SlideShare a Scribd company logo
1 of 2
Download to read offline
1
G.NaveenKumar
Design Engineer - Instrumentation
Phone: +91 9443235655 Email: naveen.beice@yahoo.com
Professional Summary
● Engineer responsible for Design & Detailed Engineering.
● Installation Inspection & Commissioning Assistance.
● Field Trainings in Power plants & Petro-chemical plants
● Training on Honeywell Experion C-300, Yokogawa CS-3000, Emerson Delta-V MD+, Rockwell / Allen
Bradley SLC 5/03 PLC.
● Training on PDMS.
● Knowledge on Intergraph Smart Plant Instrumentation (INTools).
● Experience on AutoCAD, MS Office & Allen Bradley Integrated Architecture Builder.
Education
Graduate
2006 - 2010
Degree in Bachelor of Engineering in Instrumentation & Control with first class
at Tamilnadu College of Engineering (Coimbatore) – ANNA UNIVERSITY.
Schooling
2005 - 2006
12th: Arul Sasthalaya higher sec. school (Pondicherry) with 76%.
Experience
ProU India
Nov’12 – Present
MEK (Methyl Ethyl Ketone) & SBA (Secondary Butyl Alcohol) EXPANSION PROJECT
- CETEX PETROCHEMICALS, CHENNAI, TAMIL NADU
The project involves with providing Design & Detailed engineering, Installation
Inspection Services for MEK & SBA Expansion Project for the CETEX Petrochemicals.
PVC PLANT - UPGRADATION & AUTOMATION PHASE I & II - DCW LTD,
TUTICORIN, TAMIL NADU
The objective of this project is to provide Design & Detailed Engineering Service.
The Project essentially consists of the following independent projects.
1) Automation of Chemicals charging for the first set of 8 reactors & automation of
reactor No.15. (Phase - I)
2) Dryer Expansion (Phase - I)
3) Residual VCM stripper system (Phase - I)
4) Automation of Chemicals charging & remaining 15 reactors (Phase – II)
MINA ABDHULLA REFINERY-KUWAIT NATIONAL PETROLEUM COMPANY,
KUWAIT
The Project essentially consists of 6 numbers of independent brown field projects. This
project involves with providing Design & Detailed engineering along interfacing with
Centralized Control Room as per KNPC Standard.
MIBK PROJECT - CETEX PETROCHEMICALS, CHENNAI, TAMIL NADU
The entire process is defined as per M/s Shell’s Process Documents of their Houston,
USA Plant. A) Acetone to MIBK is in 3 steps : 1) Acetone to Di Acetone Alcohol (DAA)
2) DAA to Mesityl Oxide(MO) ; 3) Mesityl Oxide to Methyl Iso Butyl Ketone(MIBK);
B. MIBK is converted to MIBC. Done all engineering activities required for this project.
2
(Deputed to) COMPUTER SYSTEM PROTECTION CHAMBERS & INTEGRATED
COMMUNICATIONS CO. LTD. DAMMAM 31492, KINGDOM OF SAUDI ARABIA
Designing various Telecommunication Shelters (Control rooms / Satellite Instrument
Building) in all disciplines for SAUDI ARAMCO, YANPET (SAUDI YANBU
PETROCHEMICAL CO. , SEC (Saudi Electricity Company) according to their
respective standards.
Vetri Engineers
Jan’11 - Nov’12
MINA AL-AHMADI REFINERY - KUWAIT NATIONAL PETROLEUM COMPANY,
KUWAIT
(2 Year’s) The objective of this project is to perform design & Detailed engineering deliverables
for Modernization of Obsolete Instrumentation Project (MOIP-II) as per KNPC Std.
YANBU PETROCHEMICALS (YANPET), SAUDI ARABIA.
Prepared Control System Architectures and pre-bidding documents for five units .
Skills
Personal Details
Father’s name : J.Gunasekaran
D.O.B : 27.06.1988
Languages Known : Tamil, English
Nationality : Indian
Passport Number : J8548154 expires on 04.12.2021.
Marital Status : Married
[ G.NAVEEN KUMAR]
DESIGN & DETAILED ENGINEERING OTHER PROJECT ACTIVITIES
Study and review of Tender Documents
Design Basis / Control Narrative
Instrument Index
I/O Lists
Cause & Effect Matrix
Control System Architecture
Data Sheets / Specifications
Installation diagram / Hook-Up
Instrument Location Layout
Junction Box Location Layout
Cable Tray Routing Diagram
Loop Diagram
Cable Block Diagram
Cable schedule
Junction Box Wiring Diagram
Fire & Gas Detection and Alarm System Layout
Fire & Gas Riser diagram
Fire Alarm System Interconnection Diagram
Techno-Commercial Bid Evaluation
Tender for Instrumentation Erection Contract
Inter-departmental checks & co-ordination
Process
Electrical
Mechanical/Piping
Civil
Procurement Assistance
RFQ for Instruments & accessories
Technical Bid Evaluation for Instruments
Review vendor quotations, proposals and
technical documents
Co-ordinate with instrument vendors.
Project estimation
Prepare estimate for man-hours
Project cost estimation
Preliminary project Schedule
Other Department works
Single Line Diagram & Load Schedule
Power & Control wiring diagram
Grounding Layout

More Related Content

What's hot

Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cvS Kumar
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Raushan Kumar
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limitedHimanshu9974
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon
 
2014, GT ENGINEERING, LLC, BROCHURE
2014, GT ENGINEERING, LLC, BROCHURE2014, GT ENGINEERING, LLC, BROCHURE
2014, GT ENGINEERING, LLC, BROCHURETodd Hackney
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015David Karbach
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.docAbdul Razzaq
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesPuneet Jaggi
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vhen Atienza
 

What's hot (20)

Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cv
 
CV_Talgat Turekulov_eng
CV_Talgat Turekulov_engCV_Talgat Turekulov_eng
CV_Talgat Turekulov_eng
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
Resume-Murugan
Resume-MuruganResume-Murugan
Resume-Murugan
 
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
 
James Bullen CV
James Bullen CVJames Bullen CV
James Bullen CV
 
GE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear InnovationGE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear Innovation
 
My CV
My CVMy CV
My CV
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
2014, GT ENGINEERING, LLC, BROCHURE
2014, GT ENGINEERING, LLC, BROCHURE2014, GT ENGINEERING, LLC, BROCHURE
2014, GT ENGINEERING, LLC, BROCHURE
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
GMcnicol CV
GMcnicol CVGMcnicol CV
GMcnicol CV
 
Personal Presentation
Personal PresentationPersonal Presentation
Personal Presentation
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
 

Similar to G. Naveen Kumar-Instrumentation Design Engineer

Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEvijayabaskar v
 
Gary Hall CV 2015
Gary Hall  CV 2015Gary Hall  CV 2015
Gary Hall CV 2015Gary Hall
 
Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016Sondus Ahmed
 
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expCV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expRashesh Shah
 
Jimmy M Barker_Resume
Jimmy M Barker_ResumeJimmy M Barker_Resume
Jimmy M Barker_ResumeJimmy Barker
 
Jimmy Barker Resume
Jimmy Barker ResumeJimmy Barker Resume
Jimmy Barker ResumeJimmy Barker
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Uday Kiran Updated Resume
Uday Kiran Updated ResumeUday Kiran Updated Resume
Uday Kiran Updated ResumeUday Kiran
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Boytoy Domer
 
Rowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon
 
Krishna Moorthi Resume updated 2016
Krishna Moorthi Resume updated 2016Krishna Moorthi Resume updated 2016
Krishna Moorthi Resume updated 2016D.KRISHNA MOORTHI
 

Similar to G. Naveen Kumar-Instrumentation Design Engineer (20)

Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
CV 2016 new
CV 2016 newCV 2016 new
CV 2016 new
 
Gary Hall CV 2015
Gary Hall  CV 2015Gary Hall  CV 2015
Gary Hall CV 2015
 
noorCV
noorCVnoorCV
noorCV
 
Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
CV_AD1
CV_AD1CV_AD1
CV_AD1
 
CV
CVCV
CV
 
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expCV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
 
Resume iif 2020
Resume iif 2020Resume iif 2020
Resume iif 2020
 
Khlau Rev0 150701
Khlau Rev0 150701Khlau Rev0 150701
Khlau Rev0 150701
 
Jimmy M Barker_Resume
Jimmy M Barker_ResumeJimmy M Barker_Resume
Jimmy M Barker_Resume
 
Jimmy Barker Resume
Jimmy Barker ResumeJimmy Barker Resume
Jimmy Barker Resume
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
Uday Kiran Updated Resume
Uday Kiran Updated ResumeUday Kiran Updated Resume
Uday Kiran Updated Resume
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
 
Rowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSU
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
Krishna Moorthi Resume updated 2016
Krishna Moorthi Resume updated 2016Krishna Moorthi Resume updated 2016
Krishna Moorthi Resume updated 2016
 

G. Naveen Kumar-Instrumentation Design Engineer

  • 1. 1 G.NaveenKumar Design Engineer - Instrumentation Phone: +91 9443235655 Email: naveen.beice@yahoo.com Professional Summary ● Engineer responsible for Design & Detailed Engineering. ● Installation Inspection & Commissioning Assistance. ● Field Trainings in Power plants & Petro-chemical plants ● Training on Honeywell Experion C-300, Yokogawa CS-3000, Emerson Delta-V MD+, Rockwell / Allen Bradley SLC 5/03 PLC. ● Training on PDMS. ● Knowledge on Intergraph Smart Plant Instrumentation (INTools). ● Experience on AutoCAD, MS Office & Allen Bradley Integrated Architecture Builder. Education Graduate 2006 - 2010 Degree in Bachelor of Engineering in Instrumentation & Control with first class at Tamilnadu College of Engineering (Coimbatore) – ANNA UNIVERSITY. Schooling 2005 - 2006 12th: Arul Sasthalaya higher sec. school (Pondicherry) with 76%. Experience ProU India Nov’12 – Present MEK (Methyl Ethyl Ketone) & SBA (Secondary Butyl Alcohol) EXPANSION PROJECT - CETEX PETROCHEMICALS, CHENNAI, TAMIL NADU The project involves with providing Design & Detailed engineering, Installation Inspection Services for MEK & SBA Expansion Project for the CETEX Petrochemicals. PVC PLANT - UPGRADATION & AUTOMATION PHASE I & II - DCW LTD, TUTICORIN, TAMIL NADU The objective of this project is to provide Design & Detailed Engineering Service. The Project essentially consists of the following independent projects. 1) Automation of Chemicals charging for the first set of 8 reactors & automation of reactor No.15. (Phase - I) 2) Dryer Expansion (Phase - I) 3) Residual VCM stripper system (Phase - I) 4) Automation of Chemicals charging & remaining 15 reactors (Phase – II) MINA ABDHULLA REFINERY-KUWAIT NATIONAL PETROLEUM COMPANY, KUWAIT The Project essentially consists of 6 numbers of independent brown field projects. This project involves with providing Design & Detailed engineering along interfacing with Centralized Control Room as per KNPC Standard. MIBK PROJECT - CETEX PETROCHEMICALS, CHENNAI, TAMIL NADU The entire process is defined as per M/s Shell’s Process Documents of their Houston, USA Plant. A) Acetone to MIBK is in 3 steps : 1) Acetone to Di Acetone Alcohol (DAA) 2) DAA to Mesityl Oxide(MO) ; 3) Mesityl Oxide to Methyl Iso Butyl Ketone(MIBK); B. MIBK is converted to MIBC. Done all engineering activities required for this project.
  • 2. 2 (Deputed to) COMPUTER SYSTEM PROTECTION CHAMBERS & INTEGRATED COMMUNICATIONS CO. LTD. DAMMAM 31492, KINGDOM OF SAUDI ARABIA Designing various Telecommunication Shelters (Control rooms / Satellite Instrument Building) in all disciplines for SAUDI ARAMCO, YANPET (SAUDI YANBU PETROCHEMICAL CO. , SEC (Saudi Electricity Company) according to their respective standards. Vetri Engineers Jan’11 - Nov’12 MINA AL-AHMADI REFINERY - KUWAIT NATIONAL PETROLEUM COMPANY, KUWAIT (2 Year’s) The objective of this project is to perform design & Detailed engineering deliverables for Modernization of Obsolete Instrumentation Project (MOIP-II) as per KNPC Std. YANBU PETROCHEMICALS (YANPET), SAUDI ARABIA. Prepared Control System Architectures and pre-bidding documents for five units . Skills Personal Details Father’s name : J.Gunasekaran D.O.B : 27.06.1988 Languages Known : Tamil, English Nationality : Indian Passport Number : J8548154 expires on 04.12.2021. Marital Status : Married [ G.NAVEEN KUMAR] DESIGN & DETAILED ENGINEERING OTHER PROJECT ACTIVITIES Study and review of Tender Documents Design Basis / Control Narrative Instrument Index I/O Lists Cause & Effect Matrix Control System Architecture Data Sheets / Specifications Installation diagram / Hook-Up Instrument Location Layout Junction Box Location Layout Cable Tray Routing Diagram Loop Diagram Cable Block Diagram Cable schedule Junction Box Wiring Diagram Fire & Gas Detection and Alarm System Layout Fire & Gas Riser diagram Fire Alarm System Interconnection Diagram Techno-Commercial Bid Evaluation Tender for Instrumentation Erection Contract Inter-departmental checks & co-ordination Process Electrical Mechanical/Piping Civil Procurement Assistance RFQ for Instruments & accessories Technical Bid Evaluation for Instruments Review vendor quotations, proposals and technical documents Co-ordinate with instrument vendors. Project estimation Prepare estimate for man-hours Project cost estimation Preliminary project Schedule Other Department works Single Line Diagram & Load Schedule Power & Control wiring diagram Grounding Layout