The document summarizes a project in Malabo, Equatorial Guinea where François REMOND served as the Senior Site Engineer from 2006 to 2008. The project involved constructing three concrete bridges and 17 box culverts on the Malabo bypass at a cost of 17,000 euros. REMOND managed a team of 5 local supervisors and 80 workers to plan and oversee the construction works while ensuring quality, safety, and environmental standards were met according to certifications.
1. EQUATORIAL GUINEA - MALABO
MALABO BY PASS, Lot 5A
Bridges & Box
Culvert
Client:. Ministry of Infrastructure of
Equatorial Guinea
Consultant: BCEOM (EGIS)
Contractor: BOUYGUES EQUATORIAL
GUINEA
Construction: Apr 2006 – Apr 2008
Description of the Project:
Location Malabo – Bioko Island – Equatorial Guinea
Structures The project was the construction of three bridges in concrete structure and 17 box culverts.
Project value 17 000 k€
Position and responsibility :
Project Senior Site Engineer in charge of :
Management of the site team : 5 local supervisors and 80 local workers
Planning and organisation of construction works, taking complex meteorological and infrastructural
conditions into consideration.
Project budget management.
Application of quality, security and environmental standards (certification ISO 9001 version 2000)
-Contract management with local sub-contractors and authority.
François REMOND
Engineer with specialisation in civil and environmental engineering
francois.remond@centraliens-nantes.net
This document is confidential and may not be used, reproduced or
communicated either in whole or in part, in any form or manner
without the prior written agreement of François REMOND