Project Background
The preferred design offer the following:
Poses minimal impact to possible future multi‐use path
on Douro St.
Elevator eliminates the need for out‐of‐way travel and
it is accessible for cyclists at all levels.
Requires the least amount of tree removal.
Poses minimal impacts to residential and commercial
properties.
Poses no impacts to archaeological or heritage
resources.
Poses no Impacts to Metrolinx / CN / CP rail
operations.
6
8. BelleRiverWind
toronto.ca/king‐liberty‐bridgeDecember 8, 2016
8
Tree Inventory: Western Battery Rd
The tree inventory study area includes the Project Area plus a 6m buffer. There are 24
trees near the southern part of the bridge that may need removal, subject to final design.
Trees range from 4.5cm – 18cm Diameter at Breast Height.
Ironwood Red maple & Oak
White Pine
Spruce
Tree replacement opportunities are being reviewed and will be identified at Public Drop‐in Event # 2
9. BelleRiverWind
toronto.ca/king‐liberty‐bridgeDecember 8, 2016
9
Tree Inventory: Douro St
Manitoba Maples
Norway Maple
The tree inventory study area includes the Project Area plus a 6m buffer. There are 7 trees
near the northern part of the bridge that may need removal, subject to final design. Trees
range from 2cm ‐7cm Diameter at Breast Height.
Tree replacement opportunities are being reviewed and will be identified at Public Drop‐in Event # 2
18. BelleRiverWind
toronto.ca/king‐liberty‐bridgeDecember 8, 2016
18
Glass Wall – W2
DOURO STREET ELEVATION
DOURO STREET ELEVATION
WEST BATTERY ELEVATION
WEST BATTERY ELEVATION
GLASS SIDE WALLS
WITH INTEGRATED
HANDRAILS
ROOF
OPEN
ROOF
SOLID SIDE WALLS
WITH INTEGRATED
HANDRAILS
OPEN
Staircase & Railing Options
Solid Wall – W1
SOUTH STAIR – W 1
NORTH STAIR – W 2
WEST BATTERY ELEVATION
PERSPECTIVE
VIEWS
23. BelleRiverWind
toronto.ca/king‐liberty‐bridgeDecember 8, 2016
23
Timeline & Next Steps
• Deadline for feedback on these materials: January 6, 2017
• Incorporate feedback: Early‐2017
• Continue detailed design work
• Public Drop‐in Event #2: Mid‐2017
• Incorporate feedback: Late‐2017
• Finalize the design for the Project: Late‐2017
• Proceed to construction: 2018
24. BelleRiverWind
toronto.ca/king‐liberty‐bridgeDecember 8, 2016
Thank You for Attending!
Please let us know what you think
about this project by completing a
feedback form.
Paper forms are available at the
registration table or use the online
feedback form on our
web page:
toronto.ca/king‐liberty‐bridge