This document discusses the differences between open loop and closed loop control systems and their application to project management and software development. An open loop system does not use feedback to adjust its output, while a closed loop system compares its actual output to a target and uses feedback to correct any errors. For software projects, an open loop approach does not ensure meeting a planned completion date, while a closed loop approach uses feedback from progress measurements to manage toward the target date if deviations occur.
Chapter 1 basic components of control systemHarish Odedra
This presentation is on basic of control engineering subject which is offered to 5th sem Mechanical Engineering Department in Gujarat Technological University.
Chapter 7 Controls Systems Analysis and Design by the frequency response analysis . From the book (Ogata Modern Control Engineering 5th).
7-1 introduction.
7-2 Bode diagrams.
Ch2 mathematical modeling of control system Elaf A.Saeed
Chapter 2 Mathematical modeling of control system From the book (Ogata Modern Control Engineering 5th).
2-1 introduction.
2-2 transfer function and impulse response function.
2-3 automatic control systems.
Chapter 1 basic components of control systemHarish Odedra
This presentation is on basic of control engineering subject which is offered to 5th sem Mechanical Engineering Department in Gujarat Technological University.
Chapter 7 Controls Systems Analysis and Design by the frequency response analysis . From the book (Ogata Modern Control Engineering 5th).
7-1 introduction.
7-2 Bode diagrams.
Ch2 mathematical modeling of control system Elaf A.Saeed
Chapter 2 Mathematical modeling of control system From the book (Ogata Modern Control Engineering 5th).
2-1 introduction.
2-2 transfer function and impulse response function.
2-3 automatic control systems.
state space modeling of electrical systemMirza Baig
Introduction
As systems become more complex, representing them with differential equations or transfer functions becomes cumbersome. This is even more true if the system has multiple inputs and outputs. This document introduces the state space method which largely alleviates this problem. The state space representation of a system replaces an nth order differential equation with a single first order matrix differential equation. The state space representation of a system is given by two equations :
The first equation is called the state equation, the second equation is called the output equation. For an nth order system (i.e., it can be represented by an nth order differential equation) with r inputs and m outputs the size of each of the matrices is as follows:
Several features:The state equation has a single first order derivative of the state vector on the left, and the state vector, q(t), and the input u(t) on the right. There are no derivatives on the right hand side.The output equation has the output on the left, and the state vector, q(t), and the input u(t) on the right. There are no derivatives on the right hand side.
q is nx1 (n rows by 1 column)q is called the state vector, it is a function of timeA is nxn; A is the state matrix, a constantB is nxr; B is the input matrix, a constant u is rx1; u is the input, a function of time C is mxn; C is the output matrix, a constant D is mxr; D is the direct transition matrix, a constant y is mx1; y is the output, a function of time
Derivation of of State Space Model (Electrical)
To develop a state space system for an electrical system, they choosing the voltage across capacitors, and current through inductors as state variables. Recall that
so if we can write equations for the voltage across an inductor, it becomes a state equation when we divide by the inductance (i.e., if we have an equation for einductor and divide by L, it becomes an equation for diinductor/dt which is one of our state variable). Likewise if we can write an equation for the current through the capacitor and divide by the capacitance it becomes a state equation for ecapacitor
There are three energy storage elements, so we expect three state equations. Try choosing i1, i2 and e1 as state variables. Now we want equations for their derivatives. The voltage across the inductor L2 is e1 (which is one of our state variables)so our first state variable equation is
This equation has our input (ia) and two state variable (iL2 and iL1) and the current through the capacitor. So from this we can get our second state equation
Our third, and final, state equation we get by writing an equation for the voltage across L1 (which is e2) in terms of our other state variables
references:
http://lpsa.swarthmore.edu/Representations/SysRepSS.html
https://en.wikipedia.org/wiki/State-space_representation
This presentation gives the information about introduction to control systems
Subject: Control Engineering as per VTU Syllabus of Aeronautical Engineering.
Notes Compiled By: Hareesha N Gowda, Assistant Professor, DSCE, Bengaluru-78.
Disclaimer:
The contents used in this presentation are taken from the text books mentioned in the references. I do not hold any copyrights for the contents. It has been prepared to use in the class lectures, not for commercial purpose.
Ch5 transient and steady state response analyses(control)Elaf A.Saeed
Chapter 5 Transient and steady-state response analyses. From the book (Ogata Modern Control Engineering 5th).
5-1 introduction.
5-2 First-Order System.
5-3 second-order system.
5-6 Routh’s stability criterion.
5-8 Steady-state errors in unity-feedback control systems.
Part of Lecture Series on Automatic Control Systems delivered by me to Final year Diploma in Engg. Students. Equally useful for higher level. Easy language and step by step procedure for drawing Bode Plots. Three illustrative examples are included.
state space modeling of electrical systemMirza Baig
Introduction
As systems become more complex, representing them with differential equations or transfer functions becomes cumbersome. This is even more true if the system has multiple inputs and outputs. This document introduces the state space method which largely alleviates this problem. The state space representation of a system replaces an nth order differential equation with a single first order matrix differential equation. The state space representation of a system is given by two equations :
The first equation is called the state equation, the second equation is called the output equation. For an nth order system (i.e., it can be represented by an nth order differential equation) with r inputs and m outputs the size of each of the matrices is as follows:
Several features:The state equation has a single first order derivative of the state vector on the left, and the state vector, q(t), and the input u(t) on the right. There are no derivatives on the right hand side.The output equation has the output on the left, and the state vector, q(t), and the input u(t) on the right. There are no derivatives on the right hand side.
q is nx1 (n rows by 1 column)q is called the state vector, it is a function of timeA is nxn; A is the state matrix, a constantB is nxr; B is the input matrix, a constant u is rx1; u is the input, a function of time C is mxn; C is the output matrix, a constant D is mxr; D is the direct transition matrix, a constant y is mx1; y is the output, a function of time
Derivation of of State Space Model (Electrical)
To develop a state space system for an electrical system, they choosing the voltage across capacitors, and current through inductors as state variables. Recall that
so if we can write equations for the voltage across an inductor, it becomes a state equation when we divide by the inductance (i.e., if we have an equation for einductor and divide by L, it becomes an equation for diinductor/dt which is one of our state variable). Likewise if we can write an equation for the current through the capacitor and divide by the capacitance it becomes a state equation for ecapacitor
There are three energy storage elements, so we expect three state equations. Try choosing i1, i2 and e1 as state variables. Now we want equations for their derivatives. The voltage across the inductor L2 is e1 (which is one of our state variables)so our first state variable equation is
This equation has our input (ia) and two state variable (iL2 and iL1) and the current through the capacitor. So from this we can get our second state equation
Our third, and final, state equation we get by writing an equation for the voltage across L1 (which is e2) in terms of our other state variables
references:
http://lpsa.swarthmore.edu/Representations/SysRepSS.html
https://en.wikipedia.org/wiki/State-space_representation
This presentation gives the information about introduction to control systems
Subject: Control Engineering as per VTU Syllabus of Aeronautical Engineering.
Notes Compiled By: Hareesha N Gowda, Assistant Professor, DSCE, Bengaluru-78.
Disclaimer:
The contents used in this presentation are taken from the text books mentioned in the references. I do not hold any copyrights for the contents. It has been prepared to use in the class lectures, not for commercial purpose.
Ch5 transient and steady state response analyses(control)Elaf A.Saeed
Chapter 5 Transient and steady-state response analyses. From the book (Ogata Modern Control Engineering 5th).
5-1 introduction.
5-2 First-Order System.
5-3 second-order system.
5-6 Routh’s stability criterion.
5-8 Steady-state errors in unity-feedback control systems.
Part of Lecture Series on Automatic Control Systems delivered by me to Final year Diploma in Engg. Students. Equally useful for higher level. Easy language and step by step procedure for drawing Bode Plots. Three illustrative examples are included.
Start with defining the deliverables to produce the capabilities needed for project success. Then what work is needed, the order of that work, and the defined outcomes of that work become obvious. Sequence that work, assign durations and resources and you've generated the plans and schedule for success
The management of software development is fraught with risk: technical risk, market risk, requirements risk, and financial risk. This paper describes nine (9) key management principles for
guiding the development of a software project. These principles are not original. They are taken directly from the work of Norm Brown, the founder and executive Director of the Software Program Managers Network (SPMN).
Project driven organization require lifecycle management to successfully deliver value to those paying for the outcomes of the project effort. This involves processes and data for Executive processes, Enterprise Governance, Program Management Office activities, Applications that enable the delivery of value, and overarching processes and data.
The integrated master plan and integrated master scheduleGlen Alleman
The Integrated Master Plan (IMP) and Integrated Master Schedule( (IMS) provide a strategy for the incremental delivery of program outcomes through increasing maturity assessments with Measures of Effectiveness, Measures of Performance, Technical Performance Measures, and Key Performance Parameters.
These assessment assure the needed capabilities of the project are met at each assessment point to confirm physical percent complete as planned in the Integrated Master Plan
Performance-Based Project Management® id s deliverables based approach to project success. Deliverables start with the needed capabilities that the project produces to meet the mission objectives or fulfill a business case.
These deliverables fulfill the requirements, assessed through Measures of Effectiveness and Measures of Performance
Managing in the presence of uncertaintyGlen Alleman
Uncertainty is the source of risk. Uncertainty comes in two types, aleatory and epistemic. It is important to understand both and deal with both in distinct ways, in order to produce a credible risk handling strategy.
The resources listed here are the starting point for anyone interested in applying the principles developed in this briefing for integrating Agile with Earned Value Management projects
IS EARNED VALUE + AGILE A MATCH MADE IN HEAVEN?
Increasing the Probability of Program Success requires by connecting the dots between EV and Agile Development.
Presented at
The Nexus of Agile Software Development and
Earned Value Management, OSD-PARCA,
February 19 – 20, 2015
Institute for Defense Analysis, Alexandria, VA
Starting with an EIA–748–C compliant Earned Value Management System, integrating an Agile Software Development Lifecycle (Agile) is straightforward when there is a Bright Line between the Performance Measurement Baseline (PMB) and the Sprints and Tasks of the Agile Software Development Process.
Earned Value Management Meets Big DataGlen Alleman
The Earned Value Management System (EVMS) maintains period–by–period data in its underlying databases. The contents of the Earned Value repository can be considered BIG DATA, characterized by three attributes – 1) Volume: Large amounts of data; 2) Variety: data comes from different sources, including traditional data bases, documents, and complex records; 3) Velocity: the content is continually being updated by absorbing other data collections, through previously archived data, and through streamed data from external sources.
With this time series information in the repository, analysis of trends, cost and schedule forecasts, and confidence levels of these performance estimates can be calculated using statistical analysis techniques enabled by the Autoregressive Integrated Moving Average (ARIMA) algorithm provided by the R programming system. ARIMA provides a statistically informed Estimate At Completion (EAC) and Estimate to Complete (ETC) to the program in ways not available using standard EVM calculations. Using ARIMA reveals underlying trends not available through standard EVM reporting calculations.
With ARIMA in place and additional data from risk, technical performance and the Work Breakdown Structure, Principal Component Analysis can be used to identify the drivers of unanticipated EAC.
Recent College of Performance Management Webinar on using Technical Performance to inform Earned Value Management. Six steps to building a credible Performance Measurement Baseline to connect the dots between all the elements of the program
From being a Luxury, now the eProcurement Software has turned into a necessity. While the whole World is eyeing towards digital transformation, the main aim of this article is to let the procurement professionals know the process of evaluating and implementing eProcurement solutions.
All in One Platform To Run Your Business TrackOlap Live Tracking SoftwareTrackolap
Employee Efficiency Platform - automates and mobilize the routine activities of various field forces who works remotely or on sight. This platform enables organizations to establish 24/7 engagement, track minute activities and enhance the productivity of their task forces.
It is a decision making tool in the hands of management with which they can draw conclusive decisions on the basis of insightful reports and vivid analytical reports. This is a custom built solution for business organizations of every scale.
Segregation of duties in SAP @ ISACA Pune presentation on 18.4.2015 CA CISA Jayjit Biswas
SOD conflict mitigation is a complex subject considering present manpower constraints and lack of technical understanding of core SAP domain. It is a mix of BPR and Technology together where process as well as IT knowledge is must to encounter this specialized area.
Creative Automation - All you need to know. Automated testing of look and feel for your responsive websites with Galen Framework. Approach, Scenarios, Features etc.
Do you sometimes feel like your company is being held hostage by your legacy ERP?
Have you outgrown QuickBooks, GCS, or another system?
Did you build a home-grown system and you have simply outgrown it?
Change is scary, but making the switch to a purpose-built, cloud based, ERP solution does not have to be.
Supporting an ERP tool you have outgrown is expensive and inefficient. Poor visibility, constant reconciliation, manual integration, compliance challenges, and disparate spreadsheets are symptoms of an ERP that has outlived its usefulness.
In this webinar you will learn about Unanet, the one tool for People, Projects and Financials and how it can revolutionize your business operations.
• One source of truth – One UI, One dB, One Application
• Accessible 24/7 - 100% Web Based
• Full cycle ‘Bid-to-Bill-to-Book’ for GovCon & Commercial Firms
• Real-time Visibility into Project Status, Billings & Revenue
• Resource Forecasting & Reporting
• Flexible Invoicing, Integrated Financials with "Revolutionary” Cost Pool Calculations
Top Signs You May Have Outgrown Your Legacy ERP SystemUnanet
Do you sometimes feel like your company is being held hostage by your legacy ERP?
Have you outgrown QuickBooks, GCS, or another system?
Did you build a home-grown system and you have simply outgrown it?
Change is scary, but making the switch to a purpose-built, cloud based, ERP solution does not have to be.
Supporting an ERP tool you have outgrown is expensive and inefficient. Poor visibility, constant reconciliation, manual integration, compliance challenges, and disparate spreadsheets are symptoms of an ERP that has outlived its usefulness.
In this webinar you will learn about Unanet, the one tool for People, Projects and Financials and how it can revolutionize your business operations.
• One source of truth – One UI, One dB, One Application
• Accessible 24/7 - 100% Web Based
• Full cycle ‘Bid-to-Bill-to-Book’ for GovCon & Commercial Firms
• Real-time Visibility into Project Status, Billings & Revenue
• Resource Forecasting & Reporting
• Flexible Invoicing, Integrated Financials with “Revolutionary” Cost Pool Calculations
Learn more at: https://www.unanet.com/news/demand-webinars
The aim of this talk was to make people aware of the scale of the mobile challenge, the various problem areas and some ideas to help avoid/ overcome them
Joget Workflow v6 Training Slides - 11 - SLA and DeadlinesJoget Workflow
List of Modules
1-Introduction to Joget Workflow
2-Setting up Joget Workflow
3-Designing your first Process
4-Localizing your Joget Workflow
5-Designing your first Form
6-Using your first Process Tool
7-Designing your first Datalist
8-Designing your first Userview
9-Hash Variable
10-SLA and Deadlines
12-Version Control
13-Improving your Form design and Presentation
14-Introduction to Reporting
15-Introduction to Plugin Architecture
16-Preparing Development Environment
17-Building Plugins
18-Integrating with External System
19-Doing more with your Process Design
20-Basic System Administration
21-Best Practices on Application Building
Joget Workflow Training – Basic & Advance for v3.1 – Module 9 – SLA and Deadl...Joget Workflow
Joget Workflow is an open source web-based workflow software to develop workflow and BPM applications. It is also a rapid application development platform that offers full-fledged agile development capabilities (consisting of processes, forms, lists, CRUD and UI), not just back-end EAI/orchestration/integration or the task-based interface.
This document contains the ninth module out of 11 of the training slides prepared for those keen on learning more about Joget Workflow. The slides are prepared based on Joget v3.1.
Module listing:-
Module 1: Introduction
Introduction to Business Process and Workflow
Introduction to Joget Workflow
Overview of Joget Workflow v3 Architecture
Module 2: Setting up Joget Workflow
Requirements
Installation
Overview of User Management
Module 3: Building your first Process-driven Application
Business Process Design
Designing Your First Workflow with Workflow Designer
Running Your First Automated Process
Module 4: Process Monitoring
Administration of Process Instances in Joget
Module 5: Creating your first Forms
Creating your First Forms using Joget Form Builder
Understanding the relationship between Forms and Process Activities
Module 6: Using the Email Tool
Implementing Email Tool Plugin on your Process Tool.
Module 7: Creating Datalist and Userview
Creating a Listing of submitted Form data.
Creating a User Interface (UI) for end-user access.
Module 8: Participant Mapping and Permission Control
Defining Process Participant Mapping on your Process
Enforcing Permission Control on your App
Module 9: SLA and Deadlines
Service Level Agreement implementation on Workflow Process.
Creating Email Reminder on Workflow Process using Deadline implementation.
Module 10: Hash Variables
Dynamically populate Form fields, Email plugin.
Using Hash Variable
Module 11: A Revision - Building a Support Ticketing System
What I learned from 5 years of sciencing the crap out of DevOpsDevOpsDays DFW
For years we laboured under the misapprehension that going faster meant breaking things. After several years of science-ing, Jez and Dr Nicole Forsgren have identified the key elements that enable not just higher throughput but also higher stability, availability and quality, lower cost, and happier teams. Discover how continuous delivery, cloud infrastructure, and effective management and leadership practices produce higher software delivery performance (and indeed what we might mean by performance), along with how to measure culture and its impact on IT and organizational culture. Find out how we actually ensure our results are reliable and meaningful. Learn the patterns and practices used by high performing organizations to outcompete their peers.
Pay pal paypal continuous performance as a self-service with fully-automated...Dynatrace
PayPal's ongoing leadership as an industry innovator requires faster development cycles and increased adoption of continuous testing practices. For special efforts, the development teams needed more frequent feedback about application performance, scalability limitations and variances between builds. Accelerating the frequency of performance simulations would help increase the rate of innovation and improve the quality of code delivered to production.
In this session we'll review some the automation techniques that helped PayPal Credit increase testing feedback from a monthly effort to a nearly-continuous daily activity. We'll spend time looking at the benefits of a fully-automated, actionable performance feedback loop that delivers performance feedback to developers in hours rather than weeks or months. Additionally, we will take a closer look at how these changes impacted the culture of development and operations, improving both the quality of critical thinking about performance and the value delivered back to the business.
This "Secret Sauce" session will include conceptual learnings and hands-on demonstration:
- What a continuous performance environment looks like and the benefits it brings to your DevOps team
- How to create a parallel pipeline for on-demand performance feedback using JIRA, Rundeck, JMeter and Dynatrace
- Where and how to leverage performance feedback to optimize flow
- How to get engineers on-board and excited about building better performant code
Refactorisation de code : comment l’intégrer à sa roadmap Produit ?Thiga
MOBILE PRODUCT MANAGEMENT : https://www.meetup.com/fr-FR/mobilepm/
Pourquoi le faire & quels sont les impacts sur le mobile ? Videdressing nous fait un retour d'expérience sur son projet de refonte technique de ses briques de paiement & cycle de vie de la commande.
Talk par Jérôme Joly - Product Manager @VideDressing
10 Warning Signs of Weak Requirements ManagementPerforce
Struggling to find the latest version of your requirements document? Stakeholder input and reviews getting lost? Customers finding bugs that should have been fixed and tested before release? These common problems and seven others mean you need a better way to manage and track requirements.
We will also show you how Helix ALM solves these problems and helps:
- Facilitate requirements reviews.
- Centralize, organize, and customize requirements data.
- Automate traceability.
- Simplify backwards and forwards impact analysis.
- Extend JIRA’s capabilities to requirements management.
Planning projects usually starts with tasks and milestones. The planner gathers this information from the participants – customers, engineers, subject matter experts. This information is usually arranged in the form of activities and milestones. PMBOK defines “project time management” in this manner. The activities are then sequenced according to the projects needs and mandatory dependencies.
Increasing the Probability of Project SuccessGlen Alleman
Risk Management is essential for development and production programs. Information about key cost, performance and schedule attributes are often uncertain or unknown until late in the program.
Risk issues that can be identified early in the program, which may potentially impact the program, termed Known Unknowns, can be alleviated with good risk management. -- Effective Risk Management 2nd Edition, Page 1, Edmund Conrow, American Institute of Aeronautics and Astronautics, 2003
Cost and schedule growth for complex projects is created when unrealistic technical performance expectations, unrealistic cost and schedule estimates, inadequate risk assessments, unanticipated technical issues, and poorly performed and ineffective risk management, contribute to project technical and programmatic shortfalls
From Principles to Strategies for Systems EngineeringGlen Alleman
From Principles to Strategies How to apply Principles, Practices, and Processes of Systems Engineering to solve complex technical, operational,
and organizational problems
Building a Credible Performance Measurement BaselineGlen Alleman
Establishing a credible Performance Measurement Baseline, with a risk adjusted Integrated Master Plan and Integrated Master Schedule, starts with the WBS and connects Technical Measures of progress to Earned Value
Capabilities‒Based Planning the capabilities needed to accomplish a mission or fulfill a business strategy
Only when capabilities are defined can we start with requirements elicitation
Starting with the development of a Rough Order of Magnitude (ROM) estimate of work and duration, creating the Product Roadmap and Release Plan, the Product and Sprint Backlogs, executing and statusing the Sprint, and informing the Earned Value Management Systems, using Physical Percent Complete of progress to plan.
Program Management Office Lean Software Development and Six SigmaGlen Alleman
Successfully combining a PMO, Agile, and Lean / 6 starts with understanding what benefit each paradigm brings to the table. Architecting a solution for the enterprise requires assembling a “Systems” with processes, people, and principles – all sharing the goal of business improvement.
This resource document describes the Program Governance Road map for product development, deployment, and sustainment of products and services in compliance with CMS guidance, ITIL IT management, CMMI best practices, and other guidance to assure high quality software is deployed for sustained operational success in mission critical domains.
JMeter webinar - integration with InfluxDB and GrafanaRTTS
Watch this recorded webinar about real-time monitoring of application performance. See how to integrate Apache JMeter, the open-source leader in performance testing, with InfluxDB, the open-source time-series database, and Grafana, the open-source analytics and visualization application.
In this webinar, we will review the benefits of leveraging InfluxDB and Grafana when executing load tests and demonstrate how these tools are used to visualize performance metrics.
Length: 30 minutes
Session Overview
-------------------------------------------
During this webinar, we will cover the following topics while demonstrating the integrations of JMeter, InfluxDB and Grafana:
- What out-of-the-box solutions are available for real-time monitoring JMeter tests?
- What are the benefits of integrating InfluxDB and Grafana into the load testing stack?
- Which features are provided by Grafana?
- Demonstration of InfluxDB and Grafana using a practice web application
To view the webinar recording, go to:
https://www.rttsweb.com/jmeter-integration-webinar
UiPath Test Automation using UiPath Test Suite series, part 3DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 3. In this session, we will cover desktop automation along with UI automation.
Topics covered:
UI automation Introduction,
UI automation Sample
Desktop automation flow
Pradeep Chinnala, Senior Consultant Automation Developer @WonderBotz and UiPath MVP
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
Generating a custom Ruby SDK for your web service or Rails API using Smithyg2nightmarescribd
Have you ever wanted a Ruby client API to communicate with your web service? Smithy is a protocol-agnostic language for defining services and SDKs. Smithy Ruby is an implementation of Smithy that generates a Ruby SDK using a Smithy model. In this talk, we will explore Smithy and Smithy Ruby to learn how to generate custom feature-rich SDKs that can communicate with any web service, such as a Rails JSON API.
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...UiPathCommunity
💥 Speed, accuracy, and scaling – discover the superpowers of GenAI in action with UiPath Document Understanding and Communications Mining™:
See how to accelerate model training and optimize model performance with active learning
Learn about the latest enhancements to out-of-the-box document processing – with little to no training required
Get an exclusive demo of the new family of UiPath LLMs – GenAI models specialized for processing different types of documents and messages
This is a hands-on session specifically designed for automation developers and AI enthusiasts seeking to enhance their knowledge in leveraging the latest intelligent document processing capabilities offered by UiPath.
Speakers:
👨🏫 Andras Palfi, Senior Product Manager, UiPath
👩🏫 Lenka Dulovicova, Product Program Manager, UiPath
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualityInflectra
In this insightful webinar, Inflectra explores how artificial intelligence (AI) is transforming software development and testing. Discover how AI-powered tools are revolutionizing every stage of the software development lifecycle (SDLC), from design and prototyping to testing, deployment, and monitoring.
Learn about:
• The Future of Testing: How AI is shifting testing towards verification, analysis, and higher-level skills, while reducing repetitive tasks.
• Test Automation: How AI-powered test case generation, optimization, and self-healing tests are making testing more efficient and effective.
• Visual Testing: Explore the emerging capabilities of AI in visual testing and how it's set to revolutionize UI verification.
• Inflectra's AI Solutions: See demonstrations of Inflectra's cutting-edge AI tools like the ChatGPT plugin and Azure Open AI platform, designed to streamline your testing process.
Whether you're a developer, tester, or QA professional, this webinar will give you valuable insights into how AI is shaping the future of software delivery.
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf91mobiles
91mobiles recently conducted a Smart TV Buyer Insights Survey in which we asked over 3,000 respondents about the TV they own, aspects they look at on a new TV, and their TV buying preferences.
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.