1. The document discusses the importance of interdisciplinary interface engineering for electrical projects and describes various types of interfaces and deliverables that must be coordinated between electrical and other disciplines like process, piping, civil, and instrumentation.
2. It provides examples of typical electrical deliverables that interface with other groups and deliverables received from other groups including plans, diagrams, schedules, specifications and calculations.
3. Maintaining proper documentation through methods like document control indexes, distribution matrices, notes of meetings and memos is important to facilitate interface engineering and coordination between groups.