SlideShare a Scribd company logo
1 of 2
ABHINAV RAWAT
RZ 7A/24, Puran Nagar Street No-4, Palam colony, New Delhi 110077
Contact: +91 9013258637; Email: rawat.abhinav@hotmail.com, phobos_abhi@hotmail.com
MECHANICAL ENGINEER- Engineering, Procurement & Construction, Project Execution.
5+ years of experience; seeking challenging assignments across Project Management, Engineering, Procurement, Construction
& Commissioning-Power Plant & Petrochemical units.
PROFILE
 Competent and Dynamic Techno-Commercial Professional with 5+ years of experience predominantly in the areas
of Engineering, Project Execution & Management, Erection & Commissioning.
 Currently spearheading functions with Mekaster Eco System (Vapor Recovery Unit) as Assistant Manager.
 Exhibit strong Project Management skills including project scheduling, and monitoring coupled with structured
inputs for engineering, purchase & procurement, contracts management, materials management, site management,
cost rationalization and continuous improvement.
 Skilled leader and mentor, able to build teams cohesion inspire and empower individuals to strive toward ever-
higher levels of achievement.
Key Strength Areas
Construction, Commissioning & Fabrication  Reports/Documentation  Customer/Client Relationship Management 
Quality Enhancement  Process Improvement & Engineering  Procurement  Resource Optimization
Functional Competencies
 Knowledge of piping standards like ASME B31.1, ASME B31.3, B 16.11, B16.5 & B16.9
 NDT standards like ASME BPVC sec V,ASME Section VIII, API527
 Knowledge of Auto cad, Pro E, Grant Project.
 Gas Conditioning Skid (K.O.D, cyclone separators, filter separators, PRCS, interlocking arrangements & operation
philosophy)
 Knowledge Petroleum Loading arm for Tanker Trucks & Petroleum Raliway Wagons.
 Vapor recovery skids for petroleum products (scrubber vessel, Pressure Swing Adsorption, silencers, liquid ring
compressor & vacuum pump)
 Knowledge of Gas turbines 6 FA & Auxiliaries(dual Collaser filter, Lube oil & gas module, compressor washing skid, Co₂
fire protection system etc & interconnecting piping) ; Steam turbines SC2-23 & Auxiliaries ( lube oil module, rundown
tank ,turning gear & interconnecting piping)
 Knowledge of pump & shaft alignment process.
 Heat recovery steam generator & Auxiliaries (boiler feed pumps, recirculation pump, economizers, harps & insulation).
 Air Cooled Condensers & Auxiliaries (hot well, C.E.P, ejectors & interlocking etc.); Fin Fan Coolers & Auxiliaries;
Compressed air system & Auxiliaries; Bypass valves & dump tubes.
 Knowledge of W.T.P, W.W.T.P, E.T.P & S.T.P
 Instrumentation work like single line diagram, cable schedule, solenoid valve, actuators, Positioners, switches, pneumatic
tubing etc.
Technical Responsibilities Performed
 Conducted Hydro test, Magnetic partial test & review stress relieving of Boiler Drums & HARP’s at H.R.S.G at vendors
works.
 Review of Radiographic test, conducted hydro test & DFT test of knock out drum, filter separators & water bath heater of
Fuel Gas Conditioning Skid vendors works.
 Involved in fabrication, erection & assembly work for Vapor Recovery unit. Conducted hydrotest, Pneumatic test &
tightness test for complete skid. Conducted instrument tubing work & also assisted in the instrumentation testing of
actuated valve, limit switches, solenoid valves, IP converters & continuity of pressure switches.
 Erection of VRU Skid, buffer vessel& loading arms at site conducting alignment of skid, pumps & compressors, fabrication
of Motor spirit vapour line, cable laying & tubing work.
 Erection & alignment of Harps & interconnecting piping of HRSG also conducted hydro test at site of complete HRSG.
 Pump Alignment work for Boiler feed pumps & other pumps in the plant.
 Erection work for Gas turbine auxiliaries, Conducted lube oil flushing for Gas Turbines, erection of fuel Gas pipe line, IBH
line, compressor bleeding line, sealing & cooling lines.
 Involved in erection of Steam turbine, conducted bearing inspection, rotor centering, Alignment & interconnecting piping.
 Fabrication& erection of Air Cool Condenser like steam duct fabrication, bundle alignment, A- frame fabrication.
 Erection of Fuel Gas pipe & IBR pipeline, conducted welder qualification test & NDT for the gas & IBR pipe line. Also
conducted required preheating & stress reliving test.
 Erection of Gas conditioning skid of capacity 16.5 Kg/ sec.
 Fabrication & assembly of pipe spools & base frame of Vapor recovery unit; Steel Structures like STG building, Run down
tank platform, ACC support structures & sheds for other equipments.
 Conducted the bar bending & casting of the civil structure like STG lube oil tank foundation, cooling towers, passenger lift
& pipe support pedestals.
 Erection of FRP cooling tower. Painting procedures & conducting sand blasting D.F.T & W.F.T test to ensure the proper
thickness of paint. Conducted thermal insulation work for Stacks & wrapping coating work for underground piping.
 Conducted welder qualification test, NDT like (DPT, MPT, Radiography tests & holiday testing), cardboard blasting &
flushing for Quality assurance.
CAREER GLIMPSE
MEKASTER ECO SYSTEM (Vapor Recovery Unit) since Aug’13
Assistant Manager
 Driving efforts across overall erection & commissioning of the skid while ensuring adherence to safety parameters.
 Organizing regular inspections & meetings to ensure the established standards & procedures are complied with the
set standards.
 Coordinating on-site activities to ensure smooth work progress and conceptualized and implemented measures for
enhancing operational efficient and optimizing resource utilization.
 Accountable for Material management and handling like loading, unloading and shifting of components and
equipments to the project site for erection & Commissioning.
 Adept at performing root-cause analysis of defects while developing & improving the processes by taking corrective
actions to prevent any reoccurrences & defective issues.
 Swiftly ramping up erection & commissioning with cross-functional skills and ensuring timely deliverables within pre-
set cost parameters.
 Accountable for floating tender enquiries to the various vendors & receiving the technical & commercial offers for the
same & evaluation of the same for order finalization.
 Involved in making B.O.Q & costing of equipments, piping erection work & steel fabrication work.
 Responsible for checking the P&ID, general arrangement drawing, & other technical data sheet for various
equipment’s submitted by vendor & the consultant for approval & necessary action.
 Extending coordination & making B.O.Q, Q.A.P, finalizing the construction drawings for mechanical & civil i.e. piping
isometric drawings, equipment layout drawing, piping & support drawing & civil drawing.
 Conducted work under Hot permit & with Proper safety
BETA INFRATECH PVT LTD (GAS BASED POWER PLANT) Feb’11-Aug’13
Site Engineer
 Proactively coordinated with contractors & construction supervisors for reducing the wastage of time & man power
requirement; inspected all the equipments for erection.
 Instrumental in implementing planned and erection & commissioning to maximize operational life of all machines;
defined schedule of activities and deployed manpower judiciously to accomplish work execution within laid out
timelines.
 Planned the overall activities of the projects and identifying key milestones and critical path analysis forecasting
completion timeline and finalizing target.
SCHOLASTIC PORTFOLIO
B Tech (Mechanical Engineering); 2010
Graphic Era Institute of Technology Dehra Dun (Uttrakhand Technical University); 66.32%
Trainings Attended
 Summer training at Badarpur Thermal power station (NTPC):
o Working process involved in Thermal power plant.
o Steam Turbines; Boilers; Cola Handling Plant; Ash Handling plant & Water treatment Plant.
Computer Proficiencies: AutoCAD 2010, Pro-e 0.2 and 0.4
Date of Birth: 13th
May 1988
References: Available on Request

More Related Content

What's hot

RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashid Faruqi
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteRameshchandra Prajapati
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resumeSteve Chu
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiBùi Minh Hải
 
Operation & intervention engineer achievements
Operation & intervention engineer achievementsOperation & intervention engineer achievements
Operation & intervention engineer achievementsJoseph Bracic
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievementsJoseph Bracic
 
Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experienceSachin Patil
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad GilbertThad Gilbert
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedAbbas Saeidi
 

What's hot (20)

A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Riaz Cv
Riaz CvRiaz Cv
Riaz Cv
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas Website
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014
 
Abhishek
AbhishekAbhishek
Abhishek
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh Hai
 
Operation & intervention engineer achievements
Operation & intervention engineer achievementsOperation & intervention engineer achievements
Operation & intervention engineer achievements
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
 
Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_Resume
 
Latest CV of Gangadhar
Latest CV of GangadharLatest CV of Gangadhar
Latest CV of Gangadhar
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
KASHF ALI
KASHF ALIKASHF ALI
KASHF ALI
 
My Updated CV
My  Updated CVMy  Updated CV
My Updated CV
 

Viewers also liked

Viewers also liked (6)

Ahmed Adel Resume (1)
Ahmed Adel Resume (1)Ahmed Adel Resume (1)
Ahmed Adel Resume (1)
 
Abraham - Resume
Abraham - ResumeAbraham - Resume
Abraham - Resume
 
AlexanderLightResume
AlexanderLightResumeAlexanderLightResume
AlexanderLightResume
 
Adam Middleton Resume 2016
Adam Middleton Resume 2016Adam Middleton Resume 2016
Adam Middleton Resume 2016
 
Aaron Shields Resume
Aaron Shields ResumeAaron Shields Resume
Aaron Shields Resume
 
Achin Resume
Achin ResumeAchin Resume
Achin Resume
 

Similar to abhinav rawat resume

Similar to abhinav rawat resume (20)

Resume UAE
Resume UAEResume UAE
Resume UAE
 
SUMER_MECH_Er
SUMER_MECH_ErSUMER_MECH_Er
SUMER_MECH_Er
 
Siddharth_resume_Engg.
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
DIPESH KUMAR
DIPESH KUMARDIPESH KUMAR
DIPESH KUMAR
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
khizar hayat cv.
khizar hayat cv.khizar hayat cv.
khizar hayat cv.
 
khizar hayat cv.
khizar hayat cv.khizar hayat cv.
khizar hayat cv.
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
cv
cvcv
cv
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
adrian cv
adrian cvadrian cv
adrian cv
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 

abhinav rawat resume

  • 1. ABHINAV RAWAT RZ 7A/24, Puran Nagar Street No-4, Palam colony, New Delhi 110077 Contact: +91 9013258637; Email: rawat.abhinav@hotmail.com, phobos_abhi@hotmail.com MECHANICAL ENGINEER- Engineering, Procurement & Construction, Project Execution. 5+ years of experience; seeking challenging assignments across Project Management, Engineering, Procurement, Construction & Commissioning-Power Plant & Petrochemical units. PROFILE  Competent and Dynamic Techno-Commercial Professional with 5+ years of experience predominantly in the areas of Engineering, Project Execution & Management, Erection & Commissioning.  Currently spearheading functions with Mekaster Eco System (Vapor Recovery Unit) as Assistant Manager.  Exhibit strong Project Management skills including project scheduling, and monitoring coupled with structured inputs for engineering, purchase & procurement, contracts management, materials management, site management, cost rationalization and continuous improvement.  Skilled leader and mentor, able to build teams cohesion inspire and empower individuals to strive toward ever- higher levels of achievement. Key Strength Areas Construction, Commissioning & Fabrication  Reports/Documentation  Customer/Client Relationship Management  Quality Enhancement  Process Improvement & Engineering  Procurement  Resource Optimization Functional Competencies  Knowledge of piping standards like ASME B31.1, ASME B31.3, B 16.11, B16.5 & B16.9  NDT standards like ASME BPVC sec V,ASME Section VIII, API527  Knowledge of Auto cad, Pro E, Grant Project.  Gas Conditioning Skid (K.O.D, cyclone separators, filter separators, PRCS, interlocking arrangements & operation philosophy)  Knowledge Petroleum Loading arm for Tanker Trucks & Petroleum Raliway Wagons.  Vapor recovery skids for petroleum products (scrubber vessel, Pressure Swing Adsorption, silencers, liquid ring compressor & vacuum pump)  Knowledge of Gas turbines 6 FA & Auxiliaries(dual Collaser filter, Lube oil & gas module, compressor washing skid, Co₂ fire protection system etc & interconnecting piping) ; Steam turbines SC2-23 & Auxiliaries ( lube oil module, rundown tank ,turning gear & interconnecting piping)  Knowledge of pump & shaft alignment process.  Heat recovery steam generator & Auxiliaries (boiler feed pumps, recirculation pump, economizers, harps & insulation).  Air Cooled Condensers & Auxiliaries (hot well, C.E.P, ejectors & interlocking etc.); Fin Fan Coolers & Auxiliaries; Compressed air system & Auxiliaries; Bypass valves & dump tubes.  Knowledge of W.T.P, W.W.T.P, E.T.P & S.T.P  Instrumentation work like single line diagram, cable schedule, solenoid valve, actuators, Positioners, switches, pneumatic tubing etc. Technical Responsibilities Performed  Conducted Hydro test, Magnetic partial test & review stress relieving of Boiler Drums & HARP’s at H.R.S.G at vendors works.  Review of Radiographic test, conducted hydro test & DFT test of knock out drum, filter separators & water bath heater of Fuel Gas Conditioning Skid vendors works.  Involved in fabrication, erection & assembly work for Vapor Recovery unit. Conducted hydrotest, Pneumatic test & tightness test for complete skid. Conducted instrument tubing work & also assisted in the instrumentation testing of actuated valve, limit switches, solenoid valves, IP converters & continuity of pressure switches.  Erection of VRU Skid, buffer vessel& loading arms at site conducting alignment of skid, pumps & compressors, fabrication of Motor spirit vapour line, cable laying & tubing work.  Erection & alignment of Harps & interconnecting piping of HRSG also conducted hydro test at site of complete HRSG.  Pump Alignment work for Boiler feed pumps & other pumps in the plant.  Erection work for Gas turbine auxiliaries, Conducted lube oil flushing for Gas Turbines, erection of fuel Gas pipe line, IBH line, compressor bleeding line, sealing & cooling lines.  Involved in erection of Steam turbine, conducted bearing inspection, rotor centering, Alignment & interconnecting piping.  Fabrication& erection of Air Cool Condenser like steam duct fabrication, bundle alignment, A- frame fabrication.  Erection of Fuel Gas pipe & IBR pipeline, conducted welder qualification test & NDT for the gas & IBR pipe line. Also conducted required preheating & stress reliving test.  Erection of Gas conditioning skid of capacity 16.5 Kg/ sec.
  • 2.  Fabrication & assembly of pipe spools & base frame of Vapor recovery unit; Steel Structures like STG building, Run down tank platform, ACC support structures & sheds for other equipments.  Conducted the bar bending & casting of the civil structure like STG lube oil tank foundation, cooling towers, passenger lift & pipe support pedestals.  Erection of FRP cooling tower. Painting procedures & conducting sand blasting D.F.T & W.F.T test to ensure the proper thickness of paint. Conducted thermal insulation work for Stacks & wrapping coating work for underground piping.  Conducted welder qualification test, NDT like (DPT, MPT, Radiography tests & holiday testing), cardboard blasting & flushing for Quality assurance. CAREER GLIMPSE MEKASTER ECO SYSTEM (Vapor Recovery Unit) since Aug’13 Assistant Manager  Driving efforts across overall erection & commissioning of the skid while ensuring adherence to safety parameters.  Organizing regular inspections & meetings to ensure the established standards & procedures are complied with the set standards.  Coordinating on-site activities to ensure smooth work progress and conceptualized and implemented measures for enhancing operational efficient and optimizing resource utilization.  Accountable for Material management and handling like loading, unloading and shifting of components and equipments to the project site for erection & Commissioning.  Adept at performing root-cause analysis of defects while developing & improving the processes by taking corrective actions to prevent any reoccurrences & defective issues.  Swiftly ramping up erection & commissioning with cross-functional skills and ensuring timely deliverables within pre- set cost parameters.  Accountable for floating tender enquiries to the various vendors & receiving the technical & commercial offers for the same & evaluation of the same for order finalization.  Involved in making B.O.Q & costing of equipments, piping erection work & steel fabrication work.  Responsible for checking the P&ID, general arrangement drawing, & other technical data sheet for various equipment’s submitted by vendor & the consultant for approval & necessary action.  Extending coordination & making B.O.Q, Q.A.P, finalizing the construction drawings for mechanical & civil i.e. piping isometric drawings, equipment layout drawing, piping & support drawing & civil drawing.  Conducted work under Hot permit & with Proper safety BETA INFRATECH PVT LTD (GAS BASED POWER PLANT) Feb’11-Aug’13 Site Engineer  Proactively coordinated with contractors & construction supervisors for reducing the wastage of time & man power requirement; inspected all the equipments for erection.  Instrumental in implementing planned and erection & commissioning to maximize operational life of all machines; defined schedule of activities and deployed manpower judiciously to accomplish work execution within laid out timelines.  Planned the overall activities of the projects and identifying key milestones and critical path analysis forecasting completion timeline and finalizing target. SCHOLASTIC PORTFOLIO B Tech (Mechanical Engineering); 2010 Graphic Era Institute of Technology Dehra Dun (Uttrakhand Technical University); 66.32% Trainings Attended  Summer training at Badarpur Thermal power station (NTPC): o Working process involved in Thermal power plant. o Steam Turbines; Boilers; Cola Handling Plant; Ash Handling plant & Water treatment Plant. Computer Proficiencies: AutoCAD 2010, Pro-e 0.2 and 0.4 Date of Birth: 13th May 1988 References: Available on Request