TOTAL STATION
Total station is a combination of :

          EDM
          Theodolite
          Auto Leveler
          Microprocessor with specific memory
          Battery/spare
            which works about 5 working hours

    About 100 models were released till now by
different firms.
     
Principle of Total station:

Distance = Velocity x
 Time
Basic components of Total Station


Prism reflector:
        It is a combination of ranging rod, staff and and
               optical cuboidal mirror.
        having 2/3 lifts with 5cms interval graduations.

        adjustable height from 1.5m to 3.75m.

        More number of prisms, will give more accuracy.
ACCURACY OF TOTAL STATION
More accuracy can be achieve by :
           1. Careful Centering
           2. Accurate pointing target
           3. Average of multiple points
           4. Better optical lense
           5. Strong Tripod
           6. Verticality of prism pole

1.Angular accuracy is from 1 to 20 Sec.
2.Linear accuracy is from 2mm to 10mm/per KM
3.Different instruments have different accuracy
                                                          Linear
                      Angular
                                           With 1 Prism            With 3 prisms
   NIKON               1 Sec                 + 2 mm                   + 1 mm
   LIEKA               1 Sec                 + 2 mm                   + 1 mm
   SOKKIA              1 Sec                   2 mm                   + 1 mm
Accuracy varies with Price
    Distance measure with:
            1.Single Prism – up to 2.5 Km
            2.Two prisms - 5 to 7 Km
            3.Three prisms - 10 to 12 Km
Functions of T.S:
1. It simultaneously measures angles & distances and Record
2. Correcting the measured distance with:
                                     1. Prism constant
                                     2. Atmospheric Pr.
                                     3. Temperature
                                     4. Curvature of earth
                                     5. Refraction correction
3. Computing the point elevation
4. Computing the coordinates of every point
5. Remote elevation measurement
6. Remote distance measurement
7. Area calculations
8. Data Transferring facility from instrument to S/W and S/W
   to instrument
9. Format of conversion of units
Application of Total station:
         1. Updating mapping
         2. Topographic survey
         3. Hydrographic survey
         4. Cadastral survey
         5. Project construction survey
         6. Road, Rail Survey
         7. Mining survey
Operations   involved               while   using   Total
  Stations :
1. Establishing the site Datum:
      a) Selecting the site Datum
      b) Establishing North

2. Setting up the Total station:
      a) Placing and leveling Tripod on Datum
      b) Placing and leveling the Gun on Tripod
      c) Linking the data connector to Gun

3. Data collector options and setting
      a) Main menu
      b) Basic settings
4. Creating and Operating Job files:
      a) Creating a new Job file
      b) Opening an existing file

5. Shooting points
      a) Identifying the important points to shoot
      b) shooting points
      c) Shooting additional points
      d) Noting the special features

6.Post Processing – Data down loading,conversion

7.Plotting/Map generation.
Computer software packages
The following post processing computer software
  packages are in use for various engineering
  applications.
   1.Arc Pad, arc view, arc info
         -conversion from raster to vector form

   2.Micro Station - Map generation

   3.Erdas – Image processing s/w

   4.Surfer, Auto plotter, Civil cad, Pythagarus
          – preparation of contours
   5. Survey aid – to draw c/s and l/s

The information received is to be analyzed depending
  on the users requirement.
Limitations:
1.    It is not a Rugged instrument (Sensitive).
2.    Prism verticality is questionable.
3.    Visibility is must.
4.    More Expensive.
5.    Requires calibration at every six months.
6.    Amount of error is greater at short distances.
7.   Height of instrument and prism is to fed.
8.   Awareness on battery maintenance.

9.   To establish north- compass is required.
SAFETY PRECAUTIONS
1.   Focusing directly at the sun, can result - loss of eyesight
     on the spot. Use a filter when observing the sun.

2.   Never remove the hand grip carelessly. If the grip is
     loosely or incompletely attached, the instrument could fall
     and may cause a serious injury.

3.   Make sure not to short the battery terminals. If these are
     shorted, the resulting high current would not only damage
     to the battery, but also start a fire.

4.   If the instrument or battery comes in contact with water,
     wipe it off as quickly as possible and set it in a dry place
     for a while. When it is completely dry, put it back in the
     case.

5.   Never disassemble the instrument, if you find a problem.
     Contact the dealer.
THANK YOU

More Related Content

What's hot

Welcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationWelcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationShashank Javalagi
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital TheodoliteEhab AL-Timimi
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Gokul Saud
 
Horizontal Distance Measurement - Report
Horizontal Distance Measurement - ReportHorizontal Distance Measurement - Report
Horizontal Distance Measurement - ReportSarchia Khursheed
 
EDM ( Electronic distance meter)
EDM ( Electronic distance meter)EDM ( Electronic distance meter)
EDM ( Electronic distance meter)Umarfarook Momin
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & RangingRakesh Verma
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Bathla Tuition Centre
 
Total station surveying
Total station surveyingTotal station surveying
Total station surveyingBinabh Devkota
 
Advanced surveying instruments
Advanced surveying instrumentsAdvanced surveying instruments
Advanced surveying instrumentsAjeykumar VG
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveyingMujeeb Muji
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and TrilaterationPramesh Hada
 
LAB MANUAL contouring by indirect method . dce: fet: iiui
LAB MANUAL contouring by indirect method . dce: fet: iiuiLAB MANUAL contouring by indirect method . dce: fet: iiui
LAB MANUAL contouring by indirect method . dce: fet: iiuicivilengineerf14
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptxSaddoAjmal
 
Modern surveying instruments
Modern surveying instrumentsModern surveying instruments
Modern surveying instrumentsAditya Mistry
 

What's hot (20)

Welcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationWelcome to the presentation on ‘total station
Welcome to the presentation on ‘total station
 
Total station
Total stationTotal station
Total station
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital Theodolite
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
 
Horizontal Distance Measurement - Report
Horizontal Distance Measurement - ReportHorizontal Distance Measurement - Report
Horizontal Distance Measurement - Report
 
EDM ( Electronic distance meter)
EDM ( Electronic distance meter)EDM ( Electronic distance meter)
EDM ( Electronic distance meter)
 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
 
Trigonometric levelling
Trigonometric levellingTrigonometric levelling
Trigonometric levelling
 
EDM and Total Stations
EDM and Total StationsEDM and Total Stations
EDM and Total Stations
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)
 
Total station surveying
Total station surveyingTotal station surveying
Total station surveying
 
Advanced surveying instruments
Advanced surveying instrumentsAdvanced surveying instruments
Advanced surveying instruments
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and Trilateration
 
LAB MANUAL contouring by indirect method . dce: fet: iiui
LAB MANUAL contouring by indirect method . dce: fet: iiuiLAB MANUAL contouring by indirect method . dce: fet: iiui
LAB MANUAL contouring by indirect method . dce: fet: iiui
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptx
 
Modern surveying instruments
Modern surveying instrumentsModern surveying instruments
Modern surveying instruments
 
Engineering survey
Engineering surveyEngineering survey
Engineering survey
 
Levelling
LevellingLevelling
Levelling
 

Similar to Total station

Total Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdfTotal Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdfDenish Jangid
 
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 Meter
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 MeterTotal Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 Meter
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 MeterSaepulloh
 
Jual Total Station Sokkia IM-105 Call 082119953499
Jual Total Station Sokkia IM-105 Call 082119953499Jual Total Station Sokkia IM-105 Call 082119953499
Jual Total Station Sokkia IM-105 Call 082119953499Budi anto
 
Total Station Sokkia IM 102 Ketelitian 2 Detik Reflectorles
Total Station Sokkia IM 102 Ketelitian 2 Detik ReflectorlesTotal Station Sokkia IM 102 Ketelitian 2 Detik Reflectorles
Total Station Sokkia IM 102 Ketelitian 2 Detik ReflectorlesSaepulloh
 
4. lecture 3 data capturing techniques - total station and gps
4. lecture 3   data capturing techniques - total station and gps4. lecture 3   data capturing techniques - total station and gps
4. lecture 3 data capturing techniques - total station and gpsFenTaHun6
 
4. lecture 3 data capturing techniques - total station and gps
4. lecture 3   data capturing techniques - total station and gps4. lecture 3   data capturing techniques - total station and gps
4. lecture 3 data capturing techniques - total station and gpsFenTaHun6
 
biometry - Copy.pptx
biometry - Copy.pptxbiometry - Copy.pptx
biometry - Copy.pptxfajrimohammed
 
Instruction manual | Aimpoint CompM4 and CompM4s | Optics Trade
Instruction manual | Aimpoint CompM4 and CompM4s | Optics TradeInstruction manual | Aimpoint CompM4 and CompM4s | Optics Trade
Instruction manual | Aimpoint CompM4 and CompM4s | Optics TradeOptics-Trade
 
5535484946484884497358484048446605251.pdf
5535484946484884497358484048446605251.pdf5535484946484884497358484048446605251.pdf
5535484946484884497358484048446605251.pdfkrishnakondu
 
Optical fibre testing mahendra singh
Optical fibre testing mahendra singhOptical fibre testing mahendra singh
Optical fibre testing mahendra singhMahendra Singh
 

Similar to Total station (20)

Total station
Total stationTotal station
Total station
 
Tot.st 1
Tot.st 1Tot.st 1
Tot.st 1
 
Tot.st 1
Tot.st 1Tot.st 1
Tot.st 1
 
Total Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdfTotal Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdf
 
Total station
Total stationTotal station
Total station
 
Total station .pdf
Total station .pdfTotal station .pdf
Total station .pdf
 
Total station .pptx
Total station .pptxTotal station .pptx
Total station .pptx
 
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 Meter
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 MeterTotal Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 Meter
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 Meter
 
Jual Total Station Sokkia IM-105 Call 082119953499
Jual Total Station Sokkia IM-105 Call 082119953499Jual Total Station Sokkia IM-105 Call 082119953499
Jual Total Station Sokkia IM-105 Call 082119953499
 
Total Station Sokkia IM 102 Ketelitian 2 Detik Reflectorles
Total Station Sokkia IM 102 Ketelitian 2 Detik ReflectorlesTotal Station Sokkia IM 102 Ketelitian 2 Detik Reflectorles
Total Station Sokkia IM 102 Ketelitian 2 Detik Reflectorles
 
MODERN SURVEYING TECHNIQUES.pptx
 MODERN SURVEYING TECHNIQUES.pptx MODERN SURVEYING TECHNIQUES.pptx
MODERN SURVEYING TECHNIQUES.pptx
 
4. lecture 3 data capturing techniques - total station and gps
4. lecture 3   data capturing techniques - total station and gps4. lecture 3   data capturing techniques - total station and gps
4. lecture 3 data capturing techniques - total station and gps
 
4. lecture 3 data capturing techniques - total station and gps
4. lecture 3   data capturing techniques - total station and gps4. lecture 3   data capturing techniques - total station and gps
4. lecture 3 data capturing techniques - total station and gps
 
MM-UNIT-V.pptx
MM-UNIT-V.pptxMM-UNIT-V.pptx
MM-UNIT-V.pptx
 
UNIT-V.pptx
UNIT-V.pptxUNIT-V.pptx
UNIT-V.pptx
 
biometry - Copy.pptx
biometry - Copy.pptxbiometry - Copy.pptx
biometry - Copy.pptx
 
Instruction manual | Aimpoint CompM4 and CompM4s | Optics Trade
Instruction manual | Aimpoint CompM4 and CompM4s | Optics TradeInstruction manual | Aimpoint CompM4 and CompM4s | Optics Trade
Instruction manual | Aimpoint CompM4 and CompM4s | Optics Trade
 
5535484946484884497358484048446605251.pdf
5535484946484884497358484048446605251.pdf5535484946484884497358484048446605251.pdf
5535484946484884497358484048446605251.pdf
 
Total Station.pptx
Total Station.pptxTotal Station.pptx
Total Station.pptx
 
Optical fibre testing mahendra singh
Optical fibre testing mahendra singhOptical fibre testing mahendra singh
Optical fibre testing mahendra singh
 

More from Rushabh shah

Sustainable development model for American Cities
Sustainable development model for American CitiesSustainable development model for American Cities
Sustainable development model for American CitiesRushabh shah
 
Research paper of leaning tower of pisa
Research paper of leaning tower of pisaResearch paper of leaning tower of pisa
Research paper of leaning tower of pisaRushabh shah
 
performance of soil reinforcement
performance of soil reinforcement performance of soil reinforcement
performance of soil reinforcement Rushabh shah
 
DESIGN OF SEMINAR HALL PROJECT DOCUMENT
DESIGN OF SEMINAR HALL PROJECT DOCUMENTDESIGN OF SEMINAR HALL PROJECT DOCUMENT
DESIGN OF SEMINAR HALL PROJECT DOCUMENTRushabh shah
 
Design of seminar hall
Design of seminar hallDesign of seminar hall
Design of seminar hallRushabh shah
 
Detailed ppt on Curing of concrete
Detailed ppt on Curing of concreteDetailed ppt on Curing of concrete
Detailed ppt on Curing of concreteRushabh shah
 
curing of concrete
curing of concrete curing of concrete
curing of concrete Rushabh shah
 

More from Rushabh shah (10)

Sustainable development model for American Cities
Sustainable development model for American CitiesSustainable development model for American Cities
Sustainable development model for American Cities
 
Leader
Leader Leader
Leader
 
Research paper of leaning tower of pisa
Research paper of leaning tower of pisaResearch paper of leaning tower of pisa
Research paper of leaning tower of pisa
 
performance of soil reinforcement
performance of soil reinforcement performance of soil reinforcement
performance of soil reinforcement
 
DESIGN OF SEMINAR HALL PROJECT DOCUMENT
DESIGN OF SEMINAR HALL PROJECT DOCUMENTDESIGN OF SEMINAR HALL PROJECT DOCUMENT
DESIGN OF SEMINAR HALL PROJECT DOCUMENT
 
Design of seminar hall
Design of seminar hallDesign of seminar hall
Design of seminar hall
 
RMC
RMCRMC
RMC
 
HIGHWAYS
HIGHWAYS HIGHWAYS
HIGHWAYS
 
Detailed ppt on Curing of concrete
Detailed ppt on Curing of concreteDetailed ppt on Curing of concrete
Detailed ppt on Curing of concrete
 
curing of concrete
curing of concrete curing of concrete
curing of concrete
 

Recently uploaded

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 

Recently uploaded (20)

Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 

Total station

  • 2. Total station is a combination of : EDM Theodolite Auto Leveler Microprocessor with specific memory Battery/spare which works about 5 working hours About 100 models were released till now by different firms.  
  • 3. Principle of Total station: Distance = Velocity x Time
  • 4. Basic components of Total Station Prism reflector: It is a combination of ranging rod, staff and and optical cuboidal mirror. having 2/3 lifts with 5cms interval graduations. adjustable height from 1.5m to 3.75m. More number of prisms, will give more accuracy.
  • 5.
  • 6. ACCURACY OF TOTAL STATION More accuracy can be achieve by : 1. Careful Centering 2. Accurate pointing target 3. Average of multiple points 4. Better optical lense 5. Strong Tripod 6. Verticality of prism pole 1.Angular accuracy is from 1 to 20 Sec. 2.Linear accuracy is from 2mm to 10mm/per KM 3.Different instruments have different accuracy Linear Angular With 1 Prism With 3 prisms NIKON 1 Sec + 2 mm + 1 mm LIEKA 1 Sec + 2 mm + 1 mm SOKKIA 1 Sec 2 mm + 1 mm Accuracy varies with Price Distance measure with: 1.Single Prism – up to 2.5 Km 2.Two prisms - 5 to 7 Km 3.Three prisms - 10 to 12 Km
  • 7. Functions of T.S: 1. It simultaneously measures angles & distances and Record 2. Correcting the measured distance with: 1. Prism constant 2. Atmospheric Pr. 3. Temperature 4. Curvature of earth 5. Refraction correction 3. Computing the point elevation 4. Computing the coordinates of every point 5. Remote elevation measurement 6. Remote distance measurement 7. Area calculations 8. Data Transferring facility from instrument to S/W and S/W to instrument 9. Format of conversion of units
  • 8. Application of Total station: 1. Updating mapping 2. Topographic survey 3. Hydrographic survey 4. Cadastral survey 5. Project construction survey 6. Road, Rail Survey 7. Mining survey
  • 9. Operations involved while using Total Stations : 1. Establishing the site Datum: a) Selecting the site Datum b) Establishing North 2. Setting up the Total station: a) Placing and leveling Tripod on Datum b) Placing and leveling the Gun on Tripod c) Linking the data connector to Gun 3. Data collector options and setting a) Main menu b) Basic settings
  • 10. 4. Creating and Operating Job files: a) Creating a new Job file b) Opening an existing file 5. Shooting points a) Identifying the important points to shoot b) shooting points c) Shooting additional points d) Noting the special features 6.Post Processing – Data down loading,conversion 7.Plotting/Map generation.
  • 11. Computer software packages The following post processing computer software packages are in use for various engineering applications. 1.Arc Pad, arc view, arc info -conversion from raster to vector form 2.Micro Station - Map generation 3.Erdas – Image processing s/w 4.Surfer, Auto plotter, Civil cad, Pythagarus – preparation of contours 5. Survey aid – to draw c/s and l/s The information received is to be analyzed depending on the users requirement.
  • 12. Limitations: 1. It is not a Rugged instrument (Sensitive). 2. Prism verticality is questionable. 3. Visibility is must. 4. More Expensive. 5. Requires calibration at every six months. 6. Amount of error is greater at short distances. 7. Height of instrument and prism is to fed. 8. Awareness on battery maintenance. 9. To establish north- compass is required.
  • 13. SAFETY PRECAUTIONS 1. Focusing directly at the sun, can result - loss of eyesight on the spot. Use a filter when observing the sun. 2. Never remove the hand grip carelessly. If the grip is loosely or incompletely attached, the instrument could fall and may cause a serious injury. 3. Make sure not to short the battery terminals. If these are shorted, the resulting high current would not only damage to the battery, but also start a fire. 4. If the instrument or battery comes in contact with water, wipe it off as quickly as possible and set it in a dry place for a while. When it is completely dry, put it back in the case. 5. Never disassemble the instrument, if you find a problem. Contact the dealer.