SlideShare a Scribd company logo
1/29
Capabilities‒Based Planning for
Enterprise Projects
Capabilities‒Based Planning the capabilities
needed to accomplish a mission or fulfill a business
strategy
Only when capabilities are defined can we start
with requirements elicitation
2/29
“End to end” delivery of Enterprise Solutions rests on
the keystone of Project Portfolio Management,
balanced by a Scorecard and a Capabilities Plan
n Business Mission and Vision
drives capabilities need
n Balanced Scorecard defines
the testable strategies for
delivering business value
n Capabilities Based Planning
defines business outcomes
n Event based tasks are the
basis of increasing
capabilities maturity
Capabilities
Based
Planning
Project
Portfolio
Management
Balanced
Scorecard
Strategy
E
v
e
n
t
B
a
s
e
d
T
a
s
k
s
B
u
s
i
n
e
s
s
M
i
s
s
i
o
n
A
n
d
V
i
s
i
o
n
“Done”
“Demand”
3/29
The supporting elements must be in place to enable
Capabilities Based Planning to succeed. This
presentation focuses Capabilities Based Planning
n Project Portfolio Management
defines the “trade space” for
decisions that impact value of
the work needed to produce a
business capability
n Capabilities Based Planning
defines business outcomes
resulting from these decisions
n Deliverables based tasks are the
mechanisms for increasing
maturity of the capabilities
Capabilities
Based
Planning
Project
Portfolio
Management
Balanced
Scorecard
D
e
l
i
v
e
r
a
b
l
e
s
B
a
s
e
d
T
a
s
k
s
B
u
s
i
n
e
s
s
M
i
s
s
i
o
n
A
n
d
V
i
s
i
o
n
“Done”
“Demand”
4/29
Capabilities‒Base Planning transforms
enterprise services from the delivery of
features and functions to the delivery
processes that support strategy
n Capabilities Based Planning is planning, under
uncertainty, to provide capabilities suitable for a
wide range of business challenges and
circumstances, while working within an
economic framework
n Capabilities Based Planning emphasizes
flexibility, adaptiveness and robust capabilities,
implying a modular building-block approach to
Enterprise Services
n When transformation takes place, it is because
new modules have come into use
Stages of a Capabilities‒Based
Plan
5/29
External
Guidance
Project
Priorities
Future Environment
(Competition, Technology)
Deployment
Options
Business
Priorities
1st Stage of Capabilities Based
Planning
n The 1st Stage takes an outward‒looking
strategic top-down perspective of the
demands of the business environment
n Capability Goals are statements, in
specific measurable terms of the desired
level of capability to meet a needed
priority or objective
n Scenarios built to determine factors that
warrant consideration in planning and
surface concerns
6/29
2nd Stage of Capabilities Based
Planning
n The 2nd Stage takes a bottom‒up view to
assess the performance of the current
system with respect to capability goals to
inform remedial action
n Comprehensible identification of
capability gaps, including deficiencies
and excesses
n The final step generates capability
options to mitigate gaps and assessment
of each option’s cost, schedule, and risk
7/29
8/29
Capabilities Based Planning is understood at the
execution level, but needs to be raised to the level
of enterprise process analysis
1. Identify a needed capability in operational
requirements terms;
2. using the set of capability options to;
3. assess the effectiveness in an operations
paradigm, and;
4. make choices about requirements and ways to
achieve the capability using an integrated
portfolio framework;
5. to produce of output set of options based on
these operational paradigms.
9/29
Many enterprise projects focus on the delivery of
improved features and functions; ignoring the delivery
of the capabilities needed to implement strategy
Standish Chaos Report Failure Modes Capabilities Based Planning
Absence of a clear vision and statement
of the requirements expectations
Maturity assessment program events
provide visibility of progress independent
of effort or time
Estimating difficulties and organizational
politics result in unrealistic expectations
Capability assessment points define
“done” using agreed on measures of
progress
Poor project decomposition Master Plan and Master Schedule
vertically and horizontally integrated
Inadequate staffing Resource loaded schedules
Lack of stakeholder involvement Capabilities defined by business needs
Lack of strategic focus Capabilities connected to Balanced
Scorecard
10/29
Capabilities Based Planning starts with business
scenarios, the tasks needed to implement the
scenarios, and testable capability outcomes
Scenarios
The business unit’s
operational needs in
scenario terms
Merge a General Ledger
from a 3rd party database
through a data
conversation process
Work Tasks
The individual work
processes needed to fulfill
the scenarios
1. Define the data to be
acquired from the new
firm
2. Verify data
conversation can take
place
3. Verify that business
operations can
continue
Capabilities
The planned capability of
the Business Units at each
level of maturity
“Acquire a $100M business
unit in 90 days or less”
“Process 100% AP invoices
from tier 1 vendors saving
$9M annually”
Business Process
Improvement
Strategy Management
Project Management
11/29
Defining the desired maturity of a business processes
is the starting point for integrating Balanced Scorecard
with the Enterprise Services deployment processes
n The Integrated Master Plan (IMP) for Enterprise
Services starts with the identification of
increasing maturity of capabilities
n The successful delivery of supporting features
and functions can be measured by the
completion of the Significant Accomplishments
and their Criteria
12/29
The focus of Capabilities‒Based Planning is on
assessing the increasing maturity of functionality
defined by the Balanced Scorecard strategy
n Planning under uncertainty, provides
capabilities suitable for a wide range of
challenges and circumstances while working
within an economic framework that necessitates
choice
n Focus on “possibilities” rather than features
¡ “What features do we need to achieve the desired
capabilities?”
¡ “How much of each capability to we need at this
point in time?”
¡ “How robust, flexible, and capable should we be at a
point time to provide the needed capability?”
13/29
Capabilities Based Planning takes a near term and
long-term view of the emerging functional maturity
needed to implement the Enterprise Services strategy
n Near term effective use of processes, tools,
features and functions
n Future use of sound infrastructure and system
capabilities
¡ Joint solutions to problem by identifying vertical
connections between business processes
¡ Risk tradeoff assessment of vertical solutions within
and across business processes
¡ Build capability to respond to a wide variety of
possible demands
14/29
Six trusted friends of a project-based organization are
the basis of capabilities based planning and balanced
scorecard
Why are we doing this? Balanced Scorecard
What is it we’re doing? Program Events
How is this going to be accomplished? Significant Accomplishments
When will we know it is done? Accomplishment Criteria
When will we be done? Tasks
Who going to do the work at what cost? Resources
Where will the work take place? Teams
15/29
The measure of Enterprise Services Business Effect’s
is made visible at each maturity assessment point.
“Is this want done looks like?” must be the question
§ Derive business effects from capabilities
§ Link capabilities to effects
§ Explicitly identify cross links and
interdependencies between capabilities
§ Highlight “enabler” capabilities
Sub-
Capability
Capability
Business
Effect
Business
Effect
Capability
Capability
Sub-
Capability
Sub-
Capability
Sub-
Capability
Sub-
Capability
§ Functional decomposition of capabilities
§ Capabilities must be Collectively Exhaustive
and Mutually Exclusive
§ Provide a “menu” from which operations can
choose required capabilities
Capability 1 Capability 2
Sub-
Capability
Sub-
Capability
Sub-
Capability
Sub-Sub-
Capability
Sub-Sub-
Capability
Sub-Sub-
Capability
Sub-Sub-
Capability
Sub-Sub-
Capability
Sub-Sub-
Capability
16/29
Evidence that the strategy is being fulfilled is tested in
the “units of measure” of the capabilities of a project
whose maturity is assessed at periodic events
Program Maturity
Assessment
Events
What are the maturity assessment points
along the way to completion?
Significant
Accomplishments
What accomplishments must take place in
order for this maturity to have occurred?
Accomplishment
Criteria
What is the evidence that the
accomplishments occurred?
Tasks What effort must take place for the
accomplishments to have be completed?
17/29
The process drivers for Capabilities Based Planning
starts with functionality and ends with deliverable
effects on the business process
n Functional or feature planning does not deliver
the real value to the business units
¡ Features are not connected to strategy
n Balanced Scorecard connections are capabilities not
features
n Testing strategy involves a capabilities impact not the
presence of a feature
¡ Features are not connected to business value
n Business strategy is tested through scenarios and
capabilities
n Delivered value results from the use of a capability in a
scenario
18/29
Capabilities Based Planning augments features with
business value, traceable to strategy through a
portfolio of projects and their Program Events
n Plan the delivery of capabilities rather than the
delivery of features and functions
n Features and functions are the raw materials of
Capabilities
n Capabilities enable the delivery of the strategy
19/29
Program Events are evaluation points in the project
for assessing the maturity of the capability and its
effect on the business
n Program Events are Celebratory Opportunities
along the path to maturity
¡ Significant accomplishments enable a new capability
that supports a strategy
¡ The maturity of the derived effects are assured
through the assessment of the Significant
Accomplishment
20/29
Significant Accomplishments describe the delivery of
capability needed to fulfill a business strategy using
work processes of the system
n A Capability is the deployment or delivery of a
feature or function in support of a business
process, product or service initiative
n Significant Accomplishments deliver this
capability
n Stating the needed maturity connects the
capability with strategy
21/29
Accomplishment Criteria are the “exit criteria” for the
Significant Accomplishments, assuring the intent of
the Accomplishment is met
n Exit criteria are the evidence that the significant
accomplishment has been achieved
n The gathering and assessment of the Balance
Scorecard KPI in support of a Significant
Accomplishment
22/29
Tasks are the raw material to implement the
functionality needed for the business process to
deliver on the capabilities
n The effort expended to deliver the
Accomplishment Criteria in support of the
Significant Accomplishment
n Short duration activities (20 to 40 working days)
with clearly defined deliverables
¡ 0% or 100% credit for the deliverables
¡ No partial completion of tasks
¡ Predefined technical outcomes
23/29
Management consists of Capabilities Assessments
(Events), the Significant Accomplishments (SA) and
the Accomplishment Criteria (AC)
Business Strategy
IMP Process Step
WBS Element or
Subsystem
Events
Tasks
Accomplishments
Criteria
Significant
Accomplishments
(SA)
Accomplishment
Criteria (AC)
Subsystem
State of the
Project
State of the
Capability
State of the
Process
Demonstrates
Maturity
Identifies
End Item
How
Defines
Customer/Program
Direction
Program/Team
Direction
Team Direction
Performance
Team Status
Team Status
Something
Completed
Effort
Expended
Deliverables
24/29
Starting with a “mini-Kaizen,” the maturity Assessment
Points (Events) are gathered along with the Significant
Accomplishments and Accomplishment Criteria
25/29
A simple example of vertical and horizontal linking of
the capability — provisioning a new employee
illustrates the assessment of maturity
Human Resources
New Employee Ready to Work
Insurance
Orientation
Laptop Account Setup
Charge account setup
Information Technology
Finance
Buying authority available
Supply Chain Management
Capability: Provide Buying Authority within 10 working days of hire
26/29
Maturity assessments allow progress to be measured
in how terms of “capability” effects the business; not
just the consumption of time and resources
n Define the desired maturity points along the
path to completion
n Measure the accomplishments
n Assess the effect on business improvement
n Engage all participants in a conversation about
capability
27/29
The deployment of Capabilities Based Planning is the
basis of managing the deployment of Enterprise
Services
n What does done look like in terms of
operational capabilities?
n How can we measure the increasing maturity of
Enterprise Services in terms of “done,” rather
than the passage of time?
n How can the user community define their
operational needs in terms of capabilities rather
than features and functions?
28/29
Capabilities based planning

More Related Content

What's hot

Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
Glen Alleman
 
Cure for cost and schedule growth
Cure for cost and schedule growthCure for cost and schedule growth
Cure for cost and schedule growth
Glen Alleman
 
Brownfields agile draft v11
Brownfields agile draft v11Brownfields agile draft v11
Brownfields agile draft v11
tony1234
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
Glen Alleman
 
Strategic portfolio management
Strategic portfolio managementStrategic portfolio management
Strategic portfolio management
Glen Alleman
 
Capabilities based planning essay
Capabilities based planning essayCapabilities based planning essay
Capabilities based planning essay
Glen Alleman
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
Glen Alleman
 
Making Agile Development work in Government Contracting
Making Agile Development work in Government ContractingMaking Agile Development work in Government Contracting
Making Agile Development work in Government Contracting
Glen Alleman
 
Performance based management in a nut shell (v5)
Performance based management in a nut shell (v5)Performance based management in a nut shell (v5)
Performance based management in a nut shell (v5)
Glen Alleman
 
The Role of the Architect in ERP and PDM System Deployment
The Role of the Architect in ERP and PDM System DeploymentThe Role of the Architect in ERP and PDM System Deployment
The Role of the Architect in ERP and PDM System Deployment
Glen Alleman
 
Design Patterns in Electronic Data Management
Design Patterns in Electronic Data ManagementDesign Patterns in Electronic Data Management
Design Patterns in Electronic Data Management
Glen Alleman
 
Establishing the Performance Measurement Baseline
Establishing the Performance Measurement BaselineEstablishing the Performance Measurement Baseline
Establishing the Performance Measurement Baseline
Glen Alleman
 
Integrating risk with earned value
Integrating risk with earned valueIntegrating risk with earned value
Integrating risk with earned value
Glen Alleman
 
Getting To Done - A Master Class Workshop
Getting To Done - A Master Class WorkshopGetting To Done - A Master Class Workshop
Getting To Done - A Master Class Workshop
Glen Alleman
 
A Guide for Capital Project Mamnagers
A Guide for Capital Project MamnagersA Guide for Capital Project Mamnagers
A Guide for Capital Project Mamnagers
Glen Alleman
 
Earned Value Management and Agile
Earned Value Management and AgileEarned Value Management and Agile
Earned Value Management and Agile
Glen Alleman
 
Integrating cost, schedule, and technical performance
Integrating cost, schedule, and technical performanceIntegrating cost, schedule, and technical performance
Integrating cost, schedule, and technical performance
Glen Alleman
 
IMP IMS overview
IMP IMS overviewIMP IMS overview
IMP IMS overview
Glen Alleman
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
Glen Alleman
 
Increasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and PracticesIncreasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and Practices
Glen Alleman
 

What's hot (20)

Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
 
Cure for cost and schedule growth
Cure for cost and schedule growthCure for cost and schedule growth
Cure for cost and schedule growth
 
Brownfields agile draft v11
Brownfields agile draft v11Brownfields agile draft v11
Brownfields agile draft v11
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Strategic portfolio management
Strategic portfolio managementStrategic portfolio management
Strategic portfolio management
 
Capabilities based planning essay
Capabilities based planning essayCapabilities based planning essay
Capabilities based planning essay
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Making Agile Development work in Government Contracting
Making Agile Development work in Government ContractingMaking Agile Development work in Government Contracting
Making Agile Development work in Government Contracting
 
Performance based management in a nut shell (v5)
Performance based management in a nut shell (v5)Performance based management in a nut shell (v5)
Performance based management in a nut shell (v5)
 
The Role of the Architect in ERP and PDM System Deployment
The Role of the Architect in ERP and PDM System DeploymentThe Role of the Architect in ERP and PDM System Deployment
The Role of the Architect in ERP and PDM System Deployment
 
Design Patterns in Electronic Data Management
Design Patterns in Electronic Data ManagementDesign Patterns in Electronic Data Management
Design Patterns in Electronic Data Management
 
Establishing the Performance Measurement Baseline
Establishing the Performance Measurement BaselineEstablishing the Performance Measurement Baseline
Establishing the Performance Measurement Baseline
 
Integrating risk with earned value
Integrating risk with earned valueIntegrating risk with earned value
Integrating risk with earned value
 
Getting To Done - A Master Class Workshop
Getting To Done - A Master Class WorkshopGetting To Done - A Master Class Workshop
Getting To Done - A Master Class Workshop
 
A Guide for Capital Project Mamnagers
A Guide for Capital Project MamnagersA Guide for Capital Project Mamnagers
A Guide for Capital Project Mamnagers
 
Earned Value Management and Agile
Earned Value Management and AgileEarned Value Management and Agile
Earned Value Management and Agile
 
Integrating cost, schedule, and technical performance
Integrating cost, schedule, and technical performanceIntegrating cost, schedule, and technical performance
Integrating cost, schedule, and technical performance
 
IMP IMS overview
IMP IMS overviewIMP IMS overview
IMP IMS overview
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
 
Increasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and PracticesIncreasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and Practices
 

Similar to Capabilities based planning

Five Immutable Principles of Program Success and Their Supporting Processes a...
Five Immutable Principles of Program Success and Their Supporting Processes a...Five Immutable Principles of Program Success and Their Supporting Processes a...
Five Immutable Principles of Program Success and Their Supporting Processes a...
Glen Alleman
 
Using Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project PerformanceUsing Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project Performance
LewisFowlerLLC
 
Increasing the probability of success for your project
Increasing the probability of success for your projectIncreasing the probability of success for your project
Increasing the probability of success for your project
Glen Alleman
 
Connecting PMB® with PMBOK®
Connecting PMB® with PMBOK®Connecting PMB® with PMBOK®
Connecting PMB® with PMBOK®
Glen Alleman
 
Building risk tolerance
Building risk toleranceBuilding risk tolerance
Building risk tolerance
Glen Alleman
 
PPT-for-report-march-19.pptx
PPT-for-report-march-19.pptxPPT-for-report-march-19.pptx
PPT-for-report-march-19.pptx
zaldymendoza1
 
Deliverables Based Planning
Deliverables Based PlanningDeliverables Based Planning
Deliverables Based Planning
Glen Alleman
 
Earned Value Management Essentials
Earned Value Management EssentialsEarned Value Management Essentials
Earned Value Management Essentials
Glen Alleman
 
Chapter 0 of Performance Based Project Management (sm)
Chapter 0 of Performance Based Project Management (sm)Chapter 0 of Performance Based Project Management (sm)
Chapter 0 of Performance Based Project Management (sm)
Glen Alleman
 
CORTAC PPC General
CORTAC PPC GeneralCORTAC PPC General
CORTAC PPC GeneralDerek Regan
 
Getting to Done (PMI Denver)
Getting to Done (PMI Denver)Getting to Done (PMI Denver)
Getting to Done (PMI Denver)
Glen Alleman
 
The Five Immutable Principles of Project DSuccess
The Five Immutable Principles of Project DSuccessThe Five Immutable Principles of Project DSuccess
The Five Immutable Principles of Project DSuccess
Glen Alleman
 
Developing Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityDeveloping Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule Quality
Acumen
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management Services
Eugene Nizeyimana
 
Increasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementIncreasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementGlen Alleman
 
Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio ManagementAnand Subramaniam
 
Capabilities based planning (v2)
Capabilities based planning (v2)Capabilities based planning (v2)
Capabilities based planning (v2)
Glen Alleman
 
Lc Presentation
Lc PresentationLc Presentation
Lc Presentationreachab7
 

Similar to Capabilities based planning (20)

Governance
GovernanceGovernance
Governance
 
Five Immutable Principles of Program Success and Their Supporting Processes a...
Five Immutable Principles of Program Success and Their Supporting Processes a...Five Immutable Principles of Program Success and Their Supporting Processes a...
Five Immutable Principles of Program Success and Their Supporting Processes a...
 
Using Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project PerformanceUsing Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project Performance
 
Increasing the probability of success for your project
Increasing the probability of success for your projectIncreasing the probability of success for your project
Increasing the probability of success for your project
 
Connecting PMB® with PMBOK®
Connecting PMB® with PMBOK®Connecting PMB® with PMBOK®
Connecting PMB® with PMBOK®
 
Building risk tolerance
Building risk toleranceBuilding risk tolerance
Building risk tolerance
 
PPT-for-report-march-19.pptx
PPT-for-report-march-19.pptxPPT-for-report-march-19.pptx
PPT-for-report-march-19.pptx
 
Deliverables Based Planning
Deliverables Based PlanningDeliverables Based Planning
Deliverables Based Planning
 
Earned Value Management Essentials
Earned Value Management EssentialsEarned Value Management Essentials
Earned Value Management Essentials
 
Chapter 0 of Performance Based Project Management (sm)
Chapter 0 of Performance Based Project Management (sm)Chapter 0 of Performance Based Project Management (sm)
Chapter 0 of Performance Based Project Management (sm)
 
Santhosh Kumar, PMP
Santhosh Kumar, PMPSanthosh Kumar, PMP
Santhosh Kumar, PMP
 
CORTAC PPC General
CORTAC PPC GeneralCORTAC PPC General
CORTAC PPC General
 
Getting to Done (PMI Denver)
Getting to Done (PMI Denver)Getting to Done (PMI Denver)
Getting to Done (PMI Denver)
 
The Five Immutable Principles of Project DSuccess
The Five Immutable Principles of Project DSuccessThe Five Immutable Principles of Project DSuccess
The Five Immutable Principles of Project DSuccess
 
Developing Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityDeveloping Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule Quality
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management Services
 
Increasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementIncreasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value Management
 
Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio Management
 
Capabilities based planning (v2)
Capabilities based planning (v2)Capabilities based planning (v2)
Capabilities based planning (v2)
 
Lc Presentation
Lc PresentationLc Presentation
Lc Presentation
 

More from Glen Alleman

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
Glen Alleman
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
Glen Alleman
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
Glen Alleman
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
Glen Alleman
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
Glen Alleman
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
Glen Alleman
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Glen Alleman
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
Glen Alleman
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
Glen Alleman
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
Glen Alleman
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
Glen Alleman
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
Glen Alleman
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
Glen Alleman
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
Glen Alleman
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure Rollout
Glen Alleman
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan Development
Glen Alleman
 
Project Management Theory
Project Management TheoryProject Management Theory
Project Management Theory
Glen Alleman
 
Seven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project managerSeven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project manager
Glen Alleman
 
Paradigm of agile project management (update)
Paradigm of agile project management (update)Paradigm of agile project management (update)
Paradigm of agile project management (update)
Glen Alleman
 
The 5 Immutable principles of project management
The 5 Immutable principles of project managementThe 5 Immutable principles of project management
The 5 Immutable principles of project management
Glen Alleman
 

More from Glen Alleman (20)

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure Rollout
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan Development
 
Project Management Theory
Project Management TheoryProject Management Theory
Project Management Theory
 
Seven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project managerSeven Habits of a Highly Effective agile project manager
Seven Habits of a Highly Effective agile project manager
 
Paradigm of agile project management (update)
Paradigm of agile project management (update)Paradigm of agile project management (update)
Paradigm of agile project management (update)
 
The 5 Immutable principles of project management
The 5 Immutable principles of project managementThe 5 Immutable principles of project management
The 5 Immutable principles of project management
 

Recently uploaded

From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
CatarinaPereira64715
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
Abida Shariff
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
Fwdays
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 

Recently uploaded (20)

From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 

Capabilities based planning

  • 1. 1/29 Capabilities‒Based Planning for Enterprise Projects Capabilities‒Based Planning the capabilities needed to accomplish a mission or fulfill a business strategy Only when capabilities are defined can we start with requirements elicitation
  • 2. 2/29 “End to end” delivery of Enterprise Solutions rests on the keystone of Project Portfolio Management, balanced by a Scorecard and a Capabilities Plan n Business Mission and Vision drives capabilities need n Balanced Scorecard defines the testable strategies for delivering business value n Capabilities Based Planning defines business outcomes n Event based tasks are the basis of increasing capabilities maturity Capabilities Based Planning Project Portfolio Management Balanced Scorecard Strategy E v e n t B a s e d T a s k s B u s i n e s s M i s s i o n A n d V i s i o n “Done” “Demand”
  • 3. 3/29 The supporting elements must be in place to enable Capabilities Based Planning to succeed. This presentation focuses Capabilities Based Planning n Project Portfolio Management defines the “trade space” for decisions that impact value of the work needed to produce a business capability n Capabilities Based Planning defines business outcomes resulting from these decisions n Deliverables based tasks are the mechanisms for increasing maturity of the capabilities Capabilities Based Planning Project Portfolio Management Balanced Scorecard D e l i v e r a b l e s B a s e d T a s k s B u s i n e s s M i s s i o n A n d V i s i o n “Done” “Demand”
  • 4. 4/29 Capabilities‒Base Planning transforms enterprise services from the delivery of features and functions to the delivery processes that support strategy n Capabilities Based Planning is planning, under uncertainty, to provide capabilities suitable for a wide range of business challenges and circumstances, while working within an economic framework n Capabilities Based Planning emphasizes flexibility, adaptiveness and robust capabilities, implying a modular building-block approach to Enterprise Services n When transformation takes place, it is because new modules have come into use
  • 5. Stages of a Capabilities‒Based Plan 5/29 External Guidance Project Priorities Future Environment (Competition, Technology) Deployment Options Business Priorities
  • 6. 1st Stage of Capabilities Based Planning n The 1st Stage takes an outward‒looking strategic top-down perspective of the demands of the business environment n Capability Goals are statements, in specific measurable terms of the desired level of capability to meet a needed priority or objective n Scenarios built to determine factors that warrant consideration in planning and surface concerns 6/29
  • 7. 2nd Stage of Capabilities Based Planning n The 2nd Stage takes a bottom‒up view to assess the performance of the current system with respect to capability goals to inform remedial action n Comprehensible identification of capability gaps, including deficiencies and excesses n The final step generates capability options to mitigate gaps and assessment of each option’s cost, schedule, and risk 7/29
  • 8. 8/29 Capabilities Based Planning is understood at the execution level, but needs to be raised to the level of enterprise process analysis 1. Identify a needed capability in operational requirements terms; 2. using the set of capability options to; 3. assess the effectiveness in an operations paradigm, and; 4. make choices about requirements and ways to achieve the capability using an integrated portfolio framework; 5. to produce of output set of options based on these operational paradigms.
  • 9. 9/29 Many enterprise projects focus on the delivery of improved features and functions; ignoring the delivery of the capabilities needed to implement strategy Standish Chaos Report Failure Modes Capabilities Based Planning Absence of a clear vision and statement of the requirements expectations Maturity assessment program events provide visibility of progress independent of effort or time Estimating difficulties and organizational politics result in unrealistic expectations Capability assessment points define “done” using agreed on measures of progress Poor project decomposition Master Plan and Master Schedule vertically and horizontally integrated Inadequate staffing Resource loaded schedules Lack of stakeholder involvement Capabilities defined by business needs Lack of strategic focus Capabilities connected to Balanced Scorecard
  • 10. 10/29 Capabilities Based Planning starts with business scenarios, the tasks needed to implement the scenarios, and testable capability outcomes Scenarios The business unit’s operational needs in scenario terms Merge a General Ledger from a 3rd party database through a data conversation process Work Tasks The individual work processes needed to fulfill the scenarios 1. Define the data to be acquired from the new firm 2. Verify data conversation can take place 3. Verify that business operations can continue Capabilities The planned capability of the Business Units at each level of maturity “Acquire a $100M business unit in 90 days or less” “Process 100% AP invoices from tier 1 vendors saving $9M annually” Business Process Improvement Strategy Management Project Management
  • 11. 11/29 Defining the desired maturity of a business processes is the starting point for integrating Balanced Scorecard with the Enterprise Services deployment processes n The Integrated Master Plan (IMP) for Enterprise Services starts with the identification of increasing maturity of capabilities n The successful delivery of supporting features and functions can be measured by the completion of the Significant Accomplishments and their Criteria
  • 12. 12/29 The focus of Capabilities‒Based Planning is on assessing the increasing maturity of functionality defined by the Balanced Scorecard strategy n Planning under uncertainty, provides capabilities suitable for a wide range of challenges and circumstances while working within an economic framework that necessitates choice n Focus on “possibilities” rather than features ¡ “What features do we need to achieve the desired capabilities?” ¡ “How much of each capability to we need at this point in time?” ¡ “How robust, flexible, and capable should we be at a point time to provide the needed capability?”
  • 13. 13/29 Capabilities Based Planning takes a near term and long-term view of the emerging functional maturity needed to implement the Enterprise Services strategy n Near term effective use of processes, tools, features and functions n Future use of sound infrastructure and system capabilities ¡ Joint solutions to problem by identifying vertical connections between business processes ¡ Risk tradeoff assessment of vertical solutions within and across business processes ¡ Build capability to respond to a wide variety of possible demands
  • 14. 14/29 Six trusted friends of a project-based organization are the basis of capabilities based planning and balanced scorecard Why are we doing this? Balanced Scorecard What is it we’re doing? Program Events How is this going to be accomplished? Significant Accomplishments When will we know it is done? Accomplishment Criteria When will we be done? Tasks Who going to do the work at what cost? Resources Where will the work take place? Teams
  • 15. 15/29 The measure of Enterprise Services Business Effect’s is made visible at each maturity assessment point. “Is this want done looks like?” must be the question § Derive business effects from capabilities § Link capabilities to effects § Explicitly identify cross links and interdependencies between capabilities § Highlight “enabler” capabilities Sub- Capability Capability Business Effect Business Effect Capability Capability Sub- Capability Sub- Capability Sub- Capability Sub- Capability § Functional decomposition of capabilities § Capabilities must be Collectively Exhaustive and Mutually Exclusive § Provide a “menu” from which operations can choose required capabilities Capability 1 Capability 2 Sub- Capability Sub- Capability Sub- Capability Sub-Sub- Capability Sub-Sub- Capability Sub-Sub- Capability Sub-Sub- Capability Sub-Sub- Capability Sub-Sub- Capability
  • 16. 16/29 Evidence that the strategy is being fulfilled is tested in the “units of measure” of the capabilities of a project whose maturity is assessed at periodic events Program Maturity Assessment Events What are the maturity assessment points along the way to completion? Significant Accomplishments What accomplishments must take place in order for this maturity to have occurred? Accomplishment Criteria What is the evidence that the accomplishments occurred? Tasks What effort must take place for the accomplishments to have be completed?
  • 17. 17/29 The process drivers for Capabilities Based Planning starts with functionality and ends with deliverable effects on the business process n Functional or feature planning does not deliver the real value to the business units ¡ Features are not connected to strategy n Balanced Scorecard connections are capabilities not features n Testing strategy involves a capabilities impact not the presence of a feature ¡ Features are not connected to business value n Business strategy is tested through scenarios and capabilities n Delivered value results from the use of a capability in a scenario
  • 18. 18/29 Capabilities Based Planning augments features with business value, traceable to strategy through a portfolio of projects and their Program Events n Plan the delivery of capabilities rather than the delivery of features and functions n Features and functions are the raw materials of Capabilities n Capabilities enable the delivery of the strategy
  • 19. 19/29 Program Events are evaluation points in the project for assessing the maturity of the capability and its effect on the business n Program Events are Celebratory Opportunities along the path to maturity ¡ Significant accomplishments enable a new capability that supports a strategy ¡ The maturity of the derived effects are assured through the assessment of the Significant Accomplishment
  • 20. 20/29 Significant Accomplishments describe the delivery of capability needed to fulfill a business strategy using work processes of the system n A Capability is the deployment or delivery of a feature or function in support of a business process, product or service initiative n Significant Accomplishments deliver this capability n Stating the needed maturity connects the capability with strategy
  • 21. 21/29 Accomplishment Criteria are the “exit criteria” for the Significant Accomplishments, assuring the intent of the Accomplishment is met n Exit criteria are the evidence that the significant accomplishment has been achieved n The gathering and assessment of the Balance Scorecard KPI in support of a Significant Accomplishment
  • 22. 22/29 Tasks are the raw material to implement the functionality needed for the business process to deliver on the capabilities n The effort expended to deliver the Accomplishment Criteria in support of the Significant Accomplishment n Short duration activities (20 to 40 working days) with clearly defined deliverables ¡ 0% or 100% credit for the deliverables ¡ No partial completion of tasks ¡ Predefined technical outcomes
  • 23. 23/29 Management consists of Capabilities Assessments (Events), the Significant Accomplishments (SA) and the Accomplishment Criteria (AC) Business Strategy IMP Process Step WBS Element or Subsystem Events Tasks Accomplishments Criteria Significant Accomplishments (SA) Accomplishment Criteria (AC) Subsystem State of the Project State of the Capability State of the Process Demonstrates Maturity Identifies End Item How Defines Customer/Program Direction Program/Team Direction Team Direction Performance Team Status Team Status Something Completed Effort Expended Deliverables
  • 24. 24/29 Starting with a “mini-Kaizen,” the maturity Assessment Points (Events) are gathered along with the Significant Accomplishments and Accomplishment Criteria
  • 25. 25/29 A simple example of vertical and horizontal linking of the capability — provisioning a new employee illustrates the assessment of maturity Human Resources New Employee Ready to Work Insurance Orientation Laptop Account Setup Charge account setup Information Technology Finance Buying authority available Supply Chain Management Capability: Provide Buying Authority within 10 working days of hire
  • 26. 26/29 Maturity assessments allow progress to be measured in how terms of “capability” effects the business; not just the consumption of time and resources n Define the desired maturity points along the path to completion n Measure the accomplishments n Assess the effect on business improvement n Engage all participants in a conversation about capability
  • 27. 27/29 The deployment of Capabilities Based Planning is the basis of managing the deployment of Enterprise Services n What does done look like in terms of operational capabilities? n How can we measure the increasing maturity of Enterprise Services in terms of “done,” rather than the passage of time? n How can the user community define their operational needs in terms of capabilities rather than features and functions?
  • 28. 28/29