STATES UNDER GRID REGION
SwitchYard
Definition-
It is switching station with incoming and outgoing
feeders but without the transformer. It is a type of
substation but incoming feeders and outgoing feeders
are of same voltage level. Some times, the out door
area of a substation where the circuit breakers are
located are also called switchyard of the substation
 A switchyard connects and disconnects lines on the
grid for various regions. The operations and
equipment are essentially all at the same voltage level.
SwitchYard Equipment
•Transmission conductor
•Lightning Arrester
•Capacitor Voltage
Transformer
•Wave Trap
•Earth Switch
•Isolator
•Line Reactor
•Current Transformer
•Circuit Breaker
•Bus Bar
• Post Bus Insulator
•Corona Ring
•Static VAr Compensator
•ICT
Transmission Conductor-
•Application : To provide conducting medium
and connecting substation.
Specification:
•Stranded wire is used for decreasing skin effect.
•Material Used: ACSR Moose
•Nominal Voltage: 400kv
•Max. Systemvoltage:420kv
Lightning Arrester
A Surge Arrestor is a voltage-sensitive device that it
operates in principle, as a non-liner resistor.
It is a protective device which conducts the high
voltage surges on the power systems to the ground.
ISOLATORS
 Isolator is an off load device
which is operated by remote
control or local.
 Isolators provided in switchyard
are central break type.
Earth switch
Earth switch is required to
discharge the trapped charges on the
line & consists of vertical break.
Earth switch can only be operated
locally.
BUS BAR
 The flow of electrical power
between incoming and outgoing
circuits takes place through the bus
bars.
 These are junction points carrying
huge power’
 These are copper rods or thin
walled tubes operating at constant
voltage. Wave traps
Wave traps are used for
communication purpose during
fault conditions.
Wave traps offer high impedance
path for high frequency signals &
low impedance path for power
frequency current.
POST INSULATORS
 These provides necessary
insulation between line
conductors and supports and
thus prevent the leakage of
current from conductors to
earth
Corona Ring
To distribute the electric field
gradient and lower its maximum
values below the corona
threshold preventing corona
discharge.
CURRENT TRANSFORMERS
Used for measuring high value currents.
 Designed to provide a current in its
secondary coil proportional to current
flowing in its primary coil.
 Primary winding consists of very few turns.
 Secondary winding consists of large no. of
turns.
 Current to be measured is passes through
primary winding.
Capacitor Voltage
Transformer
 Also known as Potential transformer
Used to step down extra high
voltage signals and provide a low
voltage signal, for measurement or to
operate a protective relay.
TRANSFORMER
Used to step down /step up the voltage .
In switchyard it is used step down to
11kv from 440kv of bus bars.
Line Reactor
It is used under the light load
condition to compensate the
capacitive Var of long lines.
Static VAr Compensator(SVC)
 One of the FACTS devices.
 Used to stabilization of voltage of line .
 It provide and compensate the reactive power of line
under variation of load.
 Thyristor controlled device.
 Removes 5th and 7th harmonics of line.
CIRCUIT BREAKERS
 These are switching devices, design to close or
open an electrical circuit under normal or
abnormal conditions.
 It is on load device.
 For arc quenching medium SF6 used .
 Spring SF6 circuit breaker
 Hydraulic circuit breaker
 Pneumatic circuit breaker
Relay
Relay detects the faulty element in
the integrated power system and
removes it with the help of circuit
breaker from the remaining healthy
system as quickly as possible to
avoid the damage
KVL & KCL…???

More Related Content

What's hot

Firing Circuit
Firing CircuitFiring Circuit
Firing Circuit
ashutoshgupta1102
 
Facts static voltage & phase angle regulators
Facts   static voltage & phase angle regulatorsFacts   static voltage & phase angle regulators
Facts static voltage & phase angle regulators
SITCOE, Yadrav
 
My training
My trainingMy training
My training
skysunilyadav
 
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERINGTREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
Prasant Kumar
 
Substations
SubstationsSubstations
Substations
itfakash
 
Current Source Inverter and Voltage Source Inverter
Current Source Inverter and Voltage Source Inverter Current Source Inverter and Voltage Source Inverter
Current Source Inverter and Voltage Source Inverter
Sadanand Purohit
 
concept of resilience and self healing in smart grid
concept of resilience and self healing in smart gridconcept of resilience and self healing in smart grid
concept of resilience and self healing in smart grid
Kundan Kumar
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
SIIT, Jaipur
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
Subhash Mahla
 
Static relay
Static relayStatic relay
Static relay
jawaharramaya
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relay
CS V
 
220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar
Devendra khairiya
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Sudhir Cement Industries Pvt. Ltd. Meerut
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppcl
VISHAL VERMA
 
surge arrester
surge arrestersurge arrester
surge arrester
shubham kumar
 
power quality improvement by using DVR
power quality improvement by using DVRpower quality improvement by using DVR
power quality improvement by using DVR
Sumanth Prince
 
Automatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxAutomatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.Pptx
Sveris COE Pandharpur
 
presentation on 400kv gss heerapura @mnit
presentation on 400kv gss heerapura @mnitpresentation on 400kv gss heerapura @mnit
presentation on 400kv gss heerapura @mnit
Suresh Choudhary
 
Unified Power Flow Controller(upfc) 2
Unified Power Flow Controller(upfc) 2Unified Power Flow Controller(upfc) 2
Unified Power Flow Controller(upfc) 2
JayakalyanReddy
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
pk130992
 

What's hot (20)

Firing Circuit
Firing CircuitFiring Circuit
Firing Circuit
 
Facts static voltage & phase angle regulators
Facts   static voltage & phase angle regulatorsFacts   static voltage & phase angle regulators
Facts static voltage & phase angle regulators
 
My training
My trainingMy training
My training
 
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERINGTREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
 
Substations
SubstationsSubstations
Substations
 
Current Source Inverter and Voltage Source Inverter
Current Source Inverter and Voltage Source Inverter Current Source Inverter and Voltage Source Inverter
Current Source Inverter and Voltage Source Inverter
 
concept of resilience and self healing in smart grid
concept of resilience and self healing in smart gridconcept of resilience and self healing in smart grid
concept of resilience and self healing in smart grid
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
 
Static relay
Static relayStatic relay
Static relay
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relay
 
220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppcl
 
surge arrester
surge arrestersurge arrester
surge arrester
 
power quality improvement by using DVR
power quality improvement by using DVRpower quality improvement by using DVR
power quality improvement by using DVR
 
Automatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxAutomatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.Pptx
 
presentation on 400kv gss heerapura @mnit
presentation on 400kv gss heerapura @mnitpresentation on 400kv gss heerapura @mnit
presentation on 400kv gss heerapura @mnit
 
Unified Power Flow Controller(upfc) 2
Unified Power Flow Controller(upfc) 2Unified Power Flow Controller(upfc) 2
Unified Power Flow Controller(upfc) 2
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 

Similar to Indian grid system

33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
Lalit Kumar
 
33kv substation
33kv substation33kv substation
33kv substation
Abhishek Dawachya
 
Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipur
kishankky
 
400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf 400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf
Ishan Khandelwal
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
sohaib268827
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
fallinhay
 
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
Harvindar Singh
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
VSRAGHU
 
Load Distribution
Load DistributionLoad Distribution
Load Distribution
Arpit Gupta
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)
Pankaj Rawal
 
Visit to 400 kV substation, Hadala
Visit to 400 kV substation, HadalaVisit to 400 kV substation, Hadala
Visit to 400 kV substation, Hadala
Nandan Desai
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
Vaibhav Bhargava
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
sahid raja khan
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660
bhagat ram meena
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
Kamal Mittal
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
Ashwani Kumar
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Gangwal
 
LEC - 2 (SUBSTATIONS).pdf
LEC - 2 (SUBSTATIONS).pdfLEC - 2 (SUBSTATIONS).pdf
LEC - 2 (SUBSTATIONS).pdf
HASNAINNAZIR1
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Yatendra Parashar
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
imkanhaiyalal
 

Similar to Indian grid system (20)

33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
 
33kv substation
33kv substation33kv substation
33kv substation
 
Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipur
 
400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf 400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
 
Load Distribution
Load DistributionLoad Distribution
Load Distribution
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)
 
Visit to 400 kV substation, Hadala
Visit to 400 kV substation, HadalaVisit to 400 kV substation, Hadala
Visit to 400 kV substation, Hadala
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
 
LEC - 2 (SUBSTATIONS).pdf
LEC - 2 (SUBSTATIONS).pdfLEC - 2 (SUBSTATIONS).pdf
LEC - 2 (SUBSTATIONS).pdf
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 

Recently uploaded

AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 

Recently uploaded (20)

AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 

Indian grid system

  • 4. SwitchYard Definition- It is switching station with incoming and outgoing feeders but without the transformer. It is a type of substation but incoming feeders and outgoing feeders are of same voltage level. Some times, the out door area of a substation where the circuit breakers are located are also called switchyard of the substation  A switchyard connects and disconnects lines on the grid for various regions. The operations and equipment are essentially all at the same voltage level.
  • 5. SwitchYard Equipment •Transmission conductor •Lightning Arrester •Capacitor Voltage Transformer •Wave Trap •Earth Switch •Isolator •Line Reactor •Current Transformer •Circuit Breaker •Bus Bar • Post Bus Insulator •Corona Ring •Static VAr Compensator •ICT
  • 6. Transmission Conductor- •Application : To provide conducting medium and connecting substation. Specification: •Stranded wire is used for decreasing skin effect. •Material Used: ACSR Moose •Nominal Voltage: 400kv •Max. Systemvoltage:420kv Lightning Arrester A Surge Arrestor is a voltage-sensitive device that it operates in principle, as a non-liner resistor. It is a protective device which conducts the high voltage surges on the power systems to the ground.
  • 7. ISOLATORS  Isolator is an off load device which is operated by remote control or local.  Isolators provided in switchyard are central break type. Earth switch Earth switch is required to discharge the trapped charges on the line & consists of vertical break. Earth switch can only be operated locally.
  • 8. BUS BAR  The flow of electrical power between incoming and outgoing circuits takes place through the bus bars.  These are junction points carrying huge power’  These are copper rods or thin walled tubes operating at constant voltage. Wave traps Wave traps are used for communication purpose during fault conditions. Wave traps offer high impedance path for high frequency signals & low impedance path for power frequency current.
  • 9. POST INSULATORS  These provides necessary insulation between line conductors and supports and thus prevent the leakage of current from conductors to earth Corona Ring To distribute the electric field gradient and lower its maximum values below the corona threshold preventing corona discharge.
  • 10. CURRENT TRANSFORMERS Used for measuring high value currents.  Designed to provide a current in its secondary coil proportional to current flowing in its primary coil.  Primary winding consists of very few turns.  Secondary winding consists of large no. of turns.  Current to be measured is passes through primary winding. Capacitor Voltage Transformer  Also known as Potential transformer Used to step down extra high voltage signals and provide a low voltage signal, for measurement or to operate a protective relay.
  • 11. TRANSFORMER Used to step down /step up the voltage . In switchyard it is used step down to 11kv from 440kv of bus bars. Line Reactor It is used under the light load condition to compensate the capacitive Var of long lines.
  • 12. Static VAr Compensator(SVC)  One of the FACTS devices.  Used to stabilization of voltage of line .  It provide and compensate the reactive power of line under variation of load.  Thyristor controlled device.  Removes 5th and 7th harmonics of line.
  • 13. CIRCUIT BREAKERS  These are switching devices, design to close or open an electrical circuit under normal or abnormal conditions.  It is on load device.  For arc quenching medium SF6 used .  Spring SF6 circuit breaker  Hydraulic circuit breaker  Pneumatic circuit breaker Relay Relay detects the faulty element in the integrated power system and removes it with the help of circuit breaker from the remaining healthy system as quickly as possible to avoid the damage