SlideShare a Scribd company logo
1 of 11
1
RAJISH CHANDRA
Mobile: Qatar +974 33230992 /India +91 9961140367
E-Mail: - chandrarajish92@gmail.com
A Goal-Oriented Individual Targeting Assignments in QC/ Welding Operations/Rotary & static
equipment/ Painting/ Inspection Testing with a Leading Organization of High Repute
PROFILE SUMMARY
A Dynamic professional with over16 years of experience in:
 Quality Assurance & Control
 Testing & Inspection
 Audit & Compliance
 Piping Operations
 Erection & Commissioning
 Welding Operations
 Fabrication
 Vendor Assessment
 Team Management
 Demonstrated proficiency in executing operations under contract condition and ensuring Quality
Compliance
 Gained multi-cultural experience of working in Qatar, Kingdom of Saudi Arabia, Bahrain, Kuwait &
Russia.
 Proficient in handling & implementing process enhancement and quality control techniques conversant
with quality codes &standards
 Demonstrated excellence in carrying out planning & project execution functions and Non Destructive
Testing (NDT) as per the specified time deadlines
 Experience of managing project procurement quality control of large size projects with proficiency in
swiftly ramping up with competent cross-functional skills and on time execution
2
 Excellent relationship management, communication skills with the ability to network with consummate
ease
CORE COMPETENCIES
 Developing and implementing a stage-by-stage quality assurance and control system to ensure adherence
to technical specifications/codes & standards/ contract.
 Preparing & reviewing project Inspection and Test Plan (ITP), reviewing procedures and maintaining QC
documentation to ensure adequate documented evidence is available to prove contract compliance.
 Ensuring that all tests are carried out as per contract & code requirements.
 Carrying out the stage wise inspection for piping pre-fabrication, welding and reviewing sub-contractor
as per specifications; supervising fit-up, welding consumables, pre-heating, process welding, visual
check, etc.
 Carrying out stage wise inspection of rotary and static equipment’s as per the approved ITP and relevant
project standards.
Key Result Areas:
 Carrying out welding inspection of pipeline, piping and steel structures. coordination with third party
inspection and testing agencies
 Involved in welding procedure qualification & welder performance qualification tests as per necessary
essential variables of ASME Sec IX.
 Responsible for entire preparation and review of MAR,ITP, & Method Statement
 Evaluation the NDT & Hydro-testing procedures and examining the test packs together with walk down
for line check with updated P & IDS and isometric drawings.
 Review of NDT documents as submitted by EPC contractor for review and approval
 Participating in stage-wise painting inspection like surface preparation, DFT, WFT check and witnessing
with third party holiday inspection test.
 Raising site inspection reports through NCR, CQSR if any deficiency observed and maintaining the logs.
 Attending weekly kick off meeting with EPC QA/ QC manager and all sub-contractors.
3
ORGANISATIONAL EXPERIENCE
Career Profile-Summary:
Name of organization
Duration
Project DesignationFrom To
Qatar Solar
Technologies (QSTec ).
A member of Qatar
Foundation.
Jul
2013
Till Date
POLYSILICON
PLANT PROJECT,
RASS LAFFAN.
Sr.QC- Inspector
RAMSIS ENGINEERING,
CO. W.L.L MARCH 2011
NOV2012
PRODUCED FLUIDS
AND WATER
TREATMENT PLANT
FOR
TATWEER
PETROLEUM,
KINGDOM OF
BAHRAIN.
QA/QC Inspector
NCC Construction
Division Ltd (Rezayat
Group ofCompanies)
August 31
2010
December
12 2011
SABIYA CCGT
(Combined Cycle
Gas Turbine Project),
at SABIYA
Power Station,
Sabiya, Kuwait
QA/QC Engineer
PunjLlyod
Kazakhstan
14 July 2009
18
November
2009
KARACHAGANAK
4th STABILISATION
& SWEETENING
TRAIN
QA/QC Inspector
M/s. Lahoud
Engineering Co.,Abu
Dhabi
29th May,2007 14
januarary
2009
OGD –III ( Habshan
3)
QA/QC Inspector
4
M/s. Nasser S Al Hajri
Corporation limited
March 2005
February
2007
Hadeed HotStrip Mill
Enhancement
Project& Hadded
Direct reduction
Plant expansion
project,MODULE– E
QA/QC Engineer
M/s. Lahoud
Engineering Co.Ltd
November,
2003
August,
2004
ULG/LSGOproject.
Welding
Supervisor
MIDEAST
CONSTRUCTORS
W.L.L.,Doha,Qatar
March,2001 May,2002.
Expansion projectat
NGL 4, Dukhan site
Welding
Supervisor
EDUCATION
DME:Diploma in Mechanical Engineering From HIET, CHENNAI
Other Course

 Diploma in Computer Design software (Auto Cad) from IEC Software.
CERTIFICATIONS
 American Society of Non Destructive Testing-ASNT Certification – Level II (Liquid Penetrant
Test, Magnetic Particle Test, Ultrasonic Test & RT)
PROFESSIONAL ENHANCEMENTS
o Safety HSE Training, Working at Height, Confined Space& Hot Works
o Safety Inspection and Audits Training
o Basic Fire Fighting Training
5
IT SKILLS
o Conversant with:MS Dos and MS Office-Word/Excel, and Internet Applications
PERSONAL DETAILS
Full Name: Rajish Chandra
Father’s Name: M.C.S.PILLAI
Date of Birth: 10-09-1975
Nationality: Indian
Passport Details: F9270503 (Issued at ABU DHABI & Valid until 29-th September 2017)
Qatar Visa Status: RP / NOC- Available From Present Employer
Languages Known: English, Hindi, Tamil
Marital Status: Married
Address: APRA-6, PULLY LANE, CHACKAI, TRIVANDRUM-690524.
INDIA.
6
Please refer Annexure for project details:
ANNEXURE
Major Projects Handled:
COMPANY NAME - QATAR SOLAR TECHNOLOGIES ( QSTec ), DOHA-QATAR
MEMBER OF QATAR FOUNDATION
EPC CONTRACTOR – PUNJJ LLOYD LTD
PROJECT TITTLE – POLYSILICON PLANT PROJECT
DATE OF JOINING – 26-JULY-2013 TO TILL DATE
RESPONSIBILITIES HANDLED
Attending inspection of all incoming materials with relevant to project specification and approved vendors.
Review of OSDR reports as raised by EPC contractor
Attending inspection calls as raised by EPC for all sub-contractors concerned.
Review of documents and vendor packages as submitted by EPC for review and approval, and raising TDCR if any
deficiency noted.
Witnessing PQR tests, WQT test with relevant to the approved project WPS.
Reviewing of WPS as submitted by contractor for approval.
Attending daily inspection for tanks, piping, structure, rotary, static equipment’s with respect to approved ITP and
project standards and with respective codes.
Did FAT test for various rotary and static equipment’s.
Attending 12 window inspection for critical process piping in order to check for discoloration of joints, particularly for
SS316Ti piping SS materials.
Review of NDT documents for all contractors prior to release for hydro.
Attending walk down inspection with EPC and respective contractors for piping systems with updated P & IDS and
ISO drawings for the system to be hydro tested.
Checking of flange face prior to RE-INSTATEMMENT activity for the final box up of the system.
Checking of the equipment’s piping connection (WITH PIPING ON / OFF) in order to verify the stress induced.
Attending final walk down of the entire system together with operation department in order to generate the out
standing punch items.
Review of final mechanical documents for achieving mechanical completion as per approved standards and
procedures and deficiency observed in documents by ways of raising TDCRS.
COMPANY NAME - RAMSIS ENGINEERING, CO. W.L.L
CONTRACTOR - VEOLIA WATER, SOLUTIONS AND TECHNOLOGIES
PROJECT TITLE - PRODUCED FLUIDS AND WATER TREATMENT PLANT
FOR TATWEER PETROLEUM , KINGDOM OF BAHRAIN.
CLIENT - TATWEER PETROLEUM
PERIOD - FROM, MARCH 2011 TO TILL DATE
AND
WITH HYDER CONSULTING FOR ELECTRICITY AND WATER AUTHORITY ( EWA )
FOR THE CONSTRUCTION OF 2 NOS. BUFFER TANKS AND 3 NOS. OF GROUND
STORAGE TANKS IN AL - AREEN, EAST RIFFA, KINGDOM OF BAHRAIN.
DUTIES AND RESPONSIBILITIES
Checking of incoming project materials with respect to relevant MTC
Checking of fit-ups for duplex piping spools, relasing for welding activities
and final inspection clearance from the client.
Preparing for further NDT activities in accordance with project standards
and client specification.
Taking final clearance from client for hydo-test.
Doing inspection stage wise with respect to relavant to ITP, Project
standards and client specification.
Checking of plates with respect to relevant MTR.
Doing fit-up inspection of tanks, and releasing for welding activities.
Checking of all dimensional activities, vaccum box test, diesel leak test,
and leak test for all tank nozzles .
checking for surface profile after sand blasting and releasing for painting
activities.
Checking for wet film thickness ( WFT ), after painting ( DFT ),
holiday check ( HD ), and adhesion test ( DOLLY TEST ) for
ensuring strength of paints.
Doing welding inspection activities, and releasing it for
further clearance.
Prepration of project dossiers, reviewing of ndt reports
and submission of same to the client.
ployer : NCC Construction Division Ltd (Rezayat Group of Companies)
Contractor: GE (General Electric Corporation LLC)
Client : Hyundai Heavy Industries Ltd
Owner : MEW (Ministry of Electricity and Water)
Position : QA/QC Engineer
Project : SABIYA CCGT (Combined Cycle Gas Turbine Project), at SABIYA
Power Station, Sabiya, Kuwait
Witnessing of welder qualification
Checking of piping materials and component in relevant to same standard and codes.
Witnessing of internal piping cleanliness using boroscope camera and with white cloth method
Witnessing of alloy steel pipes welding, p11, p91, p22 pipes for HRSG Steam Recovery Area (HEAT RECOVERY
STEAM GENERATOR).
Witnessing of Inspection and NDT activities.
Checking of alloy steel pipes welding.
Witnessing of inspection activities of Alloy Steel Pipes in a accordance with ASME B31.1 Power Plant Piping.
Preparing daily weld visual reports, making fit-up reports and submission of same to the client.
Taking part in Internal Auditing (QA/QC).
Checking of all welding consumables ,i.e. Welders quivers, Electode Baking ovens, Maintaining correct
Employer : Punj Llyod Kazakhstan
Contractor: PFEC
Client : KPO ( KARACHAGANAK PETROLEUM OPERATING, B.V)
Position : QA/QC Inspector
Project : KARACHAGANAK 4th STABILISATION & SWEETENING TRAIN
Period : 14 July 2009 – 18 November 2009
Responsibilities:
 Verify the materials specifications againstdrawings and piping line class.
 Visualinspection of welds and accepting as perprojectspecifications and preparing reports
making QCW clearance for further activities.
 Supervise & Monitor the welding activities as per company’s quality control plan and according
to ASME standards.
 Associating with other tests like stress relieving (post welding heattreatment), hydraulic tests,
and pneumatic tests of nozzle pads.Etc.
 WelderQualification Test as perrelevant WPS.
 Inspection of Pipe and Fittings according to ASME standards.
 Preparation and Filling of PWTH Reports.
 Witnessing of NDT activities and preparation ofNDT Reports.
 Maintaining Inspection Documents ofFlange ManagementSystem.
 Preparation of daily welding report and offering for NDT activities according to relevant piping
classes.
 Preparation of Welder’s Card.
 Inspection of joints fit up priorto release for welding activities and doing visual inspection of final
welded joints with respectto relevant approved Isometric Drawings.
 Q.C Clearance of test packs accordingto companyquality procedures.
 Preparing various documents such as welding inspection reportprior to endorsementto the
client.
 Mark out the repaired location and contacting the repair as per approved repairprocedure.
 Coordination with the client/consultants to maintain the quality to move the project smoothly.


 Worked with M/s. Lahoud Engineering Co. ,Abu Dhabi, UAE at OGD –III ( Habshan 3)
project as a QA/QC Inspector for Eastern Bechtel Company Ltd. (EBCL) since 29th
May,2007 to January,2009.
JOB RESPONSIBILITIES:
 Familiarization with Project specification, (ITP) Inspection and Test Plan,
Review Scope of Work Project Specification Procedures to determine the
adequacy of such to meet Quality Control requirements.
 Approval and witnessing of WPS with supporting PQR.
 Conducting surveillance inspection of weldments.
 Closely monitoring inspection on welding parameters that is Welding
machines, Quivers, Electrodes, Preheating, Welders Identification, Amperage
and Voltage for each welding machines being used at site as per Quality
Control procedures and specifications.
 Represent the QA/QC Department and prepare minutes of meeting for
forecast scheduler for every weekend.
 Witnessing of welder qualification.
 Inspection during fit-up before welding & after welding of pipe joints
 Familiar with CS, SS , Alloy and Inconel pipe welding
 Control of Welder, welding activities and Consumables.
 Visual inspection of finished welds
 Witnessing NDT/PWHT activities.
 Monitoring Painting activities for Above/Under ground piping systems
 Preparation of QC related documents.
 Test pack punching and submission for pre test Inspection.
 Conducting and witnessing hydro/Pneumatic tests and taking final release of
line.
 Generate Documentation Inspection and test records for onward submission
to client Handover Certification.
Worked with M/s. Nasser S Al Hajri Corporation limited as a QA/QC
Engineer for Hadeed Hot Strip Mill Enhancement Project & Hadded Direct
reduction Plant expansion project, MODULE – E at Al Jubail, K.S.A. from
March 2005 to February 2007 FOR SMS – DEMAG INNSE GROUP:
GERMANY.
 Witnessing of welder qualification.
 Inspection during fit-up before welding & after welding of pipe joints
 Familiar with CS, SS , Alloy and Inconel pipe welding
 Control of Welder, welding activities and Consumables.
 Visual inspection of finished welds
 Witnessing NDT/PWHT activities.
 Monitoring Painting activities for Above/Under ground piping systems
 Preparation of QC related documents.
 Test pack punching and submission for pre test Inspection.
 Minimizing weld repairs by proper controlling and conducting tool box talk
with welders as per project specification.
Conducting and witnessing hydro/Pneumatic tests and taking final release of
Worked with M/s. Lahoud Engineering Co.Ltd. as a Piping cum
Welding Supervisor for TECNIP , Italy from November, 2003 to August,
2004 for the ULG/LSGO project, Ruwias Refinery, Abu Dhabi, U.A.E
 Witnessing of welder qualification.
 Inspection during fit-up before welding & after welding of pipe joints
 Familiar with CS, SS , Alloy and Inconel pipe welding
 Control of Welder, welding activities and Consumables.
 Visual inspection of finished welds
 Witnessing Structural welding and Tank welding activities as relevant
standard and codes.
 Witnessing NDT/PWHT activities.
Worked with MIDEAST CONSTRUCTORS W.L.L., Doha, Qatar as
Piping Foreman for SNAM PROGGETI/HYUNDAI ENGG. CONSTRUCTION
LTD. For Qatar Petroleum Expansion project at NGL 4, Dukhan site from
March, 2001 to May, 2002.
 Inspection during fit-up before welding & after welding of pipe joints
 Familiar with CS, SS , Alloy and Inconel pipe welding
 Control of Welder, welding activities and Consumables.
 Checking and confirmation of materials ( pipes & fittings), Execution of
isometric drawings, Segregation of the spools, Hydro testing , Punch list
clearance and Rectification of welding defects
Worked with M/s. Jayashree Construction Private Ltd. As a Production QC
Engineer for the Client RELIANCE PETROLEIUM LTD., at JamNagar
Refinery Marine Tank Farm Area from November, 1997 to January, 2000.
 Inspection during fit-up before welding & after welding of pipe joints
 Familiar with CS, SS , Alloy and Inconel pipe welding
 Control of Welder, welding activities and Consumables.
 Checking and confirmation of materials ( pipes & fittings), Execution of
isometric drawings,Seggregation of the spools, Hydrotesting , Punch list
clearance and Rectification of welding defects
[8] Worked with M/s. WESTON ENGINEERING CO. at Rourkela Steel
Plant as a Site Piping Supervisor of Coke ovens and Blast furnace piping
from May, 1996 to October, 1997.
 Checking and confirmation of materials ( pipes & fittings), Execution of
isometric drawings,Seggregation of the spools, Hydrotesting , Punch list
clearance and Rectification of welding defects
Place: Doha-Qatar
Date:
Name: Rajish Chandra.

More Related Content

What's hot

Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCkhursheed aiam
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipelineUDAYAKUMAR P C PANICKER
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMA SAMY
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspectorLatchanna Akula
 
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONRESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONMaypray Guimbarda
 
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorSaleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorsalimmalic
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTORNASEEB AHMAD
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)MUHAMMAD ASIF
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1karuppa samy
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expVijay Raghavan
 
QA QC Engineer-Inspector NEW
QA QC Engineer-Inspector NEWQA QC Engineer-Inspector NEW
QA QC Engineer-Inspector NEWMilen Kurian
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa
 
SANTOSH NAIR RESUME
SANTOSH NAIR RESUMESANTOSH NAIR RESUME
SANTOSH NAIR RESUMESantosh Nair
 

What's hot (20)

Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEER
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
QC. CV
QC. CVQC. CV
QC. CV
 
Cv mohd syahril awth
Cv mohd syahril awthCv mohd syahril awth
Cv mohd syahril awth
 
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONRESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
 
YOGARAJ CV
YOGARAJ CVYOGARAJ CV
YOGARAJ CV
 
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorSaleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
 
PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of exp
 
QA QC Engineer-Inspector NEW
QA QC Engineer-Inspector NEWQA QC Engineer-Inspector NEW
QA QC Engineer-Inspector NEW
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CV
 
SANTOSH NAIR RESUME
SANTOSH NAIR RESUMESANTOSH NAIR RESUME
SANTOSH NAIR RESUME
 
Updated CV - KVRao, Revised
Updated CV - KVRao, RevisedUpdated CV - KVRao, Revised
Updated CV - KVRao, Revised
 

Viewers also liked

Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...
Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...
Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...Purdicom
 
Perm recruitment brochure
Perm recruitment brochurePerm recruitment brochure
Perm recruitment brochuretombrookshaw
 
Инструкция по виджету выгрузки товаров в соцсети - Sliza.ru
Инструкция по виджету выгрузки товаров в соцсети - Sliza.ruИнструкция по виджету выгрузки товаров в соцсети - Sliza.ru
Инструкция по виджету выгрузки товаров в соцсети - Sliza.ruTytmodno.com
 
Top 8 process owner resume samples
Top 8 process owner resume samplesTop 8 process owner resume samples
Top 8 process owner resume samplesjomhawri
 
Cairn India Limited ISO 9001 Securiuty Certification Sep 2015
Cairn India Limited  ISO 9001 Securiuty Certification Sep 2015Cairn India Limited  ISO 9001 Securiuty Certification Sep 2015
Cairn India Limited ISO 9001 Securiuty Certification Sep 2015mohan singh
 
Work With Us - WeAreHolidays
Work With Us - WeAreHolidaysWork With Us - WeAreHolidays
Work With Us - WeAreHolidaysWeAreHolidays
 
S.D.Parson CV-Resume - 2016
S.D.Parson CV-Resume - 2016S.D.Parson CV-Resume - 2016
S.D.Parson CV-Resume - 2016Dean Parson
 
Orionprofile 1274089962081 Phpapp02
Orionprofile 1274089962081 Phpapp02Orionprofile 1274089962081 Phpapp02
Orionprofile 1274089962081 Phpapp02garyawatt
 
Project list
Project listProject list
Project listdhlglobal
 
Jesus Amante Dalangin Resume with scanned certificates
Jesus Amante Dalangin Resume with scanned certificatesJesus Amante Dalangin Resume with scanned certificates
Jesus Amante Dalangin Resume with scanned certificatesJesus Amante Dalangin
 
Eng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 NewEng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 NewHassan Ossama
 
Dave Yeap Resume Nov 2016
Dave Yeap Resume Nov 2016Dave Yeap Resume Nov 2016
Dave Yeap Resume Nov 2016Dave Yeap
 

Viewers also liked (20)

Ein herzundeineseele
Ein herzundeineseeleEin herzundeineseele
Ein herzundeineseele
 
Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...
Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...
Case Study - Aberdeen Harbour use Siklu EtherHaul to Integrate CCTV & Access ...
 
Resume wgb 18 jan 2016
Resume wgb 18 jan 2016Resume wgb 18 jan 2016
Resume wgb 18 jan 2016
 
Myron Betshanger Resume
Myron Betshanger ResumeMyron Betshanger Resume
Myron Betshanger Resume
 
Perm recruitment brochure
Perm recruitment brochurePerm recruitment brochure
Perm recruitment brochure
 
HARI RESUME 2016
HARI RESUME 2016HARI RESUME 2016
HARI RESUME 2016
 
Инструкция по виджету выгрузки товаров в соцсети - Sliza.ru
Инструкция по виджету выгрузки товаров в соцсети - Sliza.ruИнструкция по виджету выгрузки товаров в соцсети - Sliza.ru
Инструкция по виджету выгрузки товаров в соцсети - Sliza.ru
 
Top 8 process owner resume samples
Top 8 process owner resume samplesTop 8 process owner resume samples
Top 8 process owner resume samples
 
Cairn India Limited ISO 9001 Securiuty Certification Sep 2015
Cairn India Limited  ISO 9001 Securiuty Certification Sep 2015Cairn India Limited  ISO 9001 Securiuty Certification Sep 2015
Cairn India Limited ISO 9001 Securiuty Certification Sep 2015
 
Work With Us - WeAreHolidays
Work With Us - WeAreHolidaysWork With Us - WeAreHolidays
Work With Us - WeAreHolidays
 
S.D.Parson CV-Resume - 2016
S.D.Parson CV-Resume - 2016S.D.Parson CV-Resume - 2016
S.D.Parson CV-Resume - 2016
 
CV MJvVuuren.DOC
CV MJvVuuren.DOCCV MJvVuuren.DOC
CV MJvVuuren.DOC
 
Orionprofile 1274089962081 Phpapp02
Orionprofile 1274089962081 Phpapp02Orionprofile 1274089962081 Phpapp02
Orionprofile 1274089962081 Phpapp02
 
Kumar KV
Kumar KVKumar KV
Kumar KV
 
Project list
Project listProject list
Project list
 
Jesus Amante Dalangin Resume with scanned certificates
Jesus Amante Dalangin Resume with scanned certificatesJesus Amante Dalangin Resume with scanned certificates
Jesus Amante Dalangin Resume with scanned certificates
 
Udev Presentazione
Udev PresentazioneUdev Presentazione
Udev Presentazione
 
Eng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 NewEng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 New
 
Oliver Resume RSA
Oliver Resume RSAOliver Resume RSA
Oliver Resume RSA
 
Dave Yeap Resume Nov 2016
Dave Yeap Resume Nov 2016Dave Yeap Resume Nov 2016
Dave Yeap Resume Nov 2016
 

Similar to RAJISH CHANDRA- QAQC MECHANICAL CV.

Similar to RAJISH CHANDRA- QAQC MECHANICAL CV. (20)

CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
CV
CVCV
CV
 
SUMER_MECH_Er
SUMER_MECH_ErSUMER_MECH_Er
SUMER_MECH_Er
 
NEW RESUME AUG-16
NEW RESUME AUG-16NEW RESUME AUG-16
NEW RESUME AUG-16
 
YOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUMEYOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUME
 
E & I QA QC SUPERVISOR
E & I QA QC SUPERVISORE & I QA QC SUPERVISOR
E & I QA QC SUPERVISOR
 
Kumar.R Multi Inspector cv -5 - Copy
Kumar.R   Multi Inspector cv   -5 - CopyKumar.R   Multi Inspector cv   -5 - Copy
Kumar.R Multi Inspector cv -5 - Copy
 
FARHAN CV
FARHAN CVFARHAN CV
FARHAN CV
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
SELVAM.CV
SELVAM.CVSELVAM.CV
SELVAM.CV
 
Venugopal revised cv
Venugopal revised cvVenugopal revised cv
Venugopal revised cv
 
Arun CV
Arun CVArun CV
Arun CV
 
Venugopal revised Cv
Venugopal revised CvVenugopal revised Cv
Venugopal revised Cv
 
KARTHIK-CV
KARTHIK-CVKARTHIK-CV
KARTHIK-CV
 
Updated cv
Updated cvUpdated cv
Updated cv
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
AKSHAY BOGS CV
AKSHAY BOGS CVAKSHAY BOGS CV
AKSHAY BOGS CV
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
Varun Resume
Varun Resume Varun Resume
Varun Resume
 

RAJISH CHANDRA- QAQC MECHANICAL CV.

  • 1. 1 RAJISH CHANDRA Mobile: Qatar +974 33230992 /India +91 9961140367 E-Mail: - chandrarajish92@gmail.com A Goal-Oriented Individual Targeting Assignments in QC/ Welding Operations/Rotary & static equipment/ Painting/ Inspection Testing with a Leading Organization of High Repute PROFILE SUMMARY A Dynamic professional with over16 years of experience in:  Quality Assurance & Control  Testing & Inspection  Audit & Compliance  Piping Operations  Erection & Commissioning  Welding Operations  Fabrication  Vendor Assessment  Team Management  Demonstrated proficiency in executing operations under contract condition and ensuring Quality Compliance  Gained multi-cultural experience of working in Qatar, Kingdom of Saudi Arabia, Bahrain, Kuwait & Russia.  Proficient in handling & implementing process enhancement and quality control techniques conversant with quality codes &standards  Demonstrated excellence in carrying out planning & project execution functions and Non Destructive Testing (NDT) as per the specified time deadlines  Experience of managing project procurement quality control of large size projects with proficiency in swiftly ramping up with competent cross-functional skills and on time execution
  • 2. 2  Excellent relationship management, communication skills with the ability to network with consummate ease CORE COMPETENCIES  Developing and implementing a stage-by-stage quality assurance and control system to ensure adherence to technical specifications/codes & standards/ contract.  Preparing & reviewing project Inspection and Test Plan (ITP), reviewing procedures and maintaining QC documentation to ensure adequate documented evidence is available to prove contract compliance.  Ensuring that all tests are carried out as per contract & code requirements.  Carrying out the stage wise inspection for piping pre-fabrication, welding and reviewing sub-contractor as per specifications; supervising fit-up, welding consumables, pre-heating, process welding, visual check, etc.  Carrying out stage wise inspection of rotary and static equipment’s as per the approved ITP and relevant project standards. Key Result Areas:  Carrying out welding inspection of pipeline, piping and steel structures. coordination with third party inspection and testing agencies  Involved in welding procedure qualification & welder performance qualification tests as per necessary essential variables of ASME Sec IX.  Responsible for entire preparation and review of MAR,ITP, & Method Statement  Evaluation the NDT & Hydro-testing procedures and examining the test packs together with walk down for line check with updated P & IDS and isometric drawings.  Review of NDT documents as submitted by EPC contractor for review and approval  Participating in stage-wise painting inspection like surface preparation, DFT, WFT check and witnessing with third party holiday inspection test.  Raising site inspection reports through NCR, CQSR if any deficiency observed and maintaining the logs.  Attending weekly kick off meeting with EPC QA/ QC manager and all sub-contractors.
  • 3. 3 ORGANISATIONAL EXPERIENCE Career Profile-Summary: Name of organization Duration Project DesignationFrom To Qatar Solar Technologies (QSTec ). A member of Qatar Foundation. Jul 2013 Till Date POLYSILICON PLANT PROJECT, RASS LAFFAN. Sr.QC- Inspector RAMSIS ENGINEERING, CO. W.L.L MARCH 2011 NOV2012 PRODUCED FLUIDS AND WATER TREATMENT PLANT FOR TATWEER PETROLEUM, KINGDOM OF BAHRAIN. QA/QC Inspector NCC Construction Division Ltd (Rezayat Group ofCompanies) August 31 2010 December 12 2011 SABIYA CCGT (Combined Cycle Gas Turbine Project), at SABIYA Power Station, Sabiya, Kuwait QA/QC Engineer PunjLlyod Kazakhstan 14 July 2009 18 November 2009 KARACHAGANAK 4th STABILISATION & SWEETENING TRAIN QA/QC Inspector M/s. Lahoud Engineering Co.,Abu Dhabi 29th May,2007 14 januarary 2009 OGD –III ( Habshan 3) QA/QC Inspector
  • 4. 4 M/s. Nasser S Al Hajri Corporation limited March 2005 February 2007 Hadeed HotStrip Mill Enhancement Project& Hadded Direct reduction Plant expansion project,MODULE– E QA/QC Engineer M/s. Lahoud Engineering Co.Ltd November, 2003 August, 2004 ULG/LSGOproject. Welding Supervisor MIDEAST CONSTRUCTORS W.L.L.,Doha,Qatar March,2001 May,2002. Expansion projectat NGL 4, Dukhan site Welding Supervisor EDUCATION DME:Diploma in Mechanical Engineering From HIET, CHENNAI Other Course   Diploma in Computer Design software (Auto Cad) from IEC Software. CERTIFICATIONS  American Society of Non Destructive Testing-ASNT Certification – Level II (Liquid Penetrant Test, Magnetic Particle Test, Ultrasonic Test & RT) PROFESSIONAL ENHANCEMENTS o Safety HSE Training, Working at Height, Confined Space& Hot Works o Safety Inspection and Audits Training o Basic Fire Fighting Training
  • 5. 5 IT SKILLS o Conversant with:MS Dos and MS Office-Word/Excel, and Internet Applications PERSONAL DETAILS Full Name: Rajish Chandra Father’s Name: M.C.S.PILLAI Date of Birth: 10-09-1975 Nationality: Indian Passport Details: F9270503 (Issued at ABU DHABI & Valid until 29-th September 2017) Qatar Visa Status: RP / NOC- Available From Present Employer Languages Known: English, Hindi, Tamil Marital Status: Married Address: APRA-6, PULLY LANE, CHACKAI, TRIVANDRUM-690524. INDIA.
  • 6. 6 Please refer Annexure for project details: ANNEXURE Major Projects Handled: COMPANY NAME - QATAR SOLAR TECHNOLOGIES ( QSTec ), DOHA-QATAR MEMBER OF QATAR FOUNDATION EPC CONTRACTOR – PUNJJ LLOYD LTD PROJECT TITTLE – POLYSILICON PLANT PROJECT DATE OF JOINING – 26-JULY-2013 TO TILL DATE RESPONSIBILITIES HANDLED Attending inspection of all incoming materials with relevant to project specification and approved vendors. Review of OSDR reports as raised by EPC contractor Attending inspection calls as raised by EPC for all sub-contractors concerned. Review of documents and vendor packages as submitted by EPC for review and approval, and raising TDCR if any deficiency noted. Witnessing PQR tests, WQT test with relevant to the approved project WPS. Reviewing of WPS as submitted by contractor for approval. Attending daily inspection for tanks, piping, structure, rotary, static equipment’s with respect to approved ITP and project standards and with respective codes. Did FAT test for various rotary and static equipment’s. Attending 12 window inspection for critical process piping in order to check for discoloration of joints, particularly for SS316Ti piping SS materials. Review of NDT documents for all contractors prior to release for hydro. Attending walk down inspection with EPC and respective contractors for piping systems with updated P & IDS and ISO drawings for the system to be hydro tested. Checking of flange face prior to RE-INSTATEMMENT activity for the final box up of the system. Checking of the equipment’s piping connection (WITH PIPING ON / OFF) in order to verify the stress induced. Attending final walk down of the entire system together with operation department in order to generate the out standing punch items. Review of final mechanical documents for achieving mechanical completion as per approved standards and procedures and deficiency observed in documents by ways of raising TDCRS. COMPANY NAME - RAMSIS ENGINEERING, CO. W.L.L CONTRACTOR - VEOLIA WATER, SOLUTIONS AND TECHNOLOGIES PROJECT TITLE - PRODUCED FLUIDS AND WATER TREATMENT PLANT FOR TATWEER PETROLEUM , KINGDOM OF BAHRAIN. CLIENT - TATWEER PETROLEUM PERIOD - FROM, MARCH 2011 TO TILL DATE
  • 7. AND WITH HYDER CONSULTING FOR ELECTRICITY AND WATER AUTHORITY ( EWA ) FOR THE CONSTRUCTION OF 2 NOS. BUFFER TANKS AND 3 NOS. OF GROUND STORAGE TANKS IN AL - AREEN, EAST RIFFA, KINGDOM OF BAHRAIN. DUTIES AND RESPONSIBILITIES Checking of incoming project materials with respect to relevant MTC Checking of fit-ups for duplex piping spools, relasing for welding activities and final inspection clearance from the client. Preparing for further NDT activities in accordance with project standards and client specification. Taking final clearance from client for hydo-test. Doing inspection stage wise with respect to relavant to ITP, Project standards and client specification. Checking of plates with respect to relevant MTR. Doing fit-up inspection of tanks, and releasing for welding activities. Checking of all dimensional activities, vaccum box test, diesel leak test, and leak test for all tank nozzles . checking for surface profile after sand blasting and releasing for painting activities. Checking for wet film thickness ( WFT ), after painting ( DFT ), holiday check ( HD ), and adhesion test ( DOLLY TEST ) for ensuring strength of paints. Doing welding inspection activities, and releasing it for further clearance. Prepration of project dossiers, reviewing of ndt reports and submission of same to the client. ployer : NCC Construction Division Ltd (Rezayat Group of Companies) Contractor: GE (General Electric Corporation LLC) Client : Hyundai Heavy Industries Ltd Owner : MEW (Ministry of Electricity and Water) Position : QA/QC Engineer Project : SABIYA CCGT (Combined Cycle Gas Turbine Project), at SABIYA Power Station, Sabiya, Kuwait Witnessing of welder qualification Checking of piping materials and component in relevant to same standard and codes. Witnessing of internal piping cleanliness using boroscope camera and with white cloth method Witnessing of alloy steel pipes welding, p11, p91, p22 pipes for HRSG Steam Recovery Area (HEAT RECOVERY STEAM GENERATOR). Witnessing of Inspection and NDT activities. Checking of alloy steel pipes welding. Witnessing of inspection activities of Alloy Steel Pipes in a accordance with ASME B31.1 Power Plant Piping. Preparing daily weld visual reports, making fit-up reports and submission of same to the client. Taking part in Internal Auditing (QA/QC). Checking of all welding consumables ,i.e. Welders quivers, Electode Baking ovens, Maintaining correct Employer : Punj Llyod Kazakhstan Contractor: PFEC Client : KPO ( KARACHAGANAK PETROLEUM OPERATING, B.V) Position : QA/QC Inspector Project : KARACHAGANAK 4th STABILISATION & SWEETENING TRAIN Period : 14 July 2009 – 18 November 2009 Responsibilities:
  • 8.  Verify the materials specifications againstdrawings and piping line class.  Visualinspection of welds and accepting as perprojectspecifications and preparing reports making QCW clearance for further activities.  Supervise & Monitor the welding activities as per company’s quality control plan and according to ASME standards.  Associating with other tests like stress relieving (post welding heattreatment), hydraulic tests, and pneumatic tests of nozzle pads.Etc.  WelderQualification Test as perrelevant WPS.  Inspection of Pipe and Fittings according to ASME standards.  Preparation and Filling of PWTH Reports.  Witnessing of NDT activities and preparation ofNDT Reports.  Maintaining Inspection Documents ofFlange ManagementSystem.  Preparation of daily welding report and offering for NDT activities according to relevant piping classes.  Preparation of Welder’s Card.  Inspection of joints fit up priorto release for welding activities and doing visual inspection of final welded joints with respectto relevant approved Isometric Drawings.  Q.C Clearance of test packs accordingto companyquality procedures.  Preparing various documents such as welding inspection reportprior to endorsementto the client.  Mark out the repaired location and contacting the repair as per approved repairprocedure.  Coordination with the client/consultants to maintain the quality to move the project smoothly.    Worked with M/s. Lahoud Engineering Co. ,Abu Dhabi, UAE at OGD –III ( Habshan 3) project as a QA/QC Inspector for Eastern Bechtel Company Ltd. (EBCL) since 29th May,2007 to January,2009. JOB RESPONSIBILITIES:  Familiarization with Project specification, (ITP) Inspection and Test Plan, Review Scope of Work Project Specification Procedures to determine the adequacy of such to meet Quality Control requirements.  Approval and witnessing of WPS with supporting PQR.  Conducting surveillance inspection of weldments.  Closely monitoring inspection on welding parameters that is Welding machines, Quivers, Electrodes, Preheating, Welders Identification, Amperage and Voltage for each welding machines being used at site as per Quality Control procedures and specifications.  Represent the QA/QC Department and prepare minutes of meeting for forecast scheduler for every weekend.  Witnessing of welder qualification.  Inspection during fit-up before welding & after welding of pipe joints
  • 9.  Familiar with CS, SS , Alloy and Inconel pipe welding  Control of Welder, welding activities and Consumables.  Visual inspection of finished welds  Witnessing NDT/PWHT activities.  Monitoring Painting activities for Above/Under ground piping systems  Preparation of QC related documents.  Test pack punching and submission for pre test Inspection.  Conducting and witnessing hydro/Pneumatic tests and taking final release of line.  Generate Documentation Inspection and test records for onward submission to client Handover Certification. Worked with M/s. Nasser S Al Hajri Corporation limited as a QA/QC Engineer for Hadeed Hot Strip Mill Enhancement Project & Hadded Direct reduction Plant expansion project, MODULE – E at Al Jubail, K.S.A. from March 2005 to February 2007 FOR SMS – DEMAG INNSE GROUP: GERMANY.  Witnessing of welder qualification.  Inspection during fit-up before welding & after welding of pipe joints  Familiar with CS, SS , Alloy and Inconel pipe welding  Control of Welder, welding activities and Consumables.  Visual inspection of finished welds  Witnessing NDT/PWHT activities.  Monitoring Painting activities for Above/Under ground piping systems  Preparation of QC related documents.  Test pack punching and submission for pre test Inspection.  Minimizing weld repairs by proper controlling and conducting tool box talk with welders as per project specification. Conducting and witnessing hydro/Pneumatic tests and taking final release of Worked with M/s. Lahoud Engineering Co.Ltd. as a Piping cum Welding Supervisor for TECNIP , Italy from November, 2003 to August, 2004 for the ULG/LSGO project, Ruwias Refinery, Abu Dhabi, U.A.E  Witnessing of welder qualification.  Inspection during fit-up before welding & after welding of pipe joints  Familiar with CS, SS , Alloy and Inconel pipe welding  Control of Welder, welding activities and Consumables.
  • 10.  Visual inspection of finished welds  Witnessing Structural welding and Tank welding activities as relevant standard and codes.  Witnessing NDT/PWHT activities. Worked with MIDEAST CONSTRUCTORS W.L.L., Doha, Qatar as Piping Foreman for SNAM PROGGETI/HYUNDAI ENGG. CONSTRUCTION LTD. For Qatar Petroleum Expansion project at NGL 4, Dukhan site from March, 2001 to May, 2002.  Inspection during fit-up before welding & after welding of pipe joints  Familiar with CS, SS , Alloy and Inconel pipe welding  Control of Welder, welding activities and Consumables.  Checking and confirmation of materials ( pipes & fittings), Execution of isometric drawings, Segregation of the spools, Hydro testing , Punch list clearance and Rectification of welding defects Worked with M/s. Jayashree Construction Private Ltd. As a Production QC Engineer for the Client RELIANCE PETROLEIUM LTD., at JamNagar Refinery Marine Tank Farm Area from November, 1997 to January, 2000.  Inspection during fit-up before welding & after welding of pipe joints  Familiar with CS, SS , Alloy and Inconel pipe welding  Control of Welder, welding activities and Consumables.  Checking and confirmation of materials ( pipes & fittings), Execution of isometric drawings,Seggregation of the spools, Hydrotesting , Punch list clearance and Rectification of welding defects
  • 11. [8] Worked with M/s. WESTON ENGINEERING CO. at Rourkela Steel Plant as a Site Piping Supervisor of Coke ovens and Blast furnace piping from May, 1996 to October, 1997.  Checking and confirmation of materials ( pipes & fittings), Execution of isometric drawings,Seggregation of the spools, Hydrotesting , Punch list clearance and Rectification of welding defects Place: Doha-Qatar Date: Name: Rajish Chandra.