SlideShare a Scribd company logo
1 of 5
RESUME
Sher Chauhan, P. Eng. PMP
Senior Electrical Engineer/Project Manager
1669 Kentchestor Pl Mississauga ON L5N 7S8
Phone 416 838 0340
Sher.chauhan@gmail.com
Professional Registrations
Project Management Professional (PMP) 2009
Licensed Professional Engineer, Ontario (P.Eng) 2002
Licensed Professional Engineer, British Columbia (P.Eng) 2007
Licensed Professional Engineer, Nova Scotia (P.Eng) 2008
Qualified and registered under Bill 124, (Passed Exam for building services) 2008
Employment History
10/ 2011- 09/2016, GHD Design & Implementation Lead/ Project Manager
10/2004 – 10/2011, Earth Tech/AECOM Electrical Design and Implementation Lead
09/2003 - 05/2004, SNC Lavalin PAE, Senior Electrical Engineer
05/2002 - 09/2003, Atco Frontec, Project Engineer
Outstanding Accomplishments
Have completed more than 35 projects from conceptualdesign to commissioning and handover. For most of these
projects I did the Cost estimation activity for the Electrical works. These projects included work for Municipalities,
Transportation,Power generation, facilities, infrastructure & industry. Cost of each project varied from one to fifty
Million dollars.
My exposure to different type of Electrical Engineering projects helped me successfully work in diverse electrical
environments.
Usually clients required cost estimation at two steps,one at the design completion and other when the client wanted
to assess the estimate with respect to the budget for Tender documents in consideration of the project scope &
objectives. For bigger projects most of the time I did my input for the cost estimation work. Participated in
preparation of the value engineering documents aimed to conclude the cost estimate realistically and relate the
expenditure to the value of the deliverable content.
Earth Tech awarded ‘Gold 2007 Presidents Award for Technical Excellence in Facilities Projects Category’ for
Darlington nuclear waste disposalfacility design-built project.
Quality Assurance team Leader for various projects. Contributed in depth technical review and provided
recommendations for integration of design elements to achieve overall project objectives in a cost effective way and
in consideration with future needs of the plant.
Worked with Canadian Army for restoration of Power Distribution Systemin Bosnia during the Peace Keeping
mission.
Wrote technical guidelines & worked as SME (subject matter expert) for development of Live Line work practice
for a fault repair crew of an oil facility, established guidelines for safe work practices and developed performance
indicators for developing efficiency improvements to help monitor corporate objectives.
Most recently in Project Management role completed Arc Flash Mitigation Project for Humber Waste Water
Treatment Plant City of Toronto.A challenging project requiring systemanalysis for aging distribution system
connected to hydro and requiring various upgrades to meet the challenges of Power quality issues.Work finished in
time and within Schedule.
During the work gained good understanding ofthe CEC, Canadian Standards,and ESA regulations including the
complex interpretations and the flexibility limits as determined by the practice documents attached to the standards
which explained the technical aspects why the systemlimits are defined.
During last 15 years of work never had issue of approvals from ESA or interpretation of standards orquality control
during construction phase.
Professional Background
More than 30 years varied experience in design and implementation of electrical projects. Worked on various
projects of different categories and diverse deliverables including,
 Design built project to provide Nuclear Waste disposalfacility at Darlington Power Plant.
 Difficult projects with complexity pertaining to constructability. Prepared design,specifications, tender
documents, shop drawing reviews, load calculations, site supervision, cost estimates, project management,
commissioning, handoverof projects, O&M manuals, and developed team of young professionals during
the work.
 Work with due diligence, responsibility and professional ethics. Developed systemfor monitoring progress
of work, compliance with overall schedule,coordination with other disciplines, client and stakeholders.
 Had lead role in Total Quality exercise for a Distribution System Development Unit of a Power utility.
 Worked on High Voltage hydro systems including protection , monitoring and SCADA.
 Medium/Low Voltage Power distribution systemfor industry, infrastructure of municipalities, verse for
water and wastewater treatment plants, transit facilities, buildings, hospitals,military installations, and oil
service infrastructure.
Project Experience
(GHD 2011-2016)
Major upgrades to existing Leslie Street WW pumping station for Region of York. ( 2011 – 2014)
It was a challenging job to design and implement the upgrades covering major changes to an aging plant mostly built
during in 1970s. Constraints of the old infrastructure, space limitations, requirement to keep the plant operational
during the upgrade work needed lot of effort to put togetherthe design details . Scope of work required introduce
latest technologies for improvement in efficiency, enhance pumping capacity, improve quality of power, and
provide controls/automation/monitoring measures for improvements to overall capacity and performance of the
plant.
Salient features included,
1. Source of incoming 27.6 kV power supply by reconfiguring the substation fromsingle hydro feed to double
hydro feed.
2. Installed bigger three Standby Diesel Generators each rated for 4.16kV system,2000kW power output.
3. Installed new 4.16 kV switchgear with ability to hot transfer load from Generator Bus to Hydro supplied
bus.
4. Increase Pumping capacity by introducing bigger 4.16 kV pumping motors with active front end VFDs,
related power supply infrastructure.
Design of Richmond Hill Water Pumping station for Region of York (2012-2013)
Richmond Hill Pumping Station was to be designed/constructed forsupply of water to North York communities.
Completed the Electrical design work for the project which included,
1. A 27.6kV substation supplied by two feeders from Power Stream.
2. Standby Diesel Generator.
3. Design of primary and secondary Electrical distribution systemto meet the load requirements for present
and future needs.
4. Design based on reliability and requirement specific Electrical hardware which meets the operation
objectives of the equipment.
5. A coordinated control and monitoring systemto expectations of the users and stake holders.
Plant wide Arc Flash mitigation for High and Low Voltage Electrical system at Humber WWTP 2015
This was a unique and interesting project, aimed at improving the safety,reliability, and efficiency of the plant by
reducing arc flash levels within manageable risk.
Work involved,
1. An overall study of the plant distribution system, gather information with respect to distribution system
parameters and how they are contributing to the potential of Arc Flash hazards in different operational
conditios.
2. Doing a comprehensive System analysis to identify the areas of concern which could be due to system
configuration, outdated fault protection hardware/accuracy deficiencies, switching mechanism etc.
3. Development of different operational scenarios to address identified deficiencies, and prepare phase by
phase modifications to various devices and components.
4. After each modification verified the changes required to enable protection settings operate the tripping
devices within the time allowed for a safe and reliable tripping action without adverse effect on other
devices/operators/equipment/system.
5. On completion of work finalized the revised arc flash levels, affixed Warning Labels to each piece of
equipment with respect to Arc Flash level and recommended personalprotection required for operating the
specific equipment safely.
Earth Tech/AECOM) 2004-2011
Ontario Power Generation, Darlington Used Fuel Dry Storage Facility, Pickering, Ontario.
Member of project team responsible for electrical design documents for a new facility, to be constructed in
association with ES Fox as design-built project. Scope comprised amenity building, process building and storage
building for used nuclear waste. Electrical Work included extension of existing substation,8kv distribution feeder,
8kV/600V substation,2000 Amps Cable Bus, MCC and low voltage distribution network. Completed load
estimates, design of distribution systemtie-in with existing system, Class III (standby generatorsourced)power and
Class II UPS based power designs.Assisted in coordination of design for lighting, power provision for mechanical
equipment, overhead crane, welding and fire pump. Being a design built project an ongoing coordination was vital
to smooth performance of the work. Resolved a variety of inter-discipline issues and constructability matters too .
Upgrades to Woodward Road Waste Water Treatment Plant Hamilton
Design lead for two contracts C1 and C2, one for the new CEPT building, which included substation,chemical
dosing equipment , blowers, high voltage switchgear, and other associated facilities. It was commissioned and
completed (May 2010)
The other contract C2 involved upgrade and modifications to screen building, head works facility, one new
primary treatment tank with associated equipment and controls, electrical works staging and transition plans as the
plant has to be kept running. The contract was completed well.
Toronto Transit Commission, Fire Ventilation (5 Subway Stations), Toronto, Ontario.
Lead electrical engineer for conceptualand detail design for provision of power to large (>300-hp) ventilation fan
motors intended to rapidly remove smoke from station tunnels in case of emergencies, Prepared the control and
operating systemfor the intended functions,including communication, instrumentation and interface requirements,
during emergency response and evacuation procedures.Engineering design for this work based on NFPA 130
provisions with respect to fire rated cables, emergency access routes, communication hardware, and interlocking
arrangements. Scope involved five subway stations.Power required to be tapped from existing Toronto Hydro
Networks at stations where there is no spare capacity available at the station. 44kV or 13.8kV substations will be
built along with the HV switchgear.
Existing station loads were reviewed and site assessment made for best locations for retrofit/augmentation of power
distribution network. Coordinated with TTC staff for verification of site conditions and proposed retrofits.
Sydney Tar Ponds Agency, Tar Ponds and Coke Ovens Remedial Predesign, Sydney, Nova Scotia.
Responsible for Electrical design work required to cleanup various facilities contaminated by industrial waste from
world war II. Spread over vast area the decontamination work required to support 10-year remediation project to
cleanup one of the most contaminated sites in Canada.
Upgrades to Ashbridges Waste Water Treatment Plant for City of Toronto
Design lead for the Screen Building and Head works upgrade project. The project included a new CEPT building,
substation, new screen building, high voltage switchgear, modifications to existing Electrical distribution system,
replacement of MCCs, preparation of transition and staging plans to enable continuous plant operation, and
provision of standby power to various installations.
Prepared completion reports with commissioning checks and included in the Operation & Maintenance manual.
Updated as built drawings were prepared and verified at site prep
Harmony Creek Pumping Station, Regional Municipality of Durham, Ontario.
Lead electrical engineer for design of pumping station.Provided load calculations, source of power options,
coordination with Hydro and integration with existing facility at the site. Prepared design documents and
specifications. Work scope included 44kV /600V substation,motor control centers, standby generatorand
distribution network. Prepared bill of quantities for all major materials and provided support for tenderand shop
drawing reviews. [2005-2007]
Regional Municipality of Halton, Oakville South East WWTP UV System and Upgrades, Ontario.
Prepared electrical design of UV treatment plant and upgrades,which included provision of normal and standby
power to feed
 UV units,
 control and monitoring equipment,
 Retrofit existing MCC for handling additional load capacity.
 Added a control room which houses the control& monitoring systemhardware in the main building .
 Coordinated requirements and existing load conditions at the site and confirmed design to the plant
requirements.[2006-2007]
UV Filtration Plant for Water Supply Wells,Sudbury Valley East, Sudbury, Ontario
Provided electrical design for adding UV filtration systems to 9 existing wells. Scope required study of the existing
electrical loads and the network. Prepared drawings and specifications. [2006]
City of Stratford, Water Pollution Control Plant Improvements, Stratford, Ontario. Conducted verification of
site installations, pre-commissioning checks for the electrical power distribution network, verification of pumping
station,motor control center, chemical dosing equipment and control installations. Reviewed coordination study for
the protection devices to operate in desired sequence.Responsible for protection scheme, and installation. [2005]
Other
Canadian Army, CANCAP Project, Peace keeping Mission in Bosnia.
Objective was to restore the devastated Power distribution systemin war effected areas to the extent necessary for
Army mission activities. It provided a broad range of electrical engineering design, construction,and maintenance
support for various small electrical distribution projects involving high and low voltage installations covering
residential, offices, camps, fuel storage,and other tactical facilities. Did correspondence and documentation for
project proposals,detailed design,option analysis,and contract procurement. Conducted network reconfiguration
and systemimprovement studies to enhance reliability and operational flexibility for emergency, essentialand
normal loads. Identified requirements for changes in the distribution network, installation of generators,UPS and
automatic or manual transfer devices.
Participated in safety and hazard identification routines.
Developed operational manuals to incorporate restoration work done under the small projects.

More Related Content

What's hot

AEP texas project edison award winner
AEP texas project edison award winnerAEP texas project edison award winner
AEP texas project edison award winnerDave Bryant
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan Dey
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesPuneet Jaggi
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newvasanth morais
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Akhtar
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limitedHimanshu9974
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16mujahid nawaz
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta
 

What's hot (20)

AEP texas project edison award winner
AEP texas project edison award winnerAEP texas project edison award winner
AEP texas project edison award winner
 
0415 RECV
0415 RECV0415 RECV
0415 RECV
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
Michael%20Weir-3
Michael%20Weir-3Michael%20Weir-3
Michael%20Weir-3
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-Resume
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Resup2016
Resup2016Resup2016
Resup2016
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Abdelmagid Abdel Aziz
Abdelmagid Abdel AzizAbdelmagid Abdel Aziz
Abdelmagid Abdel Aziz
 
Engr. Asim Mahmood CV
Engr. Asim Mahmood CVEngr. Asim Mahmood CV
Engr. Asim Mahmood CV
 
cv umar
cv umarcv umar
cv umar
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
EJP CV_January2016
EJP CV_January2016EJP CV_January2016
EJP CV_January2016
 

Viewers also liked

Los saberes de mis estudiantes en las tic
Los saberes de mis estudiantes en las ticLos saberes de mis estudiantes en las tic
Los saberes de mis estudiantes en las ticEduardo García
 
ACCT 220 WEEK 8 HOMEWORK
ACCT 220 WEEK 8 HOMEWORKACCT 220 WEEK 8 HOMEWORK
ACCT 220 WEEK 8 HOMEWORKSophiaMorgans
 
Taller olimpicos
Taller olimpicosTaller olimpicos
Taller olimpicosmariadulbi
 
Leccion 1 sobre ajedrez
Leccion 1 sobre ajedrezLeccion 1 sobre ajedrez
Leccion 1 sobre ajedrezmariadulbi
 
Los 10 mejores celulares del 2016
Los 10 mejores celulares del 2016Los 10 mejores celulares del 2016
Los 10 mejores celulares del 2016Andrea Castellanos
 
Taller olimpicos
Taller olimpicosTaller olimpicos
Taller olimpicosmariadulbi
 
Creación de una nueva categoría del longboard: el oddboard. Portfolio planner...
Creación de una nueva categoría del longboard: el oddboard. Portfolio planner...Creación de una nueva categoría del longboard: el oddboard. Portfolio planner...
Creación de una nueva categoría del longboard: el oddboard. Portfolio planner...Alba Lucena Zaher
 
1. PRIOR TO CELLULAR RADIO, MOBILE RADIO AND TELEPHONE SERVICES REQUIRED:
1. PRIOR TO CELLULAR RADIO, MOBILE RADIO AND TELEPHONE SERVICES REQUIRED:1. PRIOR TO CELLULAR RADIO, MOBILE RADIO AND TELEPHONE SERVICES REQUIRED:
1. PRIOR TO CELLULAR RADIO, MOBILE RADIO AND TELEPHONE SERVICES REQUIRED:SophiaMorgans
 

Viewers also liked (20)

Sarawut choosorn
Sarawut choosornSarawut choosorn
Sarawut choosorn
 
EN_CV_PDF
EN_CV_PDFEN_CV_PDF
EN_CV_PDF
 
MIMIPO
MIMIPOMIMIPO
MIMIPO
 
Universidad de pretoria
Universidad de pretoriaUniversidad de pretoria
Universidad de pretoria
 
Fatiga vocal
Fatiga vocal Fatiga vocal
Fatiga vocal
 
Los saberes de mis estudiantes en las tic
Los saberes de mis estudiantes en las ticLos saberes de mis estudiantes en las tic
Los saberes de mis estudiantes en las tic
 
ACCT 220 WEEK 8 HOMEWORK
ACCT 220 WEEK 8 HOMEWORKACCT 220 WEEK 8 HOMEWORK
ACCT 220 WEEK 8 HOMEWORK
 
Taller olimpicos
Taller olimpicosTaller olimpicos
Taller olimpicos
 
Tutorial slideshare
Tutorial slideshareTutorial slideshare
Tutorial slideshare
 
Universidad stellenbosh
Universidad stellenboshUniversidad stellenbosh
Universidad stellenbosh
 
Leccion 1 sobre ajedrez
Leccion 1 sobre ajedrezLeccion 1 sobre ajedrez
Leccion 1 sobre ajedrez
 
ACCT 220 HOMEWORK 1
ACCT 220 HOMEWORK 1ACCT 220 HOMEWORK 1
ACCT 220 HOMEWORK 1
 
Los 10 mejores celulares del 2016
Los 10 mejores celulares del 2016Los 10 mejores celulares del 2016
Los 10 mejores celulares del 2016
 
Boletín_en_con_marcas
Boletín_en_con_marcasBoletín_en_con_marcas
Boletín_en_con_marcas
 
Taller olimpicos
Taller olimpicosTaller olimpicos
Taller olimpicos
 
Universidad de ciudad del cabo
Universidad de ciudad del caboUniversidad de ciudad del cabo
Universidad de ciudad del cabo
 
Creación de una nueva categoría del longboard: el oddboard. Portfolio planner...
Creación de una nueva categoría del longboard: el oddboard. Portfolio planner...Creación de una nueva categoría del longboard: el oddboard. Portfolio planner...
Creación de una nueva categoría del longboard: el oddboard. Portfolio planner...
 
La universidad de rhodes
La universidad de rhodesLa universidad de rhodes
La universidad de rhodes
 
Trabajo de word
Trabajo de wordTrabajo de word
Trabajo de word
 
1. PRIOR TO CELLULAR RADIO, MOBILE RADIO AND TELEPHONE SERVICES REQUIRED:
1. PRIOR TO CELLULAR RADIO, MOBILE RADIO AND TELEPHONE SERVICES REQUIRED:1. PRIOR TO CELLULAR RADIO, MOBILE RADIO AND TELEPHONE SERVICES REQUIRED:
1. PRIOR TO CELLULAR RADIO, MOBILE RADIO AND TELEPHONE SERVICES REQUIRED:
 

Similar to Res Sher Chauhan general est Nov 2016

Resume-QiangHan-March 2015
Resume-QiangHan-March 2015Resume-QiangHan-March 2015
Resume-QiangHan-March 2015Qiang Han
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016Smith Joshua
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert ResumeLarry Hebert
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016Khadar Ali Shaik,P.Eng
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
LeeHanveyPortfolio2016
LeeHanveyPortfolio2016LeeHanveyPortfolio2016
LeeHanveyPortfolio2016Lee Hanvey
 
Craig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre
 
Jackson-GM0415 Personal
Jackson-GM0415 PersonalJackson-GM0415 Personal
Jackson-GM0415 PersonalGary Jackson
 
John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood ResumeJohn Hopwood
 

Similar to Res Sher Chauhan general est Nov 2016 (20)

Resume-QiangHan-March 2015
Resume-QiangHan-March 2015Resume-QiangHan-March 2015
Resume-QiangHan-March 2015
 
PathakA Resume
PathakA ResumePathakA Resume
PathakA Resume
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert Resume
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
LeeHanveyPortfolio2016
LeeHanveyPortfolio2016LeeHanveyPortfolio2016
LeeHanveyPortfolio2016
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
RICHARD HEATH-CV3a
RICHARD HEATH-CV3aRICHARD HEATH-CV3a
RICHARD HEATH-CV3a
 
Electrical17OCT
Electrical17OCTElectrical17OCT
Electrical17OCT
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
KEVIN DAVID MORTON cv
KEVIN DAVID MORTON cvKEVIN DAVID MORTON cv
KEVIN DAVID MORTON cv
 
Craig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA Engineering
 
Jackson-GM0415 Personal
Jackson-GM0415 PersonalJackson-GM0415 Personal
Jackson-GM0415 Personal
 
MAraziR-1 (1)
MAraziR-1 (1)MAraziR-1 (1)
MAraziR-1 (1)
 
John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood Resume
 

Res Sher Chauhan general est Nov 2016

  • 1. RESUME Sher Chauhan, P. Eng. PMP Senior Electrical Engineer/Project Manager 1669 Kentchestor Pl Mississauga ON L5N 7S8 Phone 416 838 0340 Sher.chauhan@gmail.com Professional Registrations Project Management Professional (PMP) 2009 Licensed Professional Engineer, Ontario (P.Eng) 2002 Licensed Professional Engineer, British Columbia (P.Eng) 2007 Licensed Professional Engineer, Nova Scotia (P.Eng) 2008 Qualified and registered under Bill 124, (Passed Exam for building services) 2008 Employment History 10/ 2011- 09/2016, GHD Design & Implementation Lead/ Project Manager 10/2004 – 10/2011, Earth Tech/AECOM Electrical Design and Implementation Lead 09/2003 - 05/2004, SNC Lavalin PAE, Senior Electrical Engineer 05/2002 - 09/2003, Atco Frontec, Project Engineer Outstanding Accomplishments Have completed more than 35 projects from conceptualdesign to commissioning and handover. For most of these projects I did the Cost estimation activity for the Electrical works. These projects included work for Municipalities, Transportation,Power generation, facilities, infrastructure & industry. Cost of each project varied from one to fifty Million dollars. My exposure to different type of Electrical Engineering projects helped me successfully work in diverse electrical environments. Usually clients required cost estimation at two steps,one at the design completion and other when the client wanted to assess the estimate with respect to the budget for Tender documents in consideration of the project scope & objectives. For bigger projects most of the time I did my input for the cost estimation work. Participated in preparation of the value engineering documents aimed to conclude the cost estimate realistically and relate the expenditure to the value of the deliverable content. Earth Tech awarded ‘Gold 2007 Presidents Award for Technical Excellence in Facilities Projects Category’ for Darlington nuclear waste disposalfacility design-built project. Quality Assurance team Leader for various projects. Contributed in depth technical review and provided recommendations for integration of design elements to achieve overall project objectives in a cost effective way and in consideration with future needs of the plant. Worked with Canadian Army for restoration of Power Distribution Systemin Bosnia during the Peace Keeping mission. Wrote technical guidelines & worked as SME (subject matter expert) for development of Live Line work practice for a fault repair crew of an oil facility, established guidelines for safe work practices and developed performance indicators for developing efficiency improvements to help monitor corporate objectives. Most recently in Project Management role completed Arc Flash Mitigation Project for Humber Waste Water
  • 2. Treatment Plant City of Toronto.A challenging project requiring systemanalysis for aging distribution system connected to hydro and requiring various upgrades to meet the challenges of Power quality issues.Work finished in time and within Schedule. During the work gained good understanding ofthe CEC, Canadian Standards,and ESA regulations including the complex interpretations and the flexibility limits as determined by the practice documents attached to the standards which explained the technical aspects why the systemlimits are defined. During last 15 years of work never had issue of approvals from ESA or interpretation of standards orquality control during construction phase. Professional Background More than 30 years varied experience in design and implementation of electrical projects. Worked on various projects of different categories and diverse deliverables including,  Design built project to provide Nuclear Waste disposalfacility at Darlington Power Plant.  Difficult projects with complexity pertaining to constructability. Prepared design,specifications, tender documents, shop drawing reviews, load calculations, site supervision, cost estimates, project management, commissioning, handoverof projects, O&M manuals, and developed team of young professionals during the work.  Work with due diligence, responsibility and professional ethics. Developed systemfor monitoring progress of work, compliance with overall schedule,coordination with other disciplines, client and stakeholders.  Had lead role in Total Quality exercise for a Distribution System Development Unit of a Power utility.  Worked on High Voltage hydro systems including protection , monitoring and SCADA.  Medium/Low Voltage Power distribution systemfor industry, infrastructure of municipalities, verse for water and wastewater treatment plants, transit facilities, buildings, hospitals,military installations, and oil service infrastructure. Project Experience (GHD 2011-2016) Major upgrades to existing Leslie Street WW pumping station for Region of York. ( 2011 – 2014) It was a challenging job to design and implement the upgrades covering major changes to an aging plant mostly built during in 1970s. Constraints of the old infrastructure, space limitations, requirement to keep the plant operational during the upgrade work needed lot of effort to put togetherthe design details . Scope of work required introduce latest technologies for improvement in efficiency, enhance pumping capacity, improve quality of power, and provide controls/automation/monitoring measures for improvements to overall capacity and performance of the plant. Salient features included, 1. Source of incoming 27.6 kV power supply by reconfiguring the substation fromsingle hydro feed to double hydro feed. 2. Installed bigger three Standby Diesel Generators each rated for 4.16kV system,2000kW power output. 3. Installed new 4.16 kV switchgear with ability to hot transfer load from Generator Bus to Hydro supplied bus. 4. Increase Pumping capacity by introducing bigger 4.16 kV pumping motors with active front end VFDs, related power supply infrastructure. Design of Richmond Hill Water Pumping station for Region of York (2012-2013) Richmond Hill Pumping Station was to be designed/constructed forsupply of water to North York communities. Completed the Electrical design work for the project which included,
  • 3. 1. A 27.6kV substation supplied by two feeders from Power Stream. 2. Standby Diesel Generator. 3. Design of primary and secondary Electrical distribution systemto meet the load requirements for present and future needs. 4. Design based on reliability and requirement specific Electrical hardware which meets the operation objectives of the equipment. 5. A coordinated control and monitoring systemto expectations of the users and stake holders. Plant wide Arc Flash mitigation for High and Low Voltage Electrical system at Humber WWTP 2015 This was a unique and interesting project, aimed at improving the safety,reliability, and efficiency of the plant by reducing arc flash levels within manageable risk. Work involved, 1. An overall study of the plant distribution system, gather information with respect to distribution system parameters and how they are contributing to the potential of Arc Flash hazards in different operational conditios. 2. Doing a comprehensive System analysis to identify the areas of concern which could be due to system configuration, outdated fault protection hardware/accuracy deficiencies, switching mechanism etc. 3. Development of different operational scenarios to address identified deficiencies, and prepare phase by phase modifications to various devices and components. 4. After each modification verified the changes required to enable protection settings operate the tripping devices within the time allowed for a safe and reliable tripping action without adverse effect on other devices/operators/equipment/system. 5. On completion of work finalized the revised arc flash levels, affixed Warning Labels to each piece of equipment with respect to Arc Flash level and recommended personalprotection required for operating the specific equipment safely. Earth Tech/AECOM) 2004-2011 Ontario Power Generation, Darlington Used Fuel Dry Storage Facility, Pickering, Ontario. Member of project team responsible for electrical design documents for a new facility, to be constructed in association with ES Fox as design-built project. Scope comprised amenity building, process building and storage building for used nuclear waste. Electrical Work included extension of existing substation,8kv distribution feeder, 8kV/600V substation,2000 Amps Cable Bus, MCC and low voltage distribution network. Completed load estimates, design of distribution systemtie-in with existing system, Class III (standby generatorsourced)power and Class II UPS based power designs.Assisted in coordination of design for lighting, power provision for mechanical equipment, overhead crane, welding and fire pump. Being a design built project an ongoing coordination was vital to smooth performance of the work. Resolved a variety of inter-discipline issues and constructability matters too . Upgrades to Woodward Road Waste Water Treatment Plant Hamilton Design lead for two contracts C1 and C2, one for the new CEPT building, which included substation,chemical dosing equipment , blowers, high voltage switchgear, and other associated facilities. It was commissioned and completed (May 2010) The other contract C2 involved upgrade and modifications to screen building, head works facility, one new primary treatment tank with associated equipment and controls, electrical works staging and transition plans as the plant has to be kept running. The contract was completed well. Toronto Transit Commission, Fire Ventilation (5 Subway Stations), Toronto, Ontario. Lead electrical engineer for conceptualand detail design for provision of power to large (>300-hp) ventilation fan motors intended to rapidly remove smoke from station tunnels in case of emergencies, Prepared the control and operating systemfor the intended functions,including communication, instrumentation and interface requirements, during emergency response and evacuation procedures.Engineering design for this work based on NFPA 130
  • 4. provisions with respect to fire rated cables, emergency access routes, communication hardware, and interlocking arrangements. Scope involved five subway stations.Power required to be tapped from existing Toronto Hydro Networks at stations where there is no spare capacity available at the station. 44kV or 13.8kV substations will be built along with the HV switchgear. Existing station loads were reviewed and site assessment made for best locations for retrofit/augmentation of power distribution network. Coordinated with TTC staff for verification of site conditions and proposed retrofits. Sydney Tar Ponds Agency, Tar Ponds and Coke Ovens Remedial Predesign, Sydney, Nova Scotia. Responsible for Electrical design work required to cleanup various facilities contaminated by industrial waste from world war II. Spread over vast area the decontamination work required to support 10-year remediation project to cleanup one of the most contaminated sites in Canada. Upgrades to Ashbridges Waste Water Treatment Plant for City of Toronto Design lead for the Screen Building and Head works upgrade project. The project included a new CEPT building, substation, new screen building, high voltage switchgear, modifications to existing Electrical distribution system, replacement of MCCs, preparation of transition and staging plans to enable continuous plant operation, and provision of standby power to various installations. Prepared completion reports with commissioning checks and included in the Operation & Maintenance manual. Updated as built drawings were prepared and verified at site prep Harmony Creek Pumping Station, Regional Municipality of Durham, Ontario. Lead electrical engineer for design of pumping station.Provided load calculations, source of power options, coordination with Hydro and integration with existing facility at the site. Prepared design documents and specifications. Work scope included 44kV /600V substation,motor control centers, standby generatorand distribution network. Prepared bill of quantities for all major materials and provided support for tenderand shop drawing reviews. [2005-2007] Regional Municipality of Halton, Oakville South East WWTP UV System and Upgrades, Ontario. Prepared electrical design of UV treatment plant and upgrades,which included provision of normal and standby power to feed  UV units,  control and monitoring equipment,  Retrofit existing MCC for handling additional load capacity.  Added a control room which houses the control& monitoring systemhardware in the main building .  Coordinated requirements and existing load conditions at the site and confirmed design to the plant requirements.[2006-2007] UV Filtration Plant for Water Supply Wells,Sudbury Valley East, Sudbury, Ontario Provided electrical design for adding UV filtration systems to 9 existing wells. Scope required study of the existing electrical loads and the network. Prepared drawings and specifications. [2006] City of Stratford, Water Pollution Control Plant Improvements, Stratford, Ontario. Conducted verification of site installations, pre-commissioning checks for the electrical power distribution network, verification of pumping station,motor control center, chemical dosing equipment and control installations. Reviewed coordination study for the protection devices to operate in desired sequence.Responsible for protection scheme, and installation. [2005] Other Canadian Army, CANCAP Project, Peace keeping Mission in Bosnia.
  • 5. Objective was to restore the devastated Power distribution systemin war effected areas to the extent necessary for Army mission activities. It provided a broad range of electrical engineering design, construction,and maintenance support for various small electrical distribution projects involving high and low voltage installations covering residential, offices, camps, fuel storage,and other tactical facilities. Did correspondence and documentation for project proposals,detailed design,option analysis,and contract procurement. Conducted network reconfiguration and systemimprovement studies to enhance reliability and operational flexibility for emergency, essentialand normal loads. Identified requirements for changes in the distribution network, installation of generators,UPS and automatic or manual transfer devices. Participated in safety and hazard identification routines. Developed operational manuals to incorporate restoration work done under the small projects.