SlideShare a Scribd company logo
1 of 7
PERSONAL AND CONFIDENTIAL
IMAN KALYAN MUKHERJEE
Address Najda Street, Abu Dhabi, United Arab Emirates, P.O. Box: 44169
Phone +971528938960,+97126223063,+919836796254
E-Mail iman_mukherjee@yahoo.com
Seeking assignments in Engineering & Design with an organization of repute
Synopsis
 12.5 years of experience in Engineering Consultancies, in the Oil & Gas,Refinery and
Petrochemical sector, currently working with Worley Parsons, Abu Dhabi as Senior
Engineer: Electrical. Have been working as Electrical Discipline Lead Engineer for Shell
BGC Umbrella contract for the last 2.5 years, successfully delivering upon over 30K Man-
hours worth of Engineering Deliverables, Procurement Support and Site Support Activities.
Responsibilities include managing a team of 7 Engineers and 3 Designers, Inter-Discipline
Coordination, Man-power planning, project scheduling, budgeting and delivering on the project
maintaining the quality of deliverables within the productivity targets.
 Thorough understanding of the various procedures in design and engineering of oil & gas,
refinery and petrochemical installations.
 Adept at various aspects of Electrical Engineering including system studies, equipment sizing
calculations, hazardous area classification studies, engineering layouts among others.
 Experienced at planning for project manpower requirement and ensuring delivery of projects
maintaining budget and productivity targets.
 An effective communicator with good analyzing and problem solving skills.
Core Competencies
Engineering & Design
 System studies with working knowledge of ETAP for Load Flow Studies, Short Circuit
Calculation, Harmonics Studies and Motor Start Up Studies (Dynamic and Static Motor Start
Up).
 Preparation of Key Single Line Diagrams.
 Preparation of Metering and Protection Single Line Diagrams.
 Load Analysis and preparation of Electrical Load Schedules.
 Sizing of equipments: Transformers, NGR, Capacitors, Switchboards, DC and AC UPS, EDG.
 Earthing & Lightning Protection Calculations, Lighting Calculations, Cable sizing.
 Review of Substation Equipment Layouts, Cable Routing Layouts.
 Review of control schematics of switchgear.
 Preparation of Datasheets and Material Requisitions.
 Preparation of RFQs for Long Lead as well as Package Items, Review of Vendor Documents for
the same.
 Hazardous Area Classification Studies and preparation of HAC Layouts.
 Equipment Selection for Hazardous Area.
PERSONAL AND CONFIDENTIAL
Career Features
Worley Parsons, Abu Dhabi Senior Engineer June’13- Till Date
Projects :
Shell Basra: Shell Umbrella of Rehabilitation and Greenfield Projects in West Quarna,
North Rumeila and Hammar Oil Fields, Iraq: Oct’13-Till Date
 Working as Electrical Discipline Lead Engineer for Shell Basra Umbrella Project Client
being JV of Shell and BGC (Basrah Gas Company, Iraq).
 Responsibilities include : Development of Electrical Design Basis
 Development of Key Single Line Diagram
 Preparation of Electrical Load Schedule
 Development of Metering and Protection Single Line Diagram
 Calculations :
 Earthing & Lightning Protection Calculation
 Diesel Generator Sizing Calculations
 Cable sizing Calculations
 Transformer Sizing Calculation
 Battery and UPS Sizing Calculation
 Lighting Calculation and Panel Schdule
 Power System Study :
 Load flow analysis
 Short Circuit study
 Motor Start up Study
 Layouts :
 Preparation of Substation Equipment Layout.
 Preparation of Cable Routing Layout.
 Preparation of Power Layout.
 Preparation of Earthing Layout
 Preparation of Lighting Layout
 Review of Hazardous Area Layouts.
 Preparation of Specifications :
 Specification for Switchgears.
 Specifications of Transformers.
 Specifications for Prefabricated Modular Substations.
 Specification for LV & MV Motors
 Specification for DC & AC UPS and Battery system
 Specification for Emergency Diesel Generator
 Specification for Bulk Materials
 Lists & Schedules :
 Preparation of Electrical Load List
 Preparation of Switchgear I/O Schedule
 Preparation of Cable Schedule.
 Preparation of Datasheets :
 Datasheet for LV & MV Motor
 Datasheet for MV & LV Switchgear
 Data Sheet for Transformer
 Datasheet for AC & DC UPS
PERSONAL AND CONFIDENTIAL
 Datasheet for Diesel Generator.
 Preparation and Review of Switchgear Control Schematics.
 Preparation and Review of Switchgear Interconnection drawing and schedule
 Preparation of Cable Schedules, Cable MTO and Bulk MTO.
 Vendor document review
 Responsible for adherence to proper quality procedures in all project activities as per the
recommendations and requirements of ISO quality procedures.
 Deliver the project within the budgeted hours maintaining progress and productivity
targets.
 Man-power planning for the project and preparing quarterly manpower forecasts for the
discipline.
Successfully lead a team of 7 engineers and 3 designers delivering more than 30,000 hours of
Engineering, Procurement and Construction Support activities and deliverables with an overall
project productivity of 0.95- 1.05,for Shell/BGC Umbrella of projects.
Third River Water Transfer: June’13- Oct’13
 Worked as Lead Electrical Engineer for Third River Water Transfer FEED Project. The site
is at, Iraq. Client being Lukoil
 The responsibilities include preparation of all electrical deliverables including :
 Electrical Load List.
 Single Line Diagram (Key SLD as well as Metering & Protection SLD)
 Calculations :
 Earthing & Lightning Protection Calculation
 Diesel Generator Sizing Calculations
 Cable sizing Calculations
 Transformer Sizing Calculation
 Battery and UPS Sizing Calculation
 Power System Study :
 Load flow analysis
 Short Circuit study
 Harmonics study.
 Layouts :
 Preparation of Substation Equipment Layout.
 Preparation of Cable Routing Layout.
 Preparation of Power Layout.
 Preparation of Earthing Layout
 Preparation of Lighting Layout
 Preparation of Specifications :
 Electrical Design Philosophy
 Specification for Earthing System
 Specification for LV & MV Motors
 Specification for DC & AC UPS and Battery system
 Specification for Bulk Materials
 Lists & Schedules :
 Preparation of Switchgear I/O Schedule
 Preparation of Cable Schedule.
 Preparation of Datasheets :
PERSONAL AND CONFIDENTIAL
 Datasheet for LV & MV Motor
 Datasheet for MV & LV Switchgear
 Datasheet for AC & DC UPS
 Datasheet for Diesel Generator.
 Preparation of Switchgear Control Schematics.
 Vendor document review
 Responsible for all quality related issues for all the project deliverables for electrical
discipline.
 Deliver the project within the budgeted hours maintaining progress and productivity
targets.
 Man-hour planning.
Dow Chemical International Lead Engineer May’12- May’13
(India Engineering Center)
Projects :
SADARA Polyethylene Project : May ‘12 – Dec’12
 Worked as the Area Lead for SADARA Polyethylene Train 2 detailed design project. Client
being a Joint Venture of Dow Chemical and Sadara (RTIP) building the largest
petrochemical facility in the world at Al Khobar , KSA, Dow IEC (India Engineering Center)
shall be providing the EPC service to the JV.
 Responsibilities included all design deliverables for Polyethylene Train 2 as follows :
 Preparation of Electrical Load List.
 Preparation of Single Line Diagram.
 System study using ETAP 11.0 (Load Flow Studies, Short Circuit Studies calculating Device
Capability & Dynamic Motor Start Up Study)
 Preparing sizing calculation for all electrical equipment.
 Preparation of Grounding and Lighting Protection Calculation and Layout.
 Preparation of data sheets for all electrical equipment and subsequently participates in
procurement function, by raising RFQ proceeding with TBE and finalising with placing of
P.O.
 Review and prepare all electrical layouts.
 Preparation of Hazardous Area Classification Layout and Selection of Electrical Equipment
for Hazardous Area.
 Liaisons with all inter related disciplines.
 Report directly to the Project Engineering Manager and the Overall Electrical Discipline
Lead for Polyethylene Envelope being accountable for the overall progress, productivity as
well as all electrical design deliverables for Train 2.
SNC LAVALIN Senior Engineer Apr’11- May’12
Projects :
ONGC OPAL :
PERSONAL AND CONFIDENTIAL
 Worked as Area Lead Engineer for ONGC OPAL Offsites and Utilities Engineering.
 Responsibilities include the following.
 System Studies including load flow studies, motor start up studies, and calculating device
ratings by short circuit analysis using ETAP 7.5.0.
 Equipment sizing, including Transformer, NGR, Battery and DC UPS Systems, Cable Sizing
Calculations, Voltage Drop Calculations.
 Preparation of Cable Schedules.
 Engineering of Substations including preparation of S/S Equipment Layout, Building Cut
Out Layout etc.
 Preparation of Key SLD as well as individual metering and protection SLD from 6.6 kV to
LT Auxiliary Boards.
 Reviewing of Vendor Packages including Cathodic Protection.
 Preparation of PR and coordination with vendors for all long lead items.
Foster Wheeler India Pvt Ltd Senior Engineer Mar’07-Feb’11
Projects :
OSOS Petrochemicals: Mar’07- Aug07
 Involved in the Front End Engineering of OSOS Petrochemicals.
 Preparation of Key Single Line Diagram Line Diagram.
 Preparation of Electrical Load Schedule.
 Preparation of Metering and Protection Single Line Diagram.
 Cable Sizing Calculation.
 Load Flow Studies, Short Circuit Calculations and Static Motor Start Up Studies using ETAP.
 Preparation of Lighting Calculations and Preparation of Lighting Layout.
 Preparation of Substation Equipment Layout.
 Preparation Of Hazardous Area Classification Layouts.
Karan Gas Facilities : Sep’07-Nov’08
 Involved in the Front End Engineering of a Gas Treatment Facility, client being Saudi
Aramco.
 Responsibilities include development of Key as well as Protection and Metering Single Line
Diagram for MV and LV systems.
 Preparation of Protection and Metering Single Line Diagram for Emergency Diesel
Generator.
 Sizing calculation for Emergency Diesel Generator.
 Preparation of Electrical Load Schedule.
 Power cable sizing calculation.
 Preparation of Cable Routing Layout.
 Preparation of Hazardous Area Classification Layout.
 AC UPS sizing calculation.
 DC Battery Charger sizing calculation.
 Preparation of Datasheets for DC battery charger and AC UPS.
 Grounding System Calculation.
 Preparation of Substation Equipment Layout.
PERSONAL AND CONFIDENTIAL
Ras Tanura Intigrated Project Nov’08- Feb’11
 Responsible for the Detailed Feed, client being a Joint Venture of Saudi Aramco and Dow Chemcals.
 Was deputed to the UK headquarters of Foster Wheeler Energy Ltd ,at Reading Berkshire
working as Area Lead Engineer.
 Working as electrical engineer for Hydrocarbons and Aromatics Envelope, and Area Lead Engineer for
Waste Treatment Systems, with the following responsibilities.
 Preparation of electrical load summary.
 Preparation of One Line Diagram.
 Preparation of Trace Heating Schedule.
 Preparation of DC system calculations.
 Preparation of Earthing calculations.
 Review of cable routing layout.
 Cable Sizing Calculations.
 NGR sizing calculations.
 Preparation of Motor Datasheets ( MV and LV).
 Preparation of Switchgear and MCC datasheets ( MV and LV)
 Review of P& ID and identifying control scheme for motors of various ratings.
Reliance Industries Ltd Manager Apr’04-Feb’07
Joined Reliance Industries Limited as GEL ( Graduate Engineer Learner ) in April 2004, and worked
as a Manager from May 2005 – February 2007 upon successful completion of one year training.
Involved in detail engineering activities in the expansion of CPP Jamnagar. Following are the
details of the areas of exposure with RIL Jamnagar:
Detail Engineering:
 Power System Study using ETAP (Load Flow, Short Circuit and Dynamic Motor Start-Up
Studies)
 Preparation of Electrical Load Schedule.
 Preparation of Single Line Diagram.
 Cable sizing for HT/LT motors, transformer feeders, MCC feeders.
 Preparation of cable schedules.
 Sizing of Power and Distribution transformers, and sizing of NGR.
 Earthing and Lighting protection calculations and preparation of Grounding and Lightening
Protection Layout .
 Lighting Calculations for both plant and indoor areas.
 Preparation of Hazardous Area Classification Layouts and Selection of Equipment for
Hazardous Area.
 Preparation of Substation Equipment Layout.
 Preparation of Datasheet for Motors, Transformers, MCCs and Switch Gear.
 Vendor Document Review.
 Preparation of RFQ, participating in TBE and placement of Purchase Order using SAP.
 Review of Control schematics of HT/LT switchgear.
PERSONAL AND CONFIDENTIAL
Bharat Bijlee Limited Engineer Aug’03-Feb’04
Joined Bharat Bijlee Limited, Kolkata as Trainee Engineer.
Undergone extensive training in company’s projects department and was absorbed after successful
completion of the training.
Academia
B.Tech in Electrical Engg : Kalyani University 2003 80.49%
Higher Secondary : 10+2 South Point High School, Kolkata 1998 71.1%
Madhyamik :10 South Point High School, Kolkata 1996 77.22%
IT Credentials
Software : ETAP 12.5, Smart Plant 3D, Smart Plant Review,
Personal Vitae
Date of Birth : 17th
May, 1979
Marital Status : Married
Permanent Address : P-69, Greenview, Baishnabghata, Kolkata-700084
Email id : iman_mukherjee@yahoo.com
Phone : +971528938960,+97126223063,+919836796254
Passport Number : G1767968.

More Related Content

What's hot

Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping EngineerPopovici Adrian
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016RUKNUDDIN ALI
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsNoor Wali Khan
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMohammed Akbar
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP SupervisorArun Arun
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Sarim Mujtaba
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs expSudipto Majumder
 

What's hot (20)

Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
CV Solar
CV SolarCV Solar
CV Solar
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
Electrical Supervisor
Electrical SupervisorElectrical Supervisor
Electrical Supervisor
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
RATHEESH - CV - 19-08-2015
RATHEESH  - CV - 19-08-2015RATHEESH  - CV - 19-08-2015
RATHEESH - CV - 19-08-2015
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs exp
 

Viewers also liked

Elf By: Jake Daniels & James Welch
Elf  By: Jake Daniels & James WelchElf  By: Jake Daniels & James Welch
Elf By: Jake Daniels & James Welchjwelch88
 
Command Line Interface - Control Chamber
Command Line Interface - Control ChamberCommand Line Interface - Control Chamber
Command Line Interface - Control ChamberWorachart Pirunruk
 
Unit 125 city life presentation
Unit 125   city life presentationUnit 125   city life presentation
Unit 125 city life presentationDeclan Brophy
 
True experimental research design, by Aweke Shishigu
True experimental research design, by Aweke ShishiguTrue experimental research design, by Aweke Shishigu
True experimental research design, by Aweke ShishiguAweke Shishigu
 
Joints and cartilages
Joints and cartilagesJoints and cartilages
Joints and cartilagesalshahbaa
 
Storyboard number 2
Storyboard number 2Storyboard number 2
Storyboard number 2tomanton
 
Marketing Automation: the Future of Email Marketing
Marketing Automation: the Future of Email MarketingMarketing Automation: the Future of Email Marketing
Marketing Automation: the Future of Email MarketingKickoffLabs_Marketing
 
Session viii(state mngtserver)
Session viii(state mngtserver)Session viii(state mngtserver)
Session viii(state mngtserver)Shrijan Tiwari
 
Adiviñas ilustracións
Adiviñas ilustraciónsAdiviñas ilustracións
Adiviñas ilustraciónseduc-arte
 
Poetry unit plan
Poetry unit planPoetry unit plan
Poetry unit planpalmer57
 
CV ANGLAIS BOUARBI WALID
CV ANGLAIS BOUARBI WALIDCV ANGLAIS BOUARBI WALID
CV ANGLAIS BOUARBI WALIDwalid boua
 
SACRRA BCISI Industry Positioning
SACRRA BCISI  Industry PositioningSACRRA BCISI  Industry Positioning
SACRRA BCISI Industry PositioningKevin Vlietman
 
Perangkat keras-internet1
Perangkat keras-internet1Perangkat keras-internet1
Perangkat keras-internet1Adam51000
 
How to talk to your partner about Erectile Dysfunction
How to talk to your partner about Erectile DysfunctionHow to talk to your partner about Erectile Dysfunction
How to talk to your partner about Erectile DysfunctionRistard Flynn
 

Viewers also liked (20)

Elf By: Jake Daniels & James Welch
Elf  By: Jake Daniels & James WelchElf  By: Jake Daniels & James Welch
Elf By: Jake Daniels & James Welch
 
1st
1st1st
1st
 
Command Line Interface - Control Chamber
Command Line Interface - Control ChamberCommand Line Interface - Control Chamber
Command Line Interface - Control Chamber
 
Unit 125 city life presentation
Unit 125   city life presentationUnit 125   city life presentation
Unit 125 city life presentation
 
True experimental research design, by Aweke Shishigu
True experimental research design, by Aweke ShishiguTrue experimental research design, by Aweke Shishigu
True experimental research design, by Aweke Shishigu
 
Joints and cartilages
Joints and cartilagesJoints and cartilages
Joints and cartilages
 
SBC
SBCSBC
SBC
 
Calendário de eventos e treinamentos 2016 segundo SEMESTRE
Calendário de eventos e treinamentos 2016 segundo SEMESTRECalendário de eventos e treinamentos 2016 segundo SEMESTRE
Calendário de eventos e treinamentos 2016 segundo SEMESTRE
 
Annisaa noviyanti
Annisaa noviyantiAnnisaa noviyanti
Annisaa noviyanti
 
Storyboard number 2
Storyboard number 2Storyboard number 2
Storyboard number 2
 
Marketing Automation: the Future of Email Marketing
Marketing Automation: the Future of Email MarketingMarketing Automation: the Future of Email Marketing
Marketing Automation: the Future of Email Marketing
 
Session viii(state mngtserver)
Session viii(state mngtserver)Session viii(state mngtserver)
Session viii(state mngtserver)
 
Adiviñas ilustracións
Adiviñas ilustraciónsAdiviñas ilustracións
Adiviñas ilustracións
 
Poetry unit plan
Poetry unit planPoetry unit plan
Poetry unit plan
 
Evaluation 3
Evaluation 3Evaluation 3
Evaluation 3
 
CV ANGLAIS BOUARBI WALID
CV ANGLAIS BOUARBI WALIDCV ANGLAIS BOUARBI WALID
CV ANGLAIS BOUARBI WALID
 
SACRRA BCISI Industry Positioning
SACRRA BCISI  Industry PositioningSACRRA BCISI  Industry Positioning
SACRRA BCISI Industry Positioning
 
Perangkat keras-internet1
Perangkat keras-internet1Perangkat keras-internet1
Perangkat keras-internet1
 
DODIG-2015-009
DODIG-2015-009DODIG-2015-009
DODIG-2015-009
 
How to talk to your partner about Erectile Dysfunction
How to talk to your partner about Erectile DysfunctionHow to talk to your partner about Erectile Dysfunction
How to talk to your partner about Erectile Dysfunction
 

Similar to Resume

d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)Reddy Premnath
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Akhtar
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBala G
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)sajid akram
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photoronnie luneta
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineerNISHITKUMAR JOSHI
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 

Similar to Resume (20)

tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
CV_Krishnanand
CV_KrishnanandCV_Krishnanand
CV_Krishnanand
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 
Ashok resume till Date
Ashok resume till DateAshok resume till Date
Ashok resume till Date
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical Designer
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
khalid obaidullah resume
khalid obaidullah resumekhalid obaidullah resume
khalid obaidullah resume
 
RCPRESUMEOCT2016
RCPRESUMEOCT2016RCPRESUMEOCT2016
RCPRESUMEOCT2016
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photo
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
 
CV imran-Asghar
CV imran-AsgharCV imran-Asghar
CV imran-Asghar
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 

Recently uploaded

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Recently uploaded (20)

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Resume

  • 1. PERSONAL AND CONFIDENTIAL IMAN KALYAN MUKHERJEE Address Najda Street, Abu Dhabi, United Arab Emirates, P.O. Box: 44169 Phone +971528938960,+97126223063,+919836796254 E-Mail iman_mukherjee@yahoo.com Seeking assignments in Engineering & Design with an organization of repute Synopsis  12.5 years of experience in Engineering Consultancies, in the Oil & Gas,Refinery and Petrochemical sector, currently working with Worley Parsons, Abu Dhabi as Senior Engineer: Electrical. Have been working as Electrical Discipline Lead Engineer for Shell BGC Umbrella contract for the last 2.5 years, successfully delivering upon over 30K Man- hours worth of Engineering Deliverables, Procurement Support and Site Support Activities. Responsibilities include managing a team of 7 Engineers and 3 Designers, Inter-Discipline Coordination, Man-power planning, project scheduling, budgeting and delivering on the project maintaining the quality of deliverables within the productivity targets.  Thorough understanding of the various procedures in design and engineering of oil & gas, refinery and petrochemical installations.  Adept at various aspects of Electrical Engineering including system studies, equipment sizing calculations, hazardous area classification studies, engineering layouts among others.  Experienced at planning for project manpower requirement and ensuring delivery of projects maintaining budget and productivity targets.  An effective communicator with good analyzing and problem solving skills. Core Competencies Engineering & Design  System studies with working knowledge of ETAP for Load Flow Studies, Short Circuit Calculation, Harmonics Studies and Motor Start Up Studies (Dynamic and Static Motor Start Up).  Preparation of Key Single Line Diagrams.  Preparation of Metering and Protection Single Line Diagrams.  Load Analysis and preparation of Electrical Load Schedules.  Sizing of equipments: Transformers, NGR, Capacitors, Switchboards, DC and AC UPS, EDG.  Earthing & Lightning Protection Calculations, Lighting Calculations, Cable sizing.  Review of Substation Equipment Layouts, Cable Routing Layouts.  Review of control schematics of switchgear.  Preparation of Datasheets and Material Requisitions.  Preparation of RFQs for Long Lead as well as Package Items, Review of Vendor Documents for the same.  Hazardous Area Classification Studies and preparation of HAC Layouts.  Equipment Selection for Hazardous Area.
  • 2. PERSONAL AND CONFIDENTIAL Career Features Worley Parsons, Abu Dhabi Senior Engineer June’13- Till Date Projects : Shell Basra: Shell Umbrella of Rehabilitation and Greenfield Projects in West Quarna, North Rumeila and Hammar Oil Fields, Iraq: Oct’13-Till Date  Working as Electrical Discipline Lead Engineer for Shell Basra Umbrella Project Client being JV of Shell and BGC (Basrah Gas Company, Iraq).  Responsibilities include : Development of Electrical Design Basis  Development of Key Single Line Diagram  Preparation of Electrical Load Schedule  Development of Metering and Protection Single Line Diagram  Calculations :  Earthing & Lightning Protection Calculation  Diesel Generator Sizing Calculations  Cable sizing Calculations  Transformer Sizing Calculation  Battery and UPS Sizing Calculation  Lighting Calculation and Panel Schdule  Power System Study :  Load flow analysis  Short Circuit study  Motor Start up Study  Layouts :  Preparation of Substation Equipment Layout.  Preparation of Cable Routing Layout.  Preparation of Power Layout.  Preparation of Earthing Layout  Preparation of Lighting Layout  Review of Hazardous Area Layouts.  Preparation of Specifications :  Specification for Switchgears.  Specifications of Transformers.  Specifications for Prefabricated Modular Substations.  Specification for LV & MV Motors  Specification for DC & AC UPS and Battery system  Specification for Emergency Diesel Generator  Specification for Bulk Materials  Lists & Schedules :  Preparation of Electrical Load List  Preparation of Switchgear I/O Schedule  Preparation of Cable Schedule.  Preparation of Datasheets :  Datasheet for LV & MV Motor  Datasheet for MV & LV Switchgear  Data Sheet for Transformer  Datasheet for AC & DC UPS
  • 3. PERSONAL AND CONFIDENTIAL  Datasheet for Diesel Generator.  Preparation and Review of Switchgear Control Schematics.  Preparation and Review of Switchgear Interconnection drawing and schedule  Preparation of Cable Schedules, Cable MTO and Bulk MTO.  Vendor document review  Responsible for adherence to proper quality procedures in all project activities as per the recommendations and requirements of ISO quality procedures.  Deliver the project within the budgeted hours maintaining progress and productivity targets.  Man-power planning for the project and preparing quarterly manpower forecasts for the discipline. Successfully lead a team of 7 engineers and 3 designers delivering more than 30,000 hours of Engineering, Procurement and Construction Support activities and deliverables with an overall project productivity of 0.95- 1.05,for Shell/BGC Umbrella of projects. Third River Water Transfer: June’13- Oct’13  Worked as Lead Electrical Engineer for Third River Water Transfer FEED Project. The site is at, Iraq. Client being Lukoil  The responsibilities include preparation of all electrical deliverables including :  Electrical Load List.  Single Line Diagram (Key SLD as well as Metering & Protection SLD)  Calculations :  Earthing & Lightning Protection Calculation  Diesel Generator Sizing Calculations  Cable sizing Calculations  Transformer Sizing Calculation  Battery and UPS Sizing Calculation  Power System Study :  Load flow analysis  Short Circuit study  Harmonics study.  Layouts :  Preparation of Substation Equipment Layout.  Preparation of Cable Routing Layout.  Preparation of Power Layout.  Preparation of Earthing Layout  Preparation of Lighting Layout  Preparation of Specifications :  Electrical Design Philosophy  Specification for Earthing System  Specification for LV & MV Motors  Specification for DC & AC UPS and Battery system  Specification for Bulk Materials  Lists & Schedules :  Preparation of Switchgear I/O Schedule  Preparation of Cable Schedule.  Preparation of Datasheets :
  • 4. PERSONAL AND CONFIDENTIAL  Datasheet for LV & MV Motor  Datasheet for MV & LV Switchgear  Datasheet for AC & DC UPS  Datasheet for Diesel Generator.  Preparation of Switchgear Control Schematics.  Vendor document review  Responsible for all quality related issues for all the project deliverables for electrical discipline.  Deliver the project within the budgeted hours maintaining progress and productivity targets.  Man-hour planning. Dow Chemical International Lead Engineer May’12- May’13 (India Engineering Center) Projects : SADARA Polyethylene Project : May ‘12 – Dec’12  Worked as the Area Lead for SADARA Polyethylene Train 2 detailed design project. Client being a Joint Venture of Dow Chemical and Sadara (RTIP) building the largest petrochemical facility in the world at Al Khobar , KSA, Dow IEC (India Engineering Center) shall be providing the EPC service to the JV.  Responsibilities included all design deliverables for Polyethylene Train 2 as follows :  Preparation of Electrical Load List.  Preparation of Single Line Diagram.  System study using ETAP 11.0 (Load Flow Studies, Short Circuit Studies calculating Device Capability & Dynamic Motor Start Up Study)  Preparing sizing calculation for all electrical equipment.  Preparation of Grounding and Lighting Protection Calculation and Layout.  Preparation of data sheets for all electrical equipment and subsequently participates in procurement function, by raising RFQ proceeding with TBE and finalising with placing of P.O.  Review and prepare all electrical layouts.  Preparation of Hazardous Area Classification Layout and Selection of Electrical Equipment for Hazardous Area.  Liaisons with all inter related disciplines.  Report directly to the Project Engineering Manager and the Overall Electrical Discipline Lead for Polyethylene Envelope being accountable for the overall progress, productivity as well as all electrical design deliverables for Train 2. SNC LAVALIN Senior Engineer Apr’11- May’12 Projects : ONGC OPAL :
  • 5. PERSONAL AND CONFIDENTIAL  Worked as Area Lead Engineer for ONGC OPAL Offsites and Utilities Engineering.  Responsibilities include the following.  System Studies including load flow studies, motor start up studies, and calculating device ratings by short circuit analysis using ETAP 7.5.0.  Equipment sizing, including Transformer, NGR, Battery and DC UPS Systems, Cable Sizing Calculations, Voltage Drop Calculations.  Preparation of Cable Schedules.  Engineering of Substations including preparation of S/S Equipment Layout, Building Cut Out Layout etc.  Preparation of Key SLD as well as individual metering and protection SLD from 6.6 kV to LT Auxiliary Boards.  Reviewing of Vendor Packages including Cathodic Protection.  Preparation of PR and coordination with vendors for all long lead items. Foster Wheeler India Pvt Ltd Senior Engineer Mar’07-Feb’11 Projects : OSOS Petrochemicals: Mar’07- Aug07  Involved in the Front End Engineering of OSOS Petrochemicals.  Preparation of Key Single Line Diagram Line Diagram.  Preparation of Electrical Load Schedule.  Preparation of Metering and Protection Single Line Diagram.  Cable Sizing Calculation.  Load Flow Studies, Short Circuit Calculations and Static Motor Start Up Studies using ETAP.  Preparation of Lighting Calculations and Preparation of Lighting Layout.  Preparation of Substation Equipment Layout.  Preparation Of Hazardous Area Classification Layouts. Karan Gas Facilities : Sep’07-Nov’08  Involved in the Front End Engineering of a Gas Treatment Facility, client being Saudi Aramco.  Responsibilities include development of Key as well as Protection and Metering Single Line Diagram for MV and LV systems.  Preparation of Protection and Metering Single Line Diagram for Emergency Diesel Generator.  Sizing calculation for Emergency Diesel Generator.  Preparation of Electrical Load Schedule.  Power cable sizing calculation.  Preparation of Cable Routing Layout.  Preparation of Hazardous Area Classification Layout.  AC UPS sizing calculation.  DC Battery Charger sizing calculation.  Preparation of Datasheets for DC battery charger and AC UPS.  Grounding System Calculation.  Preparation of Substation Equipment Layout.
  • 6. PERSONAL AND CONFIDENTIAL Ras Tanura Intigrated Project Nov’08- Feb’11  Responsible for the Detailed Feed, client being a Joint Venture of Saudi Aramco and Dow Chemcals.  Was deputed to the UK headquarters of Foster Wheeler Energy Ltd ,at Reading Berkshire working as Area Lead Engineer.  Working as electrical engineer for Hydrocarbons and Aromatics Envelope, and Area Lead Engineer for Waste Treatment Systems, with the following responsibilities.  Preparation of electrical load summary.  Preparation of One Line Diagram.  Preparation of Trace Heating Schedule.  Preparation of DC system calculations.  Preparation of Earthing calculations.  Review of cable routing layout.  Cable Sizing Calculations.  NGR sizing calculations.  Preparation of Motor Datasheets ( MV and LV).  Preparation of Switchgear and MCC datasheets ( MV and LV)  Review of P& ID and identifying control scheme for motors of various ratings. Reliance Industries Ltd Manager Apr’04-Feb’07 Joined Reliance Industries Limited as GEL ( Graduate Engineer Learner ) in April 2004, and worked as a Manager from May 2005 – February 2007 upon successful completion of one year training. Involved in detail engineering activities in the expansion of CPP Jamnagar. Following are the details of the areas of exposure with RIL Jamnagar: Detail Engineering:  Power System Study using ETAP (Load Flow, Short Circuit and Dynamic Motor Start-Up Studies)  Preparation of Electrical Load Schedule.  Preparation of Single Line Diagram.  Cable sizing for HT/LT motors, transformer feeders, MCC feeders.  Preparation of cable schedules.  Sizing of Power and Distribution transformers, and sizing of NGR.  Earthing and Lighting protection calculations and preparation of Grounding and Lightening Protection Layout .  Lighting Calculations for both plant and indoor areas.  Preparation of Hazardous Area Classification Layouts and Selection of Equipment for Hazardous Area.  Preparation of Substation Equipment Layout.  Preparation of Datasheet for Motors, Transformers, MCCs and Switch Gear.  Vendor Document Review.  Preparation of RFQ, participating in TBE and placement of Purchase Order using SAP.  Review of Control schematics of HT/LT switchgear.
  • 7. PERSONAL AND CONFIDENTIAL Bharat Bijlee Limited Engineer Aug’03-Feb’04 Joined Bharat Bijlee Limited, Kolkata as Trainee Engineer. Undergone extensive training in company’s projects department and was absorbed after successful completion of the training. Academia B.Tech in Electrical Engg : Kalyani University 2003 80.49% Higher Secondary : 10+2 South Point High School, Kolkata 1998 71.1% Madhyamik :10 South Point High School, Kolkata 1996 77.22% IT Credentials Software : ETAP 12.5, Smart Plant 3D, Smart Plant Review, Personal Vitae Date of Birth : 17th May, 1979 Marital Status : Married Permanent Address : P-69, Greenview, Baishnabghata, Kolkata-700084 Email id : iman_mukherjee@yahoo.com Phone : +971528938960,+97126223063,+919836796254 Passport Number : G1767968.