Agenda
Background
Business Analysis and Projects
Business Analysis in Project Life
Cycle
Introduction of PMI-PBA
© 2015 iZenBridge | Public
Background
© 2015 iZenBridge | Public
What is Project
A temporary endeavor undertaken to create a unique product,
service, or result.
- PMBOK® Guide Fifth Edition
© 2015 iZenBridge | Public
What is Business Analysis
• Application of knowledge, skills, tools and techniques to:
• Determine problems and identify business needs
• Identify and recommend solutions
• Elicit, document, and manage stakeholder requirements
• Facilitate the successful implementation of the product, service , project or
program
© 2015 iZenBridge | Public
PMI’s Increased Focus on Business Analysis
• PMBOK® Guide Fourth Edition , expanded with Collect
requirement process
• PMBOK® Guide Fifth Edition, included Stakeholder management
knowledge area
• Now Business Analysis Practice Guide
• And may develop full standard for Business Analysis
© 2015 iZenBridge | Public
Business Analysis and Projects
© 2015 iZenBridge | Public
Business Analysis
• Business Analysis is conducted in support of many business
initiatives, including program and projects as well as ongoing
operational activities, such as monitoring, modeling and forecasting
In this session we are discussing Business
Analysis in Projects Environment
© 2015 iZenBridge | Public
Business Analysis in Project Context
Project
Need
Assessment
Need Assessment,
Planning, Analysis,
Traceability
Monitoring and
Evaluation
Solution
Evaluation
© 2015 iZenBridge | Public
Business Analysis in Project Life Cycle
© 2015 iZenBridge | Public
Project Life Cycle
A project life cycle is the series of phases that a project
passes through from its initiation to its closure.
- PMBOK® Guide Fifth Edition
© 2015 iZenBridge | Public
Page no 42, A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition, ©2013 Project Management Institute
Project Life Cycle
© 2015 iZenBridge | Public
Page no 43, A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition, ©2013 Project Management Institute
Project Life Cycle
© 2015 iZenBridge | Public
Phase – Domain – Lifecycle
Page no 51, A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition, ©2013 Project Management Institute
© 2015 iZenBridge | Public
Business Analysis Domains
Need
Assessment Planning
Analysis
Traceability and Monitoring
Solution
Evaluation
Its not a sequential process but iterative
© 2015 iZenBridge | Public
Need Assessment
SWOT
Five Whys
Problem Analysis
Opportunity Analysis
Feasibility
Stakeholders EnvironmentOrganization
Goals
Business
Need
© 2015 iZenBridge | Public
Need Assessment in Project
Business Case
Develop Project
Charter
Ongoing
Assessment
Change
Request
Go / No
Go
Rigor
depend on
Project Life
Cycle
New
Requirements
© 2015 iZenBridge | Public
Business Analysis Planning
Need
Assessment
Analysis
Traceability
and
Monitoring
Evaluation
Business Analysis Planning
© 2015 iZenBridge | Public
Business Analysis Planning and Project Planning
Business Analysis Planning
Integration
Scope
Time
Quality
Cost
HumanResource
Risk
Communication
Stakeholder
Procurement
© 2015 iZenBridge | Public
Analysis
Business
Stakeholder
Solution
Elicitation and
Analysis of
Solution
Requirements
© 2015 iZenBridge | Public
Analysis and Projects
Project Scope
Management
Collect
Requirement
Develop Scope
Statement
Create WBS
© 2015 iZenBridge | Public
Traceability and Monitoring
Source ImplementationTraceability
Propose
Analysis
Development
Implementation
Monitoring
© 2015 iZenBridge | Public
Traceability and Monitoring in Projects
Monitor and
Control Project
Work
Control Scope
Manage
Communication
Manage
Stakeholders
Perform
Integrated
Change Control
Control
Communication
Control
Stakeholders
© 2015 iZenBridge | Public
Solution Evaluation
Need
Solution
Evaluation
© 2015 iZenBridge | Public
Solution Evaluation in Projects
Close Project or
Phase
Validate Scope
Evaluation
Post
Project
© 2015 iZenBridge | Public
Summarize
• Business Analysis helps in finding needs and developing solutions
• Need Assessment domain deals in identifying problems and
opportunities
• Business analysis planning works with Project Planning
• Traceability and monitoring helps in tracking requirement from source to
implementation
• Solution evaluation is all about did we get for which we started this
project or solution?
© 2015 iZenBridge | Public
Questions
© 2015 iZenBridge | Public
PMI-PBA® Overview
© 2015 iZenBridge | Public
The PMI-PBA® credential recognizes an
individual's expertise in business analysis, using
BA tools and techniques to improve the overall
success of projects.
PMI-PBA® Handbook
Overview
© 2015 iZenBridge | Public
PMI–PBA® Eligibility Requirements
Secondary
Degree
Bachelor's
Degree
7500 Hours of
BA Experience
4500 Hours of
BA Experience
2000 Hours
Project Team
35 PDUs in BA
Overview
© 2015 iZenBridge | Public
Cost $ 405 PMI Members
$ 555 Non PMI Members
Exam 200 Questions
4 Hours
Prometric Center
Overview
© 2015 iZenBridge | Public
Domain - Questions
Domain Questions %
Need Assessment 18
Planning 22
Analysis 35
Traceability and Monitoring 15
Evaluation 10
Overview
© 2015 iZenBridge | Public
Questions
© 2015 iZenBridge | Public
Stay Connected
YouTube Channel
www.youtube.com/izenbridge
PMP® / PMI-ACP®
Discussion Forum
forum.izenbridge.com
www.iZenBridge.com

More Related Content

What's hot

Transitioning from Business Analyst to Business Consultant
Transitioning  from Business Analyst to Business ConsultantTransitioning  from Business Analyst to Business Consultant
Transitioning from Business Analyst to Business ConsultantLN Mishra CBAP
 
Agile project, myths & selection criteria
Agile project, myths & selection criteriaAgile project, myths & selection criteria
Agile project, myths & selection criteriaWilliam Hill Australia
 
Agile pilot project selection
Agile pilot project selectionAgile pilot project selection
Agile pilot project selectionhemantg1
 
Lean Six Sigma Black Belt Training Part 5
Lean Six Sigma Black Belt Training Part 5Lean Six Sigma Black Belt Training Part 5
Lean Six Sigma Black Belt Training Part 5Lean Insight
 
Lean Six sigma Black Belt Training Part 6
Lean Six sigma Black Belt Training Part 6Lean Six sigma Black Belt Training Part 6
Lean Six sigma Black Belt Training Part 6Lean Insight
 
FCB Partners Course Overview: Process Redesign
FCB Partners Course Overview: Process RedesignFCB Partners Course Overview: Process Redesign
FCB Partners Course Overview: Process RedesignFCBPartners
 
Agile for Business Analysts
Agile for Business AnalystsAgile for Business Analysts
Agile for Business AnalystsJohn Goodpasture
 
Agile Portfolio Management: Not Just Another Buzzword
Agile Portfolio Management: Not Just Another BuzzwordAgile Portfolio Management: Not Just Another Buzzword
Agile Portfolio Management: Not Just Another BuzzwordKeyedIn Projects
 
How to do effective pi planning?
How to do effective pi planning?How to do effective pi planning?
How to do effective pi planning?Tarun Singh
 
Agile project management - a deep dive 2.2
Agile project management  - a deep dive 2.2Agile project management  - a deep dive 2.2
Agile project management - a deep dive 2.2Mohammad Faiz
 
Intro to agile business analysis
Intro to agile business analysisIntro to agile business analysis
Intro to agile business analysisSumit Mahajan
 
Webinar on Requirement Prioritization Process - iZenBridge
Webinar on Requirement Prioritization Process - iZenBridgeWebinar on Requirement Prioritization Process - iZenBridge
Webinar on Requirement Prioritization Process - iZenBridgeSaket Bansal
 
How to use BABoK 3.0?
How to use BABoK 3.0?How to use BABoK 3.0?
How to use BABoK 3.0?Katarzyna Kot
 

What's hot (18)

Mikel huth
Mikel huthMikel huth
Mikel huth
 
Transitioning from Business Analyst to Business Consultant
Transitioning  from Business Analyst to Business ConsultantTransitioning  from Business Analyst to Business Consultant
Transitioning from Business Analyst to Business Consultant
 
Agile project, myths & selection criteria
Agile project, myths & selection criteriaAgile project, myths & selection criteria
Agile project, myths & selection criteria
 
Agile pilot project selection
Agile pilot project selectionAgile pilot project selection
Agile pilot project selection
 
Lean Six Sigma Black Belt Training Part 5
Lean Six Sigma Black Belt Training Part 5Lean Six Sigma Black Belt Training Part 5
Lean Six Sigma Black Belt Training Part 5
 
Lean Six sigma Black Belt Training Part 6
Lean Six sigma Black Belt Training Part 6Lean Six sigma Black Belt Training Part 6
Lean Six sigma Black Belt Training Part 6
 
APM Presents - Getting into project management
APM Presents - Getting into project managementAPM Presents - Getting into project management
APM Presents - Getting into project management
 
FCB Partners Course Overview: Process Redesign
FCB Partners Course Overview: Process RedesignFCB Partners Course Overview: Process Redesign
FCB Partners Course Overview: Process Redesign
 
Agile for Business Analysts
Agile for Business AnalystsAgile for Business Analysts
Agile for Business Analysts
 
Agile Portfolio Management: Not Just Another Buzzword
Agile Portfolio Management: Not Just Another BuzzwordAgile Portfolio Management: Not Just Another Buzzword
Agile Portfolio Management: Not Just Another Buzzword
 
Agile Knowledge Management
Agile Knowledge ManagementAgile Knowledge Management
Agile Knowledge Management
 
How to do effective pi planning?
How to do effective pi planning?How to do effective pi planning?
How to do effective pi planning?
 
Agile project management - a deep dive 2.2
Agile project management  - a deep dive 2.2Agile project management  - a deep dive 2.2
Agile project management - a deep dive 2.2
 
Intro to agile business analysis
Intro to agile business analysisIntro to agile business analysis
Intro to agile business analysis
 
Webinar on Requirement Prioritization Process - iZenBridge
Webinar on Requirement Prioritization Process - iZenBridgeWebinar on Requirement Prioritization Process - iZenBridge
Webinar on Requirement Prioritization Process - iZenBridge
 
How to use BABoK 3.0?
How to use BABoK 3.0?How to use BABoK 3.0?
How to use BABoK 3.0?
 
Agile Business Analyst
Agile Business AnalystAgile Business Analyst
Agile Business Analyst
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 

Viewers also liked

Postmortem Analysis
Postmortem AnalysisPostmortem Analysis
Postmortem AnalysisSaqib Raza
 
Business analysis and project changes
Business analysis and project changesBusiness analysis and project changes
Business analysis and project changesIIBA Romania Chapter
 
Rapid assessment and recovery of troubled projects
Rapid assessment and recovery of troubled projectsRapid assessment and recovery of troubled projects
Rapid assessment and recovery of troubled projectsMohammed Al_busailiy
 
Research Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryResearch Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryPM Solutions
 
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & HeroSymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & HeroPMI Indonesia Chapter
 
Project Recovery
Project RecoveryProject Recovery
Project Recoverytrethard
 
Practical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPractical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPM Solutions
 
Project post-mortem analysis
Project post-mortem analysisProject post-mortem analysis
Project post-mortem analysisJaiveer Singh
 
The 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projectsThe 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projectsTorsten Koerting
 
POST PROJECT EVALUATION REPORT
POST PROJECT EVALUATION REPORTPOST PROJECT EVALUATION REPORT
POST PROJECT EVALUATION REPORT03363635718
 
Identifying and Recovering Troubled Projects
Identifying and Recovering Troubled ProjectsIdentifying and Recovering Troubled Projects
Identifying and Recovering Troubled ProjectsRicardo Viana Vargas
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure ChecklistDemand Metric
 

Viewers also liked (18)

PMI Professional in Business Analyisis (PMI-PBA) Certification
PMI Professional in Business Analyisis (PMI-PBA) Certification PMI Professional in Business Analyisis (PMI-PBA) Certification
PMI Professional in Business Analyisis (PMI-PBA) Certification
 
Postmortem Analysis
Postmortem AnalysisPostmortem Analysis
Postmortem Analysis
 
Business analysis and project changes
Business analysis and project changesBusiness analysis and project changes
Business analysis and project changes
 
Rapid assessment and recovery of troubled projects
Rapid assessment and recovery of troubled projectsRapid assessment and recovery of troubled projects
Rapid assessment and recovery of troubled projects
 
Research Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryResearch Report: Strategies for Project Recovery
Research Report: Strategies for Project Recovery
 
Recovering a delayed project
Recovering a delayed projectRecovering a delayed project
Recovering a delayed project
 
Project recovery
Project recoveryProject recovery
Project recovery
 
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & HeroSymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
 
Project Recovery
Project RecoveryProject Recovery
Project Recovery
 
Practical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPractical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar Slides
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure Checklist
 
Project post-mortem analysis
Project post-mortem analysisProject post-mortem analysis
Project post-mortem analysis
 
The 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projectsThe 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projects
 
POST PROJECT EVALUATION REPORT
POST PROJECT EVALUATION REPORTPOST PROJECT EVALUATION REPORT
POST PROJECT EVALUATION REPORT
 
Identifying and Recovering Troubled Projects
Identifying and Recovering Troubled ProjectsIdentifying and Recovering Troubled Projects
Identifying and Recovering Troubled Projects
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure Checklist
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure Report
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 

Similar to Webinar on Business Analysis in Project Context - PMI PBA

Webinar on Agile and PMBOK® Guide Sixth Edition
Webinar on Agile and PMBOK® Guide Sixth EditionWebinar on Agile and PMBOK® Guide Sixth Edition
Webinar on Agile and PMBOK® Guide Sixth EditionSaket Bansal
 
PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1Skillogic Solutions
 
Introduction of Project Management
Introduction of Project ManagementIntroduction of Project Management
Introduction of Project ManagementSaket Bansal
 
PMP Training Course - Project Management Framework
PMP Training Course - Project Management FrameworkPMP Training Course - Project Management Framework
PMP Training Course - Project Management FrameworkSkillogic Solutions
 
Project Value Delivery methodology and interventions
Project Value Delivery methodology and interventionsProject Value Delivery methodology and interventions
Project Value Delivery methodology and interventionsJeremie Averous
 
20130312 The Zombies of Project Management
20130312 The Zombies of Project Management20130312 The Zombies of Project Management
20130312 The Zombies of Project ManagementYoussef Mourra
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionJohn Khateeb
 
#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN Panigrahi#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN PanigrahiSN Panigrahi, PMP
 
Project Delivery Lifecycle
Project Delivery LifecycleProject Delivery Lifecycle
Project Delivery LifecycleMousumi Borah
 
Effektiv ledelse skaber værdidrevne teams - Karolina Jackson-Ward Manager Cus...
Effektiv ledelse skaber værdidrevne teams - Karolina Jackson-Ward Manager Cus...Effektiv ledelse skaber værdidrevne teams - Karolina Jackson-Ward Manager Cus...
Effektiv ledelse skaber værdidrevne teams - Karolina Jackson-Ward Manager Cus...Mediehuset Ingeniøren Live
 
Breakthrough competences in the development of public administration
Breakthrough competences in the development of public administrationBreakthrough competences in the development of public administration
Breakthrough competences in the development of public administrationSPOCE Project Management
 
7 steps to a successful itsm tool implementation - itsmf atlanta
7 steps to a successful itsm tool implementation - itsmf atlanta7 steps to a successful itsm tool implementation - itsmf atlanta
7 steps to a successful itsm tool implementation - itsmf atlantaNavvia
 
How to Make Your Business More Agile
How to Make Your Business More AgileHow to Make Your Business More Agile
How to Make Your Business More AgileUdemy for Business
 

Similar to Webinar on Business Analysis in Project Context - PMI PBA (20)

Webinar on Agile and PMBOK® Guide Sixth Edition
Webinar on Agile and PMBOK® Guide Sixth EditionWebinar on Agile and PMBOK® Guide Sixth Edition
Webinar on Agile and PMBOK® Guide Sixth Edition
 
Lessons From The Project Front Line - 4th November 2015
Lessons From The Project Front Line - 4th November 2015Lessons From The Project Front Line - 4th November 2015
Lessons From The Project Front Line - 4th November 2015
 
PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1
 
Benefit Realization Management iZenBridge
Benefit Realization Management  iZenBridgeBenefit Realization Management  iZenBridge
Benefit Realization Management iZenBridge
 
Introduction of Project Management
Introduction of Project ManagementIntroduction of Project Management
Introduction of Project Management
 
PMP Training Course - Project Management Framework
PMP Training Course - Project Management FrameworkPMP Training Course - Project Management Framework
PMP Training Course - Project Management Framework
 
Project Value Delivery methodology and interventions
Project Value Delivery methodology and interventionsProject Value Delivery methodology and interventions
Project Value Delivery methodology and interventions
 
20130312 The Zombies of Project Management
20130312 The Zombies of Project Management20130312 The Zombies of Project Management
20130312 The Zombies of Project Management
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
 
#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN Panigrahi#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN Panigrahi
 
Project Delivery Lifecycle
Project Delivery LifecycleProject Delivery Lifecycle
Project Delivery Lifecycle
 
Effektiv ledelse skaber værdidrevne teams - Karolina Jackson-Ward Manager Cus...
Effektiv ledelse skaber værdidrevne teams - Karolina Jackson-Ward Manager Cus...Effektiv ledelse skaber værdidrevne teams - Karolina Jackson-Ward Manager Cus...
Effektiv ledelse skaber værdidrevne teams - Karolina Jackson-Ward Manager Cus...
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 
Universal consulting
Universal consultingUniversal consulting
Universal consulting
 
Universal consulting
Universal consultingUniversal consulting
Universal consulting
 
UC | Top Strategy Implementation Consulting Firm in India
UC | Top Strategy Implementation Consulting Firm in India UC | Top Strategy Implementation Consulting Firm in India
UC | Top Strategy Implementation Consulting Firm in India
 
Strategy Implementation Practice | UC STRATEGY | Nov 2019
Strategy Implementation Practice | UC STRATEGY | Nov 2019Strategy Implementation Practice | UC STRATEGY | Nov 2019
Strategy Implementation Practice | UC STRATEGY | Nov 2019
 
Breakthrough competences in the development of public administration
Breakthrough competences in the development of public administrationBreakthrough competences in the development of public administration
Breakthrough competences in the development of public administration
 
7 steps to a successful itsm tool implementation - itsmf atlanta
7 steps to a successful itsm tool implementation - itsmf atlanta7 steps to a successful itsm tool implementation - itsmf atlanta
7 steps to a successful itsm tool implementation - itsmf atlanta
 
How to Make Your Business More Agile
How to Make Your Business More AgileHow to Make Your Business More Agile
How to Make Your Business More Agile
 

More from iZenBridge Consultancy Pvt. Ltd.

Explore the difference between DASM(Disciplined Agile Scrum Master) and DASSM...
Explore the difference between DASM(Disciplined Agile Scrum Master) and DASSM...Explore the difference between DASM(Disciplined Agile Scrum Master) and DASSM...
Explore the difference between DASM(Disciplined Agile Scrum Master) and DASSM...iZenBridge Consultancy Pvt. Ltd.
 
Why you should do an Advanced Certified Scrum Master Certification
Why you should do an Advanced Certified Scrum Master CertificationWhy you should do an Advanced Certified Scrum Master Certification
Why you should do an Advanced Certified Scrum Master CertificationiZenBridge Consultancy Pvt. Ltd.
 
How to Prioritize Risks with Qualitative and Quantitative Risk analysis
How to Prioritize Risks with Qualitative and Quantitative Risk analysisHow to Prioritize Risks with Qualitative and Quantitative Risk analysis
How to Prioritize Risks with Qualitative and Quantitative Risk analysisiZenBridge Consultancy Pvt. Ltd.
 

More from iZenBridge Consultancy Pvt. Ltd. (20)

Principles of PM
Principles of PMPrinciples of PM
Principles of PM
 
Difference Between SAFe and Scrum
Difference Between SAFe and ScrumDifference Between SAFe and Scrum
Difference Between SAFe and Scrum
 
What is SAFe?
What is SAFe?What is SAFe?
What is SAFe?
 
Project Management LifeCycle
Project Management LifeCycleProject Management LifeCycle
Project Management LifeCycle
 
Explore the difference between DASM(Disciplined Agile Scrum Master) and DASSM...
Explore the difference between DASM(Disciplined Agile Scrum Master) and DASSM...Explore the difference between DASM(Disciplined Agile Scrum Master) and DASSM...
Explore the difference between DASM(Disciplined Agile Scrum Master) and DASSM...
 
COIN Conversation - iZenBridge
COIN Conversation - iZenBridgeCOIN Conversation - iZenBridge
COIN Conversation - iZenBridge
 
Project Manager Role in The Agile World - iZenBridge
Project Manager Role in The Agile World - iZenBridge Project Manager Role in The Agile World - iZenBridge
Project Manager Role in The Agile World - iZenBridge
 
Why you should do an Advanced Certified Scrum Master Certification
Why you should do an Advanced Certified Scrum Master CertificationWhy you should do an Advanced Certified Scrum Master Certification
Why you should do an Advanced Certified Scrum Master Certification
 
Agile Project and Delivery Management
Agile Project and Delivery ManagementAgile Project and Delivery Management
Agile Project and Delivery Management
 
Coin conversation
Coin conversationCoin conversation
Coin conversation
 
SAFe DeVOps
SAFe DeVOpsSAFe DeVOps
SAFe DeVOps
 
SAFe Scrum Master Certification
SAFe Scrum Master CertificationSAFe Scrum Master Certification
SAFe Scrum Master Certification
 
Project manager role in the Agile world
Project manager role in the Agile world Project manager role in the Agile world
Project manager role in the Agile world
 
Describing SAFe POPM Slides
Describing SAFe POPM SlidesDescribing SAFe POPM Slides
Describing SAFe POPM Slides
 
Panel Discussion on How to Achieve Business Agility
Panel Discussion on How to Achieve Business AgilityPanel Discussion on How to Achieve Business Agility
Panel Discussion on How to Achieve Business Agility
 
Agile Project Managment and Delivery Management
Agile Project Managment and Delivery ManagementAgile Project Managment and Delivery Management
Agile Project Managment and Delivery Management
 
Project Management Lifecycle
Project Management LifecycleProject Management Lifecycle
Project Management Lifecycle
 
Enablers in SAFe
Enablers in SAFeEnablers in SAFe
Enablers in SAFe
 
How to Prioritize Risks with Qualitative and Quantitative Risk analysis
How to Prioritize Risks with Qualitative and Quantitative Risk analysisHow to Prioritize Risks with Qualitative and Quantitative Risk analysis
How to Prioritize Risks with Qualitative and Quantitative Risk analysis
 
Agile Coaching Development Path
Agile Coaching Development PathAgile Coaching Development Path
Agile Coaching Development Path
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

Webinar on Business Analysis in Project Context - PMI PBA

  • 1. © 2015 iZenBridge | Public Webinar on Business Analysis in Project Context
  • 2. © 2015 iZenBridge | Public Agenda Background Business Analysis and Projects Business Analysis in Project Life Cycle Introduction of PMI-PBA
  • 3. © 2015 iZenBridge | Public Background
  • 4. © 2015 iZenBridge | Public What is Project A temporary endeavor undertaken to create a unique product, service, or result. - PMBOK® Guide Fifth Edition
  • 5. © 2015 iZenBridge | Public What is Business Analysis • Application of knowledge, skills, tools and techniques to: • Determine problems and identify business needs • Identify and recommend solutions • Elicit, document, and manage stakeholder requirements • Facilitate the successful implementation of the product, service , project or program
  • 6. © 2015 iZenBridge | Public PMI’s Increased Focus on Business Analysis • PMBOK® Guide Fourth Edition , expanded with Collect requirement process • PMBOK® Guide Fifth Edition, included Stakeholder management knowledge area • Now Business Analysis Practice Guide • And may develop full standard for Business Analysis
  • 7. © 2015 iZenBridge | Public Business Analysis and Projects
  • 8. © 2015 iZenBridge | Public Business Analysis • Business Analysis is conducted in support of many business initiatives, including program and projects as well as ongoing operational activities, such as monitoring, modeling and forecasting In this session we are discussing Business Analysis in Projects Environment
  • 9. © 2015 iZenBridge | Public Business Analysis in Project Context Project Need Assessment Need Assessment, Planning, Analysis, Traceability Monitoring and Evaluation Solution Evaluation
  • 10. © 2015 iZenBridge | Public Business Analysis in Project Life Cycle
  • 11. © 2015 iZenBridge | Public Project Life Cycle A project life cycle is the series of phases that a project passes through from its initiation to its closure. - PMBOK® Guide Fifth Edition
  • 12. © 2015 iZenBridge | Public Page no 42, A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition, ©2013 Project Management Institute Project Life Cycle
  • 13. © 2015 iZenBridge | Public Page no 43, A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition, ©2013 Project Management Institute Project Life Cycle
  • 14. © 2015 iZenBridge | Public Phase – Domain – Lifecycle Page no 51, A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition, ©2013 Project Management Institute
  • 15. © 2015 iZenBridge | Public Business Analysis Domains Need Assessment Planning Analysis Traceability and Monitoring Solution Evaluation Its not a sequential process but iterative
  • 16. © 2015 iZenBridge | Public Need Assessment SWOT Five Whys Problem Analysis Opportunity Analysis Feasibility Stakeholders EnvironmentOrganization Goals Business Need
  • 17. © 2015 iZenBridge | Public Need Assessment in Project Business Case Develop Project Charter Ongoing Assessment Change Request Go / No Go Rigor depend on Project Life Cycle New Requirements
  • 18. © 2015 iZenBridge | Public Business Analysis Planning Need Assessment Analysis Traceability and Monitoring Evaluation Business Analysis Planning
  • 19. © 2015 iZenBridge | Public Business Analysis Planning and Project Planning Business Analysis Planning Integration Scope Time Quality Cost HumanResource Risk Communication Stakeholder Procurement
  • 20. © 2015 iZenBridge | Public Analysis Business Stakeholder Solution Elicitation and Analysis of Solution Requirements
  • 21. © 2015 iZenBridge | Public Analysis and Projects Project Scope Management Collect Requirement Develop Scope Statement Create WBS
  • 22. © 2015 iZenBridge | Public Traceability and Monitoring Source ImplementationTraceability Propose Analysis Development Implementation Monitoring
  • 23. © 2015 iZenBridge | Public Traceability and Monitoring in Projects Monitor and Control Project Work Control Scope Manage Communication Manage Stakeholders Perform Integrated Change Control Control Communication Control Stakeholders
  • 24. © 2015 iZenBridge | Public Solution Evaluation Need Solution Evaluation
  • 25. © 2015 iZenBridge | Public Solution Evaluation in Projects Close Project or Phase Validate Scope Evaluation Post Project
  • 26. © 2015 iZenBridge | Public Summarize • Business Analysis helps in finding needs and developing solutions • Need Assessment domain deals in identifying problems and opportunities • Business analysis planning works with Project Planning • Traceability and monitoring helps in tracking requirement from source to implementation • Solution evaluation is all about did we get for which we started this project or solution?
  • 27. © 2015 iZenBridge | Public Questions
  • 28. © 2015 iZenBridge | Public PMI-PBA® Overview
  • 29. © 2015 iZenBridge | Public The PMI-PBA® credential recognizes an individual's expertise in business analysis, using BA tools and techniques to improve the overall success of projects. PMI-PBA® Handbook Overview
  • 30. © 2015 iZenBridge | Public PMI–PBA® Eligibility Requirements Secondary Degree Bachelor's Degree 7500 Hours of BA Experience 4500 Hours of BA Experience 2000 Hours Project Team 35 PDUs in BA Overview
  • 31. © 2015 iZenBridge | Public Cost $ 405 PMI Members $ 555 Non PMI Members Exam 200 Questions 4 Hours Prometric Center Overview
  • 32. © 2015 iZenBridge | Public Domain - Questions Domain Questions % Need Assessment 18 Planning 22 Analysis 35 Traceability and Monitoring 15 Evaluation 10 Overview
  • 33. © 2015 iZenBridge | Public Questions
  • 34. © 2015 iZenBridge | Public Stay Connected YouTube Channel www.youtube.com/izenbridge PMP® / PMI-ACP® Discussion Forum forum.izenbridge.com www.iZenBridge.com