ experience and More than 14 years’ experience in Structural and
Piping Construction of FPSO , X mass tree(subsea)and Jack Up rig projects for Main hull
fabrication, ,offshore/onshore Process Modules fabrication, assembly and erection , turret structure,
process pipe rack structure,spread mooring structure, modification of cargo tanks ,Living Quarter
fabrication, leg well and spud cane fabrication , assembly &erection of Panton blocks and nodes,
involve piping inspection for various system (process and marine) and handling various type of
material .Working as a Projects QA/QC inspection (Structural and piping) ensure the quality records,
acceptance certificates ,mechanical completion certification and the documentation for the specific
system in accordance with the projects requirements, review suppliers inspection and test plans
against to scope of work, resolve any discrepanciesbetween the completed items and quality
documentation.
Provide progressinformation for incorporation into projects reports, witnessed and monitor hydro
static test, monitor and control the status of punch list, attend the weekly projects meeting with
QA/QC team, Interpretation of test results to AWS, ASME, ASTM and API standards & project
specifications and class for structural and piping. Reviewthe Quality documents of
ITP/WPS/PQR/WPQRS, Specification, Drawings, Material certificates,Material tractability for
structural and piping, Perform Surveillance during fabrication and erection to compliance with
procedures, raise Non-conformance report (NCR)/Field Inspection Report (FIR) where applicable
and ensure satisfactory close out. Coordinate with the site managers for the completion of as-built
documentation.
Supervision of welding activities for Duplex (SA 790 UNS S 31803 ), Super Duplex pipe (SA 790
UNS S32750),API 5L/X52, TP316/TP304 and its Low Carbon Content TP316L/304L, SA 333 LTCS,
CuNiFe1.6Mn (90/10), and Plate Materials in ASTM/ ABS Standards includes High Tensile Steels
AH32, DH32, EH32, AH36, DH36, EH36,EQ56 and alloy steel 517-4130 for FPSO, ship building
and repairs.
Witness & approval of WPQT and WQT for GTAW, FCAW, GMAW, SAW and SMAW processesfor
structural and piping
Sound Knowledge of various Non-destructive test methods like RT,UT,MT AND PT
BABBU JAKIR HUSSAIN
Structural and Piping QA/QC inspector
CV updated on 13//11/2015
Page 2 of 7
Education:
Bachelor Degree in Science
Technical summary:
Senior Welding Inspector- CSWIP 3.2.2(Level 3) with Radiography interpreter-
Awarded by the Welding Institute – UK- Valid till 2019 Feb
ASNT Level II in RT, UT, PT and MT
Tech weld - Technician Member by TWI
Singapore NDT Society
Janwary2015 to till to date
Company : Japan drilling corporation
Project : Jack-up rig projects-Pacific class 400drilling unit
Position held : Project supervisor for structural and piping and NDE
Responsibilities & Duties:
Monitoring & inspection of execution of Steel Structure works pertaining to Main hull structure ,
spud can structure, leg well structure , upperguide with braces/jack frame structure and lower guide
structure, jack case structure, cantilever and drill floor structure, accommodation structure and leg
bracing structure , attending to RFI’s raised by Concerned at various stages of inspection and for
various activities ( Material verification, shop fabrication, Block assembly , erection tank inspection,
air test, vacuum test and hose test, Pad Plate inspection, Fit-up & Welding,NDE inspection
Monitor all piping(class I,II and III) construction activities from pre fabrication of spools throughout
to field installation, line walk down, testing, reinstatement activitiesand ensure all activities are
executed in accordance with the appropriate standards, proceduresand the schedule. Witness and
Hold point inspections in accordance with the approved Inspection & Test Plans. Review AFC
drawing (P&ID, ISO and site arrangement) / Specification and Contractor's shop drawings.
Review and inspection of NDE techniques and reports for piping, hydrostatic test reports and
pneumatic reports,, chemical cleaning reports and Hot oil flushing reports, Hardness report and
PWHT reports
June2013to September 2014
Company : M3nergy.
Project : FPSO Nusantara for Bukit Tua field (Keppel benoi shipyard)
Position held : Project structural and piping& NDE supervisor
Responsibilities & Duties:
BABBU JAKIR HUSSAIN
Structural and Piping QA/QC inspector
CV updated on 13//11/2015
Page 3 of 7
Monitoring & inspection of execution of Steel Structure works pertaining to Main deck pipe rack
structure, main deck modification structure, cargo tank modification structure ,heli deck structure,
spread mooring structure, module support structure,accommodation modification structure and
attending to RFI’s raised by Concerned at various stagesof inspection and for various activities
(Material verification, shop fabrication, Block assembly , erection tank inspection, air test, vacuum
test and hose test, Pad Plate inspection, Fit-up & Welding,NDE inspection, gratings fixing, handrail
erection, etc). Release of Structure to preceding department afterinspection, issuing Punch list on job
completion and closing Punch list for final completion
Review and Witness Welding Procedures and WitnessWelders Qualification test and Materials
testing (charpy V-notch, tensile strength, hardness and macro test )as per code required or in
accordance with specifications, reviewinspection test plan, review the quality control and quality
assurance aspects to inspection of the contractor's quality assurance manual, quality control manual
and procedures, review AFC drawing / specification and contractor's shop, drawings, review
contractor's purchase inquiry documents, supervising of PQR & materials traceability before
Fabrication & installation and Welding Consumables.
Monitor and inspection for duplex stainless steel, austenitic stainless steel, processpipe lines, Top
side modules and Marine (Engine room, Pump room, Pipe rack, Main Deck, accommodation)
process piping,gas pipe lines, glass reinforced epoxy (GRE) piping, valves, mega structure and heavy
structural fabrications
Monitor all piping( processand marine) construction activities from pre fabrication of spools
through out to field installation, line walk down, testing, reinstatement activitiesand ensure all
activities are executed in accordance with the appropriate standards, procedures and the schedule.
Witness and Hold point inspections in accordance with the approved Inspection & Test Plans. Report
non conformities and improvement areas to the Piping Lead Construction Supervisor.
Interpret drawings and codes (plan, general arrangement drawings, joint connection details, P&ID,
iso, spool and general arrangement drawing) project spec.
Final documentation of piping Ensure Site queries, engineering modification Reviewthe As built
drawings.
Review and inspection of NDT techniques and reports, hydrostatic test packages and pneumatic
reports, , chemical cleaning reports and Hot oil flushing reports, Hardnessreport and PWHT reports
November 2012 to May2013
Company : Woodside.
Project : Great western Flank.(Subsea projects)
Position held : QA/QC Project supervisor
Project profile:
This is a X mass tree and WHP fabrication work for Great western flank field development
(Australia) fabricated by FMC and executed by Woodside
Responsibilities & Duties: Monitor and Inspect materials for wellhead equipment and
Christmas trees to ensure that Material agreed with the description shown in purchase order, part list
and drawing, Surface condition of material are satisfactory. Materials are traceable to mill
BABBU JAKIR HUSSAIN
Structural and Piping QA/QC inspector
CV updated on 13//11/2015
Page 4 of 7
certification by having the heat code or cast number affixed to each individual piece by hard
stamping or other means of marking acceptable to the Client. Review mill certificates to ensure that
the chemical analysis,mechanical properties and heat treatment conform to the manufacturers’
Material Specification, API and NACE specifications.
Review and ensure that welding procedures including repair proceduresapproval.
Witness and review welding procedure qualification on completion of procedure qualification all
documentation including mechanical test and hardness result (if required) .
Review welders’or operator’s qualifications to ensure they are qualified for the welding process and
material being used.
Witness qualification of welders or operators, on completion of this, all documentation including
non-destructive testing or mechanical test record signed and returned to vendor for retention as
records.
Involve visual and dimensional inspection for block valve, bonnets, tubing hanger and tubing heads
as per relevant official specification (API/ ANSI), manufacturers speciation ( Eg premium threads)
and any other threads specification as per purchaser order.
Witnessing for all the NDT test , Air test, Hydro pressure test, gas test ,drift test, function test, stack
up test, integration test and proof load test for X mass tree and WHP per relevant official
specification ( API/ ANSI), manufacturersspeciation.
Issue Inspection Release Note upon acceptance of equipment
June 2012 to October 2012
Company : Teekay corporation
Project : FPSO Cidade de itajai @Jurong shipyard
Position held : Project QA/QC Piping Inspector/supervisor
May 2011 to May 2012
Company : Petrofac.
Project : Berantai FPSO.(Keppel shipyard)
Position held : Project NDE and QA/QC Inspector
Responsibilities & Duties: Interpret drawings and codes(plan,general arrangement drawings,
joint connection details, P&ID, iso, spool and general arrangement drawing) project spec and RLE
work pack
Monitor and Involve inspection activities on piping and Mechanical for Marine and process module,
Witness and Hold point inspections in accordance with the approved Inspection & Test Plans,
Provide input to site team to avoid/resolve piping problems. Report non conformities and
improvement areasto the Piping Lead Construction Supervisor. ReviewPiping dimensional control
reports to ensure that tolerance requirements are met., Interpretation of test results to AWS, ASME,
ASTM and API standards and project specifications
BABBU JAKIR HUSSAIN
Structural and Piping QA/QC inspector
CV updated on 13//11/2015
Page 5 of 7
Monitor all piping construction activities from pre fabrication of spools through out to field
installation, line walk down, testing, reinstatement activities and ensure all activities are executed in
accordance with the appropriate standards.
Regular surveillance checking at site to ensure that all comments had appropriate corrective action
such as preservation requirementsand correct bolts as per project requirements during construction
stage, check that preservation status of equipment at site and storage area to ensure requirements of
vendor and project spec. Check the physical condition of anchor bolts and leveling of foundation
before erection of equipment’s as per vendor and project spec.
Involve on Piping Mechanical completion verification and handover (Pre Hydro test line walk ,Bolt
tensioning, Flushing / Hydro testing / Drying, punch list clearance & Re instatement ).
September 2010 to April 2011:
Company : Bluewater energy bv.
Project : Glas Dowr FPSO.(Sembawang shipyard)
Position held : QA/QC Project inspector
Responsibilities & Duties:
Monitoring and Inspection of various module structure (Turret and topside module/ pipe rack)
Welding fabrication and erection activities of the contractors in all phases of the work, review
approved ITP, quality plan & procedures.
Ensure that the fabrication and construction work is in accordance with company drawings,
specifications and regulatory classrequirements.
Inspect and certify fit-up and final visual of all welds of the fabricated and erected structure on
behalf of the company during and after construction.
Release of Structure to preceding department after inspection, to check all weld parameters adhered
to ensure safe working practices being upheld. Full participation in day to day activities of
fabrication and installation involved on the modules under construction .Issuing Punch list on job
completion and closing Punch list for final completion.
Monitor all piping construction activities from pre fabrication of spools through out to field
installation, line walk down, testing, reinstatement activities and ensure all activities are executed in
accordance with the appropriate standards,procedures and schedule ,witnessand Hold point
inspections in accordance with the approved Inspection & Test Plans. Provide input to site team to
avoid/resolve piping problems. Report non conformities and improvement areas to the Piping Lead
Construction Supervisor. Review piping dimensional control reports to ensure that tolerance
requirements are met.Participate along with piping construction team in weekly discipline meetings.
Review and evaluate Contractor’s records.Review Contractor’s and Suppliers’ completion files for
acceptance.
Carried out in field inspection for incoming material (plate, pipe, fittings,valves and strainers),
Joints assembly and final weld inspection as per code and project spec,
Witnessing, pneumatic,hose and vacuum test as per code and project spec
BABBU JAKIR HUSSAIN
Structural and Piping QA/QC inspector
CV updated on 13//11/2015
Page 6 of 7
Review and inspection of NDE techniques and reports, hydrostatic test packages (line walk, flushing,
hydro test, reinstatement and punch list) and pneumatic reports, , chemical cleaning reportsand Hot
oil flushing reports, Hardness report and PWHT reports.
Monitor the subcontractors for N2/He leak test activitiesand mechanical completion and ensure
these are executed in accordance with project HSC,technical specification, quality standard and
procedure defined in the contract.
To attend the technical discussion and resole technical querieswith construction team in quality
matters.
April 2010 to August 2010
Company : Woodside Energy limited.
Project : OKHA FPSO @Keppel shipyard
Position held : Project Piping Inspector/supervisor
April 2009 to March 2010
Company : Petroserv
Project : Dynamic producer FDPSO @ Sembawang shipyard
Position held : Project Structural / Piping supervisor
April 2008 to March2009
Company : Transocean.
Project : 706 DP3 Upgrading-Semi sub @Keppel fels shipyard
Position held : Project piping supervisor
Janwary2007 to March 2008
Company : Bluewater energy bv.
Project : AOKU MIZU FPSO@ Sembawang shipyard
Position held : Project Piping Inspector
Janwary2002 to December 2006
Company : Third party inspection agency ( Hi-Tech) Singapore
Project : Seconded to Sembawang and Kfels @ Singapore
Position held : Structural and Piping inspector
May1998 TO November 2001
BABBU JAKIR HUSSAIN
Structural and Piping QA/QC inspector
CV updated on 13//11/2015
Page 7 of 7
Company : Third party inspection agency .Singapore
Project : Keppel fels,Keppel singmarine,Hitachi zosen and sspl/smoe.singapore.
Position held : NDE/Welding inspector.
Janwary 1993 to March 1998
Company : Third party inspection agency .India
Position held : NDE Inspector
References:
Mr. Stuwart Brown
Construction Manager for Rathu Nusantara FPSO (Bukit Tua M3nergy)
Construction Manager for Cidade de itajai FPSO -Teekay corporation
HP +65-96621206
srbrown@singnet.com.sg
Mr. Colin Danby,
Topside construction Superintend for Bluewater- Aku mizhu FPSO &Glas Dowr FPSO,
Mobile: + 65- 92364731
fabricator41@hotmail.com
Mr. Brian Robbie,
Transocean - Sedco 706 DP3 project, , .
Mobile: +44 (0) 7771670717.
E-Mail:Brian.Robbie@deepwater.com

More Related Content

What's hot

qc welding inspector resume
qc welding inspector resumeqc welding inspector resume
qc welding inspector resumeshahwaz siddique
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expVijay Raghavan
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipelineUDAYAKUMAR P C PANICKER
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updatedSantosh Gurajada
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)Rajeev Kumar
 
Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14Saravana Konar
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)MUHAMMAD ASIF
 
HASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVHASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVGhulam Hassan
 
Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2Sundar Rajan
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORMohsin Iqubal
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 

What's hot (20)

qc welding inspector resume
qc welding inspector resumeqc welding inspector resume
qc welding inspector resume
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of exp
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
 
Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14
 
YOGARAJ CV
YOGARAJ CVYOGARAJ CV
YOGARAJ CV
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
 
Welding Inspector - QC Inspector
Welding Inspector - QC InspectorWelding Inspector - QC Inspector
Welding Inspector - QC Inspector
 
HASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVHASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CV
 
Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
Mani cv
Mani   cvMani   cv
Mani cv
 

Similar to Babbu jakir resume

Similar to Babbu jakir resume (20)

CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
Varun Resume
Varun Resume Varun Resume
Varun Resume
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
mechanical cv
mechanical cvmechanical cv
mechanical cv
 
CV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOCCV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOC
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
CV_Suhail
CV_SuhailCV_Suhail
CV_Suhail
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
Mohamad Elyaas CV & Certf
Mohamad Elyaas CV & CertfMohamad Elyaas CV & Certf
Mohamad Elyaas CV & Certf
 
KUMARESH.CV
KUMARESH.CVKUMARESH.CV
KUMARESH.CV
 
LINGAM
LINGAMLINGAM
LINGAM
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_original
 
Phairat-CV(2015)
Phairat-CV(2015)Phairat-CV(2015)
Phairat-CV(2015)
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipelineQa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
 
Faizal CV Rev 1
Faizal CV Rev 1Faizal CV Rev 1
Faizal CV Rev 1
 
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+W
 
Prem's Resume
Prem's  ResumePrem's  Resume
Prem's Resume
 

Babbu jakir resume

  • 1. BABBU JAKIR HUSSAIN Structural and Piping QA/QC inspector CV updated on 13//11/2015 Page 1 of 7 RESUME BABBU JAKIR HUSSAIN. Nationality-Singaporean Avenue 5, Blk 483, Cho Chu Kang Ave 5 #06 – 166, Singapore – 680483. Mobile +65-90085319 and 90024786 jakirsuryaa@yahoo.com.sg linkedin-babbujakir hussain ------------------------------------------------------------------------------------------------------------------- Introduction: More than 18 years’ experience and More than 14 years’ experience in Structural and Piping Construction of FPSO , X mass tree(subsea)and Jack Up rig projects for Main hull fabrication, ,offshore/onshore Process Modules fabrication, assembly and erection , turret structure, process pipe rack structure,spread mooring structure, modification of cargo tanks ,Living Quarter fabrication, leg well and spud cane fabrication , assembly &erection of Panton blocks and nodes, involve piping inspection for various system (process and marine) and handling various type of material .Working as a Projects QA/QC inspection (Structural and piping) ensure the quality records, acceptance certificates ,mechanical completion certification and the documentation for the specific system in accordance with the projects requirements, review suppliers inspection and test plans against to scope of work, resolve any discrepanciesbetween the completed items and quality documentation. Provide progressinformation for incorporation into projects reports, witnessed and monitor hydro static test, monitor and control the status of punch list, attend the weekly projects meeting with QA/QC team, Interpretation of test results to AWS, ASME, ASTM and API standards & project specifications and class for structural and piping. Reviewthe Quality documents of ITP/WPS/PQR/WPQRS, Specification, Drawings, Material certificates,Material tractability for structural and piping, Perform Surveillance during fabrication and erection to compliance with procedures, raise Non-conformance report (NCR)/Field Inspection Report (FIR) where applicable and ensure satisfactory close out. Coordinate with the site managers for the completion of as-built documentation. Supervision of welding activities for Duplex (SA 790 UNS S 31803 ), Super Duplex pipe (SA 790 UNS S32750),API 5L/X52, TP316/TP304 and its Low Carbon Content TP316L/304L, SA 333 LTCS, CuNiFe1.6Mn (90/10), and Plate Materials in ASTM/ ABS Standards includes High Tensile Steels AH32, DH32, EH32, AH36, DH36, EH36,EQ56 and alloy steel 517-4130 for FPSO, ship building and repairs. Witness & approval of WPQT and WQT for GTAW, FCAW, GMAW, SAW and SMAW processesfor structural and piping Sound Knowledge of various Non-destructive test methods like RT,UT,MT AND PT
  • 2. BABBU JAKIR HUSSAIN Structural and Piping QA/QC inspector CV updated on 13//11/2015 Page 2 of 7 Education: Bachelor Degree in Science Technical summary: Senior Welding Inspector- CSWIP 3.2.2(Level 3) with Radiography interpreter- Awarded by the Welding Institute – UK- Valid till 2019 Feb ASNT Level II in RT, UT, PT and MT Tech weld - Technician Member by TWI Singapore NDT Society Janwary2015 to till to date Company : Japan drilling corporation Project : Jack-up rig projects-Pacific class 400drilling unit Position held : Project supervisor for structural and piping and NDE Responsibilities & Duties: Monitoring & inspection of execution of Steel Structure works pertaining to Main hull structure , spud can structure, leg well structure , upperguide with braces/jack frame structure and lower guide structure, jack case structure, cantilever and drill floor structure, accommodation structure and leg bracing structure , attending to RFI’s raised by Concerned at various stages of inspection and for various activities ( Material verification, shop fabrication, Block assembly , erection tank inspection, air test, vacuum test and hose test, Pad Plate inspection, Fit-up & Welding,NDE inspection Monitor all piping(class I,II and III) construction activities from pre fabrication of spools throughout to field installation, line walk down, testing, reinstatement activitiesand ensure all activities are executed in accordance with the appropriate standards, proceduresand the schedule. Witness and Hold point inspections in accordance with the approved Inspection & Test Plans. Review AFC drawing (P&ID, ISO and site arrangement) / Specification and Contractor's shop drawings. Review and inspection of NDE techniques and reports for piping, hydrostatic test reports and pneumatic reports,, chemical cleaning reports and Hot oil flushing reports, Hardness report and PWHT reports June2013to September 2014 Company : M3nergy. Project : FPSO Nusantara for Bukit Tua field (Keppel benoi shipyard) Position held : Project structural and piping& NDE supervisor Responsibilities & Duties:
  • 3. BABBU JAKIR HUSSAIN Structural and Piping QA/QC inspector CV updated on 13//11/2015 Page 3 of 7 Monitoring & inspection of execution of Steel Structure works pertaining to Main deck pipe rack structure, main deck modification structure, cargo tank modification structure ,heli deck structure, spread mooring structure, module support structure,accommodation modification structure and attending to RFI’s raised by Concerned at various stagesof inspection and for various activities (Material verification, shop fabrication, Block assembly , erection tank inspection, air test, vacuum test and hose test, Pad Plate inspection, Fit-up & Welding,NDE inspection, gratings fixing, handrail erection, etc). Release of Structure to preceding department afterinspection, issuing Punch list on job completion and closing Punch list for final completion Review and Witness Welding Procedures and WitnessWelders Qualification test and Materials testing (charpy V-notch, tensile strength, hardness and macro test )as per code required or in accordance with specifications, reviewinspection test plan, review the quality control and quality assurance aspects to inspection of the contractor's quality assurance manual, quality control manual and procedures, review AFC drawing / specification and contractor's shop, drawings, review contractor's purchase inquiry documents, supervising of PQR & materials traceability before Fabrication & installation and Welding Consumables. Monitor and inspection for duplex stainless steel, austenitic stainless steel, processpipe lines, Top side modules and Marine (Engine room, Pump room, Pipe rack, Main Deck, accommodation) process piping,gas pipe lines, glass reinforced epoxy (GRE) piping, valves, mega structure and heavy structural fabrications Monitor all piping( processand marine) construction activities from pre fabrication of spools through out to field installation, line walk down, testing, reinstatement activitiesand ensure all activities are executed in accordance with the appropriate standards, procedures and the schedule. Witness and Hold point inspections in accordance with the approved Inspection & Test Plans. Report non conformities and improvement areas to the Piping Lead Construction Supervisor. Interpret drawings and codes (plan, general arrangement drawings, joint connection details, P&ID, iso, spool and general arrangement drawing) project spec. Final documentation of piping Ensure Site queries, engineering modification Reviewthe As built drawings. Review and inspection of NDT techniques and reports, hydrostatic test packages and pneumatic reports, , chemical cleaning reports and Hot oil flushing reports, Hardnessreport and PWHT reports November 2012 to May2013 Company : Woodside. Project : Great western Flank.(Subsea projects) Position held : QA/QC Project supervisor Project profile: This is a X mass tree and WHP fabrication work for Great western flank field development (Australia) fabricated by FMC and executed by Woodside Responsibilities & Duties: Monitor and Inspect materials for wellhead equipment and Christmas trees to ensure that Material agreed with the description shown in purchase order, part list and drawing, Surface condition of material are satisfactory. Materials are traceable to mill
  • 4. BABBU JAKIR HUSSAIN Structural and Piping QA/QC inspector CV updated on 13//11/2015 Page 4 of 7 certification by having the heat code or cast number affixed to each individual piece by hard stamping or other means of marking acceptable to the Client. Review mill certificates to ensure that the chemical analysis,mechanical properties and heat treatment conform to the manufacturers’ Material Specification, API and NACE specifications. Review and ensure that welding procedures including repair proceduresapproval. Witness and review welding procedure qualification on completion of procedure qualification all documentation including mechanical test and hardness result (if required) . Review welders’or operator’s qualifications to ensure they are qualified for the welding process and material being used. Witness qualification of welders or operators, on completion of this, all documentation including non-destructive testing or mechanical test record signed and returned to vendor for retention as records. Involve visual and dimensional inspection for block valve, bonnets, tubing hanger and tubing heads as per relevant official specification (API/ ANSI), manufacturers speciation ( Eg premium threads) and any other threads specification as per purchaser order. Witnessing for all the NDT test , Air test, Hydro pressure test, gas test ,drift test, function test, stack up test, integration test and proof load test for X mass tree and WHP per relevant official specification ( API/ ANSI), manufacturersspeciation. Issue Inspection Release Note upon acceptance of equipment June 2012 to October 2012 Company : Teekay corporation Project : FPSO Cidade de itajai @Jurong shipyard Position held : Project QA/QC Piping Inspector/supervisor May 2011 to May 2012 Company : Petrofac. Project : Berantai FPSO.(Keppel shipyard) Position held : Project NDE and QA/QC Inspector Responsibilities & Duties: Interpret drawings and codes(plan,general arrangement drawings, joint connection details, P&ID, iso, spool and general arrangement drawing) project spec and RLE work pack Monitor and Involve inspection activities on piping and Mechanical for Marine and process module, Witness and Hold point inspections in accordance with the approved Inspection & Test Plans, Provide input to site team to avoid/resolve piping problems. Report non conformities and improvement areasto the Piping Lead Construction Supervisor. ReviewPiping dimensional control reports to ensure that tolerance requirements are met., Interpretation of test results to AWS, ASME, ASTM and API standards and project specifications
  • 5. BABBU JAKIR HUSSAIN Structural and Piping QA/QC inspector CV updated on 13//11/2015 Page 5 of 7 Monitor all piping construction activities from pre fabrication of spools through out to field installation, line walk down, testing, reinstatement activities and ensure all activities are executed in accordance with the appropriate standards. Regular surveillance checking at site to ensure that all comments had appropriate corrective action such as preservation requirementsand correct bolts as per project requirements during construction stage, check that preservation status of equipment at site and storage area to ensure requirements of vendor and project spec. Check the physical condition of anchor bolts and leveling of foundation before erection of equipment’s as per vendor and project spec. Involve on Piping Mechanical completion verification and handover (Pre Hydro test line walk ,Bolt tensioning, Flushing / Hydro testing / Drying, punch list clearance & Re instatement ). September 2010 to April 2011: Company : Bluewater energy bv. Project : Glas Dowr FPSO.(Sembawang shipyard) Position held : QA/QC Project inspector Responsibilities & Duties: Monitoring and Inspection of various module structure (Turret and topside module/ pipe rack) Welding fabrication and erection activities of the contractors in all phases of the work, review approved ITP, quality plan & procedures. Ensure that the fabrication and construction work is in accordance with company drawings, specifications and regulatory classrequirements. Inspect and certify fit-up and final visual of all welds of the fabricated and erected structure on behalf of the company during and after construction. Release of Structure to preceding department after inspection, to check all weld parameters adhered to ensure safe working practices being upheld. Full participation in day to day activities of fabrication and installation involved on the modules under construction .Issuing Punch list on job completion and closing Punch list for final completion. Monitor all piping construction activities from pre fabrication of spools through out to field installation, line walk down, testing, reinstatement activities and ensure all activities are executed in accordance with the appropriate standards,procedures and schedule ,witnessand Hold point inspections in accordance with the approved Inspection & Test Plans. Provide input to site team to avoid/resolve piping problems. Report non conformities and improvement areas to the Piping Lead Construction Supervisor. Review piping dimensional control reports to ensure that tolerance requirements are met.Participate along with piping construction team in weekly discipline meetings. Review and evaluate Contractor’s records.Review Contractor’s and Suppliers’ completion files for acceptance. Carried out in field inspection for incoming material (plate, pipe, fittings,valves and strainers), Joints assembly and final weld inspection as per code and project spec, Witnessing, pneumatic,hose and vacuum test as per code and project spec
  • 6. BABBU JAKIR HUSSAIN Structural and Piping QA/QC inspector CV updated on 13//11/2015 Page 6 of 7 Review and inspection of NDE techniques and reports, hydrostatic test packages (line walk, flushing, hydro test, reinstatement and punch list) and pneumatic reports, , chemical cleaning reportsand Hot oil flushing reports, Hardness report and PWHT reports. Monitor the subcontractors for N2/He leak test activitiesand mechanical completion and ensure these are executed in accordance with project HSC,technical specification, quality standard and procedure defined in the contract. To attend the technical discussion and resole technical querieswith construction team in quality matters. April 2010 to August 2010 Company : Woodside Energy limited. Project : OKHA FPSO @Keppel shipyard Position held : Project Piping Inspector/supervisor April 2009 to March 2010 Company : Petroserv Project : Dynamic producer FDPSO @ Sembawang shipyard Position held : Project Structural / Piping supervisor April 2008 to March2009 Company : Transocean. Project : 706 DP3 Upgrading-Semi sub @Keppel fels shipyard Position held : Project piping supervisor Janwary2007 to March 2008 Company : Bluewater energy bv. Project : AOKU MIZU FPSO@ Sembawang shipyard Position held : Project Piping Inspector Janwary2002 to December 2006 Company : Third party inspection agency ( Hi-Tech) Singapore Project : Seconded to Sembawang and Kfels @ Singapore Position held : Structural and Piping inspector May1998 TO November 2001
  • 7. BABBU JAKIR HUSSAIN Structural and Piping QA/QC inspector CV updated on 13//11/2015 Page 7 of 7 Company : Third party inspection agency .Singapore Project : Keppel fels,Keppel singmarine,Hitachi zosen and sspl/smoe.singapore. Position held : NDE/Welding inspector. Janwary 1993 to March 1998 Company : Third party inspection agency .India Position held : NDE Inspector References: Mr. Stuwart Brown Construction Manager for Rathu Nusantara FPSO (Bukit Tua M3nergy) Construction Manager for Cidade de itajai FPSO -Teekay corporation HP +65-96621206 srbrown@singnet.com.sg Mr. Colin Danby, Topside construction Superintend for Bluewater- Aku mizhu FPSO &Glas Dowr FPSO, Mobile: + 65- 92364731 fabricator41@hotmail.com Mr. Brian Robbie, Transocean - Sedco 706 DP3 project, , . Mobile: +44 (0) 7771670717. E-Mail:Brian.Robbie@deepwater.com