Project Information: Project Name: Company Name: Location: Date : Sl. No Description Yes No N/A Comments DBs/ SDBs 1. Is earth conducted continued up to DB/ SDB? 2. Whether DBs & extension boards are protected from rain/ water? 3. Is there any overloading of DBs/ SDBs? 4. Are correct rated Circuit breakers provided in all main boards and sub-boards? 5. Is energized wiring in junction boxes, Circuit board panels & similar places covered all times? CABLES 6. Whether the condition of cable is checked? 7. Are cables received checked for insulation resistance before using them? 8. Are all main cables taken either underground/ overhead? 9. Are main cables protected from sharp/ heavy materials? 10. Is any improper jointing of cable identified? 11. Are all plugs and sockets in good condition? RCD (ELCB) 12. Is the connections routed through 30mA RCD? 13. EARTHING 14. Are main DB, Generator and other panel’s ear thing done? 15. Earth resistance checked and found within limits? ELECTRICALLY OPERATED MACHINES/ ACCESSORIES 16. Whether the machine supply cable has industrial type socket and plug? 17. Are all metal parts of electrical equipment and light fittings/ accessories grounded? 18. Is there any shed/ cover for machines? 19. Are flood lights/ task lights fixed properly away from combustibles? 20. Others if any: Remarks: Inspected By: Signature: Reviewed By HSE Manager / In charge : Signature: Noted by Project Leader : Signature: