JOB TITLE / AIM: JSA for Hydrotesting (Utility water, fire water, potable water)
JSA DATE: 19/06/06 JSA NO./ REVISION: 101
SUPERVISOR/ JSA LEADER: M. Ramzan SCRIBE: Hernand Suyom/Abdullah Khan
PARTICIPANTS : Sharif Ullah Khan, Shoaib Farman
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Approved:
Bruce Boxshall 21-June-06
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of Equipment & workers
2. Water Refilling
3. Hydro testing
4. Water Releasing
5.Demobilization
Alternatives Considered: N/A
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
-
1 Mobilization of the following
equipment:
- Hand pump
- Pressure gauge
- Flexible wire hose
Unauthorised equipment/tools brought out to
site
Before mobilizing any equipment/tools make sure
that the E &P Personnel & BHP got inspected the
equipment. Checklist are in equipment
Ensure that gas testing was conducted whenever
bringing the equipment in transition and
Operations areas
Unskilled and uninducted personnel starting
the job
Ensure that all personnel prior to start have been
inducted and oriented about the hazard in the job
site. All persons working in Operations areaa to
be Operaitons inducted. Only trained personnel
shall do the Hydrotesting
Workers starting the job unfit to work All personnel must be undergone fitness for work
assessment thru DEL doctor
Workers starting the job without necessary
controls in place (eg JSA, Permits as required)
JSA must be in place prior to work. Ensure all the
persons take part in the toolbox meeting
discussion. Persons signed at the back of JSA at
each toolbox meeting.
All works undertaken in Operations areas to be
performed under CWP.
Hand Injury Ensure proper hauling of materials/get help if
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Back injury
Miscommunication
required/Wear hand gloves.
Ensure proper posture and positioning
Ensure standby radio fully charge are in place at
all times
Ensure that area to be secured and barricaded with
hydrotesting sign board in place
2 Water Refilling & Pressurizing to
15 bar manually using hand pump
Unauthorised person
Miscommunication
Trips/fallls
Poor visibility/lighting
Heat Stress/Exhaustion
Snake bite
Tripping hazards
SIMOPS
Ensure that all workers have been informed when
the Hydrotesting will be conducted properly lit
and barricaded by a barrier. Ensure only 15bars
max. pressure to be conducted for testing.
It is advised that the testing to be conducted at
night or break time hours to minimized the
SIMOPS or personnel interface
Ensure that workers shall not step of the pipe
walking across the pipe
Ensure workers are following the correct
procedure of positioning and lifting. Get help if
required.
Ensure sufficient light are in place.
Ensure that workers are oriented about the job and
no one will be allowed to work alone. Make
buddy system
Ensure potable water/sufficient shelter is available
each area where workers are doing the job. First
aid kit available at site.
Workers will inform and be aware about the
presence at the area. No killing of snakes
Ensure that workers accessing the right walkway
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
and watch your steps.
Other worker not involve in the job must not
come closer to the area
Ensure workers are accessing the right pathway
and equipment must maintain the speed limit
Ensure banks person are available at the area
Ensure no works shall perform when strong wind
comes
Ensure that whenever heavy equipment on the
area no works shall commence at excavated area
3. Hydro testing High Presssure Burst
Miscommunication
Tripping hazards
Ensure that the equipment was inspected by BHP
and calibrated prior to use. Calibration
certificates to be reviewed prior to use
Ensure that QC conducting the testing are wearing
Full PPE and a standby barrier to secure
themselves from high pressure leak
Ensure that no any person will be on the
Hydrotesting area.
Ensure max. 15bars pressure to be kept during
testing
Ensure sufficient man power will be designated as
watchman to ensure nobody will enter the
Hydrotesting zone
Ensure that workers performing the testing are
trained.
Unauthorized operator should not operate the
tester
Always refer to manufacturers methodology of
testing
Ensure that during Hydrotesting no other workers
touching the pipe
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Ensure that the Relief valve was install
Ensure that gas testing was conducted whenever
working in transition zone area
Ensure that workers will not step on the pipe
Whenever strong wind comes the work must be
stop
4. Water Releasing Unauthorised person
Miscommunication
Trips/fallls
Poor visibility/lighting
Heat Stress/Exhaustion
Snake bite
Tripping hazards
SIMOPS
Ensure that all workers have been informed when
the water releasing will be conducted properly
lit and barricaded by a barrier.
It is advised that the testing to be conducted at
night or break time hours to minimized the
SIMOPS or personnel interface
Ensure that workers shall not step of the pipe
walking across the pipe
Ensure workers are following the correct
procedure of positioning and lifting. Get help if
required.
Ensure sufficient light are in place.
Ensure that workers are oriented about the job and
no one will be allowed to work alone. Make
buddy system
Ensure potable water/sufficient shelter is available
each area where workers are doing the job. First
aid kit available at site.
Workers will inform and be aware about the
presence at the area. No killing of snakes
Ensure that workers accessing the right walkway
and watch your steps.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Other worker not involve in the job must not
come closer to the area
Ensure workers are accessing the right pathway
and equipment must maintain the speed limit
Ensure banks person are available at the area
Ensure no works shall perform when strong wind
comes
Ensure that whenever heavy equipment on the
area no works shall commence at excavated area
5. Demobilization Same as item one Same as item one

More Related Content

What's hot

HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docxHOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docxDwarika Bhushan Sharma
 
Basic Flagman Training
Basic Flagman TrainingBasic Flagman Training
Basic Flagman TrainingNatasha Azura
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templatesDwarika Bhushan Sharma
 
268138878 265218714-apr-gerenciamento riscos-leo
268138878 265218714-apr-gerenciamento riscos-leo268138878 265218714-apr-gerenciamento riscos-leo
268138878 265218714-apr-gerenciamento riscos-leoVanessa Giusti Paiva
 
SPE Process Safety Workshop PPT Slides
SPE Process Safety Workshop PPT SlidesSPE Process Safety Workshop PPT Slides
SPE Process Safety Workshop PPT Slidesidell bryan
 
HSE RISK ASSESSMENT Form # HSEQ - HSERA Rev 4 –.docx
HSE RISK ASSESSMENT Form # HSEQ - HSERA Rev 4 –.docxHSE RISK ASSESSMENT Form # HSEQ - HSERA Rev 4 –.docx
HSE RISK ASSESSMENT Form # HSEQ - HSERA Rev 4 –.docxDwarika Bhushan Sharma
 
APR-Manunteção-Preventiva-e-Corretiva-em-Geral.pdf
APR-Manunteção-Preventiva-e-Corretiva-em-Geral.pdfAPR-Manunteção-Preventiva-e-Corretiva-em-Geral.pdf
APR-Manunteção-Preventiva-e-Corretiva-em-Geral.pdfcarlosfuzario
 
Method of statement piping works
Method of statement piping works Method of statement piping works
Method of statement piping works Shaik Mohsin
 
32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templatesDwarika Bhushan Sharma
 
Aramco safety interview Questions .pdf
Aramco safety interview Questions .pdfAramco safety interview Questions .pdf
Aramco safety interview Questions .pdfjnanamaya Basu
 
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docxDanielLove24
 
DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureHENRY EROMOSELE OIGIANGBE
 
HAZID | Hazard Indentification | Gaurav Singh Rajput
HAZID | Hazard Indentification | Gaurav Singh RajputHAZID | Hazard Indentification | Gaurav Singh Rajput
HAZID | Hazard Indentification | Gaurav Singh RajputGaurav Singh Rajput
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist Rahmat Mohamed
 
26 storage of substances under co shh risk assessment templates
26 storage of substances under co shh risk assessment templates26 storage of substances under co shh risk assessment templates
26 storage of substances under co shh risk assessment templatesDwarika Bhushan Sharma
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment Nidhin Sajeevan
 
Ve icop confinedspace_2010
Ve icop confinedspace_2010Ve icop confinedspace_2010
Ve icop confinedspace_2010wizana99
 
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.docHSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.docDwarika Bhushan Sharma
 

What's hot (20)

HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docxHOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
 
2
22
2
 
Basic Flagman Training
Basic Flagman TrainingBasic Flagman Training
Basic Flagman Training
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates
 
268138878 265218714-apr-gerenciamento riscos-leo
268138878 265218714-apr-gerenciamento riscos-leo268138878 265218714-apr-gerenciamento riscos-leo
268138878 265218714-apr-gerenciamento riscos-leo
 
SPE Process Safety Workshop PPT Slides
SPE Process Safety Workshop PPT SlidesSPE Process Safety Workshop PPT Slides
SPE Process Safety Workshop PPT Slides
 
HSE RISK ASSESSMENT Form # HSEQ - HSERA Rev 4 –.docx
HSE RISK ASSESSMENT Form # HSEQ - HSERA Rev 4 –.docxHSE RISK ASSESSMENT Form # HSEQ - HSERA Rev 4 –.docx
HSE RISK ASSESSMENT Form # HSEQ - HSERA Rev 4 –.docx
 
Lifting plan template
Lifting plan templateLifting plan template
Lifting plan template
 
APR-Manunteção-Preventiva-e-Corretiva-em-Geral.pdf
APR-Manunteção-Preventiva-e-Corretiva-em-Geral.pdfAPR-Manunteção-Preventiva-e-Corretiva-em-Geral.pdf
APR-Manunteção-Preventiva-e-Corretiva-em-Geral.pdf
 
Method of statement piping works
Method of statement piping works Method of statement piping works
Method of statement piping works
 
32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates
 
Aramco safety interview Questions .pdf
Aramco safety interview Questions .pdfAramco safety interview Questions .pdf
Aramco safety interview Questions .pdf
 
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
 
DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work Procedure
 
HAZID | Hazard Indentification | Gaurav Singh Rajput
HAZID | Hazard Indentification | Gaurav Singh RajputHAZID | Hazard Indentification | Gaurav Singh Rajput
HAZID | Hazard Indentification | Gaurav Singh Rajput
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist
 
26 storage of substances under co shh risk assessment templates
26 storage of substances under co shh risk assessment templates26 storage of substances under co shh risk assessment templates
26 storage of substances under co shh risk assessment templates
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment
 
Ve icop confinedspace_2010
Ve icop confinedspace_2010Ve icop confinedspace_2010
Ve icop confinedspace_2010
 
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.docHSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
 

Similar to JSA for Hydrotesting.pdf

Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk systemYousif Fikry
 
Generic Hydrotest.doc
Generic Hydrotest.docGeneric Hydrotest.doc
Generic Hydrotest.docamrilalriza
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdfFESTUS RICHARD SIAME
 
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Task Risk Worksheet Rev1.pdf
Task Risk Worksheet Rev1.pdfTask Risk Worksheet Rev1.pdf
Task Risk Worksheet Rev1.pdfIsmailMydeen3
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJESUSBASILIOANTONIO
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenanceYousif Fikry
 
Confined Space Presentation University of Technology,Mauritius
Confined Space Presentation University of Technology,MauritiusConfined Space Presentation University of Technology,Mauritius
Confined Space Presentation University of Technology,MauritiusTarun Kumar Cheddy
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docAtif767782
 
confined-space-training.ppt
confined-space-training.pptconfined-space-training.ppt
confined-space-training.pptBuddyEko
 
JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building Alvin160771
 
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxSECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxferielvpk
 
Jha rock drill use and maintenance romo
Jha rock drill use and maintenance romoJha rock drill use and maintenance romo
Jha rock drill use and maintenance romonafable
 
Safety in construction site
Safety in construction siteSafety in construction site
Safety in construction siteakshaykathalkar
 
07 Manual Handling Assessment - RPS Floor Sorting.pdf
07 Manual Handling Assessment - RPS Floor Sorting.pdf07 Manual Handling Assessment - RPS Floor Sorting.pdf
07 Manual Handling Assessment - RPS Floor Sorting.pdfajengps11
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docxalmamunmolla96
 
Confined space
Confined spaceConfined space
Confined spaceturb022
 

Similar to JSA for Hydrotesting.pdf (20)

Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk system
 
Generic Hydrotest.doc
Generic Hydrotest.docGeneric Hydrotest.doc
Generic Hydrotest.doc
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
 
Task Risk Worksheet Rev1.pdf
Task Risk Worksheet Rev1.pdfTask Risk Worksheet Rev1.pdf
Task Risk Worksheet Rev1.pdf
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
 
Confined Space Presentation University of Technology,Mauritius
Confined Space Presentation University of Technology,MauritiusConfined Space Presentation University of Technology,Mauritius
Confined Space Presentation University of Technology,Mauritius
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
confined-space-training.ppt
confined-space-training.pptconfined-space-training.ppt
confined-space-training.ppt
 
JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building
 
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxSECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
 
Jha rock drill use and maintenance romo
Jha rock drill use and maintenance romoJha rock drill use and maintenance romo
Jha rock drill use and maintenance romo
 
Safety in construction site
Safety in construction siteSafety in construction site
Safety in construction site
 
07 Manual Handling Assessment - RPS Floor Sorting.pdf
07 Manual Handling Assessment - RPS Floor Sorting.pdf07 Manual Handling Assessment - RPS Floor Sorting.pdf
07 Manual Handling Assessment - RPS Floor Sorting.pdf
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docx
 
HSE Weather working plan
HSE Weather working planHSE Weather working plan
HSE Weather working plan
 
HIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdfHIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdf
 
Confined space
Confined spaceConfined space
Confined space
 

Recently uploaded

“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 

Recently uploaded (20)

“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 

JSA for Hydrotesting.pdf

  • 1. F _____ JOB TITLE / AIM: JSA for Hydrotesting (Utility water, fire water, potable water) JSA DATE: 19/06/06 JSA NO./ REVISION: 101 SUPERVISOR/ JSA LEADER: M. Ramzan SCRIBE: Hernand Suyom/Abdullah Khan PARTICIPANTS : Sharif Ullah Khan, Shoaib Farman LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs: Approved: Bruce Boxshall 21-June-06 Attach copies of any relevant documentation/ drawings. Part 2: Job Safety Analysis Job Steps: 1.Mobilization of Equipment & workers 2. Water Refilling 3. Hydro testing 4. Water Releasing 5.Demobilization Alternatives Considered: N/A Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03. Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of emergency
  • 2. Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system. File: 10.30 JSA No: JOB TITLE: Step Describe Job Step Potential Hazards Hazard Controls No (Copy from part 2 of form) (Use Hazard Checklist) - 1 Mobilization of the following equipment: - Hand pump - Pressure gauge - Flexible wire hose Unauthorised equipment/tools brought out to site Before mobilizing any equipment/tools make sure that the E &P Personnel & BHP got inspected the equipment. Checklist are in equipment Ensure that gas testing was conducted whenever bringing the equipment in transition and Operations areas Unskilled and uninducted personnel starting the job Ensure that all personnel prior to start have been inducted and oriented about the hazard in the job site. All persons working in Operations areaa to be Operaitons inducted. Only trained personnel shall do the Hydrotesting Workers starting the job unfit to work All personnel must be undergone fitness for work assessment thru DEL doctor Workers starting the job without necessary controls in place (eg JSA, Permits as required) JSA must be in place prior to work. Ensure all the persons take part in the toolbox meeting discussion. Persons signed at the back of JSA at each toolbox meeting. All works undertaken in Operations areas to be performed under CWP. Hand Injury Ensure proper hauling of materials/get help if
  • 3. JSA No: JOB TITLE: Step Describe Job Step Potential Hazards Hazard Controls No (Copy from part 2 of form) (Use Hazard Checklist) Back injury Miscommunication required/Wear hand gloves. Ensure proper posture and positioning Ensure standby radio fully charge are in place at all times Ensure that area to be secured and barricaded with hydrotesting sign board in place 2 Water Refilling & Pressurizing to 15 bar manually using hand pump Unauthorised person Miscommunication Trips/fallls Poor visibility/lighting Heat Stress/Exhaustion Snake bite Tripping hazards SIMOPS Ensure that all workers have been informed when the Hydrotesting will be conducted properly lit and barricaded by a barrier. Ensure only 15bars max. pressure to be conducted for testing. It is advised that the testing to be conducted at night or break time hours to minimized the SIMOPS or personnel interface Ensure that workers shall not step of the pipe walking across the pipe Ensure workers are following the correct procedure of positioning and lifting. Get help if required. Ensure sufficient light are in place. Ensure that workers are oriented about the job and no one will be allowed to work alone. Make buddy system Ensure potable water/sufficient shelter is available each area where workers are doing the job. First aid kit available at site. Workers will inform and be aware about the presence at the area. No killing of snakes Ensure that workers accessing the right walkway
  • 4. JSA No: JOB TITLE: Step Describe Job Step Potential Hazards Hazard Controls No (Copy from part 2 of form) (Use Hazard Checklist) and watch your steps. Other worker not involve in the job must not come closer to the area Ensure workers are accessing the right pathway and equipment must maintain the speed limit Ensure banks person are available at the area Ensure no works shall perform when strong wind comes Ensure that whenever heavy equipment on the area no works shall commence at excavated area 3. Hydro testing High Presssure Burst Miscommunication Tripping hazards Ensure that the equipment was inspected by BHP and calibrated prior to use. Calibration certificates to be reviewed prior to use Ensure that QC conducting the testing are wearing Full PPE and a standby barrier to secure themselves from high pressure leak Ensure that no any person will be on the Hydrotesting area. Ensure max. 15bars pressure to be kept during testing Ensure sufficient man power will be designated as watchman to ensure nobody will enter the Hydrotesting zone Ensure that workers performing the testing are trained. Unauthorized operator should not operate the tester Always refer to manufacturers methodology of testing Ensure that during Hydrotesting no other workers touching the pipe
  • 5. JSA No: JOB TITLE: Step Describe Job Step Potential Hazards Hazard Controls No (Copy from part 2 of form) (Use Hazard Checklist) Ensure that the Relief valve was install Ensure that gas testing was conducted whenever working in transition zone area Ensure that workers will not step on the pipe Whenever strong wind comes the work must be stop 4. Water Releasing Unauthorised person Miscommunication Trips/fallls Poor visibility/lighting Heat Stress/Exhaustion Snake bite Tripping hazards SIMOPS Ensure that all workers have been informed when the water releasing will be conducted properly lit and barricaded by a barrier. It is advised that the testing to be conducted at night or break time hours to minimized the SIMOPS or personnel interface Ensure that workers shall not step of the pipe walking across the pipe Ensure workers are following the correct procedure of positioning and lifting. Get help if required. Ensure sufficient light are in place. Ensure that workers are oriented about the job and no one will be allowed to work alone. Make buddy system Ensure potable water/sufficient shelter is available each area where workers are doing the job. First aid kit available at site. Workers will inform and be aware about the presence at the area. No killing of snakes Ensure that workers accessing the right walkway and watch your steps.
  • 6. JSA No: JOB TITLE: Step Describe Job Step Potential Hazards Hazard Controls No (Copy from part 2 of form) (Use Hazard Checklist) Other worker not involve in the job must not come closer to the area Ensure workers are accessing the right pathway and equipment must maintain the speed limit Ensure banks person are available at the area Ensure no works shall perform when strong wind comes Ensure that whenever heavy equipment on the area no works shall commence at excavated area 5. Demobilization Same as item one Same as item one