SlideShare a Scribd company logo
1 of 7
Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining
Company LimitedCompany Limited
Project :
Client : Royal Commission for Jubail & Yanbu
Ref.
No.
:
RESUMES OF KEY PERSONNEL
Name:
FARRUKH M CHUGHTAI
Proposed Position: CONST.MANAGE E&I Age: 58
Discipline: ELECTRICAL ENGINEER. Nationality: PAKISTANI
English Speaking Capability: VERY GOOD
Education:
School/University Dates in Attendance Degree/Certification
UET Lahore Pakistan
Distributed Control System
(DCS) training in Singapore
1993
1996
BSC in Electrical Engineering.
Certification in DCS Training.
Summary of Experience
Having more than 20 years of diversified experience in the field of Industrial Electrical (MV/LV),
instrumentation / Instrumentation works in construction of plants such as Petrochemicals, Cement
Plant, Gas Field, Infra Structure development Project at Jubail with communication & Cathodic
Protection Installation works for Structure, piping line and tanks in Pakistan and Saudi Arabia.
Detailed Job Description
 Responsible for review the electrical design, power and control requirement.
 Coordination with client and discuss technical issues review drawings and specification,
calculation & submittal approval.
 Responsible for preparation of line diagram of the 13.8 Kv/34.5 KV distribution systems
including the emergency power supply and as built drawings. Responsible for the execution of
electrical works and assistance of commissioning of electrical equipment such as MV & LV
transformers Electrical panels, Motors, MCCs, Grounding, Cable laying and lighting works.
 Preparation of electrical method statements, and as built drawings for electrical works.
 Supervised the Cathodic protection works for the installation of impress current or sacrificial
system start up and preventive maintenance such as additional installation of anode beds
repair defective anode connection, DC rectifier(Oil immersed & Dry type) and bonding boxes,
and assistance in commissioning.
 Prepared purchase requisition for major and minor electrical equipment MV/LV Transformers,
MV/LV SWGRS, 480V MCC, UPS equipments, DC Battery Charger, lighting panels.
Page 1 of 5
Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining
Company LimitedCompany Limited
Project :
Client : Royal Commission for Jubail & Yanbu
Ref.
No.
:
 Responsible for the installation of field instrumentation fire alarm system, HVAC, control room
accessories such as installation of Patch Panels, PLC/DCS panels, Marshaling Cabinets,
communication through FO Cable etc.
---------------*****------------------
Specific Job Experience
Position : Construction Manager E&I
Employer : Petroleum, Chemicals and Mining Company Limited
Duration : (April 2013–August 2014)
Project Name : SWRO-4 project, Jubail.
EPC for the Medium voltage works.
 worked for new development of 34.5 KV SEC Interface Substation 25MVA at SWRO-4 project
Jubail, Removal of existing 34.5 system(Cables and SWGRs) with the coordination of Saudi
Electricity Co. it includes the new Interface Substation Electrical design review, & to get the
approval of design from SEC along with installation of 34.5 KV Load Break Switches with GE
Relay MIFII type, Installation of 34.5 KV Cables, 34.5KV Switch Gear 34.5KV, 127VDC
battery charger with 8 hr Battery bank, AC Panels, DC Panels, lighting Panels, HVAC , fire
alarm System and to establish the 24V Hard wire communication of HVAC, Fire Alarm, with
Remote I/O Cabinet and the communication of Remote I/O cabinet with DCS through Fiber
Optic Cable.
Position : Construction Manager E&I
Employer : Petroleum, Chemicals and Mining Company Limited
Duration : (January 2010 – March 2013)
 Project Name : Development of Infra St. facilities at Jubail-2 Phase-2 (065--C46R)
Responsible for to establish the Electrical Substation in Jubail-2 development of Infrastructure
facilities at Jubail-2 Phase-2 project. It includes the close coordination with Saudi Electricity
Co and to get approval for installation on of 34.5 KV load break switches (Type-3 Control &
GE-Relay MIFII), installation of MV Cables, 500KVA 34.5KV XFMR with metering. The SOW
includes the installation of LV cables & SWGR, LV-Panels for MOV and lighting panels at
different valve chambers with 2Nos 3.0KVA UPS, RTUs. Fire alarm system and to establish
FF-Bus, Profibus, Mod bus communication through FO Cables with DCS.
Position : Construction Manager E&I
Employer : Petroleum, Chemicals and Mining Company Limited
Duration : ( March 2006 - January 2010 )
Page 2 of 5
Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining
Company LimitedCompany Limited
Project :
Client : Royal Commission for Jubail & Yanbu
Ref.
No.
:
Project Name : Technical Services Department.
 Worked at the proposal department in the main office & responsible for review the E&I work
for Bidding. This includes the estimation of electrical and instrumentation and CP work.
Position : Sr, Engineer E&I.
• Employer : Saudi Binladin Group-PCM
Duration : (June 2005 – February 2006)
Project Name : JUBAIL UNITED PETROCHEMICAL Complex.(JUPC)
 The contract work includes the following.
 Cathodic Protection work for the intake structure, tanks firehadrent with mechanical piping
and Oxygen Line.
 Installation of Field instruments and cable laying Hexane tank.
 Installation of control room equipment DCS panels, and Consoles.
 Cable tray lighting and conduit works.
 Assistance in commissioning works.
• Position : Sr, Engineer E&I.
• Employer : Saudi Binladin Group-PCM
• Duration : (June2002 - November2004)
• Project Name : SWC Wet Wells & pipes for Secondary Industries Park(185-C13)
JUBAIL.
 Procurement and construction of seawater cooling laterals, surge tanks flow meter chambers
Outstations with water quality measurement equipment, ancillaries work includes but not
limited to the installation of sluice gates, Cathodic protection work etc.
The E&I work includes the upgrading the outstation#20 at SWC canal and construction of
three new outstations , installation of Cathodic protection work for Diversion chambers 1,2 &3
and Surge Tank A&B .Review RC CP design and installation of ribbon anodes for the
uncoated rebar protection. The Outstation work includes installation of area lighting , RTUs,
Analyzers for water quality measurement, MOV installation of sluice gates and installation of
ultrasonic transmitters at Seawater laterals for flow measurement and transferring of data to
control room through SCADA (Serial communication).
• Position : Sr, Engineer E&I.
• Employer : SBG-PCM
• Duration : (September2000 to May 2002)
Page 3 of 5
Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining
Company LimitedCompany Limited
Project :
Client : Royal Commission for Jubail & Yanbu
Ref.
No.
:
• Project Name : SWC SIPHON REPAIR & OFF TAKE STRUCTURE
PROJECT.JUBAIL.
 Procurement const. and replacement of Siphon No.3 and 2 Off Take structure Cathodic
Protection works which includes but not limited to 2nos of precast concrete access bridge,
3.5Mtr dia pipes . The electrical works includes the upgrading the outstation#24 and
construction of new Outstation 24Aincluding the instrumentation installation inside the
outstation and relocation of Pad mounted transformer 34.5KV, 75KVA. The work also
includes the lighting work of the two off take structure flow chambers 24 & 24A field
instruments RTU, Analyzers for the water quality measurement, electrification and
instrumentation of sluice gates Installation of level swiches at flow measurement chambers
and the data transformer through RTU to SWC Control room through SCADA serial
communication.
 the Cathodic Protection installation of the concrete Structures of the Diversion Chambers A,
B,C & SURGE tanks A & B having volume appox. (17mx12mx40m) and (17mx8mx36m)
respectively and to develop the communication Link between field to Royal Commission SWC
(Sea Water Cooling) Control room through (SCADA) Communication and to commission the
newly installed facilities.
• Position : Incharge E&I.
• Employer : Saudi Binladin Group –PCM Division
• Duration : (January 1999 to August 2000)
• Project Name : KEMYA MAJOR EXPENTION PROJECT JUBAIL(3 Major
Package)
 Selected Underground Construction
 Procurement and construction of Sea Water intake and outlet structures foundations for
equipments pipe racks firewater and sea water pipe line area drainage and paving and
distribution duct banks which includes but not limited to 40300M3 of excavation work, 3200
LM of FRP Piping installation and 320 MT of steel structure work.
 OSBL Utilities Procurement and construction of FRP Seawater Distribution System from
RC Canal to the entire KEMYA site miscellaneous piping(i.e. potable water sanitary water oily
sewer and waste water) installation of sea water pumps and sluice gates communication
system and power cables which includes but not limited to the complete installation of
Medium voltage cables laying and terminations of seawater intake motors 4.16 KV and switch
gears at substations MV/LV and controls cable laying between the substations. This also
includes the installations of field instruments and ultrasonic flow transmitter at various
locations Upgrading the hardware of DCS of central control room as per new modified works.
 Substation Building
Page 4 of 5
Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining
Company LimitedCompany Limited
Project :
Client : Royal Commission for Jubail & Yanbu
Ref.
No.
:
 Procurement and construction of 5 No of substation building electrical materials (13.8
KV/4.16KV and 480V equipments (MV/LV switch gears MCCs, Transformers MV/LV, Bus
ducts, lighting panels and accessories) MV/LV Cable laying / termination of MV(4.16KV)
motors & at MCCs, Installation of Fire alarm system paging and public address system
installation of Instt. cabinets consoles indoor and outdoor lighting works.,
• Position : Sr. Engineer E&I.
• Employer : DESCON Engineering. Pakistan.
• Duration : (1993 to 1999)
• Project Name : Various Projects
Specific Duties and Responsibilities/Scope of Work:
Various Project sites in Pakistan:
 Fauji Jordan Fertilizer Co. (Pakistan) – As Electrical and Instrumentation Engineer, the
main responsibility was laying of electrical cables installation (MV, LV), testing of electrical
equipment at the main power house with 2 x 13 MW GE Gas Turbines, HRSG, Waste heat
Boiler’s instrument installation, Fire alarm and paging system and installation of field
instruments at the power house gas turbine, utilities, cooling tower and Bagging area along
with Installation of DCS Panels, work stations commissioning of Elsag Belly Distributed
Control System (DCS) at utilities and Ammonia Plant.
 Fauji Cement Co, Texila (Pakistan) – As Instrumentation and Electrical Engineer, was
responsible for installation of MV motors at Crushers, Cement mill, and the commissioning of
LV switchgears & MCCs at two sub-station and calibration of field instruments and fire alarm
system in side CCR along with the installation of PLC hardware at CCR.
 Lucky Cement Co. D.I. Khan (Pakistan) – Responsible for the installation and
calibration of field instrumentation, installation and commissioning of FoxBoro DCS and fire
alarm system inside the control room
 Kadun Wari Gas Fields (Pakistan) – As Instrumentation Engineer at the Gas-field,
under Foster Wheeler, UK, I was responsible for the installation and testing / calibration of
field instruments for Slug Catcher, Fin-fans and Control room Development.
 Associated Cement Company, Wah (Pakistan) - as Electrical and Instrumentation
Engineer, responsible for the installation of field instrumentation and installation / testing of
electrical equipment in the MW switchgear and substations with the calibration of FL
smith/ABB.
Position: Operational Supervisor Duration: 1979 to 1984
Employer: Packages Ltd, Pakistan, FF Co.
Project: Lahore and Sadiq-Abad
Page 5 of 5
Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining
Company LimitedCompany Limited
Project :
Client : Royal Commission for Jubail & Yanbu
Ref.
No.
:
Specific Duties and Responsibilities/Scope of Work:
 Worked as shift in-charge on Water Treatment Plant (Demineralization Unit) in Packages Ltd.
Lahore and Fauji Fertilizers Co. Pakistan. These plants produce mineral free water to be used
in Thermal Power Generation and Cooling Towers. These units consist of Pre treatment
Plant, Demineralization Units, Mix bed polishers and Waste water treatment plant.
Page 6 of 5
Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining
Company LimitedCompany Limited
Project :
Client : Royal Commission for Jubail & Yanbu
Ref.
No.
:
Specific Duties and Responsibilities/Scope of Work:
 Worked as shift in-charge on Water Treatment Plant (Demineralization Unit) in Packages Ltd.
Lahore and Fauji Fertilizers Co. Pakistan. These plants produce mineral free water to be used
in Thermal Power Generation and Cooling Towers. These units consist of Pre treatment
Plant, Demineralization Units, Mix bed polishers and Waste water treatment plant.
Page 6 of 5

More Related Content

What's hot

Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta
 
CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15Karim Kamarudin
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.docAbdul Razzaq
 
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebMario Rey Rguieb_68
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015???? ?????
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan Dey
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071Nithy Anantham
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)rana maqsood
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and constructionrana maqsood
 

What's hot (20)

PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
CV karim convert[1] (2)
CV karim convert[1] (2)CV karim convert[1] (2)
CV karim convert[1] (2)
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15CV - Karim Kamarudin - Oct 15
CV - Karim Kamarudin - Oct 15
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
 
Glad CV
Glad CVGlad CV
Glad CV
 
Chandru_CV
Chandru_CVChandru_CV
Chandru_CV
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey Guieb
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Ww CV 2016
Ww CV 2016Ww CV 2016
Ww CV 2016
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
Resume-Sudhin
Resume-SudhinResume-Sudhin
Resume-Sudhin
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-Resume
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 

Viewers also liked (6)

SMEDA
SMEDASMEDA
SMEDA
 
Smeda
SmedaSmeda
Smeda
 
Smeda
SmedaSmeda
Smeda
 
Smeda
SmedaSmeda
Smeda
 
Role of SMEs in Pakistan
Role of SMEs in PakistanRole of SMEs in Pakistan
Role of SMEs in Pakistan
 
Sme in pakistan
Sme in pakistanSme in pakistan
Sme in pakistan
 

Similar to E&I Farukh

Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016Konstantinos Valvis
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning EngineerKumaresanT7
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Abdul Alim Dewan
 
Eng.Ahmed Madkour CV
Eng.Ahmed Madkour CVEng.Ahmed Madkour CV
Eng.Ahmed Madkour CVAHMED MADKOUR
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)jamsheer p
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newvasanth morais
 

Similar to E&I Farukh (20)

MY CV
MY CVMY CV
MY CV
 
Kazunda Simon CV1
Kazunda Simon CV1Kazunda Simon CV1
Kazunda Simon CV1
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
Resume_Gopala
Resume_GopalaResume_Gopala
Resume_Gopala
 
Eng.Ahmed Madkour CV
Eng.Ahmed Madkour CVEng.Ahmed Madkour CV
Eng.Ahmed Madkour CV
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Thousif_CV
Thousif_CVThousif_CV
Thousif_CV
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
osama dwedar ..
osama dwedar ..osama dwedar ..
osama dwedar ..
 

E&I Farukh

  • 1. Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining Company LimitedCompany Limited Project : Client : Royal Commission for Jubail & Yanbu Ref. No. : RESUMES OF KEY PERSONNEL Name: FARRUKH M CHUGHTAI Proposed Position: CONST.MANAGE E&I Age: 58 Discipline: ELECTRICAL ENGINEER. Nationality: PAKISTANI English Speaking Capability: VERY GOOD Education: School/University Dates in Attendance Degree/Certification UET Lahore Pakistan Distributed Control System (DCS) training in Singapore 1993 1996 BSC in Electrical Engineering. Certification in DCS Training. Summary of Experience Having more than 20 years of diversified experience in the field of Industrial Electrical (MV/LV), instrumentation / Instrumentation works in construction of plants such as Petrochemicals, Cement Plant, Gas Field, Infra Structure development Project at Jubail with communication & Cathodic Protection Installation works for Structure, piping line and tanks in Pakistan and Saudi Arabia. Detailed Job Description  Responsible for review the electrical design, power and control requirement.  Coordination with client and discuss technical issues review drawings and specification, calculation & submittal approval.  Responsible for preparation of line diagram of the 13.8 Kv/34.5 KV distribution systems including the emergency power supply and as built drawings. Responsible for the execution of electrical works and assistance of commissioning of electrical equipment such as MV & LV transformers Electrical panels, Motors, MCCs, Grounding, Cable laying and lighting works.  Preparation of electrical method statements, and as built drawings for electrical works.  Supervised the Cathodic protection works for the installation of impress current or sacrificial system start up and preventive maintenance such as additional installation of anode beds repair defective anode connection, DC rectifier(Oil immersed & Dry type) and bonding boxes, and assistance in commissioning.  Prepared purchase requisition for major and minor electrical equipment MV/LV Transformers, MV/LV SWGRS, 480V MCC, UPS equipments, DC Battery Charger, lighting panels. Page 1 of 5
  • 2. Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining Company LimitedCompany Limited Project : Client : Royal Commission for Jubail & Yanbu Ref. No. :  Responsible for the installation of field instrumentation fire alarm system, HVAC, control room accessories such as installation of Patch Panels, PLC/DCS panels, Marshaling Cabinets, communication through FO Cable etc. ---------------*****------------------ Specific Job Experience Position : Construction Manager E&I Employer : Petroleum, Chemicals and Mining Company Limited Duration : (April 2013–August 2014) Project Name : SWRO-4 project, Jubail. EPC for the Medium voltage works.  worked for new development of 34.5 KV SEC Interface Substation 25MVA at SWRO-4 project Jubail, Removal of existing 34.5 system(Cables and SWGRs) with the coordination of Saudi Electricity Co. it includes the new Interface Substation Electrical design review, & to get the approval of design from SEC along with installation of 34.5 KV Load Break Switches with GE Relay MIFII type, Installation of 34.5 KV Cables, 34.5KV Switch Gear 34.5KV, 127VDC battery charger with 8 hr Battery bank, AC Panels, DC Panels, lighting Panels, HVAC , fire alarm System and to establish the 24V Hard wire communication of HVAC, Fire Alarm, with Remote I/O Cabinet and the communication of Remote I/O cabinet with DCS through Fiber Optic Cable. Position : Construction Manager E&I Employer : Petroleum, Chemicals and Mining Company Limited Duration : (January 2010 – March 2013)  Project Name : Development of Infra St. facilities at Jubail-2 Phase-2 (065--C46R) Responsible for to establish the Electrical Substation in Jubail-2 development of Infrastructure facilities at Jubail-2 Phase-2 project. It includes the close coordination with Saudi Electricity Co and to get approval for installation on of 34.5 KV load break switches (Type-3 Control & GE-Relay MIFII), installation of MV Cables, 500KVA 34.5KV XFMR with metering. The SOW includes the installation of LV cables & SWGR, LV-Panels for MOV and lighting panels at different valve chambers with 2Nos 3.0KVA UPS, RTUs. Fire alarm system and to establish FF-Bus, Profibus, Mod bus communication through FO Cables with DCS. Position : Construction Manager E&I Employer : Petroleum, Chemicals and Mining Company Limited Duration : ( March 2006 - January 2010 ) Page 2 of 5
  • 3. Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining Company LimitedCompany Limited Project : Client : Royal Commission for Jubail & Yanbu Ref. No. : Project Name : Technical Services Department.  Worked at the proposal department in the main office & responsible for review the E&I work for Bidding. This includes the estimation of electrical and instrumentation and CP work. Position : Sr, Engineer E&I. • Employer : Saudi Binladin Group-PCM Duration : (June 2005 – February 2006) Project Name : JUBAIL UNITED PETROCHEMICAL Complex.(JUPC)  The contract work includes the following.  Cathodic Protection work for the intake structure, tanks firehadrent with mechanical piping and Oxygen Line.  Installation of Field instruments and cable laying Hexane tank.  Installation of control room equipment DCS panels, and Consoles.  Cable tray lighting and conduit works.  Assistance in commissioning works. • Position : Sr, Engineer E&I. • Employer : Saudi Binladin Group-PCM • Duration : (June2002 - November2004) • Project Name : SWC Wet Wells & pipes for Secondary Industries Park(185-C13) JUBAIL.  Procurement and construction of seawater cooling laterals, surge tanks flow meter chambers Outstations with water quality measurement equipment, ancillaries work includes but not limited to the installation of sluice gates, Cathodic protection work etc. The E&I work includes the upgrading the outstation#20 at SWC canal and construction of three new outstations , installation of Cathodic protection work for Diversion chambers 1,2 &3 and Surge Tank A&B .Review RC CP design and installation of ribbon anodes for the uncoated rebar protection. The Outstation work includes installation of area lighting , RTUs, Analyzers for water quality measurement, MOV installation of sluice gates and installation of ultrasonic transmitters at Seawater laterals for flow measurement and transferring of data to control room through SCADA (Serial communication). • Position : Sr, Engineer E&I. • Employer : SBG-PCM • Duration : (September2000 to May 2002) Page 3 of 5
  • 4. Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining Company LimitedCompany Limited Project : Client : Royal Commission for Jubail & Yanbu Ref. No. : • Project Name : SWC SIPHON REPAIR & OFF TAKE STRUCTURE PROJECT.JUBAIL.  Procurement const. and replacement of Siphon No.3 and 2 Off Take structure Cathodic Protection works which includes but not limited to 2nos of precast concrete access bridge, 3.5Mtr dia pipes . The electrical works includes the upgrading the outstation#24 and construction of new Outstation 24Aincluding the instrumentation installation inside the outstation and relocation of Pad mounted transformer 34.5KV, 75KVA. The work also includes the lighting work of the two off take structure flow chambers 24 & 24A field instruments RTU, Analyzers for the water quality measurement, electrification and instrumentation of sluice gates Installation of level swiches at flow measurement chambers and the data transformer through RTU to SWC Control room through SCADA serial communication.  the Cathodic Protection installation of the concrete Structures of the Diversion Chambers A, B,C & SURGE tanks A & B having volume appox. (17mx12mx40m) and (17mx8mx36m) respectively and to develop the communication Link between field to Royal Commission SWC (Sea Water Cooling) Control room through (SCADA) Communication and to commission the newly installed facilities. • Position : Incharge E&I. • Employer : Saudi Binladin Group –PCM Division • Duration : (January 1999 to August 2000) • Project Name : KEMYA MAJOR EXPENTION PROJECT JUBAIL(3 Major Package)  Selected Underground Construction  Procurement and construction of Sea Water intake and outlet structures foundations for equipments pipe racks firewater and sea water pipe line area drainage and paving and distribution duct banks which includes but not limited to 40300M3 of excavation work, 3200 LM of FRP Piping installation and 320 MT of steel structure work.  OSBL Utilities Procurement and construction of FRP Seawater Distribution System from RC Canal to the entire KEMYA site miscellaneous piping(i.e. potable water sanitary water oily sewer and waste water) installation of sea water pumps and sluice gates communication system and power cables which includes but not limited to the complete installation of Medium voltage cables laying and terminations of seawater intake motors 4.16 KV and switch gears at substations MV/LV and controls cable laying between the substations. This also includes the installations of field instruments and ultrasonic flow transmitter at various locations Upgrading the hardware of DCS of central control room as per new modified works.  Substation Building Page 4 of 5
  • 5. Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining Company LimitedCompany Limited Project : Client : Royal Commission for Jubail & Yanbu Ref. No. :  Procurement and construction of 5 No of substation building electrical materials (13.8 KV/4.16KV and 480V equipments (MV/LV switch gears MCCs, Transformers MV/LV, Bus ducts, lighting panels and accessories) MV/LV Cable laying / termination of MV(4.16KV) motors & at MCCs, Installation of Fire alarm system paging and public address system installation of Instt. cabinets consoles indoor and outdoor lighting works., • Position : Sr. Engineer E&I. • Employer : DESCON Engineering. Pakistan. • Duration : (1993 to 1999) • Project Name : Various Projects Specific Duties and Responsibilities/Scope of Work: Various Project sites in Pakistan:  Fauji Jordan Fertilizer Co. (Pakistan) – As Electrical and Instrumentation Engineer, the main responsibility was laying of electrical cables installation (MV, LV), testing of electrical equipment at the main power house with 2 x 13 MW GE Gas Turbines, HRSG, Waste heat Boiler’s instrument installation, Fire alarm and paging system and installation of field instruments at the power house gas turbine, utilities, cooling tower and Bagging area along with Installation of DCS Panels, work stations commissioning of Elsag Belly Distributed Control System (DCS) at utilities and Ammonia Plant.  Fauji Cement Co, Texila (Pakistan) – As Instrumentation and Electrical Engineer, was responsible for installation of MV motors at Crushers, Cement mill, and the commissioning of LV switchgears & MCCs at two sub-station and calibration of field instruments and fire alarm system in side CCR along with the installation of PLC hardware at CCR.  Lucky Cement Co. D.I. Khan (Pakistan) – Responsible for the installation and calibration of field instrumentation, installation and commissioning of FoxBoro DCS and fire alarm system inside the control room  Kadun Wari Gas Fields (Pakistan) – As Instrumentation Engineer at the Gas-field, under Foster Wheeler, UK, I was responsible for the installation and testing / calibration of field instruments for Slug Catcher, Fin-fans and Control room Development.  Associated Cement Company, Wah (Pakistan) - as Electrical and Instrumentation Engineer, responsible for the installation of field instrumentation and installation / testing of electrical equipment in the MW switchgear and substations with the calibration of FL smith/ABB. Position: Operational Supervisor Duration: 1979 to 1984 Employer: Packages Ltd, Pakistan, FF Co. Project: Lahore and Sadiq-Abad Page 5 of 5
  • 6. Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining Company LimitedCompany Limited Project : Client : Royal Commission for Jubail & Yanbu Ref. No. : Specific Duties and Responsibilities/Scope of Work:  Worked as shift in-charge on Water Treatment Plant (Demineralization Unit) in Packages Ltd. Lahore and Fauji Fertilizers Co. Pakistan. These plants produce mineral free water to be used in Thermal Power Generation and Cooling Towers. These units consist of Pre treatment Plant, Demineralization Units, Mix bed polishers and Waste water treatment plant. Page 6 of 5
  • 7. Petroleum, Chemicals and MiningPetroleum, Chemicals and Mining Company LimitedCompany Limited Project : Client : Royal Commission for Jubail & Yanbu Ref. No. : Specific Duties and Responsibilities/Scope of Work:  Worked as shift in-charge on Water Treatment Plant (Demineralization Unit) in Packages Ltd. Lahore and Fauji Fertilizers Co. Pakistan. These plants produce mineral free water to be used in Thermal Power Generation and Cooling Towers. These units consist of Pre treatment Plant, Demineralization Units, Mix bed polishers and Waste water treatment plant. Page 6 of 5