SlideShare a Scribd company logo
Waterfront Park December 22, 2010 Prepared By: City of Bangor  & Shadley Associates, P.C.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Paul Bunyan, commemorating Bangor’s 125 th  birthday in 1959 1853 lithograph 1887 ad: all specimens cured with arsenic, the only preventative against moths.
Tall ships taking on lumber, 1880’s Steamer “City of Rockland” launched 1990 Early 20 th  Century postcard
Flood of 1902 “ Bangor Tiger” river drivers Ice harvesting, shipped to Buenos Aires
 
The Bangor Waterfront was a former railroad switching yard (1986).
The 36 acre Project area acquired by the City was occupied by leaking fuel oil tank farms, unused or underutilized industrial warehouses and distribution facilities, rail yards, vacant manufacturing buildings and coal yards.  Circa 1985
 
Railroad Street Improvements, 2004 Water’s Edge Improvements, 2005 Front Street Improvements, 2003 Open Space Improvements, 2003 Park Improvements, 2009 - 2010
Front Street 2003
 
Railroad Street 2004
Water’s Edge 2005
Water’s Edge 2005
[object Object],[object Object],[object Object],[object Object],Water’s Edge 2005 American Glory docked at  Bangor Landing’s heavy vessel docking facility
Folk Festivals
 
Stormwater Treatment as approved by the DEP
[object Object],[object Object],[object Object],Coal Tar River Pollution Slides by RMT, Madison, WI
Maximum slopes of 3.5:1 Does not encroach on channel Gas discharges to surface of cap Plan View of Sediment Cap
Coal Tar Remediation, Fall 2009 Area to be loamed and seeded,  and later planted
 
Phase I Park Under Construction, 2009 - 2011 Railroad Street Parking Lot with drainage chambers, lights Waterfront Parking Lot with drainage chambers, lights and access drive Multiuse trails and grading for amphitheater Compass Rose Trail connection to Dutton Street with lights Fencing and planting along RR Right of Way
Water front Park Existing Conditions Looking north from hotel December 2008 Park Construction 2009-2011
June 2009 Park Construction 2009-2011 Compass Rose
August, 2010 Park Construction 2009-2011
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
FEDERAL FUNDING
STATE FUNDING
LOCAL FUNDING
Bangor Waterfront Development Project  Total Federal Funding    $4,670,940  40% Total State Funds    $3,375,000  29%  Total City Funds    $3,522,655  30% Total Funding  $ 11,568,595  100%
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Construction Estimate (11/09): $674,860 Construction Estimate (11/09): $1,348,960 Construction Estimate (11/09): $1,770,710 Total Constr. Estimate (11/09): $3,794,530
Area 1 Northern End of Park Restrooms Equipment ,[object Object],[object Object],[object Object]
Area 1 Northern End of Park Dry and Wet Playground
Area 1 Northern End of Park Dry and Wet Playground
Area 2 Amphitheater and Open Space to the North
Area 3 Southern End of Park
Construction Estimate (11/09): $674,860 Construction Estimate (11/09): $1,348,960 Construction Estimate (11/09): $1,770,710 Total Constr. Estimate (11/09): $3,794,530
Part 1: $1,448,636 Construction Estimates December   2010 Part 2: $278,933 Part 3: $366,113 Part 4: $520,478 Part 5: $239,892 Part 6: $243,630 Part 7: $841,585 Construction Estimate (12/22): $3,939,267
Part 1: $1,448,636 Part 2: $278,933 Part 3: $366,113 Part 4: $520,478 Part 5: $239,892 Part 6: $243,630 Part 7: $841,585 Recommendation for Spring 2011 Bid: Part 5, Restroom Building: $239,892 Part 6 Waterfront Walkway at Coal Tar Area: $243,630 Total Estimated Base Bid:$483,522 Add Alternate Part 3: $366,133 Construction Estimates December   2010
 

More Related Content

What's hot

Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Plan
awweiss
 
Beaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentationBeaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentation
City of Beaufort Planning Department
 
Sectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing PresentationSectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing Presentation
City of Beaufort Planning Department
 
Four Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force PresentationFour Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force Presentation
Northern Virginia Regional Commission
 
30th Street Industrial Corridor
30th Street Industrial Corridor30th Street Industrial Corridor
30th Street Industrial Corridor
hebham
 
Kwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 ExpansionKwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 Expansion
Grant Hepburn
 
RE developement of Bhindhi baazar
RE developement of Bhindhi baazarRE developement of Bhindhi baazar
RE developement of Bhindhi baazar
Yash Agrawal
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b Projects
Anandhan Annasamy
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
Daniel X. O'Neil
 
Bhendi bazaar
Bhendi bazaarBhendi bazaar
Bhendi bazaar
Simran Aggarwal
 
State Highway 47 Land Use Change
State Highway 47 Land Use ChangeState Highway 47 Land Use Change
State Highway 47 Land Use Change
City of College Station
 
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Adam Cohen
 
Presentation On the Development of The Springs Shopping Center
Presentation On the Development of The Springs Shopping CenterPresentation On the Development of The Springs Shopping Center
Presentation On the Development of The Springs Shopping Center
John Raymond
 
City Hall Site Selection
City Hall Site SelectionCity Hall Site Selection
City Hall Site Selection
City of College Station
 
Parks Master Plan Update
Parks Master Plan UpdateParks Master Plan Update
Parks Master Plan Update
City of College Station
 
Before and After projects presentation
Before and After projects presentationBefore and After projects presentation
Before and After projects presentation
John Sherman, CPRP
 
Union Square Open Space Plan
Union Square Open Space PlanUnion Square Open Space Plan
Union Square Open Space Plan
Rob May
 
Project Outline
Project OutlineProject Outline
Project Outline
Le Gia Khoi
 
Viability Session 5: Site-specific case studies
Viability Session 5: Site-specific case studiesViability Session 5: Site-specific case studies
Viability Session 5: Site-specific case studies
PAS_Team
 
Public Hearing Development Applications 2009 12 14
Public Hearing Development Applications 2009 12 14Public Hearing Development Applications 2009 12 14
Public Hearing Development Applications 2009 12 14
jgabateman
 

What's hot (20)

Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Plan
 
Beaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentationBeaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentation
 
Sectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing PresentationSectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing Presentation
 
Four Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force PresentationFour Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force Presentation
 
30th Street Industrial Corridor
30th Street Industrial Corridor30th Street Industrial Corridor
30th Street Industrial Corridor
 
Kwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 ExpansionKwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 Expansion
 
RE developement of Bhindhi baazar
RE developement of Bhindhi baazarRE developement of Bhindhi baazar
RE developement of Bhindhi baazar
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b Projects
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
 
Bhendi bazaar
Bhendi bazaarBhendi bazaar
Bhendi bazaar
 
State Highway 47 Land Use Change
State Highway 47 Land Use ChangeState Highway 47 Land Use Change
State Highway 47 Land Use Change
 
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
 
Presentation On the Development of The Springs Shopping Center
Presentation On the Development of The Springs Shopping CenterPresentation On the Development of The Springs Shopping Center
Presentation On the Development of The Springs Shopping Center
 
City Hall Site Selection
City Hall Site SelectionCity Hall Site Selection
City Hall Site Selection
 
Parks Master Plan Update
Parks Master Plan UpdateParks Master Plan Update
Parks Master Plan Update
 
Before and After projects presentation
Before and After projects presentationBefore and After projects presentation
Before and After projects presentation
 
Union Square Open Space Plan
Union Square Open Space PlanUnion Square Open Space Plan
Union Square Open Space Plan
 
Project Outline
Project OutlineProject Outline
Project Outline
 
Viability Session 5: Site-specific case studies
Viability Session 5: Site-specific case studiesViability Session 5: Site-specific case studies
Viability Session 5: Site-specific case studies
 
Public Hearing Development Applications 2009 12 14
Public Hearing Development Applications 2009 12 14Public Hearing Development Applications 2009 12 14
Public Hearing Development Applications 2009 12 14
 

Similar to Bangor Waterfront Park Plans by Shadley 12-2010

Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
R Ray Saikus
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panels
GardinerEast
 
Trinity River Corridor Project
Trinity  River Corridor ProjectTrinity  River Corridor Project
Trinity River Corridor Project
Sean Merrell
 
Linn Cove Viaduct
Linn Cove ViaductLinn Cove Viaduct
Linn Cove Viaduct
Manilyn Relosa
 
Lower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 ConstructionLower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 Construction
Toronto Public Consultation Unit
 
OC harbor brook wetlands stakeholder 6 15-11 final-1
OC harbor brook wetlands stakeholder 6 15-11 final-1OC harbor brook wetlands stakeholder 6 15-11 final-1
OC harbor brook wetlands stakeholder 6 15-11 final-1
Onondaga County Save the Rain
 
Removing Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a TimeRemoving Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a Time
Kathleen Llewellyn-Thomas P. Eng.
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
Fairfax County
 
Ellis Sess14 102009
Ellis Sess14 102009Ellis Sess14 102009
Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020
Fairfax County
 
318 Queens Quay Public Event 1 Display Panels
318 Queens Quay Public Event 1 Display Panels318 Queens Quay Public Event 1 Display Panels
318 Queens Quay Public Event 1 Display Panels
knelischer
 
major use of Protecting Transmission Towers.docx
major use of Protecting Transmission Towers.docxmajor use of Protecting Transmission Towers.docx
major use of Protecting Transmission Towers.docx
DemsewAdelahu
 
GHD Flood Mapping Review City of Stonnington 2008
GHD Flood Mapping Review City of Stonnington 2008GHD Flood Mapping Review City of Stonnington 2008
GHD Flood Mapping Review City of Stonnington 2008
Stonnington
 
4P - CAPSTONE FINAL POWERPOINT
4P - CAPSTONE FINAL POWERPOINT4P - CAPSTONE FINAL POWERPOINT
4P - CAPSTONE FINAL POWERPOINT
Thomas Bryce
 
Matt Mundinger Portfolio
Matt Mundinger PortfolioMatt Mundinger Portfolio
Matt Mundinger Portfolio
mmundinger
 
Cp 2 AssignmentV2 15092015
Cp 2 AssignmentV2    15092015Cp 2 AssignmentV2    15092015
Cp 2 AssignmentV2 15092015
Praveen Premkumar
 
Berwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant ApplicationBerwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant Application
Berwyn Residents
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2
Ismael Vazquez, LSIT
 
Lake shady plans
Lake shady plansLake shady plans
Lake shady plans
Post-Bulletin Co.
 
2014: Designing Dredge - Reconsidering the Toledo Riverfront
2014: Designing Dredge - Reconsidering the Toledo Riverfront2014: Designing Dredge - Reconsidering the Toledo Riverfront
2014: Designing Dredge - Reconsidering the Toledo Riverfront
northcoastdesigncompetition
 

Similar to Bangor Waterfront Park Plans by Shadley 12-2010 (20)

Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panels
 
Trinity River Corridor Project
Trinity  River Corridor ProjectTrinity  River Corridor Project
Trinity River Corridor Project
 
Linn Cove Viaduct
Linn Cove ViaductLinn Cove Viaduct
Linn Cove Viaduct
 
Lower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 ConstructionLower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 Construction
 
OC harbor brook wetlands stakeholder 6 15-11 final-1
OC harbor brook wetlands stakeholder 6 15-11 final-1OC harbor brook wetlands stakeholder 6 15-11 final-1
OC harbor brook wetlands stakeholder 6 15-11 final-1
 
Removing Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a TimeRemoving Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a Time
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
 
Ellis Sess14 102009
Ellis Sess14 102009Ellis Sess14 102009
Ellis Sess14 102009
 
Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020
 
318 Queens Quay Public Event 1 Display Panels
318 Queens Quay Public Event 1 Display Panels318 Queens Quay Public Event 1 Display Panels
318 Queens Quay Public Event 1 Display Panels
 
major use of Protecting Transmission Towers.docx
major use of Protecting Transmission Towers.docxmajor use of Protecting Transmission Towers.docx
major use of Protecting Transmission Towers.docx
 
GHD Flood Mapping Review City of Stonnington 2008
GHD Flood Mapping Review City of Stonnington 2008GHD Flood Mapping Review City of Stonnington 2008
GHD Flood Mapping Review City of Stonnington 2008
 
4P - CAPSTONE FINAL POWERPOINT
4P - CAPSTONE FINAL POWERPOINT4P - CAPSTONE FINAL POWERPOINT
4P - CAPSTONE FINAL POWERPOINT
 
Matt Mundinger Portfolio
Matt Mundinger PortfolioMatt Mundinger Portfolio
Matt Mundinger Portfolio
 
Cp 2 AssignmentV2 15092015
Cp 2 AssignmentV2    15092015Cp 2 AssignmentV2    15092015
Cp 2 AssignmentV2 15092015
 
Berwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant ApplicationBerwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant Application
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2
 
Lake shady plans
Lake shady plansLake shady plans
Lake shady plans
 
2014: Designing Dredge - Reconsidering the Toledo Riverfront
2014: Designing Dredge - Reconsidering the Toledo Riverfront2014: Designing Dredge - Reconsidering the Toledo Riverfront
2014: Designing Dredge - Reconsidering the Toledo Riverfront
 

Recently uploaded

AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
Listing Turkey
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
z5h13yqc
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
Farmland Bazaar
 
Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!
shuilykhatunnil
 
Dholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdfDholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdf
Shivgan Infratech
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
SVN International Corp.
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
Tom Blefko
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
GVRenting
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
hawifitumaed
 
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
VickyAulakh1
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
knox groups real estate
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
a7xjm8n4
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
hawifitumaed
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
olgashriki
 

Recently uploaded (14)

AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
 
Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!
 
Dholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdfDholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdf
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
 
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
 

Bangor Waterfront Park Plans by Shadley 12-2010

  • 1. Waterfront Park December 22, 2010 Prepared By: City of Bangor & Shadley Associates, P.C.
  • 2.
  • 3. Paul Bunyan, commemorating Bangor’s 125 th birthday in 1959 1853 lithograph 1887 ad: all specimens cured with arsenic, the only preventative against moths.
  • 4. Tall ships taking on lumber, 1880’s Steamer “City of Rockland” launched 1990 Early 20 th Century postcard
  • 5. Flood of 1902 “ Bangor Tiger” river drivers Ice harvesting, shipped to Buenos Aires
  • 6.  
  • 7. The Bangor Waterfront was a former railroad switching yard (1986).
  • 8. The 36 acre Project area acquired by the City was occupied by leaking fuel oil tank farms, unused or underutilized industrial warehouses and distribution facilities, rail yards, vacant manufacturing buildings and coal yards. Circa 1985
  • 9.  
  • 10. Railroad Street Improvements, 2004 Water’s Edge Improvements, 2005 Front Street Improvements, 2003 Open Space Improvements, 2003 Park Improvements, 2009 - 2010
  • 12.  
  • 16.
  • 18.  
  • 19. Stormwater Treatment as approved by the DEP
  • 20.
  • 21. Maximum slopes of 3.5:1 Does not encroach on channel Gas discharges to surface of cap Plan View of Sediment Cap
  • 22. Coal Tar Remediation, Fall 2009 Area to be loamed and seeded, and later planted
  • 23.  
  • 24. Phase I Park Under Construction, 2009 - 2011 Railroad Street Parking Lot with drainage chambers, lights Waterfront Parking Lot with drainage chambers, lights and access drive Multiuse trails and grading for amphitheater Compass Rose Trail connection to Dutton Street with lights Fencing and planting along RR Right of Way
  • 25. Water front Park Existing Conditions Looking north from hotel December 2008 Park Construction 2009-2011
  • 26. June 2009 Park Construction 2009-2011 Compass Rose
  • 27. August, 2010 Park Construction 2009-2011
  • 28.
  • 32. Bangor Waterfront Development Project Total Federal Funding $4,670,940 40% Total State Funds $3,375,000 29% Total City Funds $3,522,655 30% Total Funding $ 11,568,595 100%
  • 33.
  • 34. Construction Estimate (11/09): $674,860 Construction Estimate (11/09): $1,348,960 Construction Estimate (11/09): $1,770,710 Total Constr. Estimate (11/09): $3,794,530
  • 35.
  • 36. Area 1 Northern End of Park Dry and Wet Playground
  • 37. Area 1 Northern End of Park Dry and Wet Playground
  • 38. Area 2 Amphitheater and Open Space to the North
  • 39. Area 3 Southern End of Park
  • 40. Construction Estimate (11/09): $674,860 Construction Estimate (11/09): $1,348,960 Construction Estimate (11/09): $1,770,710 Total Constr. Estimate (11/09): $3,794,530
  • 41. Part 1: $1,448,636 Construction Estimates December 2010 Part 2: $278,933 Part 3: $366,113 Part 4: $520,478 Part 5: $239,892 Part 6: $243,630 Part 7: $841,585 Construction Estimate (12/22): $3,939,267
  • 42. Part 1: $1,448,636 Part 2: $278,933 Part 3: $366,113 Part 4: $520,478 Part 5: $239,892 Part 6: $243,630 Part 7: $841,585 Recommendation for Spring 2011 Bid: Part 5, Restroom Building: $239,892 Part 6 Waterfront Walkway at Coal Tar Area: $243,630 Total Estimated Base Bid:$483,522 Add Alternate Part 3: $366,133 Construction Estimates December 2010
  • 43.