2018 Planning
April 19, 2018
Presentation of major projects
TECHNICAL MEDIA BRIEFING
#OurProjects
+ Glen P. Carlin, Eng.
Chief Executive Officer
+ Catherine Tremblay, Eng.
Senior Director, Projects, Construction and Operations
+ François Demers, Eng.
Senior Director, Champlain/NCBC Projects
3
Sustained investment
STRUCTURES 2018
(budgeted)
Champlain Bridge $51M
Jacques Cartier Bridge $96M
Honoré Mercier Bridge $31M
Environment $3M
Melocheville Tunnel $9M
Bonaventure Expressway $12M
Champlain Bridge Ice Control
Structure
$9M
TOTAL: $211M
CRITICAL INFRASTRUCTURE
Major projects in the federal network
5
Honoré Mercier Bridge
+ Continuation of pier repair program
+ Initiation of painting program
+ Replacement of inspection
walkways
+ All this work is done with minimal
lane closures
+ Coordination with the MTMDET,
who will be doing repair work
6
Bonaventure Expressway
+ Pier repairs (purple)
+ Deck repairs (under the
structure) (orange)
+ Replacement of expansion
joints (red)
+ Repair to the median barrier
+ June to November 2018 in
coordination with the City of
Montréal, SSL and Turcot
7
Autoroute Bonaventure
#NosChantiers
+ Closure of Hwy. 10 on weekends:
+ 2 weekends (complete
closures toward downtown)
+ 1 weekend (complete closure
in both directions)
+ 2 weekends (complete
closures toward the South
Shore)
+ Approximately 10 complete night
closures in both directions
Multiple closures :
8
ENVIRONMENTAL PROJECT TO PROTECT THE RIVER
Solution Bonaventure
9
Groundwater containment and treatment system
Solution Bonaventure: West Sector
TREATMENT SYSTEM IS OPERATIONAL
+ 32 pumping wells to create a
hydraulic barrier
+ We pump an average of 290 m3/day
of raw water that is treated and then
discharged into the river
10
Retaining wall and hydrocarbon capture system
Solution Bonaventure: East Sector
+ Extraction of contaminated water and BPC
diesel contaminated
+ Recovered contaminated products will be
processed in specialized centers
+ We extract between 8,000 liters and
12,000 liters of contaminated water per
month
+ Groundwater contaminants are contained
before they migrate to the river
+ No impact on traffic
11
2018 Planning
Jacques Cartier Bridge
Reinforcement, cleaning and painting work
Viaduct repairs
Steel work
Repairs to upstream and downstream ramps
(2018)
12
STEEL STRUCTURE
REINFORCEMENT
Jacques Cartier Bridge
+ Major work to reinforce the metal
structure and extend the bridge’s
service life
+ Replacement and reinforcement of
steel members and reinforcing
plates
+ Major program for 2016-2027 done in
phases
13
Current steel work – Montreal
14
Current steel work - Montreal
Photo du chantier à Montréal
15
Planned steel work – Montreal
Summer 2018 mobilization
(between Tansley St. and De Maisonneuve)
16
Current steel work – Longueuil
17
Current steel work - Longueuil
Photo du chantier à Longueuil
18
Planned steel and painting work –
Main span
19
Planned concrete work –
Île Notre-Dame and Île Sainte-Hélène
20
Work – Longueuil sector
BLITZES 1 and 2
April 20 to 23 and May 4 to 7
BLITZ 3 - May 25 to 28
(possible blitz in August)
CLOSURE
Jacques Cartier Bridge off-ramp to St-Laurent
Blvd. West, Hwy. 20 and Hwy. 132
CLOSURE
On-ramps from St-Laurent and Taschereau
West to Jacques Cartier Bridge toward Montreal
21
Replacement of guard rails
+ Replacement of 500 guard-rail
sections along the multipurpose
path and sidewalk
+ Work scheduled to end May 20
+ Night hindrances planned for
the multipurpose path and the
sidewalk to finalize the work
TO COME
+ weekends
22
Traffic on the Jacques Cartier Bridge
+ Structural element replacement work in the evening, at night, and on the weekend
+ Optimization of traffic management scenarios
+ Coordination with other work sites
+ Coordination with stakeholders and Mobility Montréal partners
TO COME
+ Complete night closures between May and Nov
(1 a.m. to 4 a.m.) (approx. 15)
+ A number of partial night closures
+ Complete sidewalk closure from August to October
+ Complete night closure of the multipurpose path until the
end of May
+ 10 more closures planned on for the multipurpose path
from August to October
CHAMPLAIN BRIDGE SECTOR
Major repair program
24
Stable condition thanks to the deployed measures
Monitoring of the structure’s behaviour
+ Decreased risks from the edge girders
and pier caps
+ Ongoing monitoring of the structure’s
behaviour with an instrumentation system
(+330 sensors on the edge girders and
pier caps)
+ Focus on maintaining this critical
economic corridor
25
Reinforcement system being installed on 39 pier caps
Pier cap reinforcement system
26
Minimal underwater work on
2 pier footings
27
Modular Trusses
28
Universal modular trusses for interior edge girders to be installed as needed
Universal modular trusses
29
Replacement diaphragm to be installed between the interior girders as needed
Replacement diaphragm
DiaphragmInterior
girders
DECONSTRUCTION OF THE CHAMPLAIN BRIDGE
31
Owner's engineer contract
+ Contract awarded in February
2018 to Parsons, Tetra Tech and
AMEC Foster Wheeler (PTA)
+ Assist JCCBI with the
environmental assessment
process
+ Environmental assessment of the
impact of the deconstruction
+ Public consultation periods
Section 5
Section 6
Section 7
ONGOING UPDATES
Planning travel
33
In real-time so that users can plan their travel
Practical mobile solutions
+ Integrated dashboard at www.JacquesCartierChamplain.ca: live
traffic conditions, planned work, traffic cameras, major work alerts
+ Text message alerts for major closures or significant incidents on
our network
+ Email alerts for construction work
+ Alerts about traffic hindrances and information
about each structure via Twitter
- @pontJCBridge
- @pontChampBridge
- @pontHMBridge
2018 Planning

More Related Content

What's hot

Meeting of the Verdun / Le Sud Ouest - good neighbourly relations committee ...
Meeting of the Verdun / Le Sud Ouest -  good neighbourly relations committee ...Meeting of the Verdun / Le Sud Ouest -  good neighbourly relations committee ...
Meeting of the Verdun / Le Sud Ouest - good neighbourly relations committee ...Pont Samuel-De Champlain Bridge
 
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017Crosstown TO
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Crosstown TO
 
Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Crosstown TO
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)DC Department of General Services
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingVDOT Northern Virginia
 
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017Crosstown TO
 
BBGE - MALABO BY PASS - LOT 5A
BBGE - MALABO BY PASS - LOT 5ABBGE - MALABO BY PASS - LOT 5A
BBGE - MALABO BY PASS - LOT 5AFrancois REMOND
 
Meeting of the brossard good neighbourly relations committee september 21 2016
Meeting of the brossard good neighbourly relations committee   september 21 2016Meeting of the brossard good neighbourly relations committee   september 21 2016
Meeting of the brossard good neighbourly relations committee september 21 2016Pont Samuel-De Champlain Bridge
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...Pont Samuel-De Champlain Bridge
 
Good neighbourly relations committee City of Brossard - May 4, 2016
Good neighbourly relations committee City of Brossard - May 4, 2016Good neighbourly relations committee City of Brossard - May 4, 2016
Good neighbourly relations committee City of Brossard - May 4, 2016Pont Samuel-De Champlain Bridge
 
Good neighbourly relations committee meeting - Brossard - January 25, 2017
Good neighbourly relations committee meeting - Brossard - January 25, 2017Good neighbourly relations committee meeting - Brossard - January 25, 2017
Good neighbourly relations committee meeting - Brossard - January 25, 2017Pont Samuel-De Champlain Bridge
 
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018Crosstown TO
 
Presentation anti noise walls good neighbourly relations committee City of Br...
Presentation anti noise walls good neighbourly relations committee City of Br...Presentation anti noise walls good neighbourly relations committee City of Br...
Presentation anti noise walls good neighbourly relations committee City of Br...Pont Samuel-De Champlain Bridge
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyMike Bisland
 
Various Highways and Bridge design projects_Atkins UK
Various Highways and Bridge design projects_Atkins UKVarious Highways and Bridge design projects_Atkins UK
Various Highways and Bridge design projects_Atkins UKImran Siddiqui
 
Cedarvale & Forest Hill Stations Construction Liaison Committee Meeting - Sep...
Cedarvale & Forest Hill Stations Construction Liaison Committee Meeting - Sep...Cedarvale & Forest Hill Stations Construction Liaison Committee Meeting - Sep...
Cedarvale & Forest Hill Stations Construction Liaison Committee Meeting - Sep...Crosstown TO
 
Typical challenges in tunnelling
Typical challenges in tunnellingTypical challenges in tunnelling
Typical challenges in tunnellingAntti Nykänen
 

What's hot (20)

Meeting of the Verdun / Le Sud Ouest - good neighbourly relations committee ...
Meeting of the Verdun / Le Sud Ouest -  good neighbourly relations committee ...Meeting of the Verdun / Le Sud Ouest -  good neighbourly relations committee ...
Meeting of the Verdun / Le Sud Ouest - good neighbourly relations committee ...
 
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
 
Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017
 
Illumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier BridgeIllumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier Bridge
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meeting
 
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
 
BBGE - MALABO BY PASS - LOT 5A
BBGE - MALABO BY PASS - LOT 5ABBGE - MALABO BY PASS - LOT 5A
BBGE - MALABO BY PASS - LOT 5A
 
Meeting of the brossard good neighbourly relations committee september 21 2016
Meeting of the brossard good neighbourly relations committee   september 21 2016Meeting of the brossard good neighbourly relations committee   september 21 2016
Meeting of the brossard good neighbourly relations committee september 21 2016
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
 
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
 
Good neighbourly relations committee City of Brossard - May 4, 2016
Good neighbourly relations committee City of Brossard - May 4, 2016Good neighbourly relations committee City of Brossard - May 4, 2016
Good neighbourly relations committee City of Brossard - May 4, 2016
 
Good neighbourly relations committee meeting - Brossard - January 25, 2017
Good neighbourly relations committee meeting - Brossard - January 25, 2017Good neighbourly relations committee meeting - Brossard - January 25, 2017
Good neighbourly relations committee meeting - Brossard - January 25, 2017
 
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
 
Presentation anti noise walls good neighbourly relations committee City of Br...
Presentation anti noise walls good neighbourly relations committee City of Br...Presentation anti noise walls good neighbourly relations committee City of Br...
Presentation anti noise walls good neighbourly relations committee City of Br...
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
 
Various Highways and Bridge design projects_Atkins UK
Various Highways and Bridge design projects_Atkins UKVarious Highways and Bridge design projects_Atkins UK
Various Highways and Bridge design projects_Atkins UK
 
Cedarvale & Forest Hill Stations Construction Liaison Committee Meeting - Sep...
Cedarvale & Forest Hill Stations Construction Liaison Committee Meeting - Sep...Cedarvale & Forest Hill Stations Construction Liaison Committee Meeting - Sep...
Cedarvale & Forest Hill Stations Construction Liaison Committee Meeting - Sep...
 
Typical challenges in tunnelling
Typical challenges in tunnellingTypical challenges in tunnelling
Typical challenges in tunnelling
 

Similar to 2018 Planning

Brossard Good Neighbourly Relations Committee - May 17, 2017
Brossard Good Neighbourly Relations Committee - May 17, 2017Brossard Good Neighbourly Relations Committee - May 17, 2017
Brossard Good Neighbourly Relations Committee - May 17, 2017Pont Samuel-De Champlain Bridge
 
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...Pont Samuel-De Champlain Bridge
 
Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018Crosstown TO
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Crosstown TO
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCrosstown TO
 
The Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelThe Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelShivam Sood
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgradeRobert Lee - CEng, MICE, PMP
 
Sea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectSea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectUrbanSystemsCanada
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
 

Similar to 2018 Planning (20)

Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
 
Brossard Good Neighbourly Relations Committee - May 17, 2017
Brossard Good Neighbourly Relations Committee - May 17, 2017Brossard Good Neighbourly Relations Committee - May 17, 2017
Brossard Good Neighbourly Relations Committee - May 17, 2017
 
Projects list
Projects listProjects list
Projects list
 
JCCBI 2015 Project Report
JCCBI 2015 Project ReportJCCBI 2015 Project Report
JCCBI 2015 Project Report
 
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
 
Public Information Meeting - Verdu - May 25, 2016
Public Information Meeting - Verdu - May 25, 2016Public Information Meeting - Verdu - May 25, 2016
Public Information Meeting - Verdu - May 25, 2016
 
VCS Resume_May 2015
VCS Resume_May 2015VCS Resume_May 2015
VCS Resume_May 2015
 
Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
Solution Bonaveture
Solution BonavetureSolution Bonaveture
Solution Bonaveture
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 
The Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelThe Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering Marvel
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgrade
 
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
 
CV of F Verschueren - 11-04-2016
CV of F Verschueren - 11-04-2016CV of F Verschueren - 11-04-2016
CV of F Verschueren - 11-04-2016
 
Sea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectSea to Ski Higway Improvements Project
Sea to Ski Higway Improvements Project
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 
Firas Abbawy CV - Atkins
Firas Abbawy CV - AtkinsFiras Abbawy CV - Atkins
Firas Abbawy CV - Atkins
 

More from Ponts Jacques Cartier + Champlain Bridges

Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018Ponts Jacques Cartier + Champlain Bridges
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...Ponts Jacques Cartier + Champlain Bridges
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...Ponts Jacques Cartier + Champlain Bridges
 
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018Ponts Jacques Cartier + Champlain Bridges
 
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...Ponts Jacques Cartier + Champlain Bridges
 

More from Ponts Jacques Cartier + Champlain Bridges (20)

2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif
2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif
2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif
 
2018-06-19 - Jacques Cartier Bicycle Path Network - Advisory Committee
2018-06-19 - Jacques Cartier Bicycle Path Network - Advisory Committee 2018-06-19 - Jacques Cartier Bicycle Path Network - Advisory Committee
2018-06-19 - Jacques Cartier Bicycle Path Network - Advisory Committee
 
Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018
Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018
Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018
 
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
 
Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018
Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018
Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018
 
Jacques Cartier Bicycle Path Network - Advisory Committee - June 22, 2017
Jacques Cartier Bicycle Path Network - Advisory Committee - June 22, 2017Jacques Cartier Bicycle Path Network - Advisory Committee - June 22, 2017
Jacques Cartier Bicycle Path Network - Advisory Committee - June 22, 2017
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
 
Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017
Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017
Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
 
Planification 2018
Planification 2018Planification 2018
Planification 2018
 
Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018
Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018
Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018
 
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
 
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif
Réseau cyclable du pont Jacques-Cartier - Comité consultatifRéseau cyclable du pont Jacques-Cartier - Comité consultatif
Réseau cyclable du pont Jacques-Cartier - Comité consultatif
 
Jacques Cartier Bicycle Path Network - Advisory Committee
Jacques Cartier Bicycle Path Network - Advisory CommitteeJacques Cartier Bicycle Path Network - Advisory Committee
Jacques Cartier Bicycle Path Network - Advisory Committee
 
Assemblée publique annuelle 2017 / Annual Public Meeting 2017
Assemblée publique annuelle 2017 / Annual Public Meeting 2017Assemblée publique annuelle 2017 / Annual Public Meeting 2017
Assemblée publique annuelle 2017 / Annual Public Meeting 2017
 
Planification 2017 : Présentation des chantiers majeurs
Planification 2017 : Présentation des chantiers majeursPlanification 2017 : Présentation des chantiers majeurs
Planification 2017 : Présentation des chantiers majeurs
 
Réseau cyclable et piétonnier 2016
Réseau cyclable et piétonnier  2016Réseau cyclable et piétonnier  2016
Réseau cyclable et piétonnier 2016
 
Bilan des travaux 2016 de PJCCI
Bilan des travaux 2016 de PJCCIBilan des travaux 2016 de PJCCI
Bilan des travaux 2016 de PJCCI
 
Assemblée publique annuelle 2016
Assemblée publique annuelle 2016Assemblée publique annuelle 2016
Assemblée publique annuelle 2016
 

Recently uploaded

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 

Recently uploaded (20)

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 

2018 Planning

  • 1. 2018 Planning April 19, 2018 Presentation of major projects TECHNICAL MEDIA BRIEFING #OurProjects
  • 2. + Glen P. Carlin, Eng. Chief Executive Officer + Catherine Tremblay, Eng. Senior Director, Projects, Construction and Operations + François Demers, Eng. Senior Director, Champlain/NCBC Projects
  • 3. 3 Sustained investment STRUCTURES 2018 (budgeted) Champlain Bridge $51M Jacques Cartier Bridge $96M Honoré Mercier Bridge $31M Environment $3M Melocheville Tunnel $9M Bonaventure Expressway $12M Champlain Bridge Ice Control Structure $9M TOTAL: $211M
  • 4. CRITICAL INFRASTRUCTURE Major projects in the federal network
  • 5. 5 Honoré Mercier Bridge + Continuation of pier repair program + Initiation of painting program + Replacement of inspection walkways + All this work is done with minimal lane closures + Coordination with the MTMDET, who will be doing repair work
  • 6. 6 Bonaventure Expressway + Pier repairs (purple) + Deck repairs (under the structure) (orange) + Replacement of expansion joints (red) + Repair to the median barrier + June to November 2018 in coordination with the City of Montréal, SSL and Turcot
  • 7. 7 Autoroute Bonaventure #NosChantiers + Closure of Hwy. 10 on weekends: + 2 weekends (complete closures toward downtown) + 1 weekend (complete closure in both directions) + 2 weekends (complete closures toward the South Shore) + Approximately 10 complete night closures in both directions Multiple closures :
  • 8. 8 ENVIRONMENTAL PROJECT TO PROTECT THE RIVER Solution Bonaventure
  • 9. 9 Groundwater containment and treatment system Solution Bonaventure: West Sector TREATMENT SYSTEM IS OPERATIONAL + 32 pumping wells to create a hydraulic barrier + We pump an average of 290 m3/day of raw water that is treated and then discharged into the river
  • 10. 10 Retaining wall and hydrocarbon capture system Solution Bonaventure: East Sector + Extraction of contaminated water and BPC diesel contaminated + Recovered contaminated products will be processed in specialized centers + We extract between 8,000 liters and 12,000 liters of contaminated water per month + Groundwater contaminants are contained before they migrate to the river + No impact on traffic
  • 11. 11 2018 Planning Jacques Cartier Bridge Reinforcement, cleaning and painting work Viaduct repairs Steel work Repairs to upstream and downstream ramps (2018)
  • 12. 12 STEEL STRUCTURE REINFORCEMENT Jacques Cartier Bridge + Major work to reinforce the metal structure and extend the bridge’s service life + Replacement and reinforcement of steel members and reinforcing plates + Major program for 2016-2027 done in phases
  • 13. 13 Current steel work – Montreal
  • 14. 14 Current steel work - Montreal Photo du chantier à Montréal
  • 15. 15 Planned steel work – Montreal Summer 2018 mobilization (between Tansley St. and De Maisonneuve)
  • 16. 16 Current steel work – Longueuil
  • 17. 17 Current steel work - Longueuil Photo du chantier à Longueuil
  • 18. 18 Planned steel and painting work – Main span
  • 19. 19 Planned concrete work – Île Notre-Dame and Île Sainte-Hélène
  • 20. 20 Work – Longueuil sector BLITZES 1 and 2 April 20 to 23 and May 4 to 7 BLITZ 3 - May 25 to 28 (possible blitz in August) CLOSURE Jacques Cartier Bridge off-ramp to St-Laurent Blvd. West, Hwy. 20 and Hwy. 132 CLOSURE On-ramps from St-Laurent and Taschereau West to Jacques Cartier Bridge toward Montreal
  • 21. 21 Replacement of guard rails + Replacement of 500 guard-rail sections along the multipurpose path and sidewalk + Work scheduled to end May 20 + Night hindrances planned for the multipurpose path and the sidewalk to finalize the work TO COME + weekends
  • 22. 22 Traffic on the Jacques Cartier Bridge + Structural element replacement work in the evening, at night, and on the weekend + Optimization of traffic management scenarios + Coordination with other work sites + Coordination with stakeholders and Mobility Montréal partners TO COME + Complete night closures between May and Nov (1 a.m. to 4 a.m.) (approx. 15) + A number of partial night closures + Complete sidewalk closure from August to October + Complete night closure of the multipurpose path until the end of May + 10 more closures planned on for the multipurpose path from August to October
  • 24. 24 Stable condition thanks to the deployed measures Monitoring of the structure’s behaviour + Decreased risks from the edge girders and pier caps + Ongoing monitoring of the structure’s behaviour with an instrumentation system (+330 sensors on the edge girders and pier caps) + Focus on maintaining this critical economic corridor
  • 25. 25 Reinforcement system being installed on 39 pier caps Pier cap reinforcement system
  • 26. 26 Minimal underwater work on 2 pier footings
  • 28. 28 Universal modular trusses for interior edge girders to be installed as needed Universal modular trusses
  • 29. 29 Replacement diaphragm to be installed between the interior girders as needed Replacement diaphragm DiaphragmInterior girders
  • 30. DECONSTRUCTION OF THE CHAMPLAIN BRIDGE
  • 31. 31 Owner's engineer contract + Contract awarded in February 2018 to Parsons, Tetra Tech and AMEC Foster Wheeler (PTA) + Assist JCCBI with the environmental assessment process + Environmental assessment of the impact of the deconstruction + Public consultation periods Section 5 Section 6 Section 7
  • 33. 33 In real-time so that users can plan their travel Practical mobile solutions + Integrated dashboard at www.JacquesCartierChamplain.ca: live traffic conditions, planned work, traffic cameras, major work alerts + Text message alerts for major closures or significant incidents on our network + Email alerts for construction work + Alerts about traffic hindrances and information about each structure via Twitter - @pontJCBridge - @pontChampBridge - @pontHMBridge