Jones Branch Connector over I-495
Tonight's Objective
• Introduction of the Construction Team
• Present Project Scope of Work
• Construction Elements
‒ Sequence of Construction
• Answer your Questions
2
Jones Branch Connector over I-495
Project Team
• Virginia Department of Transportation
• Fairfax County
• Contractor: Archer Western Construction
3
Archer Western Construction
Jones Branch Connector over I-495
Construction Team Contact Information
VDOT Construction Management contact information:
• Chan B. Basnayake, PE, PMP, CCM – Area
Construction Engineer
(703) 259-2947 chan.basnayake@vdot.virginia.gov
• Dinesh P. Singh, PE, CCM – Construction Manager
(703) 259- 2216 dinesh.singh@vdot.virginia.gov
• Tim Diliscia, CCM – Construction Manager
(540) 247-9953 tim.diliscia@vdot.virginia.gov
4
Project updates will be posted on VDOT’s website at:
http://www.virginiadot.org/projects/northernvirginia/jones_branch_connector.asp
Jones Branch Connector over I-495
Construction Team Contact Information
VDOT Construction Management contact information:
• Abdul Razak – Project Inspector
(571) 722-2201 abdul.razak@vdot.virginia.gov
• Yan Li – Project Records Manager
(614) 806-5636 yan.li@vdot.virginia.gov
• VDOT Field Office location (open during normal
business hours):
7925 Jones Branch Drive, Suite 2250, Tysons, VA 22102
Phone: (703) 866-8183 and (703) 866-8184
5
Project updates will be posted on VDOT’s website at:
http://www.virginiadot.org/projects/northernvirginia/jones_branch_connector.asp
Jones Branch Connector over I-495
Construction Team Contact Information
Contractor: Archer Western Construction
• Pedro F. Doldan – Sr. Project Manager
(301) 357-1464 pdoldan@walshgroup.com
• Matthew Phillips – Assistant Project Manager
(804) 400-4264 mphillips@walshgroup.com
• Anthony Tundo – Assistant Project Manager
(703) 200-8826 atundo@walshgroup.com
• Andy Douglas – Area Manager
(703) 863-0365 adouglas@walshgroup.com
• Kenny Rafter – Office Engineer
(571) 288-6399 krafter@walshgroup.com
6
Jones Branch Connector over I-495
Project Location
7
Jones Branch Connector over I-495
Project Highlights
8
Jones Branch Connector over I-495
Project Information (Cont.)
• About the Project:
‒ This project, in cooperation with Fairfax County,
will provide an important new link to Route 123
over the Capital Beltway (I-495) for commuters and
visitors to Tysons. The link will improve local traffic
and access for drivers, as well as provide a vital
option for area bicyclists and pedestrians.
9
Jones Branch Connector over I-495
Project Information (Cont.)
• The half-mile project includes new roadway from the
interchange of the I-495 Express Lanes and Jones
Branch Drive to Scotts Crossing Road. Improvements
will also be made along the access road from Jones
Branch Drive to the Express Lanes, as well as along
Scotts Crossing Road.
10
Jones Branch Connector over I-495
Project Information (Cont.)
• Project features include:
‒ Two travel lanes and on-street bike lanes in each
direction
‒ Three bridges over the I-495 Express and general-
purpose lanes
‒ Eight- to 12-foot-wide lighted sidewalks,
landscaping and other streetscape amenities
‒ A wide, raised median to accommodate future
transit
11
Jones Branch Connector over I-495
Project Information (Cont.)
• By providing an alternate route across the Beltway
and linking the Tysons East and Central areas, the
Connector is expected to relieve traffic along Route
123, at the I-495 interchange, and at other congested
intersections. The road is expected to carry more
than 32,000 vehicles per day by 2040.
• The project is being completed through a
combination of federal, state and county funds. It is
Fairfax County led design and development, while
VDOT is administering construction.
12
Jones Branch Connector over I-495
Project Timeline
• Contract Executed: December 28, 2016
• Notice to Proceed Date: January 27, 2017
• Start of Construction: February 6, 2017
• Interim Milestone: December 12, 2018
‒ Open at least one lane of traffic in each direction
for full length.
• Substantial Completion: October 10, 2019
• Final Completion: November 19, 2019
• Contract Value: $39,693,825.36
13
Jones Branch Connector over I-49514
Jones Branch Connector over I-495
MOT PHASE I
Through April 2018
15
Jones Branch Connector over I-495
MOT PHASE I
Through April 2018
1. Retain traffic on existing Capital Beltway express
ramps JBNEW, JBEWN, JBSEW and JBWES.
2. Remove raised concrete median and retain traffic on
existing Scotts Crossing Road.
3. Remove existing retaining wall and rough grade
eastbound side of Route 8102 (approximately, Sta.
18+25 to Sta. 23+50). Construct new MSE retaining
wall.
16
Jones Branch Connector over I-495
MOT PHASE I
Through April 2018
4. Excavate and construct abutment A and abutment B
of B628 including RW003, RW004 and RW004A.
RW001, excavate and rough grade for abutment A of
B627.
5. Excavate and construct abutment A, abutment B,
piers 1 and pier 2 of B629 including RW005, RW005A
and RW005B.
6. Remove existing soundwall and construct SW011
and associated grading including channel.
17
Jones Branch Connector over I-495
MOT PHASE I (Cont.)
Through April 2018
7. Construct portion of MSE retaining wall RW006 from
approximately Sta. 34+50 to 37+00.
8. Fill area behind MSE wall and construct portion of
roadway, sidewalk and median to the right of the
JBCON baseline from Sta. 34+00 RT to Sta. 37+50.
9. Construct new entrance to Gates of Mclean (Spring
Gate Drive) while maintaining traffic through the
existing entrance. Mill, wedge and overlay parking
along baseline GMCL-C. Construct retaining wall
RW010.
18
Jones Branch Connector over I-495
MOT PHASE I (Cont.)
Through April 2018
10.Construct MSE retaining wall RW007.
11.Fill area behind RW007, slope at 2:1 max slope to
existing grade and construct portion of roadway,
sidewalk and median from approximately Sta. 37+75
RT to Sta. 44+25 RT.
12.Construct tie-in to Old Springhouse Road.
19
Jones Branch Connector over I-495
MOT PHASE I (Cont.)
Through April 2018
13.Construct pavement widening, sidewalk and curb
gutter from approximately Sta. 44+25 to Sta. 47+00
along the right side of JBCON. Construct RW009.
14.Maintain traffic on existing portion of Route 8102.
Maintain access to Spring Gate Drive, Old
Springhouse Road and the Scotts Run Metro Park &
Ride at all times. Maintain existing pedestrian access
at all times unless otherwise noted on the plans.
20
Jones Branch Connector over I-495
MOT PHASE II
September 2017 – October 2018
21
Jones Branch Connector over I-495
MOT PHASE II
September 2017 – October 2018
1. Retain traffic on existing Capital Beltway express
ramps JBNEW, JBEWN, JBSEW, JBWES, JBSEW
and JBWES.
2. Excavate and construct eastbound portion of
abutment A, abutment B and eastbound portion pier
1 of B627.
3. Set girders, place rebar and pour deck for the
eastbound portion of B628.
4. Set girders, place rebar and pour deck of B629.
22
Jones Branch Connector over I-495
MOT PHASE II
September 2017 – October 2018
5. Construct remaining portion of MSE retaining wall
RW006 from approximate Sta. 34+00 LT to Sta. 37+00
it while maintaining traffic in both directions to and
from the rear entrance of the Gates of Mclean (Spring
Gate Drive).
6. Fill and grade behind MSE wall RW006 and construct
remaining portion of roadway from approximate Sta.
34+00 LT to
Sta. 37+75 LT.
23
Jones Branch Connector over I-495
MOT PHASE II (Cont.)
September 2017 – October 2018
7. Construct remaining portion of new entrance to
Gates of Mclean (Spring Gate Drive) while
maintaining traffic through the new entrance.
Construct new parking area along baseline GMCL-A.
Mill, wedge and overlay existing portion of Spring
Gate Drive and construct new parking along Spring
Gate Drive.
8. Construct RW008. the proposed Dominion Virginia
Power conduit must be active from MH-6 to the
existing manhole at JBCON Sta. 45+25 prior to the
construction of RW008.
24
Jones Branch Connector over I-495
MOT PHASE II (Cont.)
September 2017 – October 2018
9. Construct remaining portion of roadway, sidewalk,
and curb gutter along Route 8102 from
approximately Sta. 37+75 LT to Sta. 44+25 LT.
10.Construct pavement widening, sidewalk, curb gutter
and permanent concrete median along SR 8102 from
approximately Sta. 44+25 LT to Sta. 47+00 LT.
11.Mill, wedge and overlay Route 8102 from
approximately
Sta. 44+25 to Sta. 47+18.
25
Jones Branch Connector over I-495
MOT PHASE II (Cont.)
September 2017 – October 2018
12.Mill, wedge and overlay the Scotts Run Metro Park &
Ride driveway.
13.Maintain traffic on new eastbound portion of Route
8102. Maintain access to Spring Gate Drive, Old
Springhouse Road and the Scotts Run Metro Park &
Ride at all times. Maintain existing pedestrian access
at all times, unless otherwise noted on the plans.
14.Maintain existing pedestrian access to sidewalk from
Scotts Run Metro Park & Ride pay station at all
times. Pedestrians must be able to cross Scotts
Crossing Road from the Scotts Run Metro Park &
Ride.
26
Jones Branch Connector over I-495
MOT PHASE III
October 2018 – December 2018
27
Jones Branch Connector over I-495
MOT PHASE III
October 2018 – December 2018
NOTE: Items 1, 2, 3 and 4, as listed below, may be
performed at any time during Phases I or II.
1. Retain traffic on existing Capital Beltway express
ramps JBNEW, JBEWN, JBSEW and JEBWES.
2. Set beams and rebar and pour deck for the eastbound
portion of B627.
3. Construct MSE wall RW002 from approximately Sta.
25+50 RT to
26+75 RT.
28
Jones Branch Connector over I-495
MOT PHASE III
October 2018 – December 2018
NOTE: Items 1, 2, 3 and 4, as listed below, may be
performed at any time during Phases I or II.
4. Fill in behind MSE wall and construct portion of
roadway, sidewalk and curb gutter along Route 8102
from approximately Sta. 25+50 RT to 27+00 RT.
5. Install concrete median island on Route 8102 from
approximately
Sta. 43+50 to Sta. 46+90.
6. Install concrete median island in the center of the
Scotts Run Metro Park & Ride driveway.
29
Jones Branch Connector over I-495
MOT PHASE IV
April 2018 – December 2018
30
Jones Branch Connector over I-495
MOT PHASE IV
April 2018 – December 2018
1. Retain traffic on existing Capital Beltway express
ramps JBNEW, JBEWN, JBSEW and JBWES.
2. Open the eastern portion of Route 8102 from
approximately
Sta. 29+75 to Sta. 47+00. The ITS system, permanent
traffic signals and final signage must be installed
and active before this portion of SR 8102 can
become active. Coordinate with Capital Beltway
Express for “burn-in” period on the ITS system.
3. Demolish existing abutment A and install pier for
westbound portion of B627.
31
Jones Branch Connector over I-495
MOT PHASE IV
April 2018 – December 2018
4. Construct westbound portion of new abutment A for
B627.
5. Set beams and rebar and pour deck for the
westbound portion of B627.
6. Demolish existing barrier along existing portions
(westbound) of B627 and B628.
32
Jones Branch Connector over I-495
MOT PHASE IV (Cont.)
April 2018 – December 2018
6. Construct MSE retaining wall RW004A and abutment
extension of B628 near ramp JBNEW.
7. Install new parapet, fence, sidewalk and
corresponding deck extensions along westbound
side of B627 and B628. Construct sidewalk, barrier
and fence along westbound SR 8102 between B627
and B628 from approximately Sta. 25+00 to Sta.
27+50.
33
Jones Branch Connector over I-495
MOT PHASE V
November 2018 – Project Completion
34
Jones Branch Connector over I-495
MOT PHASE V
November 2018 – Project Completion
1. Mill and overlay SR 8102 from approximately Sta.
18+25 to
Sta. 22+25 and from Sta. 25+00 to Sta. 27+25.
2. Remove existing pavement and construct curb and
grass median in the center of Route 8102 from
approximately
Sta. 18+50 to Sta. 22+48 and from Sta. 25+25 to Sta.
27+25.
3. Construct concrete median island on bridges B627,
B628 and B629.
35
Jones Branch Connector over I-495
MOT PHASE V
November 2018 – Project Completion
4. Mill and overlay portions of Capital Beltway express
ramps JBWES, JBSEW, JBNEW and JBEWN.
5. Remove pavement from approximately Sta. 33+75 to
Sta. 37+25 along RW006/SW012 and fill. Construct
new sidewalk along the Gates of McLean fence in the
same area.
6. Construct Capital One Service Road. Coordinate with
contractor of adjacent project to determine if the
portion of the road prior to this project's begin
construction (18+80) will be completed by the end of
this project.
36
Jones Branch Connector over I-495
MOT PHASE V
November 2018 – Project Completion
7. Construct curb gutter, curb ramps and sidewalk
along Spring Gate Drive from approximately Sta.
50+60 LT to 50+90 LT.
8. Construct curb ramps, associated sidewalk, and curb
gutter on Colshire Drive from approximately Sta.
200+50 to Sta. 202+00.
9. Install and furnish final pavement markings
(seasonally dependent).
10.Install/plant all final landscaping features (seasonally
dependent).
37
Jones Branch Connector over I-495
Lane Closure Restrictions
38
All closures in the 495 Express Lanes shall be
coordinated with the Express Lanes Operations Center at
least five (5) business days in advance using their
“Authorization to Work” form (available from the Express
Lanes Operations Center at 571-419-6046). Complete
road closures on the 495 Express Lanes will only be
permitted for 30 minutes or less in accordance with the
following table.
Jones Branch Connector over I-495
Lane Closure Restrictions
39
495 Express Lanes*
Single Lane or
Shoulder Closures
Multiple-Lane
Closures
Complete Road
Closure**
Weekday
9:30 p.m.(Sunday to
Thursday) to 4 a.m.
(Monday to Friday)
N/A 11 p.m. to 4 a.m.
Weekend
11 p.m. (Friday to
Saturday) to 9 a.m.
(Saturday to Sunday)
N/A 11 p.m. to 4 a.m.
* Includes Express Lane Ramps
** Complete road closure on Express Lanes limited to 30 minutes or less,
and must start and end within the time period shown.
Jones Branch Connector over I-49540
Single-Lane Closures* or Shoulder
Arterial
Weekday Weekend
Monday to
Thursday
Friday
Friday to
Saturday
Saturday
to Sunday
Sunday to
Monday
Major
Arterials**
9:30 a.m.
to 3 p.m. 9:30 a.m.
to 2 p.m.
10 p.m. to
9 a.m.
10 p.m. to
8 a.m.
10 p.m. to
5 a.m.10 p.m. to
5 a.m.
All Other
Roadways
9 a.m. to
3:30 p.m. 9 a.m. to
2 p.m.
10 p.m. to
9 a.m.
9 p.m. to 9
a.m.
10 p.m. to
5 a.m.9 p.m. to
5 a.m.
*Single-lane closures only permitted for multiple-lane roadways.
**Major arterials defined as primary roads, high volume secondary roads,
and all other routes that connect directly to interstates.
Lane Closure Restrictions
Jones Branch Connector over I-49541
Multiple-Lane Closures
Arterial
Weekday Weekend
Monday to
Thursday
Friday
Friday to
Saturday
Saturday
to Sunday
Sunday to
Monday
Major
Arterials**
10 p.m. to
5 a.m.
Not before
11 p.m.
11 p.m. to
5 a.m.
11 p.m. to
6 a.m.
11 p.m. to
5 a.m.
All Other
Roadways
9 p.m. to
5 a.m.
Not before
10 p.m.
10 p.m. to
6 a.m.
10 p.m. to
6 a.m.
10 p.m. to
5 a.m.
**Major arterials defined as primary roads, high volume secondary roads,
and all other routes that connect directly to interstates.
Lane Closure Restrictions
Jones Branch Connector over I-495
Question and Answer Session
42

More Related Content

What's hot

Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Crosstown TO
 
South Lakes Drive Sidewalk
South Lakes Drive Sidewalk South Lakes Drive Sidewalk
South Lakes Drive Sidewalk Fairfax County
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCrosstown TO
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017
Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017
Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017Crosstown TO
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCrosstown TO
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Crosstown TO
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsFairfax County
 
Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017Crosstown TO
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Crosstown TO
 
Mount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewMount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewCrosstown TO
 
North Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot ImprovementNorth Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot ImprovementFairfax County
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road WalkwayFairfax County
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Crosstown TO
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Crosstown TO
 

What's hot (20)

Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017
 
South Lakes Drive Sidewalk
South Lakes Drive Sidewalk South Lakes Drive Sidewalk
South Lakes Drive Sidewalk
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017
Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017
Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
 
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
 
Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
Mount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewMount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design Review
 
North Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot ImprovementNorth Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot Improvement
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
 

Similar to Jones Branch Connector "Pardon Our Dust" meeting

Fall18 Open House Western Segment Works
Fall18 Open House   Western Segment WorksFall18 Open House   Western Segment Works
Fall18 Open House Western Segment WorksCrosstown TO
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House SlidesCrosstown TO
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County
 
Central East Open House Spring 2019
Central East Open House Spring 2019Central East Open House Spring 2019
Central East Open House Spring 2019Crosstown TO
 
Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Crosstown TO
 
Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...
Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...
Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...Maureen Kenney
 
Silverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectSilverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectFairfax County
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Crosstown TO
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCrosstown TO
 
Oakton Community Park Phase 2A
Oakton Community Park Phase 2AOakton Community Park Phase 2A
Oakton Community Park Phase 2AFairfax County
 
Western works final
Western works final Western works final
Western works final Crosstown TO
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Fairfax County
 
Central West Open House
Central West Open HouseCentral West Open House
Central West Open HouseCrosstown TO
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Crosstown TO
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018Crosstown TO
 
Pohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian ImprovementsPohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian ImprovementsFairfax County
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12cityofevanston
 
Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Fairfax County
 

Similar to Jones Branch Connector "Pardon Our Dust" meeting (20)

Fall18 Open House Western Segment Works
Fall18 Open House   Western Segment WorksFall18 Open House   Western Segment Works
Fall18 Open House Western Segment Works
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020
 
Central East Open House Spring 2019
Central East Open House Spring 2019Central East Open House Spring 2019
Central East Open House Spring 2019
 
Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019
 
Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...
Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...
Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...
 
Silverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectSilverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway Project
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
The State of Rail in Illinois
The State of Rail in IllinoisThe State of Rail in Illinois
The State of Rail in Illinois
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 
Oakton Community Park Phase 2A
Oakton Community Park Phase 2AOakton Community Park Phase 2A
Oakton Community Park Phase 2A
 
Western works final
Western works final Western works final
Western works final
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
 
Central West Open House
Central West Open HouseCentral West Open House
Central West Open House
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
 
Pohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian ImprovementsPohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian Improvements
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12
 
Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021
 

More from VDOT Northern Virginia

2019 VDOT Northern Virginia Snow Briefing
2019 VDOT Northern Virginia Snow Briefing2019 VDOT Northern Virginia Snow Briefing
2019 VDOT Northern Virginia Snow BriefingVDOT Northern Virginia
 
2018 National Weather Service - VDOT Annual Snow Briefing
2018 National Weather Service - VDOT Annual Snow Briefing2018 National Weather Service - VDOT Annual Snow Briefing
2018 National Weather Service - VDOT Annual Snow BriefingVDOT Northern Virginia
 
Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016VDOT Northern Virginia
 

More from VDOT Northern Virginia (7)

2019-2020 NWS Winter Outlook
2019-2020 NWS Winter Outlook2019-2020 NWS Winter Outlook
2019-2020 NWS Winter Outlook
 
2019 VDOT Northern Virginia Snow Briefing
2019 VDOT Northern Virginia Snow Briefing2019 VDOT Northern Virginia Snow Briefing
2019 VDOT Northern Virginia Snow Briefing
 
2018 National Weather Service - VDOT Annual Snow Briefing
2018 National Weather Service - VDOT Annual Snow Briefing2018 National Weather Service - VDOT Annual Snow Briefing
2018 National Weather Service - VDOT Annual Snow Briefing
 
2018 NOVA Annual Snow Briefing
2018 NOVA Annual Snow Briefing2018 NOVA Annual Snow Briefing
2018 NOVA Annual Snow Briefing
 
Pikes Branch Stream Restoration
Pikes Branch Stream RestorationPikes Branch Stream Restoration
Pikes Branch Stream Restoration
 
2017-2018 VDOT NOVA Snow Briefing
2017-2018 VDOT NOVA Snow Briefing2017-2018 VDOT NOVA Snow Briefing
2017-2018 VDOT NOVA Snow Briefing
 
Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016
 

Recently uploaded

High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...narwatsonia7
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxTechSoupConnectLondo
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…nishakur201
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxHenryBriggs2
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urgesnarwatsonia7
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
LEAVE RULES of telangana state government employeespdf
LEAVE RULES  of telangana state government employeespdfLEAVE RULES  of telangana state government employeespdf
LEAVE RULES of telangana state government employeespdfchanduneela
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...ankitnayak356677
 
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbaisonalikaur4
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26JSchaus & Associates
 
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...narwatsonia7
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Christina Parmionova
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfMonastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfCharlynTorres1
 
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012rehmti665
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.Christina Parmionova
 

Recently uploaded (20)

High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptx
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptx
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
LEAVE RULES of telangana state government employeespdf
LEAVE RULES  of telangana state government employeespdfLEAVE RULES  of telangana state government employeespdf
LEAVE RULES of telangana state government employeespdf
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
 
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26
 
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfMonastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
 
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012
Call Girls Connaught Place Delhi reach out to us at ☎ 9711199012
 
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
Model Town (Delhi)  9953330565 Escorts, Call Girls ServicesModel Town (Delhi)  9953330565 Escorts, Call Girls Services
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.
 

Jones Branch Connector "Pardon Our Dust" meeting

  • 1. Jones Branch Connector over I-495 Pardon Our Dust Meeting May 18, 2017 at 7 p.m.
  • 2. Jones Branch Connector over I-495 Tonight's Objective • Introduction of the Construction Team • Present Project Scope of Work • Construction Elements ‒ Sequence of Construction • Answer your Questions 2
  • 3. Jones Branch Connector over I-495 Project Team • Virginia Department of Transportation • Fairfax County • Contractor: Archer Western Construction 3 Archer Western Construction
  • 4. Jones Branch Connector over I-495 Construction Team Contact Information VDOT Construction Management contact information: • Chan B. Basnayake, PE, PMP, CCM – Area Construction Engineer (703) 259-2947 chan.basnayake@vdot.virginia.gov • Dinesh P. Singh, PE, CCM – Construction Manager (703) 259- 2216 dinesh.singh@vdot.virginia.gov • Tim Diliscia, CCM – Construction Manager (540) 247-9953 tim.diliscia@vdot.virginia.gov 4 Project updates will be posted on VDOT’s website at: http://www.virginiadot.org/projects/northernvirginia/jones_branch_connector.asp
  • 5. Jones Branch Connector over I-495 Construction Team Contact Information VDOT Construction Management contact information: • Abdul Razak – Project Inspector (571) 722-2201 abdul.razak@vdot.virginia.gov • Yan Li – Project Records Manager (614) 806-5636 yan.li@vdot.virginia.gov • VDOT Field Office location (open during normal business hours): 7925 Jones Branch Drive, Suite 2250, Tysons, VA 22102 Phone: (703) 866-8183 and (703) 866-8184 5 Project updates will be posted on VDOT’s website at: http://www.virginiadot.org/projects/northernvirginia/jones_branch_connector.asp
  • 6. Jones Branch Connector over I-495 Construction Team Contact Information Contractor: Archer Western Construction • Pedro F. Doldan – Sr. Project Manager (301) 357-1464 pdoldan@walshgroup.com • Matthew Phillips – Assistant Project Manager (804) 400-4264 mphillips@walshgroup.com • Anthony Tundo – Assistant Project Manager (703) 200-8826 atundo@walshgroup.com • Andy Douglas – Area Manager (703) 863-0365 adouglas@walshgroup.com • Kenny Rafter – Office Engineer (571) 288-6399 krafter@walshgroup.com 6
  • 7. Jones Branch Connector over I-495 Project Location 7
  • 8. Jones Branch Connector over I-495 Project Highlights 8
  • 9. Jones Branch Connector over I-495 Project Information (Cont.) • About the Project: ‒ This project, in cooperation with Fairfax County, will provide an important new link to Route 123 over the Capital Beltway (I-495) for commuters and visitors to Tysons. The link will improve local traffic and access for drivers, as well as provide a vital option for area bicyclists and pedestrians. 9
  • 10. Jones Branch Connector over I-495 Project Information (Cont.) • The half-mile project includes new roadway from the interchange of the I-495 Express Lanes and Jones Branch Drive to Scotts Crossing Road. Improvements will also be made along the access road from Jones Branch Drive to the Express Lanes, as well as along Scotts Crossing Road. 10
  • 11. Jones Branch Connector over I-495 Project Information (Cont.) • Project features include: ‒ Two travel lanes and on-street bike lanes in each direction ‒ Three bridges over the I-495 Express and general- purpose lanes ‒ Eight- to 12-foot-wide lighted sidewalks, landscaping and other streetscape amenities ‒ A wide, raised median to accommodate future transit 11
  • 12. Jones Branch Connector over I-495 Project Information (Cont.) • By providing an alternate route across the Beltway and linking the Tysons East and Central areas, the Connector is expected to relieve traffic along Route 123, at the I-495 interchange, and at other congested intersections. The road is expected to carry more than 32,000 vehicles per day by 2040. • The project is being completed through a combination of federal, state and county funds. It is Fairfax County led design and development, while VDOT is administering construction. 12
  • 13. Jones Branch Connector over I-495 Project Timeline • Contract Executed: December 28, 2016 • Notice to Proceed Date: January 27, 2017 • Start of Construction: February 6, 2017 • Interim Milestone: December 12, 2018 ‒ Open at least one lane of traffic in each direction for full length. • Substantial Completion: October 10, 2019 • Final Completion: November 19, 2019 • Contract Value: $39,693,825.36 13
  • 14. Jones Branch Connector over I-49514
  • 15. Jones Branch Connector over I-495 MOT PHASE I Through April 2018 15
  • 16. Jones Branch Connector over I-495 MOT PHASE I Through April 2018 1. Retain traffic on existing Capital Beltway express ramps JBNEW, JBEWN, JBSEW and JBWES. 2. Remove raised concrete median and retain traffic on existing Scotts Crossing Road. 3. Remove existing retaining wall and rough grade eastbound side of Route 8102 (approximately, Sta. 18+25 to Sta. 23+50). Construct new MSE retaining wall. 16
  • 17. Jones Branch Connector over I-495 MOT PHASE I Through April 2018 4. Excavate and construct abutment A and abutment B of B628 including RW003, RW004 and RW004A. RW001, excavate and rough grade for abutment A of B627. 5. Excavate and construct abutment A, abutment B, piers 1 and pier 2 of B629 including RW005, RW005A and RW005B. 6. Remove existing soundwall and construct SW011 and associated grading including channel. 17
  • 18. Jones Branch Connector over I-495 MOT PHASE I (Cont.) Through April 2018 7. Construct portion of MSE retaining wall RW006 from approximately Sta. 34+50 to 37+00. 8. Fill area behind MSE wall and construct portion of roadway, sidewalk and median to the right of the JBCON baseline from Sta. 34+00 RT to Sta. 37+50. 9. Construct new entrance to Gates of Mclean (Spring Gate Drive) while maintaining traffic through the existing entrance. Mill, wedge and overlay parking along baseline GMCL-C. Construct retaining wall RW010. 18
  • 19. Jones Branch Connector over I-495 MOT PHASE I (Cont.) Through April 2018 10.Construct MSE retaining wall RW007. 11.Fill area behind RW007, slope at 2:1 max slope to existing grade and construct portion of roadway, sidewalk and median from approximately Sta. 37+75 RT to Sta. 44+25 RT. 12.Construct tie-in to Old Springhouse Road. 19
  • 20. Jones Branch Connector over I-495 MOT PHASE I (Cont.) Through April 2018 13.Construct pavement widening, sidewalk and curb gutter from approximately Sta. 44+25 to Sta. 47+00 along the right side of JBCON. Construct RW009. 14.Maintain traffic on existing portion of Route 8102. Maintain access to Spring Gate Drive, Old Springhouse Road and the Scotts Run Metro Park & Ride at all times. Maintain existing pedestrian access at all times unless otherwise noted on the plans. 20
  • 21. Jones Branch Connector over I-495 MOT PHASE II September 2017 – October 2018 21
  • 22. Jones Branch Connector over I-495 MOT PHASE II September 2017 – October 2018 1. Retain traffic on existing Capital Beltway express ramps JBNEW, JBEWN, JBSEW, JBWES, JBSEW and JBWES. 2. Excavate and construct eastbound portion of abutment A, abutment B and eastbound portion pier 1 of B627. 3. Set girders, place rebar and pour deck for the eastbound portion of B628. 4. Set girders, place rebar and pour deck of B629. 22
  • 23. Jones Branch Connector over I-495 MOT PHASE II September 2017 – October 2018 5. Construct remaining portion of MSE retaining wall RW006 from approximate Sta. 34+00 LT to Sta. 37+00 it while maintaining traffic in both directions to and from the rear entrance of the Gates of Mclean (Spring Gate Drive). 6. Fill and grade behind MSE wall RW006 and construct remaining portion of roadway from approximate Sta. 34+00 LT to Sta. 37+75 LT. 23
  • 24. Jones Branch Connector over I-495 MOT PHASE II (Cont.) September 2017 – October 2018 7. Construct remaining portion of new entrance to Gates of Mclean (Spring Gate Drive) while maintaining traffic through the new entrance. Construct new parking area along baseline GMCL-A. Mill, wedge and overlay existing portion of Spring Gate Drive and construct new parking along Spring Gate Drive. 8. Construct RW008. the proposed Dominion Virginia Power conduit must be active from MH-6 to the existing manhole at JBCON Sta. 45+25 prior to the construction of RW008. 24
  • 25. Jones Branch Connector over I-495 MOT PHASE II (Cont.) September 2017 – October 2018 9. Construct remaining portion of roadway, sidewalk, and curb gutter along Route 8102 from approximately Sta. 37+75 LT to Sta. 44+25 LT. 10.Construct pavement widening, sidewalk, curb gutter and permanent concrete median along SR 8102 from approximately Sta. 44+25 LT to Sta. 47+00 LT. 11.Mill, wedge and overlay Route 8102 from approximately Sta. 44+25 to Sta. 47+18. 25
  • 26. Jones Branch Connector over I-495 MOT PHASE II (Cont.) September 2017 – October 2018 12.Mill, wedge and overlay the Scotts Run Metro Park & Ride driveway. 13.Maintain traffic on new eastbound portion of Route 8102. Maintain access to Spring Gate Drive, Old Springhouse Road and the Scotts Run Metro Park & Ride at all times. Maintain existing pedestrian access at all times, unless otherwise noted on the plans. 14.Maintain existing pedestrian access to sidewalk from Scotts Run Metro Park & Ride pay station at all times. Pedestrians must be able to cross Scotts Crossing Road from the Scotts Run Metro Park & Ride. 26
  • 27. Jones Branch Connector over I-495 MOT PHASE III October 2018 – December 2018 27
  • 28. Jones Branch Connector over I-495 MOT PHASE III October 2018 – December 2018 NOTE: Items 1, 2, 3 and 4, as listed below, may be performed at any time during Phases I or II. 1. Retain traffic on existing Capital Beltway express ramps JBNEW, JBEWN, JBSEW and JEBWES. 2. Set beams and rebar and pour deck for the eastbound portion of B627. 3. Construct MSE wall RW002 from approximately Sta. 25+50 RT to 26+75 RT. 28
  • 29. Jones Branch Connector over I-495 MOT PHASE III October 2018 – December 2018 NOTE: Items 1, 2, 3 and 4, as listed below, may be performed at any time during Phases I or II. 4. Fill in behind MSE wall and construct portion of roadway, sidewalk and curb gutter along Route 8102 from approximately Sta. 25+50 RT to 27+00 RT. 5. Install concrete median island on Route 8102 from approximately Sta. 43+50 to Sta. 46+90. 6. Install concrete median island in the center of the Scotts Run Metro Park & Ride driveway. 29
  • 30. Jones Branch Connector over I-495 MOT PHASE IV April 2018 – December 2018 30
  • 31. Jones Branch Connector over I-495 MOT PHASE IV April 2018 – December 2018 1. Retain traffic on existing Capital Beltway express ramps JBNEW, JBEWN, JBSEW and JBWES. 2. Open the eastern portion of Route 8102 from approximately Sta. 29+75 to Sta. 47+00. The ITS system, permanent traffic signals and final signage must be installed and active before this portion of SR 8102 can become active. Coordinate with Capital Beltway Express for “burn-in” period on the ITS system. 3. Demolish existing abutment A and install pier for westbound portion of B627. 31
  • 32. Jones Branch Connector over I-495 MOT PHASE IV April 2018 – December 2018 4. Construct westbound portion of new abutment A for B627. 5. Set beams and rebar and pour deck for the westbound portion of B627. 6. Demolish existing barrier along existing portions (westbound) of B627 and B628. 32
  • 33. Jones Branch Connector over I-495 MOT PHASE IV (Cont.) April 2018 – December 2018 6. Construct MSE retaining wall RW004A and abutment extension of B628 near ramp JBNEW. 7. Install new parapet, fence, sidewalk and corresponding deck extensions along westbound side of B627 and B628. Construct sidewalk, barrier and fence along westbound SR 8102 between B627 and B628 from approximately Sta. 25+00 to Sta. 27+50. 33
  • 34. Jones Branch Connector over I-495 MOT PHASE V November 2018 – Project Completion 34
  • 35. Jones Branch Connector over I-495 MOT PHASE V November 2018 – Project Completion 1. Mill and overlay SR 8102 from approximately Sta. 18+25 to Sta. 22+25 and from Sta. 25+00 to Sta. 27+25. 2. Remove existing pavement and construct curb and grass median in the center of Route 8102 from approximately Sta. 18+50 to Sta. 22+48 and from Sta. 25+25 to Sta. 27+25. 3. Construct concrete median island on bridges B627, B628 and B629. 35
  • 36. Jones Branch Connector over I-495 MOT PHASE V November 2018 – Project Completion 4. Mill and overlay portions of Capital Beltway express ramps JBWES, JBSEW, JBNEW and JBEWN. 5. Remove pavement from approximately Sta. 33+75 to Sta. 37+25 along RW006/SW012 and fill. Construct new sidewalk along the Gates of McLean fence in the same area. 6. Construct Capital One Service Road. Coordinate with contractor of adjacent project to determine if the portion of the road prior to this project's begin construction (18+80) will be completed by the end of this project. 36
  • 37. Jones Branch Connector over I-495 MOT PHASE V November 2018 – Project Completion 7. Construct curb gutter, curb ramps and sidewalk along Spring Gate Drive from approximately Sta. 50+60 LT to 50+90 LT. 8. Construct curb ramps, associated sidewalk, and curb gutter on Colshire Drive from approximately Sta. 200+50 to Sta. 202+00. 9. Install and furnish final pavement markings (seasonally dependent). 10.Install/plant all final landscaping features (seasonally dependent). 37
  • 38. Jones Branch Connector over I-495 Lane Closure Restrictions 38 All closures in the 495 Express Lanes shall be coordinated with the Express Lanes Operations Center at least five (5) business days in advance using their “Authorization to Work” form (available from the Express Lanes Operations Center at 571-419-6046). Complete road closures on the 495 Express Lanes will only be permitted for 30 minutes or less in accordance with the following table.
  • 39. Jones Branch Connector over I-495 Lane Closure Restrictions 39 495 Express Lanes* Single Lane or Shoulder Closures Multiple-Lane Closures Complete Road Closure** Weekday 9:30 p.m.(Sunday to Thursday) to 4 a.m. (Monday to Friday) N/A 11 p.m. to 4 a.m. Weekend 11 p.m. (Friday to Saturday) to 9 a.m. (Saturday to Sunday) N/A 11 p.m. to 4 a.m. * Includes Express Lane Ramps ** Complete road closure on Express Lanes limited to 30 minutes or less, and must start and end within the time period shown.
  • 40. Jones Branch Connector over I-49540 Single-Lane Closures* or Shoulder Arterial Weekday Weekend Monday to Thursday Friday Friday to Saturday Saturday to Sunday Sunday to Monday Major Arterials** 9:30 a.m. to 3 p.m. 9:30 a.m. to 2 p.m. 10 p.m. to 9 a.m. 10 p.m. to 8 a.m. 10 p.m. to 5 a.m.10 p.m. to 5 a.m. All Other Roadways 9 a.m. to 3:30 p.m. 9 a.m. to 2 p.m. 10 p.m. to 9 a.m. 9 p.m. to 9 a.m. 10 p.m. to 5 a.m.9 p.m. to 5 a.m. *Single-lane closures only permitted for multiple-lane roadways. **Major arterials defined as primary roads, high volume secondary roads, and all other routes that connect directly to interstates. Lane Closure Restrictions
  • 41. Jones Branch Connector over I-49541 Multiple-Lane Closures Arterial Weekday Weekend Monday to Thursday Friday Friday to Saturday Saturday to Sunday Sunday to Monday Major Arterials** 10 p.m. to 5 a.m. Not before 11 p.m. 11 p.m. to 5 a.m. 11 p.m. to 6 a.m. 11 p.m. to 5 a.m. All Other Roadways 9 p.m. to 5 a.m. Not before 10 p.m. 10 p.m. to 6 a.m. 10 p.m. to 6 a.m. 10 p.m. to 5 a.m. **Major arterials defined as primary roads, high volume secondary roads, and all other routes that connect directly to interstates. Lane Closure Restrictions