DV 1x400 kV, 2x400 kV Lastva-Trebinje I Lastva-Pljevlja, PROJECT
TRANSMISSIONLINES WORKS
Contract Number:
Client: CGES
Contractor Engineer: Iberdrola Engineering
Sub-Contractor: DOKO SHPK/DSD
CLEANING OF LAND SLIDE
ACCES TRACK AT 10
Method of Statement (Specific)
Document Number: IIC-000-Mo-0-00_01_MoS-CLS_AT10
00 23/01/201 8 Approval Arber Dogani
Florian Koraqe/Dritan
Konica
Defrim Baci Eri DOKO
REV DATE ISSUED FOR ISSUED BY HSE CHECKED BY QA/QC TD PM
Contractor
Engineer
□ □ □
DATE BY APPROVED REJECTED NA COMMENTS
Present document is property of the Company and it is prohibited any copy and/or convey of its original copy w ith any means, before the w ritten
confirmation and approvalof the Company's legal representative.
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: 22/01/2018
Revision: 01
Page 2 of 22
REVISION TRACKING PAGE
Revision
Number
Revised
Page
Revision Date Description of Revision Prepared by
00 all 23/01/2018 Prepared and Published A.Dogani
Rev No. 01 02 03 04 05
Date
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 3 of 22
CONTENTS
1 PURPOSE..................................................................................................................................................................................5
2 SCOPE.......................................................................................................................................................................................5
3 DEFINITIONS ...........................................................................................................................................................................6
4 REFERENCES ............................................................................................................................................................................6
5 HEALTH, SAFETY, AND ENVIRONMENT CONSIDERATION.............................................................................................6
5.1 Requirements......................................................................................................................6
5.2 Team Members Trainings.....................................................................................................7
5.3 Tools and Equipment...........................................................................................................7
5.4 Weather Condition ..............................................................................................................8
5.5 Personal Protective Equipment(PPE)....................................................................................8
5.6 Communication...................................................................................................................8
5.7 Working time.......................................................................................................................8
5.8 First Aid and First Aider........................................................................................................8
5.9 Environmental Measures......................................................................................................9
5.10 Visitors or Vendor on site.....................................................................................................9
6 METHODOLOGY .....................................................................................................................................................................9
6.1 Description..........................................................................................................................9
6.2 Clearing and excavation Operations....................................................................................10
7 CONTRACTOR'S ORGANIZATION FOR ACCESS ROAD CONSTRUCTION....................................................................11
8 ATTACHMENT A - LOCATION MAP...................................................................................................................................12
9 ATTACHMENT B – PHOTOS................................................................................................................................................13
PHOTO 1 ..........................................................................................................................................................................................13
10 ATTACHMENT B/2 – PHOTOS ...........................................................................................................................................14
11 ATTACHMENT B/3 – PHOTOS ...........................................................................................................................................15
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 4 of 22
12 ATTACHMENT C - RISK ASSESSMENT SPECIFIC..............................................................................................................16
13 ATTACHMENT D - JOB HAZARD ANALYSIS .....................................................................................................................19
14 ATTACHMENT E – LAST MINUTE RISK ASSESSMENT....................................................................................................21
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 5 of 22
1 PURPOSE
To establish methodology on cleaning of land slide at at 10 required for construction of AT 10 and
towers 8 I, 8 u, 9 u (Appendix A - LOCATION MAP)
2 SCOPE
This procedure establishes description and guidelines for works performed during the removal of the
land slide near tower 9u.
Duration of the works is estimated to be 15 working days starting from receiving confirmation for
starting of the works. However final duration of the works, will be determined by field performance.
Will be used for these work:
Doko:
2 Excavators, 2 operators, 2 workers (Wachman’s), 1 Lead Civil Engineer
Iberdrola:
1 Geologist
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 6 of 22
3 DEFINITIONS
IIC -Iberdrola Inginieria y Construccion
PM- Project Manager
DPM- Deputy Project Manager
4 REFERENCES
Health Safety and Environmental (HSE) Plan
 Chapter 6:
Point 6.1 ; Point 6.2 ;
 Chapter 10:
Point 10.1
 Chapter 11: Point 11.1.
 Chapter 12:Point 12,1
 Chapter 13: Points 13.1, 13.2, 13.3, 13.4, 13.5, 13.6, 13.8, 13.10.
Quality Assurance / Quality Control (QA/QC) Plan
5 HEALTH, SAFETY, AND ENVIRONMENT CONSIDERATION
5.1 Requirements
Before the Contractorstart constructionof access roadto towerlocationsthe requirements listedbelow
must be followed and completed.
1. All the crew must be trained for such activity;
2. RiskAssessment(RA)(Appendix C- RISKASSESSMENT) andJobHazardAnalysis(JHA) (Appendix
D - JOB HAZARDANALYSIS) mustbe prepared before any start of activity. JHA must be read and
signed by all the members of the crew before the activity starts;
3. Equipmentmustbe ingoodconditionandall safetydevices mustbe functional andactive during
all the time;
4. Last Minute Risk Assessment will be prepared and signed from HSE Lead and Lead Engineer
every day(No Works will be performed without LMRA)
5. Tools must be in good shape and not damaged or modified;
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 7 of 22
6. Housekeeping and working area must be clean in order to protect the Environment;
7. Communication (Radio);
8. Working time (8Hours).
5.2 Team Members Trainings
Team members must be trained in different disciplines to perform this activity.
 General induction training;
o HS&E Induction
o Environmental Awareness
o Emergency Response Plan Training
o Fire Fighting Training
o First Aid Training
o JHA/Risk Assessment
o HS&E Leadership
o Stop Works
o HS&E Assessments
o Accident/Incident Reporting & Investigation
o Near Miss Reporting
o Cost of Accidents
 Tools and equipment training;
 Watchman Daily Instruction
 PPE training;
 Equipments,
Only this category of workers should be working in Cleaning of Land Slide at AT 10 construction.
5.3 Tools and Equipment
 Tools must be in good condition and free from any damage;
 Only proper tool are allowed to use in this activity;
 Homemade tools are not allowed to use on site;
 Equipment must be in good condition and checked periodically;
 Only authorized operator must use them and to be shore that the equipment to be well
maintained;
 Radio communication
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 8 of 22
 Acoustic High Signal
 Where the equipmentissettle,the areashouldbe barricade byhighvisible safetytape andalso
warning signs must be put in order to inform the public about the work activity.
5.4 Weather Condition
It is not allowed to perform any activity during bad weather condition like;
 storm
 snow
No activity will be performed if equipment are not able to perform safe work because of weather
condition.
5.5 Personal Protective Equipment (PPE)
In order to prevent any injury or accident during the working time, we are forced by the HSE plan and
the AlbanianLaborLow to use the followingpersonal protective equipment during all the time on site.
 hard hat;
 gloves;
 safetyshoes;
 highvisible vest;
 Reflectivesigns.
 Acousticsignalization
All these PPEswill be usedandwearbyeveryone thatwill be partonthe workingsite.Visitorsshall wear
these PPEs (except reflective sign), as well.
5.6 Communication
In orderto have a safe working activity, the communication is a very important issue to be considered.
Workers are not allowed to use or talk on the phone when they are operating or guiding equipment.
Visible and acoustic signs must be used on site.
5.7 Working time
In order to have a safe work condition, road access activity will be performed only during day time. If
proper lighting is provided works can be performed by management decision.
5.8 First Aid and First Aider
Emergency numbers must be place in a visible table from everyone. First aid kit will be put in a place
where everyone may have access.
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 9 of 22
5.9 Environmental Measures
In order to keep a good environment on site, spill prevention must be present on site, garbage and
waste of food will be removed from site and deposited in safe waste area. All the area must be clean
and in good environment condition after work activity.
5.10 Visitors or Vendor on site
Visitors or Vendors are not allowed to enter on site until they have permission, however, visitors and
vendormust have a brief training before they go on site and also they should sign the attendance list.
6 METHODOLOGY
6.1 Description
Cleaning of land slide at access track at 10 will be done with these steps:
 We will beginthe excavationinzone 1, as it is rocky area during excavator work, it will create a
vibrationthatwill affectthe provocation of the surrounding area to see if there is any possible
movement,thisareaisthe safestpartcompact rockerwhere the excavatorwill work and in this
way does not endanger the vehicle and maneuver.
 If the terraindoesnotshowany signof new displacing,andafterthe Iberdrola Geologist checks
and gives OK we will continue with the second phase.
 Afteritwill be continuedwithZone 3 excavation, this area consists of dislocated rock material,
no compact rock,there are soil layers between the rock layers and vegetation and about 60-70
cm of soli above the surface.
Excavationinthiszone will startfromtowerNo.8 inthe directionof landslidebyharassingandrelieving
by 3m created by the land sliding, to see if we will have any possible slide or not.
 If everythinggoeswellandthe Geologisttogetherwiththe Engineeragreesthat the structure is
stable and there is certainty to enter that already cleaned area on both sides then we can
proceed with the cleansing of the rock massive.
 Excavatorsshouldworkwith interchange, only one at the same time during the excavations of
Zone 1 and 3, to avoid any possible incident and to react on time.
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 10 of 22
 For these typesof workwhere the dangerishigh,the escortingteamshave tobe equippedwith
acoustic signalizations and radio to signal the excavator maneuverer to immediately pull back
with the vehicle in case of sliding terrain.
Picture 1: Map of landslide and zones of work
6.2 Clearing and excavation Operations
1. Main contractor shall ensure all required permits are in place prior to the start of clearing and
excavation work operations.
2. Main contractor Geologistshall be presentduringall time toestablishif terrainconditionsallow
to proceed further with the works of clearing and excavations.l
3. The Contractor shall ensure compliance with environmental requirements such as silt fencing,
run-off protection, or dust limitations during clearing and grubbing operation.
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 11 of 22
7 CONTRACTOR'S ORGANIZATION FOR ACCESS ROAD CONSTRUCTION
ProjectManager (ErlirDoko)
Construction Manager (Klevi Kalemi)
Site Engineer (Anil Doko)
Excavation Team (Surveyor,
Forman, Operator)
HSE Lead (Arber
Dogani)
Geologist(Iberdrola)
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 12 of 22
8 ATTACHMENT A - LOCATION MAP
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 13 of 22
9 ATTACHMENT B – PHOTOS
PHOTO1
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 14 of 22
10 ATTACHMENT B/2 – PHOTOS
PHOTO 2
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 15 of 22
11 ATTACHMENT B/3 – PHOTOS
PHOTO 3
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 16 of 22
12 ATTACHMENT C - RISK ASSESSMENT SPECIFIC
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 17 of 22
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 18 of 22
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 19 of 22
13 ATTACHMENT D - JOB HAZARD ANALYSIS
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 20 of 22
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 21 of 22
14 ATTACHMENT E – LAST MINUTE RISK ASSESSMENT
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 22 of 22

More Related Content

Similar to Specific method of statmeents risk assessment -job hazard analysis for land slide

Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdfBalamuruganD26
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templatesDwarika Bhushan Sharma
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...MohammedAliQazi
 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Andrew Louis
 
MC-SC-HSE-HIRA-000 Installation of Sanitary waste and venting piping system.docx
MC-SC-HSE-HIRA-000 Installation of Sanitary waste and venting piping system.docxMC-SC-HSE-HIRA-000 Installation of Sanitary waste and venting piping system.docx
MC-SC-HSE-HIRA-000 Installation of Sanitary waste and venting piping system.docxPatrick Bibila Ndansi
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docAtif767782
 
5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Safety Based Estimation FINAL
Safety Based Estimation FINALSafety Based Estimation FINAL
Safety Based Estimation FINALMelissa Spencer
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docxDwarika Bhushan Sharma
 
MS.CPS3 Carport to be designed and installed Rev0.pdf
MS.CPS3 Carport to be designed and installed Rev0.pdfMS.CPS3 Carport to be designed and installed Rev0.pdf
MS.CPS3 Carport to be designed and installed Rev0.pdfNajiRaheem2
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
A R Ram CV 2016_04 QHSSE Rev00
A R Ram CV 2016_04 QHSSE  Rev00A R Ram CV 2016_04 QHSSE  Rev00
A R Ram CV 2016_04 QHSSE Rev00A R Ram
 
7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templatesDwarika Bhushan Sharma
 
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...minte3
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
17 Traffic Operations - Working on live roads Risk Assessment Templates.docx
17 Traffic Operations - Working on live roads Risk Assessment Templates.docx17 Traffic Operations - Working on live roads Risk Assessment Templates.docx
17 Traffic Operations - Working on live roads Risk Assessment Templates.docxDwarika Bhushan Sharma
 

Similar to Specific method of statmeents risk assessment -job hazard analysis for land slide (20)

Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdf
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
 
Telehandler
TelehandlerTelehandler
Telehandler
 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
 
MC-SC-HSE-HIRA-000 Installation of Sanitary waste and venting piping system.docx
MC-SC-HSE-HIRA-000 Installation of Sanitary waste and venting piping system.docxMC-SC-HSE-HIRA-000 Installation of Sanitary waste and venting piping system.docx
MC-SC-HSE-HIRA-000 Installation of Sanitary waste and venting piping system.docx
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates
 
Safety Based Estimation FINAL
Safety Based Estimation FINALSafety Based Estimation FINAL
Safety Based Estimation FINAL
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
 
MS.CPS3 Carport to be designed and installed Rev0.pdf
MS.CPS3 Carport to be designed and installed Rev0.pdfMS.CPS3 Carport to be designed and installed Rev0.pdf
MS.CPS3 Carport to be designed and installed Rev0.pdf
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
 
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
 
A R Ram CV 2016_04 QHSSE Rev00
A R Ram CV 2016_04 QHSSE  Rev00A R Ram CV 2016_04 QHSSE  Rev00
A R Ram CV 2016_04 QHSSE Rev00
 
7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates
 
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx
 
17 Traffic Operations - Working on live roads Risk Assessment Templates.docx
17 Traffic Operations - Working on live roads Risk Assessment Templates.docx17 Traffic Operations - Working on live roads Risk Assessment Templates.docx
17 Traffic Operations - Working on live roads Risk Assessment Templates.docx
 

More from Arber Dogani

Risk evaluation template Prepared by A.Dogani 2016(1)
Risk evaluation template Prepared by A.Dogani 2016(1)Risk evaluation template Prepared by A.Dogani 2016(1)
Risk evaluation template Prepared by A.Dogani 2016(1)Arber Dogani
 
Vleresimi i riskut per punimet e percjellesit dhe trosit 110k v banje cerri...
Vleresimi  i riskut  per punimet e percjellesit dhe trosit 110k v banje cerri...Vleresimi  i riskut  per punimet e percjellesit dhe trosit 110k v banje cerri...
Vleresimi i riskut per punimet e percjellesit dhe trosit 110k v banje cerri...Arber Dogani
 
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016Arber Dogani
 
Analiza e rrezikut ne pune montim percjellesi dhe trosi 110k v banje cerrik ...
Analiza e rrezikut ne pune montim percjellesi dhe trosi  110k v banje cerrik ...Analiza e rrezikut ne pune montim percjellesi dhe trosi  110k v banje cerrik ...
Analiza e rrezikut ne pune montim percjellesi dhe trosi 110k v banje cerrik ...Arber Dogani
 
'' Plani menaxhimit te cilesise per linja transmetimi tu tm-tl dhe nenstacio...
'' Plani menaxhimit te cilesise  per linja transmetimi tu tm-tl dhe nenstacio...'' Plani menaxhimit te cilesise  per linja transmetimi tu tm-tl dhe nenstacio...
'' Plani menaxhimit te cilesise per linja transmetimi tu tm-tl dhe nenstacio...Arber Dogani
 
Hse plan zbatim ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
Hse  plan zbatim  ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03Hse  plan zbatim  ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
Hse plan zbatim ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03Arber Dogani
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.doganiArber Dogani
 
Hse templates by.arber dogani
Hse templates by.arber doganiHse templates by.arber dogani
Hse templates by.arber doganiArber Dogani
 
Ditar kantieri (formular)
Ditar kantieri (formular)Ditar kantieri (formular)
Ditar kantieri (formular)Arber Dogani
 
Raport javor punimesh linja transmetimi format raportimi javor _ arber do...
Raport javor punimesh  linja transmetimi format raportimi javor    _ arber do...Raport javor punimesh  linja transmetimi format raportimi javor    _ arber do...
Raport javor punimesh linja transmetimi format raportimi javor _ arber do...Arber Dogani
 
Raport javor siguria shendeti dhe mjedisi Raportim Mujor Statistika Arber Do...
Raport javor siguria shendeti dhe mjedisi  Raportim Mujor Statistika Arber Do...Raport javor siguria shendeti dhe mjedisi  Raportim Mujor Statistika Arber Do...
Raport javor siguria shendeti dhe mjedisi Raportim Mujor Statistika Arber Do...Arber Dogani
 
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00 arber dogani
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00  arber doganiPlan menanxhimi (mjedisi linjat e transmetimit)rev.00  arber dogani
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00 arber doganiArber Dogani
 
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber doganiPlani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber doganiArber Dogani
 
Training hse housekeeping albanian mirembajtja e vendit te punes
Training hse housekeeping albanian mirembajtja e vendit te punesTraining hse housekeeping albanian mirembajtja e vendit te punes
Training hse housekeeping albanian mirembajtja e vendit te punesArber Dogani
 
Hse trainings respiratory protection albanian by a.dogani
Hse trainings respiratory protection albanian by a.doganiHse trainings respiratory protection albanian by a.dogani
Hse trainings respiratory protection albanian by a.doganiArber Dogani
 
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte shqip 2018
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte   shqip 2018Manuali i punes ndertimin e linjave dhe nst te tensionit te larte   shqip 2018
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte shqip 2018Arber Dogani
 
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertimNew hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertimArber Dogani
 
Basic harness awareness training albanian.
Basic harness awareness training albanian.Basic harness awareness training albanian.
Basic harness awareness training albanian.Arber Dogani
 
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00Arber Dogani
 

More from Arber Dogani (19)

Risk evaluation template Prepared by A.Dogani 2016(1)
Risk evaluation template Prepared by A.Dogani 2016(1)Risk evaluation template Prepared by A.Dogani 2016(1)
Risk evaluation template Prepared by A.Dogani 2016(1)
 
Vleresimi i riskut per punimet e percjellesit dhe trosit 110k v banje cerri...
Vleresimi  i riskut  per punimet e percjellesit dhe trosit 110k v banje cerri...Vleresimi  i riskut  per punimet e percjellesit dhe trosit 110k v banje cerri...
Vleresimi i riskut per punimet e percjellesit dhe trosit 110k v banje cerri...
 
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
 
Analiza e rrezikut ne pune montim percjellesi dhe trosi 110k v banje cerrik ...
Analiza e rrezikut ne pune montim percjellesi dhe trosi  110k v banje cerrik ...Analiza e rrezikut ne pune montim percjellesi dhe trosi  110k v banje cerrik ...
Analiza e rrezikut ne pune montim percjellesi dhe trosi 110k v banje cerrik ...
 
'' Plani menaxhimit te cilesise per linja transmetimi tu tm-tl dhe nenstacio...
'' Plani menaxhimit te cilesise  per linja transmetimi tu tm-tl dhe nenstacio...'' Plani menaxhimit te cilesise  per linja transmetimi tu tm-tl dhe nenstacio...
'' Plani menaxhimit te cilesise per linja transmetimi tu tm-tl dhe nenstacio...
 
Hse plan zbatim ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
Hse  plan zbatim  ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03Hse  plan zbatim  ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
Hse plan zbatim ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
 
Hse templates by.arber dogani
Hse templates by.arber doganiHse templates by.arber dogani
Hse templates by.arber dogani
 
Ditar kantieri (formular)
Ditar kantieri (formular)Ditar kantieri (formular)
Ditar kantieri (formular)
 
Raport javor punimesh linja transmetimi format raportimi javor _ arber do...
Raport javor punimesh  linja transmetimi format raportimi javor    _ arber do...Raport javor punimesh  linja transmetimi format raportimi javor    _ arber do...
Raport javor punimesh linja transmetimi format raportimi javor _ arber do...
 
Raport javor siguria shendeti dhe mjedisi Raportim Mujor Statistika Arber Do...
Raport javor siguria shendeti dhe mjedisi  Raportim Mujor Statistika Arber Do...Raport javor siguria shendeti dhe mjedisi  Raportim Mujor Statistika Arber Do...
Raport javor siguria shendeti dhe mjedisi Raportim Mujor Statistika Arber Do...
 
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00 arber dogani
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00  arber doganiPlan menanxhimi (mjedisi linjat e transmetimit)rev.00  arber dogani
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00 arber dogani
 
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber doganiPlani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
 
Training hse housekeeping albanian mirembajtja e vendit te punes
Training hse housekeeping albanian mirembajtja e vendit te punesTraining hse housekeeping albanian mirembajtja e vendit te punes
Training hse housekeeping albanian mirembajtja e vendit te punes
 
Hse trainings respiratory protection albanian by a.dogani
Hse trainings respiratory protection albanian by a.doganiHse trainings respiratory protection albanian by a.dogani
Hse trainings respiratory protection albanian by a.dogani
 
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte shqip 2018
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte   shqip 2018Manuali i punes ndertimin e linjave dhe nst te tensionit te larte   shqip 2018
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte shqip 2018
 
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertimNew hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
 
Basic harness awareness training albanian.
Basic harness awareness training albanian.Basic harness awareness training albanian.
Basic harness awareness training albanian.
 
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
 

Recently uploaded

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 

Specific method of statmeents risk assessment -job hazard analysis for land slide

  • 1. DV 1x400 kV, 2x400 kV Lastva-Trebinje I Lastva-Pljevlja, PROJECT TRANSMISSIONLINES WORKS Contract Number: Client: CGES Contractor Engineer: Iberdrola Engineering Sub-Contractor: DOKO SHPK/DSD CLEANING OF LAND SLIDE ACCES TRACK AT 10 Method of Statement (Specific) Document Number: IIC-000-Mo-0-00_01_MoS-CLS_AT10 00 23/01/201 8 Approval Arber Dogani Florian Koraqe/Dritan Konica Defrim Baci Eri DOKO REV DATE ISSUED FOR ISSUED BY HSE CHECKED BY QA/QC TD PM Contractor Engineer □ □ □ DATE BY APPROVED REJECTED NA COMMENTS Present document is property of the Company and it is prohibited any copy and/or convey of its original copy w ith any means, before the w ritten confirmation and approvalof the Company's legal representative.
  • 2. Method of Statement Removal of land slide at AT10 ISSUING DATE: 22/01/2018 Revision: 01 Page 2 of 22 REVISION TRACKING PAGE Revision Number Revised Page Revision Date Description of Revision Prepared by 00 all 23/01/2018 Prepared and Published A.Dogani Rev No. 01 02 03 04 05 Date
  • 3. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 3 of 22 CONTENTS 1 PURPOSE..................................................................................................................................................................................5 2 SCOPE.......................................................................................................................................................................................5 3 DEFINITIONS ...........................................................................................................................................................................6 4 REFERENCES ............................................................................................................................................................................6 5 HEALTH, SAFETY, AND ENVIRONMENT CONSIDERATION.............................................................................................6 5.1 Requirements......................................................................................................................6 5.2 Team Members Trainings.....................................................................................................7 5.3 Tools and Equipment...........................................................................................................7 5.4 Weather Condition ..............................................................................................................8 5.5 Personal Protective Equipment(PPE)....................................................................................8 5.6 Communication...................................................................................................................8 5.7 Working time.......................................................................................................................8 5.8 First Aid and First Aider........................................................................................................8 5.9 Environmental Measures......................................................................................................9 5.10 Visitors or Vendor on site.....................................................................................................9 6 METHODOLOGY .....................................................................................................................................................................9 6.1 Description..........................................................................................................................9 6.2 Clearing and excavation Operations....................................................................................10 7 CONTRACTOR'S ORGANIZATION FOR ACCESS ROAD CONSTRUCTION....................................................................11 8 ATTACHMENT A - LOCATION MAP...................................................................................................................................12 9 ATTACHMENT B – PHOTOS................................................................................................................................................13 PHOTO 1 ..........................................................................................................................................................................................13 10 ATTACHMENT B/2 – PHOTOS ...........................................................................................................................................14 11 ATTACHMENT B/3 – PHOTOS ...........................................................................................................................................15
  • 4. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 4 of 22 12 ATTACHMENT C - RISK ASSESSMENT SPECIFIC..............................................................................................................16 13 ATTACHMENT D - JOB HAZARD ANALYSIS .....................................................................................................................19 14 ATTACHMENT E – LAST MINUTE RISK ASSESSMENT....................................................................................................21
  • 5. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 5 of 22 1 PURPOSE To establish methodology on cleaning of land slide at at 10 required for construction of AT 10 and towers 8 I, 8 u, 9 u (Appendix A - LOCATION MAP) 2 SCOPE This procedure establishes description and guidelines for works performed during the removal of the land slide near tower 9u. Duration of the works is estimated to be 15 working days starting from receiving confirmation for starting of the works. However final duration of the works, will be determined by field performance. Will be used for these work: Doko: 2 Excavators, 2 operators, 2 workers (Wachman’s), 1 Lead Civil Engineer Iberdrola: 1 Geologist
  • 6. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 6 of 22 3 DEFINITIONS IIC -Iberdrola Inginieria y Construccion PM- Project Manager DPM- Deputy Project Manager 4 REFERENCES Health Safety and Environmental (HSE) Plan  Chapter 6: Point 6.1 ; Point 6.2 ;  Chapter 10: Point 10.1  Chapter 11: Point 11.1.  Chapter 12:Point 12,1  Chapter 13: Points 13.1, 13.2, 13.3, 13.4, 13.5, 13.6, 13.8, 13.10. Quality Assurance / Quality Control (QA/QC) Plan 5 HEALTH, SAFETY, AND ENVIRONMENT CONSIDERATION 5.1 Requirements Before the Contractorstart constructionof access roadto towerlocationsthe requirements listedbelow must be followed and completed. 1. All the crew must be trained for such activity; 2. RiskAssessment(RA)(Appendix C- RISKASSESSMENT) andJobHazardAnalysis(JHA) (Appendix D - JOB HAZARDANALYSIS) mustbe prepared before any start of activity. JHA must be read and signed by all the members of the crew before the activity starts; 3. Equipmentmustbe ingoodconditionandall safetydevices mustbe functional andactive during all the time; 4. Last Minute Risk Assessment will be prepared and signed from HSE Lead and Lead Engineer every day(No Works will be performed without LMRA) 5. Tools must be in good shape and not damaged or modified;
  • 7. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 7 of 22 6. Housekeeping and working area must be clean in order to protect the Environment; 7. Communication (Radio); 8. Working time (8Hours). 5.2 Team Members Trainings Team members must be trained in different disciplines to perform this activity.  General induction training; o HS&E Induction o Environmental Awareness o Emergency Response Plan Training o Fire Fighting Training o First Aid Training o JHA/Risk Assessment o HS&E Leadership o Stop Works o HS&E Assessments o Accident/Incident Reporting & Investigation o Near Miss Reporting o Cost of Accidents  Tools and equipment training;  Watchman Daily Instruction  PPE training;  Equipments, Only this category of workers should be working in Cleaning of Land Slide at AT 10 construction. 5.3 Tools and Equipment  Tools must be in good condition and free from any damage;  Only proper tool are allowed to use in this activity;  Homemade tools are not allowed to use on site;  Equipment must be in good condition and checked periodically;  Only authorized operator must use them and to be shore that the equipment to be well maintained;  Radio communication
  • 8. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 8 of 22  Acoustic High Signal  Where the equipmentissettle,the areashouldbe barricade byhighvisible safetytape andalso warning signs must be put in order to inform the public about the work activity. 5.4 Weather Condition It is not allowed to perform any activity during bad weather condition like;  storm  snow No activity will be performed if equipment are not able to perform safe work because of weather condition. 5.5 Personal Protective Equipment (PPE) In order to prevent any injury or accident during the working time, we are forced by the HSE plan and the AlbanianLaborLow to use the followingpersonal protective equipment during all the time on site.  hard hat;  gloves;  safetyshoes;  highvisible vest;  Reflectivesigns.  Acousticsignalization All these PPEswill be usedandwearbyeveryone thatwill be partonthe workingsite.Visitorsshall wear these PPEs (except reflective sign), as well. 5.6 Communication In orderto have a safe working activity, the communication is a very important issue to be considered. Workers are not allowed to use or talk on the phone when they are operating or guiding equipment. Visible and acoustic signs must be used on site. 5.7 Working time In order to have a safe work condition, road access activity will be performed only during day time. If proper lighting is provided works can be performed by management decision. 5.8 First Aid and First Aider Emergency numbers must be place in a visible table from everyone. First aid kit will be put in a place where everyone may have access.
  • 9. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 9 of 22 5.9 Environmental Measures In order to keep a good environment on site, spill prevention must be present on site, garbage and waste of food will be removed from site and deposited in safe waste area. All the area must be clean and in good environment condition after work activity. 5.10 Visitors or Vendor on site Visitors or Vendors are not allowed to enter on site until they have permission, however, visitors and vendormust have a brief training before they go on site and also they should sign the attendance list. 6 METHODOLOGY 6.1 Description Cleaning of land slide at access track at 10 will be done with these steps:  We will beginthe excavationinzone 1, as it is rocky area during excavator work, it will create a vibrationthatwill affectthe provocation of the surrounding area to see if there is any possible movement,thisareaisthe safestpartcompact rockerwhere the excavatorwill work and in this way does not endanger the vehicle and maneuver.  If the terraindoesnotshowany signof new displacing,andafterthe Iberdrola Geologist checks and gives OK we will continue with the second phase.  Afteritwill be continuedwithZone 3 excavation, this area consists of dislocated rock material, no compact rock,there are soil layers between the rock layers and vegetation and about 60-70 cm of soli above the surface. Excavationinthiszone will startfromtowerNo.8 inthe directionof landslidebyharassingandrelieving by 3m created by the land sliding, to see if we will have any possible slide or not.  If everythinggoeswellandthe Geologisttogetherwiththe Engineeragreesthat the structure is stable and there is certainty to enter that already cleaned area on both sides then we can proceed with the cleansing of the rock massive.  Excavatorsshouldworkwith interchange, only one at the same time during the excavations of Zone 1 and 3, to avoid any possible incident and to react on time.
  • 10. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 10 of 22  For these typesof workwhere the dangerishigh,the escortingteamshave tobe equippedwith acoustic signalizations and radio to signal the excavator maneuverer to immediately pull back with the vehicle in case of sliding terrain. Picture 1: Map of landslide and zones of work 6.2 Clearing and excavation Operations 1. Main contractor shall ensure all required permits are in place prior to the start of clearing and excavation work operations. 2. Main contractor Geologistshall be presentduringall time toestablishif terrainconditionsallow to proceed further with the works of clearing and excavations.l 3. The Contractor shall ensure compliance with environmental requirements such as silt fencing, run-off protection, or dust limitations during clearing and grubbing operation.
  • 11. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 11 of 22 7 CONTRACTOR'S ORGANIZATION FOR ACCESS ROAD CONSTRUCTION ProjectManager (ErlirDoko) Construction Manager (Klevi Kalemi) Site Engineer (Anil Doko) Excavation Team (Surveyor, Forman, Operator) HSE Lead (Arber Dogani) Geologist(Iberdrola)
  • 12. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 12 of 22 8 ATTACHMENT A - LOCATION MAP
  • 13. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 13 of 22 9 ATTACHMENT B – PHOTOS PHOTO1
  • 14. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 14 of 22 10 ATTACHMENT B/2 – PHOTOS PHOTO 2
  • 15. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 15 of 22 11 ATTACHMENT B/3 – PHOTOS PHOTO 3
  • 16. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 16 of 22 12 ATTACHMENT C - RISK ASSESSMENT SPECIFIC
  • 17. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 17 of 22
  • 18. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 18 of 22
  • 19. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 19 of 22 13 ATTACHMENT D - JOB HAZARD ANALYSIS
  • 20. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 20 of 22
  • 21. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 21 of 22 14 ATTACHMENT E – LAST MINUTE RISK ASSESSMENT
  • 22. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 22 of 22