Project Management
Extraction/Output
Action Type
Plant Layout/
Piping
Power & Controls
HVAC/Fire Protection
Plant Engineering
MTO/Stress/Pipe Supports
Mechanical/
Vessels
Architectural
Client
Construction
Commissioning/
Validation
Project Controls
Procurement
Project CIE/Design
Coordination
Detail Design
Process
Civil/Structural
Project Design Execution Process
Create Design Areas and Model Files for all Disciplines
Set -up Interference Management Program
Set-up Design Review by Systems and areas
Update Reference Database
Develop 3D Project Execution Plan to 3DProcedure
Plot Plans and GA’s for Review by
Project Team, Construction and Client
Plot Plan for Inter-Discipline
Design And Coordination
Concrete &
Steel MTO
Wall & Floor Openings
Offline Instrument Location Plan
HVAC Plans and Sections
Foundation Piling
Building / Structures Plan
Steel Plans and Elevations
Approved Plot Plans generated AFD &
Overall Plot Plan Issue AFC W/Holds
Overall Plot Plan for review by Project Team, Construction, and Client
Equipment GA’s
Approved for Design
INTERFERENCE CHECKING RESOLUTION BY DISCIPLINE
Set-up Defaults for Iso Extraction
Input New Specialty Items into Specifications
Extract Isometrics for Checking
Incorporate Vessel Orientation Comments Area Piping Input:
Lrg Bore & Small Bore Critical Lines
LB & SB Non-Critical Process Lines
Vessel and Equipment Trim
Annotate and Plot Equipment GA’s
Underground System Design
Preliminary stress
Review for LB and
SB Piping Input
Required Data/Details
Input Foundations, Bldg / Structural Steel,
Rack Steel, Stairs
and Ladders approved for Design
Start Instrument Location Plans &
Instrument Installation Details
Up-date equipment to AFD Vendor Info
Update Models from RDB
Interface with other Design Areas
Input Lighting Fixtures and Junction Boxes
Input Vessel Clips for Ladders
Input Ladders and latforms
Input Partition Heights
Add Louvres/ Locate Major
Wall Openings
Interior Details
Resolve all Interferences as Required
Input Preliminary Cable Tray Requirements
and Electrical Equipment Requirements
Mechanical Drawing Information
Dimensions and Information
Detail Exterior Envelope
Exterior Details
Update Equipment based on AFD Drawings
Input Offline Instrument Dimensional Data to Spec
Develop Main Duct Routing
Define Fire Deluge
Routing and Envelope
Update Equipment Based on Vendor Data
Input Duct and In-line Equipment
Certified Vendor Data
Incorporate Review
Comments
CONTINUED MAINTENANCE OF ARCHITECTURAL BACKROUND
Formal Review
Approve at 75%
Model Completion
(TIMING BASED ON JOB REQUIREMENTS)
Formal Constructability Review
Formal Review
Approve at 25%
Model Completion
Develop Vendor Matrix Drawing
Intersquad Vendor Drawings
Vendor Document Matrix
Vendor Document Status
Report
Foundation Drawings
Steel Drawings
Site Plans
Piling Plans
Paving / Coating Plans
Site Plans
Equipment
Foundation Plan
Misc Steel for Openings
AG Drainage System Design
AG FW Main Riser Header Installation
Establish Variation Procedures
Set-up Project Management System
Issue Project Controls Plan
Establish Trending DocumentRe Cast +/_10% In to Cost Management System
Establish Integrated Eng / Const Schedule
Project Closeout Documentation
Interactive Design / Engineering Audit
Issue Audit Report
Define Turnover
Sequence
Turnover Package
Developement
Develop Commissioning
Master Plan
Finalize Validation
Master Plan
cGMP Review
Develop Protocols
Develop SOP’s
Plot Plan
Equipment arrangements
Piping GA’s
Tie-in List
Clash check free Model
Final P&ID’s
Equipment List
Line List
“X” Item List
Equip & Inst. Specs
Electrical Single Lines
Area Classification Dwgs
Cable Schedule
Cable Routing Dwg
Sub Station Layout Dwgs
Lighting & Power Plans
Grounding Plans
HVAC Layouts
HVAC Equip List
Fire Protection drawings
Piping Specifications
Pipe support Details
Piping Speciality Details
Equipment Vendor
Drawings
Plans, elevations, & sections
Door and Room Schedules
Protocols
SOP’s
Final VMP
Final Commissioning Plan
Turn-over Packages
Deliverables
Determine all Penetrations
Ladders and Platforms
Platforms and
Pipe supports
Formal Review
Approve at 50%
Model Completion
Formal Review
Approve at 90%
Model Completion
Interference Checked
Model to prepare for
Final Design
Issue Inst. Specs
Issue Equip Specs
CP-3121 CP-3121
Update IFD P&ID’s
Ref. Doc.
REV 0

More Related Content

What's hot

Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technipignitetribes
 
Sample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectSample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectignitetribes
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendationsubk1411
 
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...p6academy
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessAlberto Sanchez
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement ignitetribes
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsNam N.N Tran M.Eng, PMP
 
Electrical Deliverables - Interdisciplinary Interfaces
Electrical Deliverables - Interdisciplinary InterfacesElectrical Deliverables - Interdisciplinary Interfaces
Electrical Deliverables - Interdisciplinary Interfacesbiiswashruta
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draftignitetribes
 
EPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A ComparisonEPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A Comparisonhelensuni
 
Project Control Practical Way by Herve Baron
Project Control Practical Way by Herve BaronProject Control Practical Way by Herve Baron
Project Control Practical Way by Herve Baronignitetribes
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Gensol Engineering Limited
 
Strategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksStrategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksPankaj K Sinha
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeCCT International
 
Front End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control TrainingFront End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control TrainingDEVELOP
 
Contract & Tender Management
Contract & Tender ManagementContract & Tender Management
Contract & Tender ManagementAnand Subramaniam
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installationswan saiful arini
 

What's hot (20)

Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technip
 
Sample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectSample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_project
 
Epc projects and cad tools
Epc projects and cad toolsEpc projects and cad tools
Epc projects and cad tools
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
 
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning Process
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
 
Pid.pdf
Pid.pdfPid.pdf
Pid.pdf
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projects
 
Electrical Deliverables - Interdisciplinary Interfaces
Electrical Deliverables - Interdisciplinary InterfacesElectrical Deliverables - Interdisciplinary Interfaces
Electrical Deliverables - Interdisciplinary Interfaces
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draft
 
EPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A ComparisonEPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A Comparison
 
Project Control Practical Way by Herve Baron
Project Control Practical Way by Herve BaronProject Control Practical Way by Herve Baron
Project Control Practical Way by Herve Baron
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects
 
Strategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksStrategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract Risks
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
 
Front End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control TrainingFront End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control Training
 
Design Checklist Civil & Structural
Design Checklist Civil & StructuralDesign Checklist Civil & Structural
Design Checklist Civil & Structural
 
Contract & Tender Management
Contract & Tender ManagementContract & Tender Management
Contract & Tender Management
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installations
 

Similar to Project Design Execution Process

Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringCCT International
 
Samuel A McBride Resume 1-13-15
Samuel A McBride Resume 1-13-15Samuel A McBride Resume 1-13-15
Samuel A McBride Resume 1-13-15Sam McBride
 
SEG Static Equipment Generator
SEG Static Equipment GeneratorSEG Static Equipment Generator
SEG Static Equipment GeneratorN.A. Tecnologia
 
Len Ashton Resume
Len Ashton ResumeLen Ashton Resume
Len Ashton ResumeLen Ashton
 
ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3Elbert Speed III
 
Specifications 101
Specifications 101Specifications 101
Specifications 101Andrej_M
 
NASA Project Management Wall Chart
NASA Project Management Wall ChartNASA Project Management Wall Chart
NASA Project Management Wall ChartCarlos Duarte
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer Parth Tailor
 
Facility Plant Mechanical Engineer Resume
Facility Plant Mechanical Engineer ResumeFacility Plant Mechanical Engineer Resume
Facility Plant Mechanical Engineer ResumeBoeing Douglas Han
 
2009 Bim There Done That 3
2009 Bim There Done That 32009 Bim There Done That 3
2009 Bim There Done That 3John Fish
 
AMEC IPE Solution_ISEIT 2006
AMEC IPE Solution_ISEIT 2006AMEC IPE Solution_ISEIT 2006
AMEC IPE Solution_ISEIT 2006Marc-Henri Cerar
 
TEKNORGE Oil & Gas Expertise
TEKNORGE  Oil & Gas ExpertiseTEKNORGE  Oil & Gas Expertise
TEKNORGE Oil & Gas ExpertiseTEKNORGE AS
 
EXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGEEXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGETEKNORGE AS
 

Similar to Project Design Execution Process (20)

test 2
test 2	test 2
test 2
 
Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & Monitoring
 
My resume 2015
My resume 2015My resume 2015
My resume 2015
 
Samuel A McBride Resume 1-13-15
Samuel A McBride Resume 1-13-15Samuel A McBride Resume 1-13-15
Samuel A McBride Resume 1-13-15
 
SEG Static Equipment Generator
SEG Static Equipment GeneratorSEG Static Equipment Generator
SEG Static Equipment Generator
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Ashwin_L&T
Ashwin_L&TAshwin_L&T
Ashwin_L&T
 
Len Ashton Resume
Len Ashton ResumeLen Ashton Resume
Len Ashton Resume
 
ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3
 
Anilkumar
AnilkumarAnilkumar
Anilkumar
 
Specifications 101
Specifications 101Specifications 101
Specifications 101
 
NASA Project Management Wall Chart
NASA Project Management Wall ChartNASA Project Management Wall Chart
NASA Project Management Wall Chart
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer
 
Facility Plant Mechanical Engineer Resume
Facility Plant Mechanical Engineer ResumeFacility Plant Mechanical Engineer Resume
Facility Plant Mechanical Engineer Resume
 
2009 Bim There Done That 3
2009 Bim There Done That 32009 Bim There Done That 3
2009 Bim There Done That 3
 
Entregables ingles
Entregables inglesEntregables ingles
Entregables ingles
 
AMEC IPE Solution_ISEIT 2006
AMEC IPE Solution_ISEIT 2006AMEC IPE Solution_ISEIT 2006
AMEC IPE Solution_ISEIT 2006
 
TEKNORGE Oil & Gas Expertise
TEKNORGE  Oil & Gas ExpertiseTEKNORGE  Oil & Gas Expertise
TEKNORGE Oil & Gas Expertise
 
EXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGEEXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGE
 

Project Design Execution Process

  • 1. Project Management Extraction/Output Action Type Plant Layout/ Piping Power & Controls HVAC/Fire Protection Plant Engineering MTO/Stress/Pipe Supports Mechanical/ Vessels Architectural Client Construction Commissioning/ Validation Project Controls Procurement Project CIE/Design Coordination Detail Design Process Civil/Structural Project Design Execution Process Create Design Areas and Model Files for all Disciplines Set -up Interference Management Program Set-up Design Review by Systems and areas Update Reference Database Develop 3D Project Execution Plan to 3DProcedure Plot Plans and GA’s for Review by Project Team, Construction and Client Plot Plan for Inter-Discipline Design And Coordination Concrete & Steel MTO Wall & Floor Openings Offline Instrument Location Plan HVAC Plans and Sections Foundation Piling Building / Structures Plan Steel Plans and Elevations Approved Plot Plans generated AFD & Overall Plot Plan Issue AFC W/Holds Overall Plot Plan for review by Project Team, Construction, and Client Equipment GA’s Approved for Design INTERFERENCE CHECKING RESOLUTION BY DISCIPLINE Set-up Defaults for Iso Extraction Input New Specialty Items into Specifications Extract Isometrics for Checking Incorporate Vessel Orientation Comments Area Piping Input: Lrg Bore & Small Bore Critical Lines LB & SB Non-Critical Process Lines Vessel and Equipment Trim Annotate and Plot Equipment GA’s Underground System Design Preliminary stress Review for LB and SB Piping Input Required Data/Details Input Foundations, Bldg / Structural Steel, Rack Steel, Stairs and Ladders approved for Design Start Instrument Location Plans & Instrument Installation Details Up-date equipment to AFD Vendor Info Update Models from RDB Interface with other Design Areas Input Lighting Fixtures and Junction Boxes Input Vessel Clips for Ladders Input Ladders and latforms Input Partition Heights Add Louvres/ Locate Major Wall Openings Interior Details Resolve all Interferences as Required Input Preliminary Cable Tray Requirements and Electrical Equipment Requirements Mechanical Drawing Information Dimensions and Information Detail Exterior Envelope Exterior Details Update Equipment based on AFD Drawings Input Offline Instrument Dimensional Data to Spec Develop Main Duct Routing Define Fire Deluge Routing and Envelope Update Equipment Based on Vendor Data Input Duct and In-line Equipment Certified Vendor Data Incorporate Review Comments CONTINUED MAINTENANCE OF ARCHITECTURAL BACKROUND Formal Review Approve at 75% Model Completion (TIMING BASED ON JOB REQUIREMENTS) Formal Constructability Review Formal Review Approve at 25% Model Completion Develop Vendor Matrix Drawing Intersquad Vendor Drawings Vendor Document Matrix Vendor Document Status Report Foundation Drawings Steel Drawings Site Plans Piling Plans Paving / Coating Plans Site Plans Equipment Foundation Plan Misc Steel for Openings AG Drainage System Design AG FW Main Riser Header Installation Establish Variation Procedures Set-up Project Management System Issue Project Controls Plan Establish Trending DocumentRe Cast +/_10% In to Cost Management System Establish Integrated Eng / Const Schedule Project Closeout Documentation Interactive Design / Engineering Audit Issue Audit Report Define Turnover Sequence Turnover Package Developement Develop Commissioning Master Plan Finalize Validation Master Plan cGMP Review Develop Protocols Develop SOP’s Plot Plan Equipment arrangements Piping GA’s Tie-in List Clash check free Model Final P&ID’s Equipment List Line List “X” Item List Equip & Inst. Specs Electrical Single Lines Area Classification Dwgs Cable Schedule Cable Routing Dwg Sub Station Layout Dwgs Lighting & Power Plans Grounding Plans HVAC Layouts HVAC Equip List Fire Protection drawings Piping Specifications Pipe support Details Piping Speciality Details Equipment Vendor Drawings Plans, elevations, & sections Door and Room Schedules Protocols SOP’s Final VMP Final Commissioning Plan Turn-over Packages Deliverables Determine all Penetrations Ladders and Platforms Platforms and Pipe supports Formal Review Approve at 50% Model Completion Formal Review Approve at 90% Model Completion Interference Checked Model to prepare for Final Design Issue Inst. Specs Issue Equip Specs CP-3121 CP-3121 Update IFD P&ID’s Ref. Doc. REV 0