Western Power Graduate Roles & breakdown of primary work tasks
1. Rotations Undertaken
Substation Design
Compiled reference data and provided cross-referencing to distribution
documentation and standards
Provided technical input on several small jobs
Detailed investigation into Current transformer Core usages within the western
power network
Performed minor Earthing Designs
Construction Services – Construction Management
During my time in construction services I performed a variety of works, on both primary and
secondary systems. Some notable project were; Wundowie Substation Asset Replacements;
Remote Ends Work for the new Medical Centre Substation; Double feeder Terminations and
330kV Asset Replacements
Reviewed project packages,created QV sheets,ferrules and cable card.
Creation of Safety Management Plans
Coordination of system outages
Reviewed and ordered materials required for construction of individual project
Delivery of all plant and equipment required for construction to site
Resolution of any issues encountered during construction.
Organised testing, gassing of equipment as required
Site clean-up and handover to commissioning
Lines Design
Performed clearance checks and advised customers of results
Performed easement calculations and advised customers of results
Provided technical advice for internal and external customer in relation to works
near or on Western Powers transmission lines
PLS CAD modelling of lines as required
Developed transmission line electric and magnetic field calculator spreadsheet
Created a user manual for CYMCAP
Network Planning
Power factory modelling of existing feeders
Performed protection studies
Fault level calculations
Updating of protection setting on multiple feeders
Identification of under fault rated conductors to be uprated
System Forecasting
Feeder and substation peak demand forecasting
Assisted in the compilation of the loads and circuits report
Detailed forecast of Ravensthorpe feeder
Assisted in the development of a new peak selection algorithm
Operational Asset Management
Category Manager for Henley Cable Box replacement, Recloser Replacement,
Surge Arrestor Replacement,Sectionaliser Replacement
Assistant Category Manager for Pole Maintenance and Pole Top Replacement
2. Transformer Capitalization, initial work in automating the process
Aiding in the testing of a new risk based software,ADAPT