Rotations Undertaken
Substation Design
 Compiled reference data and provided cross-referencing to distribution
documentation and standards
 Provided technical input on several small jobs
 Detailed investigation into Current transformer Core usages within the western
power network
 Performed minor Earthing Designs
Construction Services – Construction Management
During my time in construction services I performed a variety of works, on both primary and
secondary systems. Some notable project were; Wundowie Substation Asset Replacements;
Remote Ends Work for the new Medical Centre Substation; Double feeder Terminations and
330kV Asset Replacements
 Reviewed project packages,created QV sheets,ferrules and cable card.
 Creation of Safety Management Plans
 Coordination of system outages
 Reviewed and ordered materials required for construction of individual project
 Delivery of all plant and equipment required for construction to site
 Resolution of any issues encountered during construction.
 Organised testing, gassing of equipment as required
 Site clean-up and handover to commissioning
Lines Design
 Performed clearance checks and advised customers of results
 Performed easement calculations and advised customers of results
 Provided technical advice for internal and external customer in relation to works
near or on Western Powers transmission lines
 PLS CAD modelling of lines as required
 Developed transmission line electric and magnetic field calculator spreadsheet
 Created a user manual for CYMCAP
Network Planning
 Power factory modelling of existing feeders
 Performed protection studies
 Fault level calculations
 Updating of protection setting on multiple feeders
 Identification of under fault rated conductors to be uprated
System Forecasting
 Feeder and substation peak demand forecasting
 Assisted in the compilation of the loads and circuits report
 Detailed forecast of Ravensthorpe feeder
 Assisted in the development of a new peak selection algorithm
Operational Asset Management
 Category Manager for Henley Cable Box replacement, Recloser Replacement,
Surge Arrestor Replacement,Sectionaliser Replacement
 Assistant Category Manager for Pole Maintenance and Pole Top Replacement
 Transformer Capitalization, initial work in automating the process
 Aiding in the testing of a new risk based software,ADAPT

More Related Content

What's hot

Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-Resume
Manoj Ahire
 
Fwb Electrical Deliverables Interdisciplinary Interfaces
Fwb Electrical Deliverables   Interdisciplinary InterfacesFwb Electrical Deliverables   Interdisciplinary Interfaces
Fwb Electrical Deliverables Interdisciplinary Interfaces
biiswashruta
 
WORKFLOW
WORKFLOW WORKFLOW
WORKFLOW
TW Carl
 

What's hot (19)

CV
CVCV
CV
 
Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar
 
Flow assurance and surge analysis
Flow assurance and surge analysisFlow assurance and surge analysis
Flow assurance and surge analysis
 
RESUM (1)
RESUM (1)RESUM (1)
RESUM (1)
 
Henkels & McCoy Renewable Energy Services
Henkels & McCoy Renewable Energy ServicesHenkels & McCoy Renewable Energy Services
Henkels & McCoy Renewable Energy Services
 
Henkels & McCoy Renewable Energy Services
Henkels & McCoy Renewable Energy ServicesHenkels & McCoy Renewable Energy Services
Henkels & McCoy Renewable Energy Services
 
Resume of ECHeausler
Resume of ECHeausler Resume of ECHeausler
Resume of ECHeausler
 
Krishna prasad fm engineer
Krishna prasad fm engineerKrishna prasad fm engineer
Krishna prasad fm engineer
 
SNeshevich_2016
SNeshevich_2016SNeshevich_2016
SNeshevich_2016
 
JPCV engineer 311216
JPCV engineer  311216JPCV engineer  311216
JPCV engineer 311216
 
A verilog based simulation methodology for estimating statistical test for th...
A verilog based simulation methodology for estimating statistical test for th...A verilog based simulation methodology for estimating statistical test for th...
A verilog based simulation methodology for estimating statistical test for th...
 
Electrical and control engineer for hammond solution
Electrical and control engineer for hammond  solutionElectrical and control engineer for hammond  solution
Electrical and control engineer for hammond solution
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-Resume
 
CV-4-1 -
CV-4-1 -CV-4-1 -
CV-4-1 -
 
Fwb Electrical Deliverables Interdisciplinary Interfaces
Fwb Electrical Deliverables   Interdisciplinary InterfacesFwb Electrical Deliverables   Interdisciplinary Interfaces
Fwb Electrical Deliverables Interdisciplinary Interfaces
 
WORKFLOW
WORKFLOW WORKFLOW
WORKFLOW
 
Episode 32 : Project Execution Part (3)
Episode 32 :  Project Execution Part (3)Episode 32 :  Project Execution Part (3)
Episode 32 : Project Execution Part (3)
 
Episode 31 : Project Execution Part (2)
Episode 31 :  Project Execution Part (2)Episode 31 :  Project Execution Part (2)
Episode 31 : Project Execution Part (2)
 
Resume
ResumeResume
Resume
 

Viewers also liked

день партизанської слави
день партизанської славидень партизанської слави
день партизанської слави
af1311
 
Menu1 merged
Menu1 mergedMenu1 merged
Menu1 merged
cuartin1
 
magasin hollister2012-hollister france blog jean hollister nous avons é
magasin hollister2012-hollister france blog jean hollister nous avons émagasin hollister2012-hollister france blog jean hollister nous avons é
magasin hollister2012-hollister france blog jean hollister nous avons é
manxfont31
 
Financial Statements Analysis and Valuation
Financial Statements Analysis and ValuationFinancial Statements Analysis and Valuation
Financial Statements Analysis and Valuation
ibtdb-tj
 
Guias de observacion ACTIVIDAD #2
Guias de observacion ACTIVIDAD #2Guias de observacion ACTIVIDAD #2
Guias de observacion ACTIVIDAD #2
AlfaBVB98
 

Viewers also liked (13)

Session 20
Session 20Session 20
Session 20
 
день партизанської слави
день партизанської славидень партизанської слави
день партизанської слави
 
Menu1 merged
Menu1 mergedMenu1 merged
Menu1 merged
 
Act2 2 isabel_lopez
Act2 2 isabel_lopezAct2 2 isabel_lopez
Act2 2 isabel_lopez
 
DeltaPSU Introducing CliQ II 24V 480W 1 Phase DIN Rail Power Supply
DeltaPSU Introducing CliQ II 24V 480W  1 Phase DIN Rail Power SupplyDeltaPSU Introducing CliQ II 24V 480W  1 Phase DIN Rail Power Supply
DeltaPSU Introducing CliQ II 24V 480W 1 Phase DIN Rail Power Supply
 
magasin hollister2012-hollister france blog jean hollister nous avons é
magasin hollister2012-hollister france blog jean hollister nous avons émagasin hollister2012-hollister france blog jean hollister nous avons é
magasin hollister2012-hollister france blog jean hollister nous avons é
 
Slide share
Slide shareSlide share
Slide share
 
Einladung wifo 2012
Einladung wifo 2012Einladung wifo 2012
Einladung wifo 2012
 
Financial Statements Analysis and Valuation
Financial Statements Analysis and ValuationFinancial Statements Analysis and Valuation
Financial Statements Analysis and Valuation
 
One world 1pager
One world 1pagerOne world 1pager
One world 1pager
 
Alcance
AlcanceAlcance
Alcance
 
Guias de observacion ACTIVIDAD #2
Guias de observacion ACTIVIDAD #2Guias de observacion ACTIVIDAD #2
Guias de observacion ACTIVIDAD #2
 
Plate compactor
Plate compactorPlate compactor
Plate compactor
 

Similar to Western Power Graduate Roles & breakdown of primary work tasks

Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineer
Suthar Vinu
 
Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis CV(2016)
Ariel Pacis CV(2016)
Ariel Pacis
 
20150121 Ausgrid PM work experience and skills
20150121 Ausgrid PM work experience and skills20150121 Ausgrid PM work experience and skills
20150121 Ausgrid PM work experience and skills
Chamath Wijeratne
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
Engr.ayaz khan
 
QuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCWQuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCW
GEORGE EBO QUARSHIE
 
QuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCWQuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCW
GEORGE EBO QUARSHIE
 
Minteer Resume 4.7.16 - Linkedin
Minteer Resume 4.7.16 - LinkedinMinteer Resume 4.7.16 - Linkedin
Minteer Resume 4.7.16 - Linkedin
Zachary Minteer
 
Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016
Yizhe Liu
 
Resume - Scott Nieass 2016
Resume - Scott Nieass 2016Resume - Scott Nieass 2016
Resume - Scott Nieass 2016
Scott Nieass
 
Uhde Shedden Project Undertaken
Uhde Shedden Project UndertakenUhde Shedden Project Undertaken
Uhde Shedden Project Undertaken
Michael Macek
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017
Gary Marphis
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
Zaheer Ahmed
 

Similar to Western Power Graduate Roles & breakdown of primary work tasks (20)

Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineer
 
Jaydeep_Resume
Jaydeep_ResumeJaydeep_Resume
Jaydeep_Resume
 
Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis CV(2016)
Ariel Pacis CV(2016)
 
20150121 Ausgrid PM work experience and skills
20150121 Ausgrid PM work experience and skills20150121 Ausgrid PM work experience and skills
20150121 Ausgrid PM work experience and skills
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
CV for Linkedin
CV for LinkedinCV for Linkedin
CV for Linkedin
 
QuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCWQuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCW
 
QuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCWQuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCW
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
RESUME
RESUMERESUME
RESUME
 
wathiq alanbaki
wathiq alanbakiwathiq alanbaki
wathiq alanbaki
 
Minteer Resume 4.7.16 - Linkedin
Minteer Resume 4.7.16 - LinkedinMinteer Resume 4.7.16 - Linkedin
Minteer Resume 4.7.16 - Linkedin
 
Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 
Dhruv patel resume
Dhruv patel resumeDhruv patel resume
Dhruv patel resume
 
Resume - Scott Nieass 2016
Resume - Scott Nieass 2016Resume - Scott Nieass 2016
Resume - Scott Nieass 2016
 
Uhde Shedden Project Undertaken
Uhde Shedden Project UndertakenUhde Shedden Project Undertaken
Uhde Shedden Project Undertaken
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 

Western Power Graduate Roles & breakdown of primary work tasks

  • 1. Rotations Undertaken Substation Design  Compiled reference data and provided cross-referencing to distribution documentation and standards  Provided technical input on several small jobs  Detailed investigation into Current transformer Core usages within the western power network  Performed minor Earthing Designs Construction Services – Construction Management During my time in construction services I performed a variety of works, on both primary and secondary systems. Some notable project were; Wundowie Substation Asset Replacements; Remote Ends Work for the new Medical Centre Substation; Double feeder Terminations and 330kV Asset Replacements  Reviewed project packages,created QV sheets,ferrules and cable card.  Creation of Safety Management Plans  Coordination of system outages  Reviewed and ordered materials required for construction of individual project  Delivery of all plant and equipment required for construction to site  Resolution of any issues encountered during construction.  Organised testing, gassing of equipment as required  Site clean-up and handover to commissioning Lines Design  Performed clearance checks and advised customers of results  Performed easement calculations and advised customers of results  Provided technical advice for internal and external customer in relation to works near or on Western Powers transmission lines  PLS CAD modelling of lines as required  Developed transmission line electric and magnetic field calculator spreadsheet  Created a user manual for CYMCAP Network Planning  Power factory modelling of existing feeders  Performed protection studies  Fault level calculations  Updating of protection setting on multiple feeders  Identification of under fault rated conductors to be uprated System Forecasting  Feeder and substation peak demand forecasting  Assisted in the compilation of the loads and circuits report  Detailed forecast of Ravensthorpe feeder  Assisted in the development of a new peak selection algorithm Operational Asset Management  Category Manager for Henley Cable Box replacement, Recloser Replacement, Surge Arrestor Replacement,Sectionaliser Replacement  Assistant Category Manager for Pole Maintenance and Pole Top Replacement
  • 2.  Transformer Capitalization, initial work in automating the process  Aiding in the testing of a new risk based software,ADAPT