M1 Deansbrook Viaduct (July 11 – December 11)
 Generated several as-built and existing structural drawings of the fire-damaged M1 viaduct bridge. This included the
general arrangement, construction sequence drawings and the details of the fire damages to the beams, soffits,
bearings etc.
Ad-hoc projects (Jan 11 – July 11)
 A244 Walton Bridge: Listed Wall General Arrangement
 Eashing Bridge: Temporary Diversion Signs
 Connect Plus: Creating new drawings. Structures work – replacement of expansion joints and general arrangements.
Creating new road markings and amending traffic signs drawings
 Snake Lane Fish Pass and Forest Row: Creating new drawings for Water & Environment
 QE2 Dartford Crossing Bridge: Referencing drawing for condition scores
 M25 CMS: Controlled Motorway scheme drawings
 London 2012 Olympic Park Infrastructure: Security details
M25 Structures (Connect Plus) (Aug 10 – Dec 10)
 Modifications and amendments to M25 structures such as bridges, footbridges, underpasses etc.
A3 Hindhead Tunnel (Aug 10)
 Created new drawings of the layouts for tunnel diversion route showing plans and sections of the signs in the
maintenance access areas of the tunnel
M25 DBFO (Jul 10 – Aug 10)
 Created new drawings of the oversized storage pipe system
 Created new flood plain drawings by referencing the flood plain maps provided by the Environmental Agency to the
M25 survey drawings
 Modified existing structures drawings of plans and profiles of bridges
A21 Tonbridge to Pembury (May 10 – Jun 10)
 CAD work on A21 Proof of Evidences
 Modified utilities drawings on Statutory Undertakers EDF Diversions and creating new x-ref drawings
A21 Kippings Cross to Lamberhurst (Nov 09 – Apr 10)
 Produced construction phase drawings of four different phases of construction of the A21
 Produced departures drawings of sign locations and statutory undertakers EDF drawings of existing public services
 Produced proposed fenceline and footpath external reference for proposed scheme plan drawings, including general
annotation of earthworks chainages
 Modified drawings to drainage layout, site compounds of temporary storage areas, environmental constraints plan,
proposed scheme layout, layout and cross section of environmental constraints
 Produced and modified several structures (elevation and profile) drawings including bridges, footbridges and retaining
wall
 Produced sustainability index drawings for the Kippings Cross to Lamberhurst scheme using the structures options
report. The same drawings was also produced for the A21 Tonbridge to Pembury scheme
Walton Bridge (Oct 09)
 Modified proposed environment scheme layouts of the Engineering Evidence 2009 drawings. Changes made to x-ref
drawings such as car park, boundaries, cycleways and footpaths etc
 Produced new layers for the survey contours external reference drawing for the flood plain around Walton Bridge
 Produced new flood compensation area drawings
A14 Ellington to Fen Ditton (Assistant Document Controller using iCosNet) (Jun 09 – Sep 09)
 Uploading and updating the mainline and cross-section drawing registers and reports into the iCosNet database
 Changing the registers with the latest revisions and sending off by email
 Distributing issue activity reports of updated registers and various deliverables
 Preparing new issue request forms for uploaded documents
 Updating and uploading SCO forms and providing a link to the daily record sheets
 Managing the files and folders in the iCosNet database
M25 DBFO (Feb 09 – Jun 09)
 Produced cross-section drawings of detail design at various chainages
 Modified base and general highway layout drawings including adding safety barriers and drainages
 Produced and modified several external reference drawings including producing the new cultural heritage features
mapping drawing
 Modified pavement drawings
N6 Galway to Ballinasloe (Nov 08 – Jan 09)
 Modified general drawings including drainage, communications, fencing, safety barriers and sketches drawings
 Calculating pavement and safety barriers bills of quantities

Various Highways and Bridge design projects_Atkins UK

  • 1.
    Imran A. Siddiqui CivilEngineering CADD Technician/Technologist 556, 175A Street SW, Edmonton, Alberta T6W 2L3, Canada  : +1 780 669 3806  : +1 780 802 6360 (Text only)  : cs96ias@yahoo.co.uk Various Highways and Bridge design projects – Atkins, UK M1 Deansbrook Viaduct (July 11 – December 11)  Generated several as-built and existing structural drawings of the fire-damaged M1 viaduct bridge. This included the general arrangement, construction sequence drawings and the details of the fire damages to the beams, soffits, bearings etc. Ad-hoc projects (Jan 11 – July 11)  A244 Walton Bridge: Listed Wall General Arrangement  Eashing Bridge: Temporary Diversion Signs  Connect Plus: Creating new drawings. Structures work – replacement of expansion joints and general arrangements. Creating new road markings and amending traffic signs drawings  Snake Lane Fish Pass and Forest Row: Creating new drawings for Water & Environment  QE2 Dartford Crossing Bridge: Referencing drawing for condition scores  M25 CMS: Controlled Motorway scheme drawings  London 2012 Olympic Park Infrastructure: Security details M25 Structures (Connect Plus) (Aug 10 – Dec 10)  Modifications and amendments to M25 structures such as bridges, footbridges, underpasses etc. A3 Hindhead Tunnel (Aug 10)  Created new drawings of the layouts for tunnel diversion route showing plans and sections of the signs in the maintenance access areas of the tunnel M25 DBFO (Jul 10 – Aug 10)  Created new drawings of the oversized storage pipe system  Created new flood plain drawings by referencing the flood plain maps provided by the Environmental Agency to the M25 survey drawings  Modified existing structures drawings of plans and profiles of bridges A21 Tonbridge to Pembury (May 10 – Jun 10)  CAD work on A21 Proof of Evidences  Modified utilities drawings on Statutory Undertakers EDF Diversions and creating new x-ref drawings A21 Kippings Cross to Lamberhurst (Nov 09 – Apr 10)  Produced construction phase drawings of four different phases of construction of the A21  Produced departures drawings of sign locations and statutory undertakers EDF drawings of existing public services  Produced proposed fenceline and footpath external reference for proposed scheme plan drawings, including general annotation of earthworks chainages  Modified drawings to drainage layout, site compounds of temporary storage areas, environmental constraints plan, proposed scheme layout, layout and cross section of environmental constraints  Produced and modified several structures (elevation and profile) drawings including bridges, footbridges and retaining wall
  • 2.
     Produced sustainabilityindex drawings for the Kippings Cross to Lamberhurst scheme using the structures options report. The same drawings was also produced for the A21 Tonbridge to Pembury scheme Walton Bridge (Oct 09)  Modified proposed environment scheme layouts of the Engineering Evidence 2009 drawings. Changes made to x-ref drawings such as car park, boundaries, cycleways and footpaths etc  Produced new layers for the survey contours external reference drawing for the flood plain around Walton Bridge  Produced new flood compensation area drawings A14 Ellington to Fen Ditton (Assistant Document Controller using iCosNet) (Jun 09 – Sep 09)  Uploading and updating the mainline and cross-section drawing registers and reports into the iCosNet database  Changing the registers with the latest revisions and sending off by email  Distributing issue activity reports of updated registers and various deliverables  Preparing new issue request forms for uploaded documents  Updating and uploading SCO forms and providing a link to the daily record sheets  Managing the files and folders in the iCosNet database M25 DBFO (Feb 09 – Jun 09)  Produced cross-section drawings of detail design at various chainages  Modified base and general highway layout drawings including adding safety barriers and drainages  Produced and modified several external reference drawings including producing the new cultural heritage features mapping drawing  Modified pavement drawings N6 Galway to Ballinasloe (Nov 08 – Jan 09)  Modified general drawings including drainage, communications, fencing, safety barriers and sketches drawings  Calculating pavement and safety barriers bills of quantities