- 1. INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTER
ELEMENTAL COST ANALYSIS - Form 2 8 - Residential Buildings
A - 24 - 16439
GROSS FLOOR AREA : 16439 m2 TENDER DATE : 9th June 2011
Total cost Cost per Element Element Reinforced Reinforce- Formwork
of element m2 GFA unit rate Ratio Per Concrete ment
(RM) (RM) (RM) m2 GFA m3 kg m2
1. Substructure
1.A. Piling
1.B. Work Below Lowest Floor Finish
Group Element Total: - - - - - - -
2. Superstructure
2.A. Frame 4,399,034.76 267.60 16,439 m2 267.60 1.000 3,904 496,634 45,382
2.B. Upper Floors 1,790,042.61 108.89 14,945 m2 119.77 0.909 1,956 167,149 14,939
2.C. Roof 211,121.49 12.84 658 m2 320.85 0.040 43 3,663 263
2.D. Stairs 221,066.02 13.45 - - - 146 7,664 1,192
2.E. Externall Walls 2,624,532.01 159.65 14,937 m2 175.70 0.909 - - -
2.F. Windows & External Doors 484,785.38 29.49 2,417 m2 200.55 0.147 - - -
2.G. Internal Walls & Partitions 339,595.95 20.66 6,093 m2 55.74 0.371 - - -
2.H. Internal Doors 1,441,919.06 87.71 1,852 m2 778.75 0.113 - - -
Group Element Total: 11,512,097.27 700.29 - - 6,049 675,110 61,775
3. Finishes
3.A. Internall Wall Finishes 1,627,661.22 99.01 40,017 m2 40.07 2.434
3.B. Internal Floor Finishes 1,270,857.10 77.31 15,010 m2 84.67 0.913
3.C. Internal Ceiling Finishes 223,466.92 15.48 14,674 m2 15.23 0.893
3.D. External Finishes 247,070.70 14.61 - -
Group Element Total: 3,369,055.94 206.40 - -
4. Fittings and Furnishings 281,552.60 17.13 - -
5. Services
5.A. Sanitary Appliances 491,300.51 29.89 1130 No. 434.78 -
5.B. Plumbing Installation 1,244,105.09 75.68 - -
5.C. Refuse Disposal - - - -
5.D. Air conditioning and 1,052,100.00 64.00 14821 Tm3 70.99 -
Ventilation System -
5.E. Electrical Installation 1,674,067.50 101.84 - -
5.F. Fire Protection Installation 521,797.50 31.74 - -
5.G. Lift and Conveyor Installation 257,796.00 15.68 - -
5.H. Communication Installation 39,157.65 2.38 - -
5.J Special Installation 116,887.05 7.11 - -
5.K. Builder's Profit and Attendance 83,515.75 5.08 - -
on Services -
5.L. Builder's Work in Connection 102,847.50 6.26 - -
with Services -
Group Element Total : 5,583,574.55 339.65 - -
Sub-total excluding External Works, 20,746,280.36 1,263.48 - -
Preliminaries and Contingencies
6. External Works
6.A. Site Work 1,502,542.00 91.40 - -
6.B. Drainage 143,617.30 8.74 - -
6.C. External Services 73,640.54 4.48 - -
6.D. Ancillary Buildings 36,426.35 2.22 - -
6.E. Recreational Facilities 320,780.25 19.51 - -
Group Element Total: 2,077,006.45 126.35
Preliminaries 2,936,745.00 161.29
TOTAL ( less Contingencies ) 25,760,031.81 1,551.11
-
-
Tendered
Sum
-
-
-
-
-
116,887.05
83,515.75
102,847.50
1,674,067.50
-
-
39,157.65
-
-
-
-
-
-
1,052,100.00
257,796.00
521,797.50
-
-
-
-
-
-
-
-
-
-
3,848,168.95
Preliminaries shown separately
SUMMARY OF ELEMENT COSTS
P.C Sum Allowed
In separate contract
In separate building
Element Unit
Quantity
-
-