INSTITUTION  OF  SURVEYORS  MALAYSIA
BUILDING  COST  INFORMATION  CENTER  
ELEMENTAL    COST      ANALYSIS    -­    Form    2 8  -­  Residential  Buildings
A  -­  24  -­  16439
GROSS  FLOOR  AREA  :  16439  m2 TENDER  DATE  :  9th  June  2011
Total  cost Cost  per Element Element Reinforced Reinforce-­ Formwork
of  element m2  GFA unit  rate Ratio  Per Concrete ment
(RM) (RM) (RM) m2  GFA m3 kg m2
1.  Substructure
1.A.   Piling
1.B.   Work  Below  Lowest  Floor  Finish
Group  Element  Total: -­ -­ -­ -­ -­ -­ -­
2.  Superstructure
2.A. Frame 4,399,034.76             267.60             16,439   m2 267.60       1.000             3,904             496,634     45,382        
2.B. Upper  Floors 1,790,042.61             108.89             14,945   m2 119.77       0.909             1,956             167,149     14,939        
2.C. Roof 211,121.49                   12.84                 658             m2 320.85       0.040             43                       3,663             263                  
2.D. Stairs 221,066.02                   13.45                 -­ -­ -­ 146                   7,664             1,192            
2.E. Externall  Walls 2,624,532.01             159.65             14,937   m2 175.70       0.909             -­ -­ -­
2.F. Windows  &  External  Doors 484,785.38                   29.49                 2,417       m2 200.55       0.147             -­ -­ -­
2.G. Internal  Walls  &  Partitions 339,595.95                   20.66                 6,093       m2 55.74           0.371             -­ -­ -­
2.H. Internal  Doors 1,441,919.06             87.71                 1,852       m2 778.75       0.113             -­ -­ -­
Group  Element  Total: 11,512,097.27         700.29             -­ -­ 6,049             675,110     61,775        
3.  Finishes
3.A. Internall  Wall  Finishes 1,627,661.22             99.01                 40,017   m2 40.07           2.434            
3.B. Internal  Floor  Finishes 1,270,857.10             77.31                 15,010   m2 84.67           0.913            
3.C. Internal  Ceiling  Finishes 223,466.92                   15.48                 14,674   m2 15.23           0.893            
3.D. External  Finishes 247,070.70                   14.61                 -­ -­
Group  Element  Total: 3,369,055.94             206.40             -­ -­
4.  Fittings  and  Furnishings 281,552.60                   17.13                 -­ -­
5.  Services
5.A. Sanitary  Appliances 491,300.51                   29.89                 1130 No. 434.78       -­
5.B. Plumbing  Installation 1,244,105.09             75.68                 -­ -­
5.C. Refuse  Disposal -­ -­ -­ -­
5.D. Air  conditioning  and 1,052,100.00             64.00                 14821 Tm3 70.99           -­
   Ventilation  System -­
5.E. Electrical  Installation 1,674,067.50             101.84             -­ -­
5.F. Fire  Protection  Installation 521,797.50                   31.74                 -­ -­
5.G. Lift  and  Conveyor  Installation 257,796.00                   15.68                 -­ -­
5.H. Communication  Installation 39,157.65                       2.38                     -­ -­
5.J Special  Installation 116,887.05                   7.11                     -­ -­
5.K. Builder's  Profit  and  Attendance 83,515.75                       5.08                     -­ -­
on  Services -­
5.L. Builder's  Work  in  Connection 102,847.50                   6.26                     -­ -­
with  Services -­
Group  Element  Total  : 5,583,574.55             339.65             -­ -­
Sub-­total  excluding  External  Works, 20,746,280.36         1,263.48       -­ -­
Preliminaries  and  Contingencies
6.  External  Works
6.A. Site  Work 1,502,542.00             91.40                 -­ -­
6.B. Drainage 143,617.30                   8.74                     -­ -­
6.C. External  Services 73,640.54                       4.48                     -­ -­
6.D. Ancillary  Buildings 36,426.35                       2.22                     -­ -­
6.E. Recreational  Facilities 320,780.25                   19.51                 -­ -­
Group  Element  Total: 2,077,006.45             126.35               
Preliminaries 2,936,745.00             161.29               
TOTAL    (  less  Contingencies  ) 25,760,031.81         1,551.11      
-­
-­
Tendered  
Sum
-­
-­
-­
-­
-­
116,887.05                              
83,515.75                                  
102,847.50                              
1,674,067.50                        
-­
-­
39,157.65                                  
-­
-­
-­
-­
-­
-­
1,052,100.00                        
257,796.00                              
521,797.50                              
-­
-­
-­
-­
-­
-­
-­
-­
-­
-­
3,848,168.95                        
Preliminaries  shown  separately
SUMMARY      OF      ELEMENT        COSTS
P.C  Sum  Allowed
In  separate  contract
In  separate  building
Element  Unit  
Quantity
-­
-­

More Related Content

Similar to Eca form2

Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysisfareezsham
 
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009Leo Lastimosa
 
BENCHMARK PROJECT ALLOCATION
BENCHMARK PROJECT ALLOCATIONBENCHMARK PROJECT ALLOCATION
BENCHMARK PROJECT ALLOCATIONahmong4
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGAnjneya Srivastava
 
Be presentation slides
Be presentation slidesBe presentation slides
Be presentation slideslohwenjun
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing conceptPaul Jacob
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing conceptPaul Jacob
 
Thangamayil Jwellery
Thangamayil JwelleryThangamayil Jwellery
Thangamayil JwelleryKunal
 
The watergate confidential
The watergate confidentialThe watergate confidential
The watergate confidentialHaris Memon
 
Vizag Real Estate
Vizag Real EstateVizag Real Estate
Vizag Real EstateGandupallii
 
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptx
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptxBaf Shaheen College (B+12) ETABS Dynamic Analysis.pptx
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptxDES Engineers Ltd
 
Jsw Ipo
Jsw IpoJsw Ipo
Jsw IpoKunal
 

Similar to Eca form2 (20)

Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysis
 
Ekit State Financial Report for the year 2012
Ekit State Financial Report for the year 2012Ekit State Financial Report for the year 2012
Ekit State Financial Report for the year 2012
 
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
 
BENCHMARK PROJECT ALLOCATION
BENCHMARK PROJECT ALLOCATIONBENCHMARK PROJECT ALLOCATION
BENCHMARK PROJECT ALLOCATION
 
Literal g3 g-may_2018
Literal g3 g-may_2018Literal g3 g-may_2018
Literal g3 g-may_2018
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDING
 
Be presentation slides
Be presentation slidesBe presentation slides
Be presentation slides
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing concept
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing concept
 
Thangamayil Jwellery
Thangamayil JwelleryThangamayil Jwellery
Thangamayil Jwellery
 
Cash Flow Portfolio
Cash Flow PortfolioCash Flow Portfolio
Cash Flow Portfolio
 
The watergate confidential
The watergate confidentialThe watergate confidential
The watergate confidential
 
Vizag Real Estate
Vizag Real EstateVizag Real Estate
Vizag Real Estate
 
Literal g3 g-abr_2018
Literal g3 g-abr_2018Literal g3 g-abr_2018
Literal g3 g-abr_2018
 
Fianl Year Project.pptx
Fianl Year Project.pptxFianl Year Project.pptx
Fianl Year Project.pptx
 
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptx
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptxBaf Shaheen College (B+12) ETABS Dynamic Analysis.pptx
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptx
 
Literal g3 g-jun_2018
Literal g3 g-jun_2018Literal g3 g-jun_2018
Literal g3 g-jun_2018
 
FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12
 
Literal g3 g-jul_2018
Literal g3 g-jul_2018Literal g3 g-jul_2018
Literal g3 g-jul_2018
 
Jsw Ipo
Jsw IpoJsw Ipo
Jsw Ipo
 

Recently uploaded

Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 

Recently uploaded (20)

Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 

Eca form2

  • 1. INSTITUTION  OF  SURVEYORS  MALAYSIA BUILDING  COST  INFORMATION  CENTER   ELEMENTAL    COST      ANALYSIS    -­    Form    2 8  -­  Residential  Buildings A  -­  24  -­  16439 GROSS  FLOOR  AREA  :  16439  m2 TENDER  DATE  :  9th  June  2011 Total  cost Cost  per Element Element Reinforced Reinforce-­ Formwork of  element m2  GFA unit  rate Ratio  Per Concrete ment (RM) (RM) (RM) m2  GFA m3 kg m2 1.  Substructure 1.A.   Piling 1.B.   Work  Below  Lowest  Floor  Finish Group  Element  Total: -­ -­ -­ -­ -­ -­ -­ 2.  Superstructure 2.A. Frame 4,399,034.76             267.60             16,439   m2 267.60       1.000             3,904             496,634     45,382         2.B. Upper  Floors 1,790,042.61             108.89             14,945   m2 119.77       0.909             1,956             167,149     14,939         2.C. Roof 211,121.49                   12.84                 658             m2 320.85       0.040             43                       3,663             263                   2.D. Stairs 221,066.02                   13.45                 -­ -­ -­ 146                   7,664             1,192             2.E. Externall  Walls 2,624,532.01             159.65             14,937   m2 175.70       0.909             -­ -­ -­ 2.F. Windows  &  External  Doors 484,785.38                   29.49                 2,417       m2 200.55       0.147             -­ -­ -­ 2.G. Internal  Walls  &  Partitions 339,595.95                   20.66                 6,093       m2 55.74           0.371             -­ -­ -­ 2.H. Internal  Doors 1,441,919.06             87.71                 1,852       m2 778.75       0.113             -­ -­ -­ Group  Element  Total: 11,512,097.27         700.29             -­ -­ 6,049             675,110     61,775         3.  Finishes 3.A. Internall  Wall  Finishes 1,627,661.22             99.01                 40,017   m2 40.07           2.434             3.B. Internal  Floor  Finishes 1,270,857.10             77.31                 15,010   m2 84.67           0.913             3.C. Internal  Ceiling  Finishes 223,466.92                   15.48                 14,674   m2 15.23           0.893             3.D. External  Finishes 247,070.70                   14.61                 -­ -­ Group  Element  Total: 3,369,055.94             206.40             -­ -­ 4.  Fittings  and  Furnishings 281,552.60                   17.13                 -­ -­ 5.  Services 5.A. Sanitary  Appliances 491,300.51                   29.89                 1130 No. 434.78       -­ 5.B. Plumbing  Installation 1,244,105.09             75.68                 -­ -­ 5.C. Refuse  Disposal -­ -­ -­ -­ 5.D. Air  conditioning  and 1,052,100.00             64.00                 14821 Tm3 70.99           -­   Ventilation  System -­ 5.E. Electrical  Installation 1,674,067.50             101.84             -­ -­ 5.F. Fire  Protection  Installation 521,797.50                   31.74                 -­ -­ 5.G. Lift  and  Conveyor  Installation 257,796.00                   15.68                 -­ -­ 5.H. Communication  Installation 39,157.65                       2.38                     -­ -­ 5.J Special  Installation 116,887.05                   7.11                     -­ -­ 5.K. Builder's  Profit  and  Attendance 83,515.75                       5.08                     -­ -­ on  Services -­ 5.L. Builder's  Work  in  Connection 102,847.50                   6.26                     -­ -­ with  Services -­ Group  Element  Total  : 5,583,574.55             339.65             -­ -­ Sub-­total  excluding  External  Works, 20,746,280.36         1,263.48       -­ -­ Preliminaries  and  Contingencies 6.  External  Works 6.A. Site  Work 1,502,542.00             91.40                 -­ -­ 6.B. Drainage 143,617.30                   8.74                     -­ -­ 6.C. External  Services 73,640.54                       4.48                     -­ -­ 6.D. Ancillary  Buildings 36,426.35                       2.22                     -­ -­ 6.E. Recreational  Facilities 320,780.25                   19.51                 -­ -­ Group  Element  Total: 2,077,006.45             126.35               Preliminaries 2,936,745.00             161.29               TOTAL    (  less  Contingencies  ) 25,760,031.81         1,551.11       -­ -­ Tendered   Sum -­ -­ -­ -­ -­ 116,887.05                               83,515.75                                   102,847.50                               1,674,067.50                         -­ -­ 39,157.65                                   -­ -­ -­ -­ -­ -­ 1,052,100.00                         257,796.00                               521,797.50                               -­ -­ -­ -­ -­ -­ -­ -­ -­ -­ 3,848,168.95                         Preliminaries  shown  separately SUMMARY      OF      ELEMENT        COSTS P.C  Sum  Allowed In  separate  contract In  separate  building Element  Unit   Quantity -­ -­