KEY QUALIFICATIONS
Having 13+ years of diversified working experience in electrical system design of different industrial
projects for oil and gas onshore plants and offshore platforms. The experience has been gained in
conceptual studies, basic design (FEED), detailed engineering projects and Project Management
Consultancy (PMC) service in various fields.
Specialisation in design, detailed engineering and review of electrical systems performing design and
sizing calculations of transformer, short circuit levels, cables, load lists, motor start up study, lighting
system, grounding & lightning system, preparing detailed engineering specifications, single line
diagrams, equipment layouts, cable routing layouts, lighting & small power layouts, grounding &
lightning layouts, cable schedules, preparation of material requisition, evaluation of vendor’s
documents/offer (TBE), preparation of material take off list, drawing review using auto cad / PDS-
smart plant / PDMS, in-house co-ordination with other disciplines during detailed design, attending
periodic (weekly/monthly) design progress review meetings with client / Contractors, attending
Factory Acceptance Tests(FAT), Instruction and co-ordination with construction personnel to meet
their objectives such as site activity co-ordination, preparation of as-built drawings on completion of
site works in project engineering co-ordination and execution in senior position and doing pre-bid
work for new project proposals.
COMPUTER SKILLS AND INTERNATIONAL STANDARDS KNOWLEDGE
Well versed in the usage of computer software packages like ETAP, lighting software’s (DIALUX,
Chalmite and victor), MS office, etc.
Have good knowledge on International codes and standards related to oil and gas sectors. Worked in
different company standards like Qatar Petroleum, SHELL DEP, GASCO, ADCO, ZADCO, SAUDI
ARAMCO, BOROUGE and TAKREER (ADNOC group of companies). Familiar with IEC, BS, IEEE,
NFPA, IP and NEC international codes and standards.
EDUCATION AND PROFESSIONAL STATUS
B E (Electrical and Electronics Engineering), National Engineering College, Manonmaniam
Sundaranar University, Kovilpatti, Tamil Nadu, India, 2003
EXPERIENCE RECORD
2014 June – 2016 July ZADCO (ADNOC) - PMC via Wood Group Kenny Ltd. (JP Kenny)
Electrical Engineer (ZADCO – EPE – IE)
Abu Dhabi
2007 March – 2014 May MOTT MACDONALD L.L.C
Electrical Engineer – Oil, Gas and Petrochemicals Unit, Abu Dhabi
2003 May – 2006 February Bharat Petroleum Corporation Limited, India (BPCL)
Engineering Supervisor (Contract basis)
CAREER HISTORY
2014 June – Present ZADCO (ADNOC) – Project Management Consultancy via Wood
Group Kenny Ltd. (JP Kenny)
Electrical Engineer (ZADCO – EPE – IE)
Abu Dhabi
Projects involved (PMC) with include:
‒ Fire and gas system upgrade project – EPC Engineering deliverables review
‒ Fourth disposal pump project - EPC Engineering deliverables review
‒ Oily water treatment plant project - FEED Engineering deliverables review
‒ ZIRKU Potable water & Sewage Network implementation project including Existing
substation extension
‒ Service area Substation Project – FEED engineering deliverables review
Responsibilities included:
‒ Review and check the design works of consultants/contractors to ensure that they are in
accordance with the agreed scope of works, standard specifications and contract documents.
‒ Reviews/approves drawings, specifications and other technical documents for all types of
projects incorporating the comments and requirements in accordance with contract
documents.
‒ Attending Factory Acceptance Tests (FAT) for equipment.
Project involved (In-house) with include:
GASCO – EPC – EMCO - New workshop and civil maintenance facilities at
Construction of new buildings such as Mechanical Store, Fabrication & Welding Workshop, Blasting
and Painting Workshop, Machine Workshop & Office Building, Civil store with all necessary facilities
including HVAC system, Electrical works such as substation, Lighting for LEED (Leadership in
Energy and Environmental Design) certification, earthing and lightning protection, power
arrangements etc., Water Supply, Drainage, Acoustical systems, Telecommunications, Data
networks, Firefighting systems / equipment and Fire, Smoke, Gas detection as applicable.
2007 March – 2014 May MOTT MACDONALD L.L.C
(Member firm of Mott MacDonald Group)
Electrical Engineer – Oil, Gas and Petrochemicals Unit,
Abu Dhabi
Project involved with include:
KJO - FEED for installation of offshore integrated well jackets IWJ-8 & IWJ-9
KJO is operating Al-Khafji Oil field which consists of 79 conventional well jackets and seven
Integrated Well Jackets (IWJ). KJO has initiated a project to support and maintain sustainable
capacity of 300 MBCD Khafji Crude and 50 MBCD Hout Crude by providing two new IWJS at flow
station area Y-3 and Y-2B area as a part of next 5 years Business Plan.
Deliverables has been prepared based on SAUDI ARAMCO standards.
QATAR PETROLEUM – FEED for Strategic Petroleum Products storage (SPPS) facilities Phase
-1.
Qatar Petroleum intends to construct Strategic Petroleum Products Storage (SPPS) facilities to meet
the stipulated demand during disruption of normal production from QPR in Mesaieed and other
Refineries in Ras Laffan. The implementation plan to build the required storage tanks and associated
facilities is envisaged in two phases.
GASCO – HABSHAN Direct Depressuring (HDD-1) Project – Engineering and Procurement
(EP) Phase
QATAR PETROLEUM – FEED for NGL-3 AGRU 1 & 2 Amine regenerators and associated
equipment revamp.
Acid Gas Removal Unit is located in NGL-3 Plant at Mesaieed. Scope of work for this project to
replace the existing regeneration columns and other equipment /items of both AGRU 1&2. Consultant
to do the feasibility study and FEED engineering to find the adequacy check of columns and its
associated equipments.
LUKOIL – Construction of 42’’ dia on shore export pipeline & associated works at the West
Qurna field (Phase – II)- IRAQ – Detailed Engineering
The 103 Km long 42” Crude Oil Export Pipeline will be designed to ensure proper transfer of crude oil
from CPF to Tuba Tank Farm area at West Qurna, Southern Iraq region. Six nos. of Actuated Valve
Stations, Bi- directional pig Launcher / Receiver stations at CPF and Tuba Tank Farm, 33KV Over
Head Line from water in-take facility substation to Block valve station-6 (Around 76km) are part of
the scope for export pipeline system.
ADCO – Engineering services for ASAB Unit – 6 & 7 - FEED
ADCO is planning to develop ASAB Unit 6 & 7 (Which is a reservoir in the ASAB field) to deliver 15
MBOPD in Phase-1 as part of ADCO’s objective of increasing sustainable production capacity to 1.8
MMBOD. The ASAB Unit 6 & 7 Phase-1 development facilities will consist of providing Three Multi
Selector Manifolds (MSMs) in RDSs 1, 2 and 6 (One in each RDS), 6 no. of natural flowing Oil
Producer Wells, 6 no. of water injection wells, 2 no. of Water Supply Wells, 2 no. of Water Disposal
Wells and 1 no. of water injection cluster (i.e., WIC-26).
ADCO – FEED for Nitrogen gas injection project – Pure case
Due to the expected increase of nitrogen content in the production fluids, work is also required at the
gas production trunk lines to enable delivery of nitrogen-rich fluid to a dedicated part of the GASCO
Habshan processing facility. This will involve modifications to the existing manifold systems to
enable diversion of the nitrogen-rich flow through existing trunk lines as well as installation of
additional trunk lines to ensure that the design capacity of existing system are not compromised.
GASCO - FEED for Installation of new metering system at GASCO ASR NGL plants
NGL metering facilities at GASCO ASR NGL plants need to be upgraded inline with the JV sites with
principle of measurement enabling component wise mass flow metering using Coriolis mass flow
meters and Gas Chromatographs (GC).
QATAR PETROLEUM – FEED for Automation upgrade at FMDS, FSDS, FNDS, FSP & NFIS.
The Automation upgrade mainly consists of the replacement of the existing DCS with a Foundation
Fieldbus based Control System (FCS), upgrading or replacement of the existing ESD and F&G
systems with a TUV certified SIL3 - based systems and upgrading the existing third party/auxiliary
systems interfacing with the above FCS as per the requirements stated in the various sections of
SOS. As part of this Project Main Distribution board, LV Switchgear and AC UPS are required to be
procured.
ADCO – Conceptual study for BAB Habshan-1 Development Project (In house study)
Phase-1 development consist of full field development consisting in total of forty one (41) oil
producers wells and forty (40) water injection wells respectively. The total oil production capacity as
part of Phase-1 development shall be 30-40 MBOPD. Conceptual study shall evaluate the possibility
of accommodating crude oil production from approximately fifteen (15) oil producers within the
existing RDS-1, 2, 3, 4, 5 & 6 and new RDS-7, 8, 9 and 10 and existing water injection clusters and
BCDS. The entire electrical facilities requirement for new RDS, WI’s are to be studied under this
project.
TAKREER – Pre-bid engineering for Inter refinery Pipelines Project-2 (IRP-2)
Having involved in preparation of pre-bid deliverables for inter pipeline project phase – II using
TAKREER design general standard specifications.
ZADCO – Emergency depressuring of propane refrigeration project at Zirku Island
Propane refrigeration unit 430 is located in UZ/UAD plant at Zirku Island, approximately 140 km NW
offshore from Abu Dhabi city as part of the oil processing, storage and offloading facilities. Company
had identified the need for a rapid depressuring of the Propane inventory in the Refrigeration Unit
430.The study shall also consider the suitability of control of ignition sources in the vicinity. The
objective of this project is to prepare a study report to evaluate the presence of existing Transformer
as a source of ignition hazard and study the existing location of the Transformer with respect to
hazardous area classification as per IP 15 rev 3.
SHELL IRAQ – Kaz power plant & Sigup field survey work
South Gas Company (SGC) in Iraq is planning to have its own power generation stations and power
distribution network. The power distribution network will feed power to the new facilities of SGC such
as degassing stations, compressor stations and NGL/LPG plants. For generating electrical power,
there is a proposal to install two (2) x 26 MW General Electric MS5001 Gas Turbine Generator sets
at the KAZ NGL/LPG plant, with the potential to be upgraded to 4 x 26 MW in the future and
preparation of condition report for existing plants.
ZADCO – Zirku facilities - Hazardous area classification project at Zirku Island
Existing Hazardous Area Classification drawings for Upper Zakum Plant are old and were classified
as per API – RP – 500B (1973 edition). The objective of this project is to carry out new hazardous
area classification for Zirku Island Facilities in line with IP code of practice, IP – 15, 3rd Edition, July
2005 (latest edition). The existing layouts were updated for HAC with information, like location of
equipment, deck drain gullies/sumps etc by undertaking the site visits.
QATAR PETROLEUM - Feed and Detail engineering for strategic gas transmission project
(SGTP).
The Project shall comprises of twin sweet gas 36”pipelines from Ras Laffan Industrial City to
Mesaieed Industrial City, work includes detail engineering of seven numbers of section block valve
stations and three gas distribution stations.
DUSUP – Feed and Detail engineering for gas expansion project.
DUSUP owns and operates a Gas Control Station in the Jebel Ali Industrial Area. The GCS receives
natural gas from DEL and supplied to the customers in the Jebel Ali area. In order to increase the
supply of gas to the LP header and ensure sustained, continuous availability of gas to the
consumers, DUSUP has decided to expand the Gas Control Station so that gas from additional
sources can be taken into the facility for supply to the growing consumer and power plant
requirements. In order to do this, it is required to lay additional pipelines to and from the GCS, and
provide additional valve stations to interconnect the different pipelines so as to ensure maximum
flexibility and reliability in the gas supply.
ADCO – Plant modification facilities (PMFs)- Detail engineering and preparation of construction
package for installation of 24V and 110V AC explosion proof sockets in BAB - BCDS and all the
RDS areas.
The Abu Dhabi Company for Onshore Oil Operation (ADCO) is implementing the plant modifications
at Sahil, Asab, Shah and Bab(oil & Gas) fields to improve present operability and safety with existing
system.
The intent of this project is to provide a scope of work and detailed engineering to install 24V and
110V AC explosion sockets in Bab BCDS and all the RDS’s which is used for maintenance.
ADCO – Typical construction package for BAB & ASAB gas producer and injector wells in
Abudhabi
The intent of the package is to provide a common scope of work for all wells and to seek
commonality in their design for both producer and injector wells in their Bab and Asab fields.The
Package will be issued by ADCO to the Contractor at IFC status, together with the specific well and
tie-in details to allow the Contractor to put together a bid for an Engineering & Construct (EC) Type
Contract.
Responsibilities include:
ZADCO – Zakum facilities (North, south, west satellites and central complex) – Hazardous
area classification project – Phase II
Preparation of Hazardous electrical equipment schedule and Drawings for ZADCO Upper Zakum
facilities like north satellite, south satellite, west satellite and central complex.
QATAR PETROLEUM - Detailed Design And Engineering Of Jetties Liquid Product Berths 24 &
25 for Qatar Shell GTL Limited (QSGTL)- Ras Laffan Industrial City, Qatar (Project Cost: USD$
18 billion)
The project scope covers the design of additional platforms for Metering skid structure, Emergency
shutdown (ESD) valve platforms in Liquid product Berths 24 & 25 and design adequacy check for the
existing Loading arm structure, Metering skid structure and pipe racks.
Responsibilities include:
- Preparation of specifications, data sheets, Material Requisitions (MR’s), Purchase Requisitions
(PR), Material Approval Report (MAR) for all electrical equipment like Transformer, Ring main
units, 33KV, 22KV, 11KV HV and GIS switchgears, 6.6KV, 3.3KV MV switchgears, 415V LV
switchgears, 415V main distribution boards, Lighting and small power distribution boards, MOV
distribution boards, outdoor distribution boards, Modification of existing switchgears, Diesel
Generators, Power supply skid (Packaged substation), Bus ducts, Interposing relay panels (IRP),
Annunciator panels, Neutral Earthing Resistors, Integrated Protection and Control System (IPCS).
Power management system (PMS), capacitor banks, 230V, 110V AC UPS, 110V, 48V & 24V DC
UPS, HV/LV power, control and earthing cables, MOV actuators, heat tracing, cathodic protection,
solar power system, Over Head Line packages, OHL switches, OPGW, Technical particulars and
Electrical bulk materials.
- Preparation of Design basis memorandum, Load schedule, equipment schedule, cable schedule,
Tie-in schedule, Interconnection schedule, Hazardous area equipment schedule.
- Preparation of calculations like cable sizing, voltage drop, Lighting, earthing and lightning
protection calculation, Transformer sizing, DG set sizing, AC /DC UPS sizing, solar panel sizing,
Thermo Electric Generator (TEG) sizing.
- Preparation power system adequacy check report for existing facilities, motor start-up study,
Transformer location study report & cost estimation for relocation, Material Take Off list (MTO).
- Input to preparation Single line diagrams, protection and metering diagrams, panel schedules,
Lighting layouts like normal lighting, Navigational aid lighting, helideck lighting, outdoor lighting and
street lighting, earthing and lightning protection layouts, cable routing layouts, power layouts, cable
tray layouts, Hazardous area classification drawings, standard installation drawings
- Preparation of Tender Bulletin Evaluation of all long lead major electrical equipment such as
Transformers, DG set, HV/LV cables, RMU’s, HV/LV switchgears, AC/DC UPS’s.
- Floating enquiries to Vendors, Vendor drawings and documents review
- Preparation of scope of work for FEED and EPC Contractors
2003 – 2006 Bharat Petroleum Corporation Limited, India (BPCL)
Engineering Supervisor (Contract basis)
Responsible to prepare all the drawings / documents related to engineering & construction and
involved in site supervision activities.
Responsibilities include:
– Design of main SLD and auxiliary distribution scheme.
– Design of panel boards and distribution boards for lighting and power.
– Grounding calculations.
– Cable sizing calculation.
– Equipment sizing & selection.
– Preparation of material requisitions for electrical equipment such as medium voltage/ low
voltage switchgears, transformers, cables, DC/AC UPS equipment.
– Technical bid evaluation.
– Review/development of schemes, logic, drawings of protection, control, metering and
synchronizing systems.
– Vendor interaction, discussion with customers/consultants.
– Cable schedule, cable interconnection/ termination and cable routing.
– Electrical layouts and materials list.
– Lighting calculations and layouts.
– Layouts for electrical buildings, residences, apartments and hotels.
– Field engineering support.
– Equipment inspection.
– Vendor drawings review.
– Preparation of distribution board/panel board schedules Selection of Electrical Equipments in
Hazardous area.
– Experienced in petrol pump erection (Gilbargo and Wayne), UG tank erection and pipe line
work.
Transformer, DG set, switchgear, servo stabilizer installation
– Himast lighting tower erection.
LANGUAGE CAPABILITY
Tamil : Mother tongue
English : Spoken – fluent; written – fluent; reading – fluent
PERSONAL DETAILS
Permanent address : 316/30, 11A, George Road, Indra Nagar, Tuticorin-628003, Tamilnadu, India.
Current address : Flat.402, Kareem shop bldg., Near Alam supermarket, Electra street, Abu
Dhabi
Passport number : L2902405
Passport Valid till : 28/07/2023
Visa status : Visit visa valid till 11th
November 2016
Marital status : Married

More Related Content

What's hot

Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELkrishna kumar
 
Piping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CVPiping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CVMuhammad Kashif
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Gensol Engineering Limited
 
G. Naveen Kumar-Instrumentation Design Engineer
G. Naveen Kumar-Instrumentation Design EngineerG. Naveen Kumar-Instrumentation Design Engineer
G. Naveen Kumar-Instrumentation Design EngineerNaveen Kumar
 
SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016Simon Baarde
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Raushan Kumar
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015David Karbach
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon
 
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Nitin Lonkar
 

What's hot (20)

Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_EL
 
Engr. Asim Mahmood CV
Engr. Asim Mahmood CVEngr. Asim Mahmood CV
Engr. Asim Mahmood CV
 
Resume
ResumeResume
Resume
 
0415 RECV
0415 RECV0415 RECV
0415 RECV
 
Piping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CVPiping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CV
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
G. Naveen Kumar-Instrumentation Design Engineer
G. Naveen Kumar-Instrumentation Design EngineerG. Naveen Kumar-Instrumentation Design Engineer
G. Naveen Kumar-Instrumentation Design Engineer
 
SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 

Viewers also liked

Tina's_Professional_Portfolio
Tina's_Professional_PortfolioTina's_Professional_Portfolio
Tina's_Professional_PortfolioTina Hamilton
 
Reflective Journal
Reflective Journal Reflective Journal
Reflective Journal Emma Rose
 
Maximising the success of your CRM with Gecko Labs
Maximising the success of your CRM with Gecko LabsMaximising the success of your CRM with Gecko Labs
Maximising the success of your CRM with Gecko LabsMarine Teste
 
How to find an address or PIN using place finder
How to find an address or PIN using place finderHow to find an address or PIN using place finder
How to find an address or PIN using place finderDrew Fioranelli
 
Incentive & event destination budapest
Incentive & event destination budapestIncentive & event destination budapest
Incentive & event destination budapestPREMIUM INCOMING
 
Proyecto de aula lizbeth chaparro
Proyecto de aula  lizbeth chaparroProyecto de aula  lizbeth chaparro
Proyecto de aula lizbeth chaparrodcpe2014
 
Bahan radioaktif
Bahan radioaktifBahan radioaktif
Bahan radioaktifmbc7885mbc
 
Despiertanos oh dios power point
Despiertanos oh dios power pointDespiertanos oh dios power point
Despiertanos oh dios power pointLuis Guazman
 
Planos y rectas en el espacio
Planos y rectas en el espacioPlanos y rectas en el espacio
Planos y rectas en el espacioIsmael Salazar
 
Filename 0=hoja 3. trigonometría iii 1��zv�{
Filename 0=hoja 3. trigonometría iii 1��zv�{Filename 0=hoja 3. trigonometría iii 1��zv�{
Filename 0=hoja 3. trigonometría iii 1��zv�{klorofila
 
Repaso 1ª evaluación 2º eso
Repaso 1ª evaluación 2º esoRepaso 1ª evaluación 2º eso
Repaso 1ª evaluación 2º esoklorofila
 
Online Recruiter: Zero to Hero [Recruiter Training]
Online Recruiter: Zero to Hero [Recruiter Training]Online Recruiter: Zero to Hero [Recruiter Training]
Online Recruiter: Zero to Hero [Recruiter Training]Amitai Givertz
 
Pancreatitis (historia natural de la enfermedad)
Pancreatitis (historia natural de la enfermedad)Pancreatitis (historia natural de la enfermedad)
Pancreatitis (historia natural de la enfermedad)Angel Castro Urquizo
 
Ayat yang paling ditakuti oleh ulama
Ayat yang paling ditakuti oleh ulamaAyat yang paling ditakuti oleh ulama
Ayat yang paling ditakuti oleh ulamaridhofharis
 

Viewers also liked (19)

kkkk
kkkkkkkk
kkkk
 
Tina's_Professional_Portfolio
Tina's_Professional_PortfolioTina's_Professional_Portfolio
Tina's_Professional_Portfolio
 
Reflective Journal
Reflective Journal Reflective Journal
Reflective Journal
 
Maximising the success of your CRM with Gecko Labs
Maximising the success of your CRM with Gecko LabsMaximising the success of your CRM with Gecko Labs
Maximising the success of your CRM with Gecko Labs
 
How to find an address or PIN using place finder
How to find an address or PIN using place finderHow to find an address or PIN using place finder
How to find an address or PIN using place finder
 
Incentive & event destination budapest
Incentive & event destination budapestIncentive & event destination budapest
Incentive & event destination budapest
 
Proyecto de aula lizbeth chaparro
Proyecto de aula  lizbeth chaparroProyecto de aula  lizbeth chaparro
Proyecto de aula lizbeth chaparro
 
slideshare
slideshareslideshare
slideshare
 
Bahan radioaktif
Bahan radioaktifBahan radioaktif
Bahan radioaktif
 
Despiertanos oh dios power point
Despiertanos oh dios power pointDespiertanos oh dios power point
Despiertanos oh dios power point
 
MDS_Overview
MDS_OverviewMDS_Overview
MDS_Overview
 
Practica n°3
Practica n°3Practica n°3
Practica n°3
 
Planos y rectas en el espacio
Planos y rectas en el espacioPlanos y rectas en el espacio
Planos y rectas en el espacio
 
Filename 0=hoja 3. trigonometría iii 1��zv�{
Filename 0=hoja 3. trigonometría iii 1��zv�{Filename 0=hoja 3. trigonometría iii 1��zv�{
Filename 0=hoja 3. trigonometría iii 1��zv�{
 
Repaso 1ª evaluación 2º eso
Repaso 1ª evaluación 2º esoRepaso 1ª evaluación 2º eso
Repaso 1ª evaluación 2º eso
 
Online Recruiter: Zero to Hero [Recruiter Training]
Online Recruiter: Zero to Hero [Recruiter Training]Online Recruiter: Zero to Hero [Recruiter Training]
Online Recruiter: Zero to Hero [Recruiter Training]
 
Geometría 5to s6
Geometría 5to s6Geometría 5to s6
Geometría 5to s6
 
Pancreatitis (historia natural de la enfermedad)
Pancreatitis (historia natural de la enfermedad)Pancreatitis (historia natural de la enfermedad)
Pancreatitis (historia natural de la enfermedad)
 
Ayat yang paling ditakuti oleh ulama
Ayat yang paling ditakuti oleh ulamaAyat yang paling ditakuti oleh ulama
Ayat yang paling ditakuti oleh ulama
 

Similar to Vasanth_Electrical Engineer_CV_new

CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016Rolando Garcia
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)Saher Jehad
 
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)RAMA SAMY
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Ibrahim
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.docAbdul Razzaq
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERRAMA SAMY
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1Mohamed Hashim
 

Similar to Vasanth_Electrical Engineer_CV_new (20)

CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
CV of Viswanathan KK
CV of Viswanathan KKCV of Viswanathan KK
CV of Viswanathan KK
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
63089_SEKAR_01_12_14
63089_SEKAR_01_12_1463089_SEKAR_01_12_14
63089_SEKAR_01_12_14
 
CV_Talgat Turekulov_eng
CV_Talgat Turekulov_engCV_Talgat Turekulov_eng
CV_Talgat Turekulov_eng
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
UMAR FAROOQ CV
UMAR FAROOQ CVUMAR FAROOQ CV
UMAR FAROOQ CV
 
DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
 
RCPRESUMEOCT2016
RCPRESUMEOCT2016RCPRESUMEOCT2016
RCPRESUMEOCT2016
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEER
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
COBRA PRESENTATION
COBRA  PRESENTATIONCOBRA  PRESENTATION
COBRA PRESENTATION
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 

Vasanth_Electrical Engineer_CV_new

  • 1. B VASANTHA KUMAR MORAIS Nationality Indian Year of Birth 1981 Profession Electrical and Electronics Engineer Present Position Senior Electrical Engineer Mobile no. 00971-50-9051797 (UAE) Mobile no. 0091-8903486451 / 0091-9894064510 (India) Email vasanth.morais@gmail.com KEY QUALIFICATIONS Having 13+ years of diversified working experience in electrical system design of different industrial projects for oil and gas onshore plants and offshore platforms. The experience has been gained in conceptual studies, basic design (FEED), detailed engineering projects and Project Management Consultancy (PMC) service in various fields. Specialisation in design, detailed engineering and review of electrical systems performing design and sizing calculations of transformer, short circuit levels, cables, load lists, motor start up study, lighting system, grounding & lightning system, preparing detailed engineering specifications, single line diagrams, equipment layouts, cable routing layouts, lighting & small power layouts, grounding & lightning layouts, cable schedules, preparation of material requisition, evaluation of vendor’s documents/offer (TBE), preparation of material take off list, drawing review using auto cad / PDS- smart plant / PDMS, in-house co-ordination with other disciplines during detailed design, attending periodic (weekly/monthly) design progress review meetings with client / Contractors, attending Factory Acceptance Tests(FAT), Instruction and co-ordination with construction personnel to meet their objectives such as site activity co-ordination, preparation of as-built drawings on completion of site works in project engineering co-ordination and execution in senior position and doing pre-bid work for new project proposals. COMPUTER SKILLS AND INTERNATIONAL STANDARDS KNOWLEDGE Well versed in the usage of computer software packages like ETAP, lighting software’s (DIALUX, Chalmite and victor), MS office, etc. Have good knowledge on International codes and standards related to oil and gas sectors. Worked in different company standards like Qatar Petroleum, SHELL DEP, GASCO, ADCO, ZADCO, SAUDI ARAMCO, BOROUGE and TAKREER (ADNOC group of companies). Familiar with IEC, BS, IEEE, NFPA, IP and NEC international codes and standards. EDUCATION AND PROFESSIONAL STATUS B E (Electrical and Electronics Engineering), National Engineering College, Manonmaniam Sundaranar University, Kovilpatti, Tamil Nadu, India, 2003 EXPERIENCE RECORD 2014 June – 2016 July ZADCO (ADNOC) - PMC via Wood Group Kenny Ltd. (JP Kenny) Electrical Engineer (ZADCO – EPE – IE) Abu Dhabi 2007 March – 2014 May MOTT MACDONALD L.L.C Electrical Engineer – Oil, Gas and Petrochemicals Unit, Abu Dhabi
  • 2. 2003 May – 2006 February Bharat Petroleum Corporation Limited, India (BPCL) Engineering Supervisor (Contract basis) CAREER HISTORY 2014 June – Present ZADCO (ADNOC) – Project Management Consultancy via Wood Group Kenny Ltd. (JP Kenny) Electrical Engineer (ZADCO – EPE – IE) Abu Dhabi Projects involved (PMC) with include: ‒ Fire and gas system upgrade project – EPC Engineering deliverables review ‒ Fourth disposal pump project - EPC Engineering deliverables review ‒ Oily water treatment plant project - FEED Engineering deliverables review ‒ ZIRKU Potable water & Sewage Network implementation project including Existing substation extension ‒ Service area Substation Project – FEED engineering deliverables review Responsibilities included: ‒ Review and check the design works of consultants/contractors to ensure that they are in accordance with the agreed scope of works, standard specifications and contract documents. ‒ Reviews/approves drawings, specifications and other technical documents for all types of projects incorporating the comments and requirements in accordance with contract documents. ‒ Attending Factory Acceptance Tests (FAT) for equipment. Project involved (In-house) with include: GASCO – EPC – EMCO - New workshop and civil maintenance facilities at Construction of new buildings such as Mechanical Store, Fabrication & Welding Workshop, Blasting and Painting Workshop, Machine Workshop & Office Building, Civil store with all necessary facilities including HVAC system, Electrical works such as substation, Lighting for LEED (Leadership in Energy and Environmental Design) certification, earthing and lightning protection, power arrangements etc., Water Supply, Drainage, Acoustical systems, Telecommunications, Data networks, Firefighting systems / equipment and Fire, Smoke, Gas detection as applicable. 2007 March – 2014 May MOTT MACDONALD L.L.C (Member firm of Mott MacDonald Group) Electrical Engineer – Oil, Gas and Petrochemicals Unit, Abu Dhabi Project involved with include: KJO - FEED for installation of offshore integrated well jackets IWJ-8 & IWJ-9 KJO is operating Al-Khafji Oil field which consists of 79 conventional well jackets and seven Integrated Well Jackets (IWJ). KJO has initiated a project to support and maintain sustainable capacity of 300 MBCD Khafji Crude and 50 MBCD Hout Crude by providing two new IWJS at flow station area Y-3 and Y-2B area as a part of next 5 years Business Plan. Deliverables has been prepared based on SAUDI ARAMCO standards.
  • 3. QATAR PETROLEUM – FEED for Strategic Petroleum Products storage (SPPS) facilities Phase -1. Qatar Petroleum intends to construct Strategic Petroleum Products Storage (SPPS) facilities to meet the stipulated demand during disruption of normal production from QPR in Mesaieed and other Refineries in Ras Laffan. The implementation plan to build the required storage tanks and associated facilities is envisaged in two phases. GASCO – HABSHAN Direct Depressuring (HDD-1) Project – Engineering and Procurement (EP) Phase QATAR PETROLEUM – FEED for NGL-3 AGRU 1 & 2 Amine regenerators and associated equipment revamp. Acid Gas Removal Unit is located in NGL-3 Plant at Mesaieed. Scope of work for this project to replace the existing regeneration columns and other equipment /items of both AGRU 1&2. Consultant to do the feasibility study and FEED engineering to find the adequacy check of columns and its associated equipments. LUKOIL – Construction of 42’’ dia on shore export pipeline & associated works at the West Qurna field (Phase – II)- IRAQ – Detailed Engineering The 103 Km long 42” Crude Oil Export Pipeline will be designed to ensure proper transfer of crude oil from CPF to Tuba Tank Farm area at West Qurna, Southern Iraq region. Six nos. of Actuated Valve Stations, Bi- directional pig Launcher / Receiver stations at CPF and Tuba Tank Farm, 33KV Over Head Line from water in-take facility substation to Block valve station-6 (Around 76km) are part of the scope for export pipeline system. ADCO – Engineering services for ASAB Unit – 6 & 7 - FEED ADCO is planning to develop ASAB Unit 6 & 7 (Which is a reservoir in the ASAB field) to deliver 15 MBOPD in Phase-1 as part of ADCO’s objective of increasing sustainable production capacity to 1.8 MMBOD. The ASAB Unit 6 & 7 Phase-1 development facilities will consist of providing Three Multi Selector Manifolds (MSMs) in RDSs 1, 2 and 6 (One in each RDS), 6 no. of natural flowing Oil Producer Wells, 6 no. of water injection wells, 2 no. of Water Supply Wells, 2 no. of Water Disposal Wells and 1 no. of water injection cluster (i.e., WIC-26). ADCO – FEED for Nitrogen gas injection project – Pure case Due to the expected increase of nitrogen content in the production fluids, work is also required at the gas production trunk lines to enable delivery of nitrogen-rich fluid to a dedicated part of the GASCO Habshan processing facility. This will involve modifications to the existing manifold systems to enable diversion of the nitrogen-rich flow through existing trunk lines as well as installation of additional trunk lines to ensure that the design capacity of existing system are not compromised. GASCO - FEED for Installation of new metering system at GASCO ASR NGL plants NGL metering facilities at GASCO ASR NGL plants need to be upgraded inline with the JV sites with principle of measurement enabling component wise mass flow metering using Coriolis mass flow meters and Gas Chromatographs (GC). QATAR PETROLEUM – FEED for Automation upgrade at FMDS, FSDS, FNDS, FSP & NFIS. The Automation upgrade mainly consists of the replacement of the existing DCS with a Foundation Fieldbus based Control System (FCS), upgrading or replacement of the existing ESD and F&G systems with a TUV certified SIL3 - based systems and upgrading the existing third party/auxiliary systems interfacing with the above FCS as per the requirements stated in the various sections of SOS. As part of this Project Main Distribution board, LV Switchgear and AC UPS are required to be procured.
  • 4. ADCO – Conceptual study for BAB Habshan-1 Development Project (In house study) Phase-1 development consist of full field development consisting in total of forty one (41) oil producers wells and forty (40) water injection wells respectively. The total oil production capacity as part of Phase-1 development shall be 30-40 MBOPD. Conceptual study shall evaluate the possibility of accommodating crude oil production from approximately fifteen (15) oil producers within the existing RDS-1, 2, 3, 4, 5 & 6 and new RDS-7, 8, 9 and 10 and existing water injection clusters and BCDS. The entire electrical facilities requirement for new RDS, WI’s are to be studied under this project. TAKREER – Pre-bid engineering for Inter refinery Pipelines Project-2 (IRP-2) Having involved in preparation of pre-bid deliverables for inter pipeline project phase – II using TAKREER design general standard specifications. ZADCO – Emergency depressuring of propane refrigeration project at Zirku Island Propane refrigeration unit 430 is located in UZ/UAD plant at Zirku Island, approximately 140 km NW offshore from Abu Dhabi city as part of the oil processing, storage and offloading facilities. Company had identified the need for a rapid depressuring of the Propane inventory in the Refrigeration Unit 430.The study shall also consider the suitability of control of ignition sources in the vicinity. The objective of this project is to prepare a study report to evaluate the presence of existing Transformer as a source of ignition hazard and study the existing location of the Transformer with respect to hazardous area classification as per IP 15 rev 3. SHELL IRAQ – Kaz power plant & Sigup field survey work South Gas Company (SGC) in Iraq is planning to have its own power generation stations and power distribution network. The power distribution network will feed power to the new facilities of SGC such as degassing stations, compressor stations and NGL/LPG plants. For generating electrical power, there is a proposal to install two (2) x 26 MW General Electric MS5001 Gas Turbine Generator sets at the KAZ NGL/LPG plant, with the potential to be upgraded to 4 x 26 MW in the future and preparation of condition report for existing plants. ZADCO – Zirku facilities - Hazardous area classification project at Zirku Island Existing Hazardous Area Classification drawings for Upper Zakum Plant are old and were classified as per API – RP – 500B (1973 edition). The objective of this project is to carry out new hazardous area classification for Zirku Island Facilities in line with IP code of practice, IP – 15, 3rd Edition, July 2005 (latest edition). The existing layouts were updated for HAC with information, like location of equipment, deck drain gullies/sumps etc by undertaking the site visits. QATAR PETROLEUM - Feed and Detail engineering for strategic gas transmission project (SGTP). The Project shall comprises of twin sweet gas 36”pipelines from Ras Laffan Industrial City to Mesaieed Industrial City, work includes detail engineering of seven numbers of section block valve stations and three gas distribution stations. DUSUP – Feed and Detail engineering for gas expansion project. DUSUP owns and operates a Gas Control Station in the Jebel Ali Industrial Area. The GCS receives natural gas from DEL and supplied to the customers in the Jebel Ali area. In order to increase the supply of gas to the LP header and ensure sustained, continuous availability of gas to the consumers, DUSUP has decided to expand the Gas Control Station so that gas from additional sources can be taken into the facility for supply to the growing consumer and power plant requirements. In order to do this, it is required to lay additional pipelines to and from the GCS, and
  • 5. provide additional valve stations to interconnect the different pipelines so as to ensure maximum flexibility and reliability in the gas supply. ADCO – Plant modification facilities (PMFs)- Detail engineering and preparation of construction package for installation of 24V and 110V AC explosion proof sockets in BAB - BCDS and all the RDS areas. The Abu Dhabi Company for Onshore Oil Operation (ADCO) is implementing the plant modifications at Sahil, Asab, Shah and Bab(oil & Gas) fields to improve present operability and safety with existing system. The intent of this project is to provide a scope of work and detailed engineering to install 24V and 110V AC explosion sockets in Bab BCDS and all the RDS’s which is used for maintenance. ADCO – Typical construction package for BAB & ASAB gas producer and injector wells in Abudhabi The intent of the package is to provide a common scope of work for all wells and to seek commonality in their design for both producer and injector wells in their Bab and Asab fields.The Package will be issued by ADCO to the Contractor at IFC status, together with the specific well and tie-in details to allow the Contractor to put together a bid for an Engineering & Construct (EC) Type Contract. Responsibilities include: ZADCO – Zakum facilities (North, south, west satellites and central complex) – Hazardous area classification project – Phase II Preparation of Hazardous electrical equipment schedule and Drawings for ZADCO Upper Zakum facilities like north satellite, south satellite, west satellite and central complex. QATAR PETROLEUM - Detailed Design And Engineering Of Jetties Liquid Product Berths 24 & 25 for Qatar Shell GTL Limited (QSGTL)- Ras Laffan Industrial City, Qatar (Project Cost: USD$ 18 billion) The project scope covers the design of additional platforms for Metering skid structure, Emergency shutdown (ESD) valve platforms in Liquid product Berths 24 & 25 and design adequacy check for the existing Loading arm structure, Metering skid structure and pipe racks. Responsibilities include: - Preparation of specifications, data sheets, Material Requisitions (MR’s), Purchase Requisitions (PR), Material Approval Report (MAR) for all electrical equipment like Transformer, Ring main units, 33KV, 22KV, 11KV HV and GIS switchgears, 6.6KV, 3.3KV MV switchgears, 415V LV switchgears, 415V main distribution boards, Lighting and small power distribution boards, MOV distribution boards, outdoor distribution boards, Modification of existing switchgears, Diesel Generators, Power supply skid (Packaged substation), Bus ducts, Interposing relay panels (IRP), Annunciator panels, Neutral Earthing Resistors, Integrated Protection and Control System (IPCS). Power management system (PMS), capacitor banks, 230V, 110V AC UPS, 110V, 48V & 24V DC UPS, HV/LV power, control and earthing cables, MOV actuators, heat tracing, cathodic protection, solar power system, Over Head Line packages, OHL switches, OPGW, Technical particulars and Electrical bulk materials. - Preparation of Design basis memorandum, Load schedule, equipment schedule, cable schedule, Tie-in schedule, Interconnection schedule, Hazardous area equipment schedule. - Preparation of calculations like cable sizing, voltage drop, Lighting, earthing and lightning protection calculation, Transformer sizing, DG set sizing, AC /DC UPS sizing, solar panel sizing,
  • 6. Thermo Electric Generator (TEG) sizing. - Preparation power system adequacy check report for existing facilities, motor start-up study, Transformer location study report & cost estimation for relocation, Material Take Off list (MTO). - Input to preparation Single line diagrams, protection and metering diagrams, panel schedules, Lighting layouts like normal lighting, Navigational aid lighting, helideck lighting, outdoor lighting and street lighting, earthing and lightning protection layouts, cable routing layouts, power layouts, cable tray layouts, Hazardous area classification drawings, standard installation drawings - Preparation of Tender Bulletin Evaluation of all long lead major electrical equipment such as Transformers, DG set, HV/LV cables, RMU’s, HV/LV switchgears, AC/DC UPS’s. - Floating enquiries to Vendors, Vendor drawings and documents review - Preparation of scope of work for FEED and EPC Contractors 2003 – 2006 Bharat Petroleum Corporation Limited, India (BPCL) Engineering Supervisor (Contract basis) Responsible to prepare all the drawings / documents related to engineering & construction and involved in site supervision activities. Responsibilities include: – Design of main SLD and auxiliary distribution scheme. – Design of panel boards and distribution boards for lighting and power. – Grounding calculations. – Cable sizing calculation. – Equipment sizing & selection. – Preparation of material requisitions for electrical equipment such as medium voltage/ low voltage switchgears, transformers, cables, DC/AC UPS equipment. – Technical bid evaluation. – Review/development of schemes, logic, drawings of protection, control, metering and synchronizing systems. – Vendor interaction, discussion with customers/consultants. – Cable schedule, cable interconnection/ termination and cable routing. – Electrical layouts and materials list. – Lighting calculations and layouts. – Layouts for electrical buildings, residences, apartments and hotels. – Field engineering support. – Equipment inspection. – Vendor drawings review. – Preparation of distribution board/panel board schedules Selection of Electrical Equipments in Hazardous area. – Experienced in petrol pump erection (Gilbargo and Wayne), UG tank erection and pipe line work. Transformer, DG set, switchgear, servo stabilizer installation – Himast lighting tower erection. LANGUAGE CAPABILITY Tamil : Mother tongue
  • 7. English : Spoken – fluent; written – fluent; reading – fluent PERSONAL DETAILS Permanent address : 316/30, 11A, George Road, Indra Nagar, Tuticorin-628003, Tamilnadu, India. Current address : Flat.402, Kareem shop bldg., Near Alam supermarket, Electra street, Abu Dhabi Passport number : L2902405 Passport Valid till : 28/07/2023 Visa status : Visit visa valid till 11th November 2016 Marital status : Married