ROCK SOLID EXPERTISE
SUCCESSFUL TUNNELLING PROJECT –
WHAT MAKES THE DIFFERENCE
12 March 2015
Antti Nykänen
COPYRIGHT©PÖYRY
 Many interfaces within a project require intense coordination
 Inaccurate geotechnical information leads to wrong cost estimates and delays in construction
 Construction works in densely populated areas disturb citizens
 Many TBM projects starting up in Scandinavia, not too much earlier experiences
 Project teams have little knowledge about specific local conditions – cooperation with local partners and
authorities is not as fluent as it could be
TYPICAL CHALLENGES IN TUNNELLING PROJECT
MARCH 2015
PÖYRY - UNDERGROUND STRUCTURES 2
COPYRIGHT©PÖYRY
Benefits of having one responsible partner throughout the project:
 Clear roles and responsibilities provide seamless transition
to the next phase in the project
 Insight across disciplines (tunnel design, tunnel infrastructure design
(e.g. ventilation, electrical and mechanical installations, fire safety) ensures
holistic approach and that the needs of the end-users guide
both design and execution
WE CAN SUPPORT YOU IN ALL PROJECT PHASES
MARCH 2015
PÖYRY - UNDERGROUND STRUCTURES 3
We can support you in:
• Studies and investigations
• Basic and detailed engineering
• Design review / 3rd party audit
• Construction supervision and
site inspection
• Measurements, monitoring and
documentation
• Inspections and refurbishment
READ MORE ABOUT OUR SERVICES
COPYRIGHT©PÖYRY
ALPTRANSIT GOTTHARD BASE TUNNEL, SWITZERLAND
 Client:
– Alp Transit Gotthard AG, Switzerland
 Project:
– Twin-tube high-speed railway tunnel, 57 km:
world’s longest rail tunnel
 Wide range of services delivered in the course of
20 years:
– Environment: environmental impact assessments, landscape
planning, environmental construction supervision, project
assistance
– Tunnelling: studies, preliminary design, tender design,
construction design, tender process, tender evaluation, final
design and construction supervision
– Electromechanics: design, tender process for tunnel and
railway facilities
– Rail traffic: technical coordination & organisational support
– Ventilation/safety: aerodynamic and thermodynamic studies,
design of ventilation for construction and operation, design
and tender process for operational and for cross passage
ventilation
 Services period:
– 1994–2016
FEBRUARY 2014
PÖYRY - UNDERGROUND STRUCTURES 4
Read more:
Realising the masterpiece of engineering
COPYRIGHT©PÖYRY
Today’s modern infrastructure is often built in ‘soft rock’ (soil) or in an urban environment. This is far
more complex than in a greenfield project. To make a demanding project successful, we provide:
 Proven methods for safe tunnelling in soil conditions
 Tailor-made solutions for excavations under existing structures and buildings
 First-hand experience with the realisation of complex projects in populated areas
 Logistic concepts to keep the city operational
 Methods to minimise negative impact on the population and the environment
SOFT ROCK TUNNELLING AND PROJECTS IN URBAN AREAS
MARCH 2015
PÖYRY - UNDERGROUND STRUCTURES 5
READ MORE ABOUT OUR SERVICES
COPYRIGHT©PÖYRY
CROSS-CITY RAILWAY LINK, ZÜRICH, SWITZERLAND
 Client:
– SBB Swiss Federal Railways
 Project:
– New underground station and connecting tunnels
underneath the existing main station. Tunnelling
through river sediments by applying an innovative
combination of various construction techniques.
Railway operations and public services remaining
fully functional throughout the construction period.
 Services:
– Conceptual studies
– Preliminary and detailed design
– Tendering
– Construction supervision
 Services period:
– 2000 - 2014
FEBRUARY 2014
PÖYRY - UNDERGROUND STRUCTURES 6
COPYRIGHT©PÖYRY
We provide profound expertise in the areas of geotechnical investigation and ground characterisation,
structural geology and geophysics, rock stress measurements and analysis, numerical analysis and
2D/3D-modelling, geotechnical design, excavation and support measures. This will contribute to:
 Solid cost estimates and construction schedules
 Optimised and most efficient construction planning
 Safe solutions during construction and operation
RELIABLE INFORMATION ABOUT THE GEOLOGICAL CONDITIONS:
COST EFFICIENCY AND KEEPING THE SCHEDULES
MARCH 2015
PÖYRY - UNDERGROUND STRUCTURES 7
READ MORE ABOUT OUR SERVICES
COPYRIGHT©PÖYRY
ROCK STRESS MEASUREMENT AND INTERPRETATION USING
THE OVERCORING TECHNIQUE WITH THE BORRE PROBE
 Client:
– Swedish Nuclear Fuel and Waste Management Co,
over 100 measuring points
– Statens vegvesen, Oslo, Norway (2012)
– Statens vegvesen, Stavanger, Norway (2012)
– Statens vegvesen, Trondheim, Norway (2012)
– Boliden Mineral AB, Skellefteå, Sweden (2011)
– LKAB, Sweden. Including development of new
measuring technique and monitoring (2013-2015)
 Services:
– Measuring of rock stresses
– Interpretation of rock stress regime
FEBRUARY 2014
PÖYRY - UNDERGROUND STRUCTURES 8
COPYRIGHT©PÖYRY
Whether for long tunnels or in difficult ground conditions, mechanised tunnelling with a tunnel boring
machine (TBM) provides often the most economical solution. We can support you with our long-lasting
experience with all TBM types and concepts, both in hard rock and soil.
 Analysis and advice in the selection of the most suitable tunnelling method
 Concepts and specifications for successful TBM tunnelling
 Proven design solutions for all types of TBM tunnels
 Monitoring tools and risk management during the construction phase
THOUSANDS OF KILOMETRES OF TBM EXPERTISE
MARCH 2015
PÖYRY - UNDERGROUND STRUCTURES 9
READ MORE ABOUT OUR SERVICES
COPYRIGHT©PÖYRY
TUNNEL EMISOR ORIENTE, MEXICO
 Client:
– CONAGUA (Comisión Nacional del Agua)
 Project:
– Construction of a 62 km long sewage pipeline, inner
diameter 7 m, between Mexico City and Hidalgo.
One of the longest wastewater tunnels in the
world. Excavation through difficult ground conditions
with six earth-pressure balanced shield TBM, up to
8.9 m diameter. Segmented lining.
 Services:
– Evaluation of proposals and programming
– Identification and assessment of risks
– Real-time evaluation of tunnelling data during
construction
– Technical advice to the Client with regard to TBM
tunnelling and risk management
 Services period:
– 2010–2014
FEBRUARY 2014
PÖYRY - UNDERGROUND STRUCTURES 10
Read how Emisor Oriente tunnel helps to mitigate flood
risk (in English)
COPYRIGHT©PÖYRY
In every project, there are things you cannot anticipate beforehand.
Small things can create big delays, unless you don’t get the support quickly.
 Our local experts are present in most parts of Scandinavia,
helping you to get expert advice quickly, avoiding delays –
and extra costs – in project execution
 Global network of experts to support in specific challenges
EXPERT ADVICE
WHEN YOU NEED IT
MARCH 2015
PÖYRY - UNDERGROUND STRUCTURES 11
READ MORE ABOUT OUR SERVICES
COPYRIGHT©PÖYRY
RING RAIL LINE – RAIL CONNECTION TO HELSINKI AIRPORT,
FINLAND
 Client:
– The Finnish Transport Agency (Rail Administration)
 Project:
– Railway twin tunnel, total length 8 km, drill and blast
– 4 underground stations
 Services:
Detailed design including:
– Architectural design
– Rail engineering
– Rock engineering
– Structural engineering
– Geotechnical engineering
– HVAC engineering
3D CFD simulations of the ventilation system to verify
and confirm compliance with the fire safety
requirements.
 Services period:
– 2008–2014
FEBRUARY 2014
PÖYRY - UNDERGROUND STRUCTURES 12
COPYRIGHT©PÖYRY
TUNNEL INSPECTIONS, OSLO, NORWAY
 Client:
– Statens Vegvesen
 Project:
– Rock mechanical inspections of road tunnels
 Services:
– Maintenance inspections of 22 road tunnels
– When appropriate, establishing plans for detailed
inspections and investigations in critical areas
– Performing detailed inspections
– Services period 2013-2015
FEBRUARY 2014
PÖYRY - UNDERGROUND STRUCTURES 13
COPYRIGHT©PÖYRY
Clients
Unique
Lifecycle
Partner
Unique
Lifecycle
Partner
Local
Relation-
ships
Local
Relation-
ships
World-
class
expertise
World-
class
expertise
PÖYRY TODAY - CONSULTING AND ENGINEERING EXPERTS
Pöyry is an international consulting and
engineering company, dedicated to
serving clients in infrastructure, energy
and industrial sectors
 6,000 experts
 10,000+ projects delivered annually
 Solutions for tunnels and underground
structures for transportation, mining,
hydropower, nuclear waste repositories,
civil and defence shelters, parking facilities
as well as water supply
 EUR 571 million net sales in 2014
FEBRUARYY 2015
PÖYRY - COMPANY PRESENTATION 14
COPYRIGHT©PÖYRY
ENGINEERING, GEOLOGY AND ROCK MECHANICS
MARCH 2015
PÖYRY - UNDERGROUND STRUCTURES 15
We want to be your preferred partner for underground projects. We provide:
 Expertise to mitigate risks and ensure profitable projects
 Expert support in each phase of the project
 Solutions and experience proven in most demanding projects all over the world
 Local network of competent specialists close to you
COPYRIGHT©PÖYRY
THANK YOU!
MARCH 2015
PÖYRY - UNDERGROUND STRUCTURES 16
I’M HAPPY TO TELL YOU MORE – GIVE ME A CALL OR EMAIL:
ANTTI NYKÄNEN
MARKETING & SALES MANAGER, REGIONAL OPERATIONS NORTHERN EUROPE
MAIL: ANTTI.NYKANEN@POYRY.COM
PHONE: +358 400 372 825
LINKEDIN: http://fi.linkedin.com/pub/antti-nyk%C3%A4nen/13/903/622

More Related Content

Viewers also liked

Important terminology in governors
Important terminology in governorsImportant terminology in governors
Important terminology in governorsNarendra Patel
 
The Watt Governor and its relevance to software systems
The Watt Governor and its relevance to software systemsThe Watt Governor and its relevance to software systems
The Watt Governor and its relevance to software systemsMatthew Skelton
 
Railwayloco 140218012723-phpapp02
Railwayloco 140218012723-phpapp02Railwayloco 140218012723-phpapp02
Railwayloco 140218012723-phpapp02Akshay Tiwari
 
Challenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of TunnellingChallenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of TunnellingIEI GSC
 
Mechanical science 2 diesel engine
Mechanical science 2 diesel engineMechanical science 2 diesel engine
Mechanical science 2 diesel engineRachmat Hidayat
 

Viewers also liked (11)

Important terminology in governors
Important terminology in governorsImportant terminology in governors
Important terminology in governors
 
The Watt Governor and its relevance to software systems
The Watt Governor and its relevance to software systemsThe Watt Governor and its relevance to software systems
The Watt Governor and its relevance to software systems
 
Governor
GovernorGovernor
Governor
 
James Watt
James WattJames Watt
James Watt
 
Srajan ppt
Srajan pptSrajan ppt
Srajan ppt
 
Railwayloco 140218012723-phpapp02
Railwayloco 140218012723-phpapp02Railwayloco 140218012723-phpapp02
Railwayloco 140218012723-phpapp02
 
Challenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of TunnellingChallenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
 
Governors
GovernorsGovernors
Governors
 
Mechanical science 2 diesel engine
Mechanical science 2 diesel engineMechanical science 2 diesel engine
Mechanical science 2 diesel engine
 
Governor
GovernorGovernor
Governor
 
Speed Governers
Speed GovernersSpeed Governers
Speed Governers
 

Similar to Typical challenges in tunnelling

TEC Experience Record 2014
TEC Experience Record 2014TEC Experience Record 2014
TEC Experience Record 2014Hans De Wit
 
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...Svenska Betongföreningen
 
3 LNG & LPG terminals_VINCI Construction Grands Projets_2015
3 LNG & LPG terminals_VINCI Construction Grands Projets_20153 LNG & LPG terminals_VINCI Construction Grands Projets_2015
3 LNG & LPG terminals_VINCI Construction Grands Projets_2015Julien Castres Saint Martin
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Muhammad Hegazy
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.VAli Fakhir
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)NABIL NASSAR
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCrosstown TO
 

Similar to Typical challenges in tunnelling (20)

KWKCV16
KWKCV16KWKCV16
KWKCV16
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
TEC Experience Record 2014
TEC Experience Record 2014TEC Experience Record 2014
TEC Experience Record 2014
 
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
 
Slk m india
Slk m indiaSlk m india
Slk m india
 
3 LNG & LPG terminals_VINCI Construction Grands Projets_2015
3 LNG & LPG terminals_VINCI Construction Grands Projets_20153 LNG & LPG terminals_VINCI Construction Grands Projets_2015
3 LNG & LPG terminals_VINCI Construction Grands Projets_2015
 
Curricula Vitae - NVB
Curricula Vitae - NVBCurricula Vitae - NVB
Curricula Vitae - NVB
 
Mhimdi Sameh Resume
Mhimdi Sameh ResumeMhimdi Sameh Resume
Mhimdi Sameh Resume
 
CV mohamed
CV mohamedCV mohamed
CV mohamed
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 
Cover Letter Seppo Matias Viio
Cover Letter Seppo Matias ViioCover Letter Seppo Matias Viio
Cover Letter Seppo Matias Viio
 
Ugeshan Naidoo1
Ugeshan Naidoo1Ugeshan Naidoo1
Ugeshan Naidoo1
 
CV NDJOCK yannick adonis english
CV NDJOCK yannick adonis englishCV NDJOCK yannick adonis english
CV NDJOCK yannick adonis english
 
Acciona Energia Madrid Information Day
Acciona Energia Madrid Information DayAcciona Energia Madrid Information Day
Acciona Energia Madrid Information Day
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
 

Recently uploaded

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 

Typical challenges in tunnelling

  • 1. 1 ROCK SOLID EXPERTISE SUCCESSFUL TUNNELLING PROJECT – WHAT MAKES THE DIFFERENCE 12 March 2015 Antti Nykänen
  • 2. COPYRIGHT©PÖYRY  Many interfaces within a project require intense coordination  Inaccurate geotechnical information leads to wrong cost estimates and delays in construction  Construction works in densely populated areas disturb citizens  Many TBM projects starting up in Scandinavia, not too much earlier experiences  Project teams have little knowledge about specific local conditions – cooperation with local partners and authorities is not as fluent as it could be TYPICAL CHALLENGES IN TUNNELLING PROJECT MARCH 2015 PÖYRY - UNDERGROUND STRUCTURES 2
  • 3. COPYRIGHT©PÖYRY Benefits of having one responsible partner throughout the project:  Clear roles and responsibilities provide seamless transition to the next phase in the project  Insight across disciplines (tunnel design, tunnel infrastructure design (e.g. ventilation, electrical and mechanical installations, fire safety) ensures holistic approach and that the needs of the end-users guide both design and execution WE CAN SUPPORT YOU IN ALL PROJECT PHASES MARCH 2015 PÖYRY - UNDERGROUND STRUCTURES 3 We can support you in: • Studies and investigations • Basic and detailed engineering • Design review / 3rd party audit • Construction supervision and site inspection • Measurements, monitoring and documentation • Inspections and refurbishment READ MORE ABOUT OUR SERVICES
  • 4. COPYRIGHT©PÖYRY ALPTRANSIT GOTTHARD BASE TUNNEL, SWITZERLAND  Client: – Alp Transit Gotthard AG, Switzerland  Project: – Twin-tube high-speed railway tunnel, 57 km: world’s longest rail tunnel  Wide range of services delivered in the course of 20 years: – Environment: environmental impact assessments, landscape planning, environmental construction supervision, project assistance – Tunnelling: studies, preliminary design, tender design, construction design, tender process, tender evaluation, final design and construction supervision – Electromechanics: design, tender process for tunnel and railway facilities – Rail traffic: technical coordination & organisational support – Ventilation/safety: aerodynamic and thermodynamic studies, design of ventilation for construction and operation, design and tender process for operational and for cross passage ventilation  Services period: – 1994–2016 FEBRUARY 2014 PÖYRY - UNDERGROUND STRUCTURES 4 Read more: Realising the masterpiece of engineering
  • 5. COPYRIGHT©PÖYRY Today’s modern infrastructure is often built in ‘soft rock’ (soil) or in an urban environment. This is far more complex than in a greenfield project. To make a demanding project successful, we provide:  Proven methods for safe tunnelling in soil conditions  Tailor-made solutions for excavations under existing structures and buildings  First-hand experience with the realisation of complex projects in populated areas  Logistic concepts to keep the city operational  Methods to minimise negative impact on the population and the environment SOFT ROCK TUNNELLING AND PROJECTS IN URBAN AREAS MARCH 2015 PÖYRY - UNDERGROUND STRUCTURES 5 READ MORE ABOUT OUR SERVICES
  • 6. COPYRIGHT©PÖYRY CROSS-CITY RAILWAY LINK, ZÜRICH, SWITZERLAND  Client: – SBB Swiss Federal Railways  Project: – New underground station and connecting tunnels underneath the existing main station. Tunnelling through river sediments by applying an innovative combination of various construction techniques. Railway operations and public services remaining fully functional throughout the construction period.  Services: – Conceptual studies – Preliminary and detailed design – Tendering – Construction supervision  Services period: – 2000 - 2014 FEBRUARY 2014 PÖYRY - UNDERGROUND STRUCTURES 6
  • 7. COPYRIGHT©PÖYRY We provide profound expertise in the areas of geotechnical investigation and ground characterisation, structural geology and geophysics, rock stress measurements and analysis, numerical analysis and 2D/3D-modelling, geotechnical design, excavation and support measures. This will contribute to:  Solid cost estimates and construction schedules  Optimised and most efficient construction planning  Safe solutions during construction and operation RELIABLE INFORMATION ABOUT THE GEOLOGICAL CONDITIONS: COST EFFICIENCY AND KEEPING THE SCHEDULES MARCH 2015 PÖYRY - UNDERGROUND STRUCTURES 7 READ MORE ABOUT OUR SERVICES
  • 8. COPYRIGHT©PÖYRY ROCK STRESS MEASUREMENT AND INTERPRETATION USING THE OVERCORING TECHNIQUE WITH THE BORRE PROBE  Client: – Swedish Nuclear Fuel and Waste Management Co, over 100 measuring points – Statens vegvesen, Oslo, Norway (2012) – Statens vegvesen, Stavanger, Norway (2012) – Statens vegvesen, Trondheim, Norway (2012) – Boliden Mineral AB, Skellefteå, Sweden (2011) – LKAB, Sweden. Including development of new measuring technique and monitoring (2013-2015)  Services: – Measuring of rock stresses – Interpretation of rock stress regime FEBRUARY 2014 PÖYRY - UNDERGROUND STRUCTURES 8
  • 9. COPYRIGHT©PÖYRY Whether for long tunnels or in difficult ground conditions, mechanised tunnelling with a tunnel boring machine (TBM) provides often the most economical solution. We can support you with our long-lasting experience with all TBM types and concepts, both in hard rock and soil.  Analysis and advice in the selection of the most suitable tunnelling method  Concepts and specifications for successful TBM tunnelling  Proven design solutions for all types of TBM tunnels  Monitoring tools and risk management during the construction phase THOUSANDS OF KILOMETRES OF TBM EXPERTISE MARCH 2015 PÖYRY - UNDERGROUND STRUCTURES 9 READ MORE ABOUT OUR SERVICES
  • 10. COPYRIGHT©PÖYRY TUNNEL EMISOR ORIENTE, MEXICO  Client: – CONAGUA (Comisión Nacional del Agua)  Project: – Construction of a 62 km long sewage pipeline, inner diameter 7 m, between Mexico City and Hidalgo. One of the longest wastewater tunnels in the world. Excavation through difficult ground conditions with six earth-pressure balanced shield TBM, up to 8.9 m diameter. Segmented lining.  Services: – Evaluation of proposals and programming – Identification and assessment of risks – Real-time evaluation of tunnelling data during construction – Technical advice to the Client with regard to TBM tunnelling and risk management  Services period: – 2010–2014 FEBRUARY 2014 PÖYRY - UNDERGROUND STRUCTURES 10 Read how Emisor Oriente tunnel helps to mitigate flood risk (in English)
  • 11. COPYRIGHT©PÖYRY In every project, there are things you cannot anticipate beforehand. Small things can create big delays, unless you don’t get the support quickly.  Our local experts are present in most parts of Scandinavia, helping you to get expert advice quickly, avoiding delays – and extra costs – in project execution  Global network of experts to support in specific challenges EXPERT ADVICE WHEN YOU NEED IT MARCH 2015 PÖYRY - UNDERGROUND STRUCTURES 11 READ MORE ABOUT OUR SERVICES
  • 12. COPYRIGHT©PÖYRY RING RAIL LINE – RAIL CONNECTION TO HELSINKI AIRPORT, FINLAND  Client: – The Finnish Transport Agency (Rail Administration)  Project: – Railway twin tunnel, total length 8 km, drill and blast – 4 underground stations  Services: Detailed design including: – Architectural design – Rail engineering – Rock engineering – Structural engineering – Geotechnical engineering – HVAC engineering 3D CFD simulations of the ventilation system to verify and confirm compliance with the fire safety requirements.  Services period: – 2008–2014 FEBRUARY 2014 PÖYRY - UNDERGROUND STRUCTURES 12
  • 13. COPYRIGHT©PÖYRY TUNNEL INSPECTIONS, OSLO, NORWAY  Client: – Statens Vegvesen  Project: – Rock mechanical inspections of road tunnels  Services: – Maintenance inspections of 22 road tunnels – When appropriate, establishing plans for detailed inspections and investigations in critical areas – Performing detailed inspections – Services period 2013-2015 FEBRUARY 2014 PÖYRY - UNDERGROUND STRUCTURES 13
  • 14. COPYRIGHT©PÖYRY Clients Unique Lifecycle Partner Unique Lifecycle Partner Local Relation- ships Local Relation- ships World- class expertise World- class expertise PÖYRY TODAY - CONSULTING AND ENGINEERING EXPERTS Pöyry is an international consulting and engineering company, dedicated to serving clients in infrastructure, energy and industrial sectors  6,000 experts  10,000+ projects delivered annually  Solutions for tunnels and underground structures for transportation, mining, hydropower, nuclear waste repositories, civil and defence shelters, parking facilities as well as water supply  EUR 571 million net sales in 2014 FEBRUARYY 2015 PÖYRY - COMPANY PRESENTATION 14
  • 15. COPYRIGHT©PÖYRY ENGINEERING, GEOLOGY AND ROCK MECHANICS MARCH 2015 PÖYRY - UNDERGROUND STRUCTURES 15 We want to be your preferred partner for underground projects. We provide:  Expertise to mitigate risks and ensure profitable projects  Expert support in each phase of the project  Solutions and experience proven in most demanding projects all over the world  Local network of competent specialists close to you
  • 16. COPYRIGHT©PÖYRY THANK YOU! MARCH 2015 PÖYRY - UNDERGROUND STRUCTURES 16 I’M HAPPY TO TELL YOU MORE – GIVE ME A CALL OR EMAIL: ANTTI NYKÄNEN MARKETING & SALES MANAGER, REGIONAL OPERATIONS NORTHERN EUROPE MAIL: ANTTI.NYKANEN@POYRY.COM PHONE: +358 400 372 825 LINKEDIN: http://fi.linkedin.com/pub/antti-nyk%C3%A4nen/13/903/622