Curriculum	Vitae	 	 		
	
NAME (Phone)
EMAIL
:
:
Sverre Viland (99396919)
sverreviland@gmail.com
Updated: Des. 2016
DATE OF BIRTH : 26.04.1975
NATIONALITY : Norwegian
LANGUAGES : Norwegian and English
PRESENT POSITION : Senior engineer -Technical safety and working environment
SUMMARY:
More than 11 years of experience within the fields of Technical Safety & Working Environment.
Project experience from topsides facilities on the Norwegian continental shelf in all the different
phases including studies, FEED, M&M and EPCI projects. Self going and take initiative wherever
needed and active follow-up. Strong on communication and active member in project and
groups.
Skilled engineer in my profession technical safety and solid multidiscipline understanding. Has
worked with all aspects of the subject, both technical and practical aspects of the subject. Was a staff
member in Fabricom until 2010 and has worked as a contractor since then.
KEY QUALIFICATIONS:
Discipline Lead & Senior Technical Safety engineer | Technical Safety incl. detailed knowledge of
firewater system design calculations with use of Pipenet etc. and commissioning |Identification,
execution and/or co-ordination of necessary project Risk & HSE studies and activities| QRA |
HAZOP/HAZID | Risk evaluation | LOPA/SIL/SRS| Commissioning and site experience |Extensive
knowledge of Norwegian and International Regulations |Regulatory Compliance | TQ/NCR |
Contractors follow up | Statoil TR Requirements | STID | Conoco TCD/BD requirements | SAP |
Word/XL/PP
REFERENCES:
Roger Vestvik (Discipline lead) Rosenberg: Phone, 905 15 655
Arnfinn Løken (Project Leader) Statoil: Email, Aloken@statoil.com
Tormod Røvik (Project Control) Statoil: Phone, 906 46 251
Arild Granli (Technical Safety) Statoil: Phone, 951 80 809
EDUCATION:
2002-2005
1998-2001
University in Stavanger: Master in offshore technology - safety.
Post graduate thesis: Risk based method to identify safety critical ESD
valves.
University in Stavanger: Chemistry engineer – technical environment.
Post graduate thesis: Waste water cleaning treatment.
CERTIFICATES: Offshore safety course.
COURSES
11.2005 Offshore Safety course
11.2005 Helicopter evacuation course, Nutec
12.2005 SAP course 1
01.2006 Course in presentation technique
11.2005-12.06 Multidiscipline trainee programme
02.2006 SAP course 2
03.2006 SAP course 3
08.2006
02.2007
05.2007
06.2007
10.2007
06.2008
09.2008
05.2009
04.2010
05.2011
10.2011
06.2013
Introduction to Microstation version 7
Safety Instrumented Systems 1 day awareness Course
SIL-GL part 1
Process safety course
SIL-GL part 2
TEKNA course in fire and explosion safety in the petroleum industry
Two days HAZOP/HAZID/SAFOP course (Scandpower)
PTIL requirements course
An advanced two days course in Gas Explosion Hazards on Offshore
Facilities (Gexcon)
TEKNA course in fire and explosion safety in the petroleum industry
TEKNA the yearly process-safety seminar
TEKNA course in fire and explosion safety in the petroleum industry
EXPERIENCE: September 2005 - present
Apr.2013-Aug.2016
Jan.2013-Apr.2013
WorelyParsons Rosenberg
Project: Kvitebjørn Pre-compression and Capacity increase project
EKOJ
Client: Statoil and Conoco
Position: Senior Safety engineer
- Conoco (April 2014-July 2016):
- Three main scopes:
1) New 4 floors gas lift module on EKOJ.
2) XOL scope from EKOM to EKOJ with various scope on
both platforms including new EV on bridged.
3) Produced water handling scope including two new
Hydrocyclones.
- FEED Study, Pre-eng. and detailed engineering (EPCIC). Follow up
various aspects within technical safety aspects like PFP, F&G, DAL,
QRA, SIL, escape routes, area classification etc. Special attention to
PFP, F&G and firewater aspects including pipenet calculations
verifying flow/pressure/capacity etc. New deluge skid to be provided
for new Gas lift module and various tie-ins to existing firewater
systems on EKOJ and EKOM to provide sufficient deluge coverage
of new equipment. Compensating measures during tie-in work etc.
Follow up 3.part regarding pressure surge issues.
- Statoil (April 2013-November 2014):
- New 3 floors compressor module on KVB. Was hired into the project
after Level 4 status. This to ensure and follow up that all various
technical safety aspects finally was fulfilled for the project. Follow up
PFP design philosophies and write PFP procedure for the project (For
all PFP aspects like pipes, valves, flanges, structure, coat back etc.)
Special attention to firewater aspects including pipenet calculations
and write commissioning procedures for firewater. Part of
commissioning team during full scale deluge tests (full scale single
and scenario tests). Follow up dynamic/water hammer issues and
implementation of delay function on manual release due to indicated
surge issues in calculations.
- Follow up DAL/QRA/F&G/SIL/SRS/FSA work in the project. Deputy
safety lead.
AIBEL
Project: Statfjord M&M and GEM
Client: Statoil and Copno
Position: Senior Safety engineer
- Follow up various Modifications on Statfjord and Ekofisk.
Oct.2010 – Des.2012
Apr.2012 –Des.2012
Mar. 2011-jun. 2012
Oct.2010-mar.2011
Mars 2011-dec 2011
AKER SOLUTIONS
Project: Snorre 2040 Concept study
Client: Statoil
Position: Senior Safety engineer
- Modifications on both SNA & SNB for different cases and options to
extend lifetime on SNA & SNB. Special attention to technical safety
aspect for the SNB modifications. Firewater responsible for both SNA
& SNB.
Project: Gudrun Tie-in to Sleipner project
Client: Statoil
Position: Senior Safety engineer
- Follow up Technical safety issues with special focusing on
active/passive fire fighting (including running pipenet simulations for
single systems, WCS, etc.), AFFF/foam philosophy and PFP (Passive
Fire Protection) requirements/philosophy etc for the project.
Project: Dagny, Draupne/Luno and Eirin Tie-in to Sleipner studies
Client: Statoil
Position: Senior Safety engineer
- Technical safety responsible for class C study related to topside
modifications for new riser tie-ins from Draupne/Luno fields. Also
partly involved in the class C study for Dagny tie-in to Sleipner on the
Technical safety aspects in general with special attention to active fire
fighting modifications.
- Involved part time on FEED and post-FEED tie-in to SLA studies
mainly focusing on active and passive fire protection.
Sep.2005 – Oct.2010
Jan.2007-Oct.2010
FABRICOM AS
Project: SNORRE IOR project
Client: Statoil
Position: Senior Safety engineer
- Technical safety lead in detailed engineering for SNB PWH project.
Responsible for FW modifications on SNB PWH project. FW
includes modifications downstream two deluge skids. Typical tasks
related to FW modifications were updating of hydraulic reports, FW
P&IDs, compensating FW reports during modification, input to
commissioning procedures, as-built etc.
- Responsible for Firewater modifications on SNA IOR from mars
2010. FW includes modifications downstream 14 deluge skids
(approximately a total of 150 new deluge nozzles). Typical tasks
related to FW modifications were updating of hydraulic reports, FW
P&IDs, compensating FW reports during modification, input to
commissioning procedures, as-built etc. Deputy Safety lead for SNA
IOR.
- Follow up SIL/SRS analyses from 3rd
part on SNA IOR
- Various study work on SNA & SNB (Concept to FEED studies).
Working tasks: Ensure that all relevant technical safety aspects are
considered and documented in accordance with various regulations
and standards.
Nov.2008-
May.2009
Oct.2005 –Jan.2007
Project: New control system for diesel machines on SFB & SFC
Client: Statoil
Position: Senior Safety engineer
- Class C study
- Make sure that requirements to technical safety and environment are
in accordance with requirements and specifications.
Project: GEM (Greater Ekofisk Modifications)
Client: ConocoPhillips
Position: Safety engineer
- M&M project related to flowlines, gaslift lines and water injection
lines on the entire EKOFISK area.
- Working tasks: Ensure that safety issues have been taken care of.
- Prepare, plan and execute different safety reviews(HAZOP, design
review, constructability review).
- Prepared input to FEEL report.
- Disciplin lead: 11.06 – 01.07.
Oct.2006 –Jan.2007 - Study of changing out all the firewater systems on EKOJ downstream
of the deluge skids because of corrosion in existing galvanized carbon
steel pipe.
- Evaluating different choice of material and prioritized order for
change-out.
- Evaluation of requirements and alternatives for compensating
measures related to changing out the systems.
- Offshore survey to gain an overview of the 20 systems to be changed
out and reviewed deluge design and location of nozzles.
May.2006 -Jul.2006 Project: SNORRE B IOR study
Client: Statoil
Position: Safety engineer
- Performed a Noise evaluation report (Class D study) related to a new
compressor module on SNORRE B.
Aug.2006 -Oct.2006 Project: SNORRE/VIGDIS A IOR bid
Client: Statoil
Position: Safety engineer
- Early phase of bi don the SNORRE/VIGDIS A IOR project.

More Related Content

What's hot

CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014Manuel Bartilotti
 
Primavera Activity ID Coding
Primavera Activity ID CodingPrimavera Activity ID Coding
Primavera Activity ID Codingignitetribes
 
TONY HERCEGl resume
TONY  HERCEGl resumeTONY  HERCEGl resume
TONY HERCEGl resumeTony Herceg
 
CV__ Doan Thi Hong Thu - English - March 2015
CV__ Doan Thi Hong Thu  - English - March 2015CV__ Doan Thi Hong Thu  - English - March 2015
CV__ Doan Thi Hong Thu - English - March 2015Hong Thu
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams
 
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSDAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSIslam Nassef
 
CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1craig alden
 
Adoption and Compliance with Energy Codes - ASHRAE 90.1 and NECB
Adoption and Compliance with Energy Codes -  ASHRAE 90.1 and NECBAdoption and Compliance with Energy Codes -  ASHRAE 90.1 and NECB
Adoption and Compliance with Energy Codes - ASHRAE 90.1 and NECBRDH Building Science
 

What's hot (14)

CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014
 
Primavera Activity ID Coding
Primavera Activity ID CodingPrimavera Activity ID Coding
Primavera Activity ID Coding
 
TONY HERCEGl resume
TONY  HERCEGl resumeTONY  HERCEGl resume
TONY HERCEGl resume
 
GEC presentation
GEC  presentationGEC  presentation
GEC presentation
 
CV__ Doan Thi Hong Thu - English - March 2015
CV__ Doan Thi Hong Thu  - English - March 2015CV__ Doan Thi Hong Thu  - English - March 2015
CV__ Doan Thi Hong Thu - English - March 2015
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
 
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSDAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
 
Ahmed Reedy CVf
Ahmed Reedy CVfAhmed Reedy CVf
Ahmed Reedy CVf
 
BGJ-CV-2015
BGJ-CV-2015BGJ-CV-2015
BGJ-CV-2015
 
CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1
 
Adoption and Compliance with Energy Codes - ASHRAE 90.1 and NECB
Adoption and Compliance with Energy Codes -  ASHRAE 90.1 and NECBAdoption and Compliance with Energy Codes -  ASHRAE 90.1 and NECB
Adoption and Compliance with Energy Codes - ASHRAE 90.1 and NECB
 
CV_AD1
CV_AD1CV_AD1
CV_AD1
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 

Viewers also liked

PATHIK MITRA-PROJECTS
PATHIK MITRA-PROJECTSPATHIK MITRA-PROJECTS
PATHIK MITRA-PROJECTSpathik mitra
 
Degree_Certificate (1).PDF
Degree_Certificate (1).PDFDegree_Certificate (1).PDF
Degree_Certificate (1).PDFNilesh Desai
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical EngineerVishnu Mohan
 
GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M
 
Rajasekaran CV-updated
Rajasekaran CV-updatedRajasekaran CV-updated
Rajasekaran CV-updatedRaja Sekhar
 
Resume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project EnginerResume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project EnginerRaees j
 
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Mohammad Arfin Alam
 

Viewers also liked (12)

updated resume
updated resumeupdated resume
updated resume
 
PATHIK MITRA-PROJECTS
PATHIK MITRA-PROJECTSPATHIK MITRA-PROJECTS
PATHIK MITRA-PROJECTS
 
Pankaj Pande
Pankaj PandePankaj Pande
Pankaj Pande
 
Degree_Certificate (1).PDF
Degree_Certificate (1).PDFDegree_Certificate (1).PDF
Degree_Certificate (1).PDF
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical Engineer
 
Recruitment of secon
Recruitment of seconRecruitment of secon
Recruitment of secon
 
GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M - 2016
GURUDEV S M - 2016
 
Rajasekaran CV-updated
Rajasekaran CV-updatedRajasekaran CV-updated
Rajasekaran CV-updated
 
Resume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project EnginerResume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project Enginer
 
Project Controller
Project ControllerProject Controller
Project Controller
 
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
 
Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest
 

Similar to Curriculum Vitae-Sverre W. Viland

Cv english bartilotti-16-01-2017
Cv english bartilotti-16-01-2017Cv english bartilotti-16-01-2017
Cv english bartilotti-16-01-2017Manuel Bartilotti
 
Dines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund
 
QC Field Engineer 2016
QC Field Engineer 2016QC Field Engineer 2016
QC Field Engineer 2016Michael Nugent
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentEugene van Brakel
 
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Sigve Hamilton Aspelund
 
CV Sigve Hamilton Aspelund 092014 Production Engineer
CV Sigve Hamilton Aspelund 092014  Production EngineerCV Sigve Hamilton Aspelund 092014  Production Engineer
CV Sigve Hamilton Aspelund 092014 Production EngineerSigve Hamilton Aspelund
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame
 
CV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionCV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionSigve Hamilton Aspelund
 
1 re sume 2016 anders engstroem piping & layout
1   re sume 2016 anders engstroem piping & layout1   re sume 2016 anders engstroem piping & layout
1 re sume 2016 anders engstroem piping & layoutAnders Engstroem
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS
 

Similar to Curriculum Vitae-Sverre W. Viland (20)

cv_overview
cv_overviewcv_overview
cv_overview
 
Jim.CV.July 16 (1)
Jim.CV.July 16 (1)Jim.CV.July 16 (1)
Jim.CV.July 16 (1)
 
Cv english bartilotti-16-01-2017
Cv english bartilotti-16-01-2017Cv english bartilotti-16-01-2017
Cv english bartilotti-16-01-2017
 
WebCruiter
WebCruiterWebCruiter
WebCruiter
 
WebCruiter
WebCruiterWebCruiter
WebCruiter
 
CV-Sven Petersen
CV-Sven PetersenCV-Sven Petersen
CV-Sven Petersen
 
HeikkiläCV201602
HeikkiläCV201602HeikkiläCV201602
HeikkiläCV201602
 
Dines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - General
 
OMN_CV_2014_eng (1)
OMN_CV_2014_eng (1)OMN_CV_2014_eng (1)
OMN_CV_2014_eng (1)
 
QC Field Engineer 2016
QC Field Engineer 2016QC Field Engineer 2016
QC Field Engineer 2016
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
 
GMcnicol CV
GMcnicol CVGMcnicol CV
GMcnicol CV
 
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
 
CV Sigve Hamilton Aspelund 092014 Production Engineer
CV Sigve Hamilton Aspelund 092014  Production EngineerCV Sigve Hamilton Aspelund 092014  Production Engineer
CV Sigve Hamilton Aspelund 092014 Production Engineer
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
 
CV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionCV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short version
 
1 re sume 2016 anders engstroem piping & layout
1   re sume 2016 anders engstroem piping & layout1   re sume 2016 anders engstroem piping & layout
1 re sume 2016 anders engstroem piping & layout
 
Muhammad Resume
Muhammad ResumeMuhammad Resume
Muhammad Resume
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1
 
MY CV feb 2016
MY CV feb 2016MY CV feb 2016
MY CV feb 2016
 

Curriculum Vitae-Sverre W. Viland

  • 1. Curriculum Vitae NAME (Phone) EMAIL : : Sverre Viland (99396919) sverreviland@gmail.com Updated: Des. 2016 DATE OF BIRTH : 26.04.1975 NATIONALITY : Norwegian LANGUAGES : Norwegian and English PRESENT POSITION : Senior engineer -Technical safety and working environment SUMMARY: More than 11 years of experience within the fields of Technical Safety & Working Environment. Project experience from topsides facilities on the Norwegian continental shelf in all the different phases including studies, FEED, M&M and EPCI projects. Self going and take initiative wherever needed and active follow-up. Strong on communication and active member in project and groups. Skilled engineer in my profession technical safety and solid multidiscipline understanding. Has worked with all aspects of the subject, both technical and practical aspects of the subject. Was a staff member in Fabricom until 2010 and has worked as a contractor since then. KEY QUALIFICATIONS: Discipline Lead & Senior Technical Safety engineer | Technical Safety incl. detailed knowledge of firewater system design calculations with use of Pipenet etc. and commissioning |Identification, execution and/or co-ordination of necessary project Risk & HSE studies and activities| QRA | HAZOP/HAZID | Risk evaluation | LOPA/SIL/SRS| Commissioning and site experience |Extensive knowledge of Norwegian and International Regulations |Regulatory Compliance | TQ/NCR | Contractors follow up | Statoil TR Requirements | STID | Conoco TCD/BD requirements | SAP | Word/XL/PP REFERENCES: Roger Vestvik (Discipline lead) Rosenberg: Phone, 905 15 655 Arnfinn Løken (Project Leader) Statoil: Email, Aloken@statoil.com Tormod Røvik (Project Control) Statoil: Phone, 906 46 251 Arild Granli (Technical Safety) Statoil: Phone, 951 80 809
  • 2. EDUCATION: 2002-2005 1998-2001 University in Stavanger: Master in offshore technology - safety. Post graduate thesis: Risk based method to identify safety critical ESD valves. University in Stavanger: Chemistry engineer – technical environment. Post graduate thesis: Waste water cleaning treatment. CERTIFICATES: Offshore safety course. COURSES 11.2005 Offshore Safety course 11.2005 Helicopter evacuation course, Nutec 12.2005 SAP course 1 01.2006 Course in presentation technique 11.2005-12.06 Multidiscipline trainee programme 02.2006 SAP course 2 03.2006 SAP course 3 08.2006 02.2007 05.2007 06.2007 10.2007 06.2008 09.2008 05.2009 04.2010 05.2011 10.2011 06.2013 Introduction to Microstation version 7 Safety Instrumented Systems 1 day awareness Course SIL-GL part 1 Process safety course SIL-GL part 2 TEKNA course in fire and explosion safety in the petroleum industry Two days HAZOP/HAZID/SAFOP course (Scandpower) PTIL requirements course An advanced two days course in Gas Explosion Hazards on Offshore Facilities (Gexcon) TEKNA course in fire and explosion safety in the petroleum industry TEKNA the yearly process-safety seminar TEKNA course in fire and explosion safety in the petroleum industry
  • 3. EXPERIENCE: September 2005 - present Apr.2013-Aug.2016 Jan.2013-Apr.2013 WorelyParsons Rosenberg Project: Kvitebjørn Pre-compression and Capacity increase project EKOJ Client: Statoil and Conoco Position: Senior Safety engineer - Conoco (April 2014-July 2016): - Three main scopes: 1) New 4 floors gas lift module on EKOJ. 2) XOL scope from EKOM to EKOJ with various scope on both platforms including new EV on bridged. 3) Produced water handling scope including two new Hydrocyclones. - FEED Study, Pre-eng. and detailed engineering (EPCIC). Follow up various aspects within technical safety aspects like PFP, F&G, DAL, QRA, SIL, escape routes, area classification etc. Special attention to PFP, F&G and firewater aspects including pipenet calculations verifying flow/pressure/capacity etc. New deluge skid to be provided for new Gas lift module and various tie-ins to existing firewater systems on EKOJ and EKOM to provide sufficient deluge coverage of new equipment. Compensating measures during tie-in work etc. Follow up 3.part regarding pressure surge issues. - Statoil (April 2013-November 2014): - New 3 floors compressor module on KVB. Was hired into the project after Level 4 status. This to ensure and follow up that all various technical safety aspects finally was fulfilled for the project. Follow up PFP design philosophies and write PFP procedure for the project (For all PFP aspects like pipes, valves, flanges, structure, coat back etc.) Special attention to firewater aspects including pipenet calculations and write commissioning procedures for firewater. Part of commissioning team during full scale deluge tests (full scale single and scenario tests). Follow up dynamic/water hammer issues and implementation of delay function on manual release due to indicated surge issues in calculations. - Follow up DAL/QRA/F&G/SIL/SRS/FSA work in the project. Deputy safety lead. AIBEL Project: Statfjord M&M and GEM Client: Statoil and Copno Position: Senior Safety engineer - Follow up various Modifications on Statfjord and Ekofisk.
  • 4. Oct.2010 – Des.2012 Apr.2012 –Des.2012 Mar. 2011-jun. 2012 Oct.2010-mar.2011 Mars 2011-dec 2011 AKER SOLUTIONS Project: Snorre 2040 Concept study Client: Statoil Position: Senior Safety engineer - Modifications on both SNA & SNB for different cases and options to extend lifetime on SNA & SNB. Special attention to technical safety aspect for the SNB modifications. Firewater responsible for both SNA & SNB. Project: Gudrun Tie-in to Sleipner project Client: Statoil Position: Senior Safety engineer - Follow up Technical safety issues with special focusing on active/passive fire fighting (including running pipenet simulations for single systems, WCS, etc.), AFFF/foam philosophy and PFP (Passive Fire Protection) requirements/philosophy etc for the project. Project: Dagny, Draupne/Luno and Eirin Tie-in to Sleipner studies Client: Statoil Position: Senior Safety engineer - Technical safety responsible for class C study related to topside modifications for new riser tie-ins from Draupne/Luno fields. Also partly involved in the class C study for Dagny tie-in to Sleipner on the Technical safety aspects in general with special attention to active fire fighting modifications. - Involved part time on FEED and post-FEED tie-in to SLA studies mainly focusing on active and passive fire protection. Sep.2005 – Oct.2010 Jan.2007-Oct.2010 FABRICOM AS Project: SNORRE IOR project Client: Statoil Position: Senior Safety engineer - Technical safety lead in detailed engineering for SNB PWH project. Responsible for FW modifications on SNB PWH project. FW includes modifications downstream two deluge skids. Typical tasks related to FW modifications were updating of hydraulic reports, FW P&IDs, compensating FW reports during modification, input to commissioning procedures, as-built etc. - Responsible for Firewater modifications on SNA IOR from mars 2010. FW includes modifications downstream 14 deluge skids (approximately a total of 150 new deluge nozzles). Typical tasks related to FW modifications were updating of hydraulic reports, FW P&IDs, compensating FW reports during modification, input to commissioning procedures, as-built etc. Deputy Safety lead for SNA IOR. - Follow up SIL/SRS analyses from 3rd part on SNA IOR - Various study work on SNA & SNB (Concept to FEED studies). Working tasks: Ensure that all relevant technical safety aspects are considered and documented in accordance with various regulations and standards.
  • 5. Nov.2008- May.2009 Oct.2005 –Jan.2007 Project: New control system for diesel machines on SFB & SFC Client: Statoil Position: Senior Safety engineer - Class C study - Make sure that requirements to technical safety and environment are in accordance with requirements and specifications. Project: GEM (Greater Ekofisk Modifications) Client: ConocoPhillips Position: Safety engineer - M&M project related to flowlines, gaslift lines and water injection lines on the entire EKOFISK area. - Working tasks: Ensure that safety issues have been taken care of. - Prepare, plan and execute different safety reviews(HAZOP, design review, constructability review). - Prepared input to FEEL report. - Disciplin lead: 11.06 – 01.07. Oct.2006 –Jan.2007 - Study of changing out all the firewater systems on EKOJ downstream of the deluge skids because of corrosion in existing galvanized carbon steel pipe. - Evaluating different choice of material and prioritized order for change-out. - Evaluation of requirements and alternatives for compensating measures related to changing out the systems. - Offshore survey to gain an overview of the 20 systems to be changed out and reviewed deluge design and location of nozzles. May.2006 -Jul.2006 Project: SNORRE B IOR study Client: Statoil Position: Safety engineer - Performed a Noise evaluation report (Class D study) related to a new compressor module on SNORRE B. Aug.2006 -Oct.2006 Project: SNORRE/VIGDIS A IOR bid Client: Statoil Position: Safety engineer - Early phase of bi don the SNORRE/VIGDIS A IOR project.