Integrated Software Defined Radio
Reference Designs and Systems Applications
Robin Getz, Title, Location
Legal Disclaimer
 Notice of proprietary information, Disclaimers and Exclusions Of Warranties
The ADI Presentation is the property of ADI. All copyright, trademark, and other intellectual property and
proprietary rights in the ADI Presentation and in the software, text, graphics, design elements, audio and all
other materials originated or used by ADI herein (the "ADI Information") are reserved to ADI and its
licensors. The ADI Information may not be reproduced, published, adapted, modified, displayed, distributed
or sold in any manner, in any form or media, without the prior written permission of ADI.
THE ADI INFORMATION AND THE ADI PRESENTATION ARE PROVIDED "AS IS". WHILE ADI INTENDS THE
ADI INFORMATION AND THE ADI PRESENTATION TO BE ACCURATE, NO WARRANTIES OF ANY KIND ARE
MADE WITH RESPECT TO THE ADI PRESENTATION AND THE ADI INFORMATION, INCLUDING WITHOUT
LIMITATION ANY WARRANTIES OF ACCURACY OR COMPLETENESS. TYPOGRAPHICAL ERRORS AND
OTHER INACCURACIES OR MISTAKES ARE POSSIBLE. ADI DOES NOT WARRANT THAT THE ADI
INFORMATION AND THE ADI PRESENTATION WILL MEET YOUR REQUIREMENTS, WILL BE ACCURATE,
OR WILL BE UNINTERRUPTED OR ERROR FREE. ADI EXPRESSLY EXCLUDES AND DISCLAIMS ALL
EXPRESS AND IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE
AND NON-INFRINGEMENT OF ANY THIRD PARTY INTELLECTUAL PROPERTY RIGHTS. ADI SHALL NOT BE
RESPONSIBLE FOR ANY DAMAGE OR LOSS OF ANY KIND ARISING OUT OF OR RELATED TO YOUR USE
OF THE ADI INFORMATION AND THE ADI PRESENTATION, INCLUDING WITHOUT LIMITATION DATA LOSS
OR CORRUPTION, COMPUTER VIRUSES, ERRORS, OMISSIONS, INTERRUPTIONS, DEFECTS OR OTHER
FAILURES, REGARDLESS OF WHETHER SUCH LIABILITY IS BASED IN TORT, CONTRACT OR OTHERWISE.
USE OF ANY THIRD-PARTY SOFTWARE REFERENCED WILL BE GOVERNED BY THE APPLICABLE
LICENSE AGREEMENT, IF ANY, WITH SUCH THIRD PARTY.
2
Today’s Agenda
Software Defined Radio (SDR) Overview
Math Behind SDR
 Zero-IF or direct-conversion transmitter/receiver
 Brief introduction to digital modulation
How to Solve Channel Impairments
 Imperfections introduced by the modulator/demodulator with particular focus on
the effect of temperature and frequency changes
 In-factory and in-field algorithms will be examined that can reduce the effect of
these imperfections, and particular focus is placed on the efficacy of in-factory
set-and-forget algorithms
Solutions for SDR
 FMComms1 board
 Tools, drivers, and example HDL designs
3
What Is a Software Defined Radio?
A software defined radio system (SDR) is a radio communication
system where components that have been typically implemented in
hardware (e.g., mixers, filters, amplifiers, modulators/demodulators,
detectors) are instead implemented by means of software on a
personal computer or embedded system.
While the concept of SDR is not new (circa ~1970 DoD labs), many
techniques which used to be only theoretically possible are now
being implemented due to the rapidly evolving capabilities of analog
and digital electronics.
 Why SDR?
 Makes RF hardware easier
 Easy to add new features, since they are all in software
 Easier to have one set of hardware handle multiple modulation techniques
4
Direct Conversion Technique (FMComms1)
5
Clock
Generator /
Sync
Clock
Distribution
Frequency
Synthesizer
ADL5375 ADL5602
ADL5380AD8366AD9643
AD9548 AD9523-1
ADF4351
LPC(32Data+3CLKLVDS)FMCConnector(500MHz)
FPGADevelopmentPlatform
RF
Out
RF
In`
Slave Clock In
Sync In
DAC
16-Bit
1250MSPS*
AD9122
Modulator
400 – 6000MHz
20dB Fixed Gain
50 – 4000MHz
ADC
14-Bit
250MSPS
0.25dB Step Size
600MHz Bandwidth
Demodulator
400 – 6000MHz
Output: 1 – 1000MHzInput: 1 – 750MHz
Output: 35 – 4400MHz
ADL5605/6
700 - 1000MHz
1800 – 2700MHz
π π
Frequency
Synthesizer
Master Clock Out
16 + 1 LVDS
Pair @
1000 Mbps
500MHz (DDR)
16 + 1 LVDS
Pair @
500 Mbps
250MHz DDR
π Pi network
Solder bump jumperS
S
S
S
S
1 LVDS
Pair
50MHz
Ref Clock
SMA connector
I2C / USB
to SPI
SPI
SPI SPI SPI
SPI
SPI
SPI
Power
5V @
500mA
ADL5523
400MHz to 4000MHz
Low Noise Amplifier
Tuned for Frequency
π
Tx
Rx
RF output power control is
accomplished by adjusting
baseband data
Optional Front End
Optional Front end
2
2
-9dB
0dB0dB
Non-SMA connector
• AD9122 DAC runs at 1000MSPS, due to max speed of
AD9523-1
Direct Conversion (Zero-IF) TRx
A direct-conversion transceiver, also known as homodyne,
synchrodyne, or zero-IF transceiver, is a radio transceiver design
that (de)modulates the radio signal using a local oscillator (LO)
whose frequency is identical to, or very close to, the carrier
frequency of the intended signal.
 Carrier frequency = local oscillator (LO) frequency
 Attractive due to simplicity of the signal path
 Suitable for high levels of integration
 Allows wider bandwidth designs
6
Homodyne Transmitter Advantages and
Challenges
Advantages:
 Low component count leads to lower system cost and power consumption
 Direct up-conversion produces less mixing product spurs
 Requires fewer filters
Challenges:
 During the analog modulation process, gain and phase mismatches of IQ
signals have a direct impact on sideband suppression performance
 Out of band transmissions
 LO / carrier leakage
 I/Q mismatch causes image in the output spectrum
• This results in degraded error vector magnitude (EVM) at the receiver,
which in turn degrades the bit error rate (BER)
7
Homodyne Receiver Advantages and
Challenges
Advantages:
 Low component count leads to lower system cost
 No image reject filter needed
 Filtering requirements more relaxed at baseband
 Gain stages at baseband provide power savings
Challenges:
 DC offset appearing at baseband
 Self mixing
 Offset voltages
 Images appearing symmetrically about zero frequency
 I/Q mismatches in phase and amplitude
 Even order nonlinearities
 Two high frequency interferers close to the channel of interest can result in
even order nonlinearities that fall within the band of interest
8
Back to Basics: Euler’s Formulas
Sin ω0t is 90° out of phase with respect to cos ω0t
 With perfect amplitude and phase matching the signal content at
- ω0 cancels
9
Amplitude and Phase Mismatch
Amplitude Mismatch Phase Mismatch
ω0
−ω0
A+B
2
A-B
2
Desired Signal
Image
10
Error Vector Magnitude—EVM
∑
∑
=
=
−
=
M
k
M
k
kR
kRkZ
EVM
1
2
1
2
)(
)()(
11
 Noise and Imperfections in transmit and receive signal chains result in demodulated
voltages which are displaced from their ideal location.
 Error Vector Magnitude expresses this dislocation
 Large EVM will result in Symbol Errors and degraded Bit Error Rate
 Higher Order Modulation Schemes → Symbols Closer Together → EVM More Critical
Ideal (Reference) Signal
Phase Error (I/Q Error Phase)
Magnitude Error (I/Q Error Mag)
I
Q
Actual
Signal
φ
Unit = %
Effects of Gain, Offset, and Phase Errors
-1.5 -1 -0.5 0 0.5 1 1.5
-1.5
-1
-0.5
0
0.5
1
1.5
-1.5 -1 -0.5 0 0.5 1 1.5
-1.5
-1
-0.5
0
0.5
1
1.5
-1.5 -1 -0.5 0 0.5 1 1.5
-1.5
-1
-0.5
0
0.5
1
1.5
fLO
+10% Quadrature
Gain Error
fLO
1o
Quadrature
Phase Error
fLO
+1% Quadrature
Offset Error
12
Symbol
Decision
Threshold
If the symbol lands
on the edge or outside
of the box, bit errors will
occur
Effects of I/Q Mismatch
f1f0 f2-f0-f1-f2 0
Desired
Signal
Ideal
Gain Error IdealPhase Error
** EVM Degradation **
** Images Occupy BW ** ** Interfere with Desired Signal **
14
Direct Conversion Transmitter Architecture
15
ADL5375 ADL5602
RF
Out
DAC
16-Bit
1250MSPS*
AD9122
Modulator
400 – 6000MHz
20dB Fixed Gain
50 – 4000MHz
ADL5605/ADL5606
700 – 1000MHz
1800 – 2700MHz
π π
16 + 1 LVDS
Pair @
1000 Mbps
500MHz (DDR)
SPI
0dB0dB
Complex IF Using IF DACs
A complex IF architecture uses IF DACs to synthesize an IF signal
and its complex conjugate as the inputs to a quadrature modulator
This makes a single sideband (SSB) upconverter that rejects the
normal mixing product, easing the BPF filtering requirements
16
IF DAC
IF DAC
PA BPFΣ BPF
RF RFIF
IF
RF
RF 0
LO 90
LOFs
Fs
Complex IF Imperfections
 Complex IF systems create several images:
 FDAC – FOUT: the main desired signal’s image
 Harmonics (2nd, 3rd, etc.), real or folded
 These must be low pass filtered prior to the quadrature modulator
 Careful frequency planning must be done to avoid folded products falling too close to
the desired signal that are then upconverted
 Post-modulator, a band pass filter is used to filter the undesired products
17
IF DAC
IF DAC
Σ
IF
RF 0
LO 90
Fs
IF Fs
RFLO
image
harmonic
Causes of Non-Ideal Sideband Suppressions
18
Fixes for Non-Ideal Issues
19
MULTICHIP
SYNCHRONIZATION
D15P/D15N
D0P/D0N
DATA
RECEIVER
FIFO HB1 HB2 HB3
NCO
AND
MOD
fDATA/2
PRE
MOD
HB1_CLK
MODE
HB2_CLK
HB3_CLK
INTP
FACTOR
PHASE
CORRECTION
INTERNAL CLOCK TIMING AND CONTROL LOGIC
16
16
10
16
16
I OFFSET
Q OFFSET
INV
SINC
AUX
1.2G
DAC 1
16-BIT
IOUT1P
IOUT1N
AUX
1.2G
DAC 2
16-BIT
IOUT2P
IOUT2N
REF
AND
BIAS FSADJ
DACCLKP
DACCLKN
REFCLKP
REFCLKN
REFIO10
GAIN1
10
GAIN2
DAC_CLK
SERIAL
INPUT/OUTPUT
PORT
PROGRAMMING
REGISTERS
POWER-ON
RESET
SDO
SDIO
SCLK
CS
RESET
IRQ
0
1
CLOCK
MULTIPLIER
(2× TO 16×)
CLK
RCVR
CLK
RCVR
PLL
CONTROL
SYNC
DAC CLK_SEL
DAC_CLK
PLL_LOCK
DCI
FRAME
08281-002
INVSINC_CLK
AD9122 Block Diagram
Fixes for Non-Ideal Issues
20
Wanted Signal
Unwanted Image
LO Feedthrough
AD9122 Functional Block Diagram
21
MULTICHIP
SYNCHRONIZATION
D15P/D15N
D0P/D0N
DATA
RECEIVER
FIFO HB1 HB2 HB3
NCO
AND
MOD
fDATA/2
PRE
MOD
HB1_CLK
MODE
HB2_CLK
HB3_CLK
INTP
FACTOR
PHASE
CORRECTION
INTERNAL CLOCK TIMING AND CONTROL LOGIC
16
16
10
16
16
I OFFSET
Q OFFSET
INV
SINC
AUX
1.2G
DAC 1
16-BIT
IOUT1P
IOUT1N
AUX
1.2G
DAC 2
16-BIT
IOUT2P
IOUT2N
REF
AND
BIAS FSADJ
DACCLKP
DACCLKN
REFCLKP
REFCLKN
REFIO10
GAIN1
10
GAIN2
DAC_CLK
SERIAL
INPUT/OUTPUT
PORT
PROGRAMMING
REGISTERS
POWER-ON
RESET
SDO
SDIO
SCLK
CS
RESET
IRQ
0
1
CLOCK
MULTIPLIER
(2× TO 16×)
CLK
RCVR
CLK
RCVR
PLL
CONTROL
SYNC
DAC CLK_SEL
DAC_CLK
PLL_LOCK
DCI
FRAME
08281-002
INVSINC_CLK
Premod/Filters/NCO
22
Increasing Interpolation Factor:
 Decreases fDATA,
 Decreases signal bandwidth
 Increases power of DAC,
decreases power of FPGA
Digital Inside DAC
Increasing interpolation factor:
 Decreases fDATA
 Decreases signal bandwidth
 Increases power of DAC
 Decreases power of FPGA
Trade off system level
performance between FPGA
processing and fixed
processing
Decreased system timing
constraints on FPGA
23
AD9122 Interpolation at a DAC Output
24
1X
2X
4X
AD9122 Digital Up-Conversion, DAC Out
(DC -> 600 MHz)
25
No
upconversion
f(DATA)/2
upconversion
8 x f(DATA)/7
upconversion
AD9122 Digital Up-Conversion at RF
(Centre @ 2.4 GHz)
26
No
upconversion
f(DATA)/2
upconversion
8 x f(DATA)/7
upconversion
When is This Useful?
No “cans” on top of Tx or Rx
chains to isolate them
Any interaction between Tx and
Rx PLLs will “bleed into the
other” when the frequencies are
within 100 kHz (due to PCB size
constraints)
27
Clock
Distribution
Frequency
Synthesizer
ADL5375
ADL5380
AD9523-1
ADF4351
Modulator
400 MHz to 6000 MHz
Demodulator
400 – 6000MHz
Output: 1 – 1000MHz
Output: 35 – 4400MHz
Frequency
Synthesizer
Master Clock Out
SPI SPI
SPI
Figure A
Rx and Tx PLL 50 kHz different Figure B
Rx and Tx PLL 100 MHz different
(RF is the same due to the DAC shift)
ADF4351
Tx Synthesizer
35 MHz to 4400 MHz
ADF4351
Rx Synthesizer
35 MHz to 4400 MHz
Receive Architectures
Direct (Zero-IF) Conversion
Cos(ωRF) Cos(ωRF)=1+Sin2(ωRF)
Cos(ωSIG) Cos(ωSIG)=1+Sin2(ωSIG)
LNA(t)=α1x(t)+α2x2(t)
input(t)=A1Cos(ω1t)+A2Cos(ω2t)
feedthrough(t)=α2A1A2Cos(ω2-ω1)t
ADL5380AD8366AD9643
RF
In`
ADC
14-Bit
250MSPS
0.25dB Step Size
600MHz Bandwidth
Demodulator
400MHZ to 6000MHz
16 + 1 LVDS
Pair @
500 Mbps
250MHz DDR
SPI
SPI
ADL5523
400MHz to 4000MHz
Low Noise Amplifier
Tuned for Frequency
π
Rx
-9dB
28
The Imperfect I/Q Demodulator
I/Q DEMODULATOR
LOIN
RFIN
0
89.5
G1
G4
G3
G2
fVo s1
V fo s2
IIN
QIN
Imbalance
In Phase
Splitter
Gain
Imbalance
(G1,G2,G3,G4)
Offset
Voltages
29
Imperfections in the I/Q Signal Path
Control
Tuning90
0
R +/- 5%
R +/- 5%
LPF
LPF
Voffset1
Voffset2
Voffset3
Voffset4
ADC
ADC
Offsets
within the
Dual Channel
ADC
PCB and
Layout
Mismatches
Component
Mismatches
30
Critical IQ Demodulator Specs—LO to RF
Leakage
If some of the LO leaks to the RF input, it mixes (multiplies) with
itself in the mixer, generating unwanted dc offsets on top of the
recovered baseband data stream
ADCLNA
ω
Desired
-70dBm
0dBm
Leakage
-60dBm
ω
-40dBm
-30dBm(~20mVp-p)
A B C
Assume,
Gain from A to C =30dB
LO to RF leakage ~ 60dB
FLO
FLO
X
31
DC Offset and Quadrature Error Correction
DC offset and quadrature error correction implemented
digitally at the end of the receive chain
 Most efficient approach in order to compensate for all potential
mismatches or errors in the signal path
DC Correction
 If DC free coding is used, a notch filter can be applied
Quadrature Error Correction
 Gain Correction
 Calculate I^2 – Q^2 to determine the power difference between I and Q.
 The power difference should be driven to zero.
 Phase Correction
 Perform a cross-multiply between I and Q.
 Can be viewed as a mixer. The DC term is proportional to the phase
difference between I and Q.
 By definition this should be zero if they are perfectly orthogonal.
32
Summary
Direct conversion or homodyne receivers have there own merits
and challenges
Gain, phase, and offset errors are a few of the challenges that can
be addressed with quadrature error correction algorithms
 Gain, phase, and offset errors cause degradations in receiver EVM and
sensitivity
 Quadrature error correction will improve EVM and sensitivity
Direct conversion offers advantages in power, cost, and
performance over IF sampling architectures
Quadrature error correction enables realizable direct conversion
solutions for macro level base stations/SDR platforms
Analog Devices’ first generation of QEC is available integrated into
the following products
 AD9262 – dual 16b continuous time sigma delta ADC
 AD9269 – dual 16b pipeline ADC
33
Clocking
AD9523-1: multi-output, clock
distribution function with low
jitter performance,
On-chip PLL and VCO with two
VCO dividers
On-chip VCO
Two cascaded PLL stages:
 First stage, PLL1, consists of an integer
division PLL that uses an external
voltage-controlled crystal oscillator
(VCXO) from 15 MHz to 250 MHz.
 Second stage, PLL2, is a frequency
multiplying PLL that translates the first
stage output frequency to a range of
2.940 GHz to 3.125 GHz.
Clock
Generator /
Sync
Clock
Distribution
AD9548 AD9523-1
Output: 1 – 1000MHzInput: 1 Hz - 750MHz
50MHz
Ref Clock
SPI SPI
122.88MHz VCXO
On FMCOMMS1
34
FMComms1 Clocking
DAC_DCO
ADC_CLK
DAC_REFCLK
DAC_CLK
N/C
N/C
N/C
N/C
LOGEN_TX_REFIN
ADC_SYNC
N/C
LOGEN_RX_REFIN
N/C
Assumes DAC is
doing no
interpolation
OUT1 or OUT2
OUT1 only
35
PLL2 Configuration
122.88MHz
983.04MHz
983.04MHz
122.88MHz
1024.00MHz
1024.00MHz
 Current config:
 122.88 MHz / 1 * 24 = 2949.12 MHz
 2949.12 MHz / 3 = 983.04 MHz
 983.04 MHz / 4 = 245.76 MSPS (ADC)
 Possible config:
 122.88 MHz / 1 * 25 = 3072.00 MHz
 3072.00 MHz / 3 = 1024.00 MHz
 1024.00 MHz / 5 = 204.8 MSPS (ADC)
 1024.00 MHz / 8 = 128.0 MSPS (ADC)
 Possible config
(max ADC rate):
 122.88 MHz / 10 * 244 = 2998.272 MHz
 2998.272 MHz / 3 = 999.4240 MHz
 999.4240 MHz / 4 = 249.856 MSPS (ADC)
36
Possible FMComms1 Clocking
37
DAC_DCO
ADC_CLK
DAC_REFCLK
DAC_CLK
N/C
N/C
N/C
N/C
LOGEN_TX_REFIN
ADC_SYNC
N/C
LOGEN_RX_REFIN
N/C
N/C
Assumes DAC is
doing 8x
interpolation
Can be 1024/n:
• 204.80 MHz
• 170.67 MHz
• 146.29 MHz
• 128.00 MHz
• 113.78 MHz
• 102.40 MHz
• 93.09 MHz
• 85.33 MHz
• 78.77 MHz
• 73.14 MHz
• 68.67 MHz
• 64.00 MHz
• 60.23 MHz
• 56.89 MHz
• 53.89 MHz
• 51.20 MHz
• 48.76 MHz
• 46.55 MHz
• 44.52 MHz
• 42.67 MHz
• 40.96 MHz
Loose Zero Delay, and
no long can sync
multiple cards together
OUT1 or OUT2
OUT1 only
Power
FMC provides 12 V, and 3.3 V
Switchers
 ADP2323
LDOs
 ADP3335
 ADP3333
 ADP151
 ADP150
 ADP1740
38
ADP2323: Ultrahigh Conversion Efficiency in
Compact Solution Size
 Compact dual output solution
size: 24 mm x 21 mm
 Heat dissipation is spread
evenly with the use of external
low-side Mosfet
39
 Ultrahigh and flat efficiency
~95% with a 12 V input and a
5 V output at 3 A load
(ADP2323)
 Optional pulse frequency
modulation (PFM) reduces
the switching losses at light
load condition
 Possible configuration up to
6 output rails in evenly
phase-shifted topology to
reduce input ripple
voltage/current and minimize
input capacitor size
24mm
21mm
50
55
60
65
70
75
80
85
90
95
100
0 0.5 1 1.5 2 2.5 3
Efficiency[%]
OutputCurrent [A]
Efficiency at 12Vin, 300kHz
Vout=5V
Vout=1.2V
Vin
A1
A2
ADP2323 (A)
INTVCC
SCFG
SYNC
SCFG
SYNC
SCFG
100kΩ180kΩ
Vin
B1
B2
ADP2323 (B)
SCFG
SYNC
SCFG
SYNC
Vin
C1
C2
ADP2323 (C)
SCFG
SYNC
ADP2323
ADP2323: Configurability for Multi-Rail
Applications
40
 Reduces input ripple voltage/current and size of the input capacitor
through phase shift. Avoids beat frequency interference in multi-rail
applications
 Two/three ADP2323’s can be used for four/six output rails configuration
Connect SCFG to
INTVCC for clock
output
Connect SCFG with
100/180kΩ resistor
to GND for 60/120°
phase shift
Vin
A1
A2
ADP2323 (A)
INTVCC
SCFG
SYNC
SCFG
SYNC
SCFG
100kΩ180kΩ Vin
B1
B2
ADP2323 (B)
SCFG
SYNC
SCFG
SYNC
Vin
C1
C2
ADP2323 (C)
SCFG
SYNC
A1
B1
C1
60°
120 °
Without Phase Shift, Input Voltage Ripple = 142mV
With Phase Shift, Input Voltage Ripple = 86mV
Up to 40%
input voltage
ripple
reduction
Input Voltage Ripple Comparison with/without phase shift
New ADI Low Noise High PSRR LDOs Summary
ADM7160 (ES)
 Target power for >14B ADC
 200 mA, 1.8, 2.5, 3.3 Vout
 9 µV rms broadband noise
 Low tempco
ADP7182 Neg VOUT LDO (ES)
 200 mA, –30 Vin
 Adjustable from –1.22 V to –VIN
 PSRR 60 dB @10 kHz at VO = –3.3 V
ADP150 ADP151 (MP)
 150 mA/200 mA, 5.5 Vin
 9 µV rms broadband noise
 20 nV/√Hz spectral eN @ 100 kHz
 70 dB PSRR @ 10 kHz
41
ADP7102 ADP7104 (MP)
 300 mA/500 mA, 20 Vin
 15 µV rms broadband noise
 35 nV/√Hz spectral eN @ 100 kHz
 80 dB PSRR @ 10 kHz
 Power good output
ADM7150 (1st Si) RF LDO (ES)
 1.5 nV/√Hz spectral noise @ 100 kHz
 800 mA, 4.5 to 16 Vin
 Vout Range: 1.5 V to 5.5 V
 100 dB PSRR DC to 100 kHz
 65 dB PSRR at 1 MHz
 40 dB at 10 MHz
MP Mass Production ES Engineering Samples, contact ADI
ADP7102/ADP7104 – Low Noise Performance
 ADP7102/ADP7104
 The ADP7104 noise does not
increase with output voltage
 No noise bypass required
 ~15 µV rms for all outputs
42
0.01
0.1
1
1.E+01 1.E+02 1.E+03 1.E+04 1.E+05
uV/rt-Hz
Freq (Hz)
Noise Spectral Density
3.3V
5V
RELEASED
 ADP7102/ADP7104
 No added bypass capacitor required
 Stable with 1 µF output capacitor
 PSRR = 70 dB @ 1 kHz, 500 mA
 PSRR = 58 dB @ 10 kHz, 500 mA
 PSRR = 50 dB @ 100 kHz, 500 mA
 PSRR = 35 dB @ 1 MHz, 500 mA
Spectral Density Noise Performance vs. Frequency
The ADP151 1/f noise superior to competition below 100 Hz
Competition noise somewhat better than ADP151 above 100 Hz
43
0.001
0.01
0.1
1
10
10 100 1000 10000 100000
Noise Spectral Density
4.5V HMC860LP3E
3.3V HMC860LP3E
ADP151-3.3V
HMC976LP3E
ADP151’s Ultralow Noise Advantage When
Powering the ADF4350 Integrated PLL/VCO Chip
Next slide compares phase noise vs frequency when powered by
ADP151, AA batteries, & the older generation ADP3334 LDO
 The ADP151 offers 1/3 the output noise of the ADP3334 LDO
RMS jitter is also improved
 Reduces from 1.23 ps to 0.87 ps by using ADP151 vs. the ADP3334
ADP151 output noise 10 µV rms over 10 Hz to 100 kHz independent
of Vout, no CNR required
ADP151 reduces PLL output phase noise (equivalent to reduced
timing jitter)
44
RELEASED
PLL Phase Noise (at 4.4 GHz)
vs. Frequency Offset
45
-120
-110
-100
-90
-80
-70
-60
1,000 10,000 100,000 1,000,000
USB 1 x ADP3334
SUPPLY 1 x ADP3334
SUPPLY 1 x ADP150
AA BATTERY (2 x 1.5V)
PhaseNoise(dBc/Hz)
Hz
ADP151 Low Noise LDO
and 2 x AA Battery
ADP3334 LDO
Traditional RF Evaluation Platforms
(Antenna to Bits)
46
 Discrete single product
evaluation boards,
connected with wires
 6 power supplies
 4 different USB
applications
 Not easy to replicate,
or use as part of a SDR
prototyping solution
 Needed small form
factor, open design
Current Prototyping Platforms
FMComms1 FMC Board
47
FMCOMMS1 Connected to Xilinx Development
System ML605 (Virtex-6)
48
Top
Bottom
FMC-Comms Board – Tx, Rx, Clocks, Power
49
Rx
Tx
Rx
Tx
AD9548
Network Clock
Generator/Synchronizer
AD9523-1
Low Jitter Clock
Generator
AD9122
DAC, 16-Bit,
1250 MSPS*
ADL5375
Modulator
400 MHz to 6000MHz
ADL5602
20 dB Fixed Gain
50 MHz to 4000 MHz
ADF4351
Tx Synthesizer
35 MHz to 4400 MHz
AD9643
ADC
14-bit , 250 MSPS
AD8366
0.25dB Step Size VGA
600MHz Bandwidth
ADL5380
Demodulator
400 – 6000MHz
ADF4351
Rx Synthesizer
35 MHz to 4400 MHz
FMC
ConnectorADC Inputs Clock Sync
Clock Sync
Inputs
DAC Outputs +5 V Output for
External Amp
ADP2323
Dual 3 A Step-
Down Switcher
ADP7104
High Accuracy
500 mA LDO
ADP1740
2 A LDO
ADP1740
2 A LDO
ADP7104
High Accuracy
500 mA LDO
ADP151
Ultralow Noise
200 mA Linear Regulator
ADP151
Ultra Low Noise
200 mA Linear
Regulator
ADG3304
4 Channel, Bidirectional,
Logic Level Translator
• AD9122 DAC runs at 1000MSPS, due to max
speed of AD9523-1
FMCOMMS1-EBZ Block Diagram
50
Clock
Generator /
Sync
Clock
Distribution
Frequency
Synthesizer
ADL5375 ADL5602
ADL5380AD8366AD9643
AD9548 AD9523-1
ADF4351
LPC(32Data+3CLKLVDS)FMCConnector(500MHz)
FPGADevelopmentPlatform
RF
Out
RF
In
Slave Clock In
Sync In
DAC
16-Bit
1250MSPS*
AD9122
Modulator
400 – 6000MHz
20dB Fixed Gain
50 – 4000MHz
ADC
14-Bit
250MSPS
0.25dB Step Size
600MHz Bandwidth
Demodulator
400 – 6000MHz
Output: 1 – 1000MHzInput: 1Hz – 750MHz
Output: 35 – 4400MHz
ADL5605/ADL5606
700 – 1000MHz
1800 – 2700MHz
π π
Frequency
Synthesizer
Master Clock Out
16 + 1 LVDS
Pair @
1000 Mbps
500MHz (DDR)
16 + 1 LVDS
Pair @
500 Mbps
250MHz DDR
π Pi network
Solder bump jumperS
S
S
S
S
1 LVDS
Pair
50MHz
Ref Clock
SMA connector
I2C/USB
to SPI
SPI
SPI SPI SPI
SPI
SPI
SPI
Power
5V @
500mA
ADL5523
400 – 4000MHz
Low Noise Amplifier
Tuned for frequency
π
Tx
Rx
RF output power control
is accomplished by
adjusting baseband
data
Optional Front end
Optional Front End
2
2
-9dB
0dB0dB
Non-SMA connector
• AD9122 DAC runs at 1000MSPS, due to max speed of
AD9523-1
Reference Designs
HDL:
 ML605 (Microblaze)
 KC705 (Microblaze)
 VC707 (Microblaze)
 ZC702 (ARM)
 ZC706 (ARM)
 Zed Board (ARM)
Software:
 Linux
 Recommended solution
 Drivers for all programmable
parts (AD9122, AD9548,
AD9523-1, ADF4351, AD9643,
AD8366)
 Streams data over network for
Microblaze platforms
 GTK+ based application for ARM
based platforms
 No-OS
 Basic drivers
http://wiki.analog.com/resources/eval/user-guides/ad-fmcomms1-ebz/reference_hdl
51
System Level/Software Level Block Diagram
52
DAC
ADC
HDMI
SPDIF
I2S
FMComms
ADV7511
HDMI Tx
ADAU1761
Audio
Codec
512 MB DDR3
Zed Board
IIO Scope – Linux Application
Visualize Data: Control Things from GUI:
53
Tweet it out! @ADI_News #ADIDC13
What We Covered
Software Defined Radio (SDR) Overview
How to Solve Channel Impairments
 New features in ADI DACs and ADCs to solve these problems
Solutions for SDR
 FMComms1 board
 Tools, drivers, and example HDL designs
 Where to go to get things
54
Tweet it out! @ADI_News #ADIDC13
Part number Description
AD9122 DUAL, 16-BIT, 1200 MSPS, TxDAC+® DIGITAL-TO-ANALOG CONVERTER
ADL5375 400 MHz TO 6 GHz BROADBAND QUADRATURE MODULATOR
ADL5602 50 MHz TO 4.0 GHz RF/IF GAIN BLOCK
AD9548 QUAD/OCTAL INPUT NETWORK CLOCK GENERATOR/SYNCHRONIZER
AD9523-1 LOW JITTER CLOCK GENERATOR WITH 14 LVPECL/LVDS/HSTL/29 LVCMOS OUTPUTS
ADF4351 WIDEBAND SYNTHESIZER WITH INTEGRATED VCO
AD9643 14-BIT, 170 MSPS/210 MSPS/250 MSPS, 1.8 V DUAL ANALOG-TO-DIGITAL CONVERTER (ADC)
AD8366 DC TO 600 MHz, DUAL-DIGITAL VARIABLE GAIN AMPLIFIERS
ADL5380 400 MHz TO 6000 MHz QUADRATURE DEMODULATOR
ADG3304 LOW VOLTAGE 1.15 V TO 5.5 V, 4 CHANNEL, BIDIRECTIONAL, LOGIC LEVEL TRANSLATOR
ADP2323 DUAL 3A, 20V SYNCHRONOUS STEP-DOWN REGULATOR WITH INTEGRATED HIGH-SIDE MOSFET
ADP3335
HIGH ACCURACY ULTRALOW QUIESCENT CURRENT, 500 mA, ANYCAP® LOW DROPOUT
ADP3333 HIGH ACCURACY ULTRALOW IQ, 300 mA, ANYCAP LOW DROPOUT REGULATOR
ADP150 ULTRALOW NOISE, 150 MA CMOS LINEAR REGULATOR
ADP151 ULTRA LOW NOISE, 200 mA CMOS LINEAR REGULATOR
ADP1740 2 A, LOW VIN DROPOUT, LINEAR REGULATOR
FMComms1-EBZ FMC COMMUNICATIONS
Selection Table of Products Covered Today
55
Tweet it out! @ADI_News #ADIDC13
FMComms1 Demo in Exhibition Hall
Ubuntu Linux on ZC702
FMComms1 on FMC
HDMI Display and USB
Keyboard/Mouse
Full Transmit and Receive
56
Image of demo/board
This demo board is available for purchase:
www.analog.com/DC13-hardware
Tweet it out! @ADI_News #ADIDC13
Next Steps
Come see the demo
Buy the AD-FMComms1-EBZ Board
(self assemble your own kit) $750
Or buy the Avnet Kit – it’s in stock $1499
 Avnet ZedBoard 7020 baseboard
 Xilinx ISE® WebPACK software with a device locked ChipScope license (device locked to XC7Z020)
 Analog Devices AD-FMCOMMS1-EBZ FMC module
 Linux drivers, applications software, HDL source, reference designs, full schematics, and Gerbers
 Two pulse LTE blade antennas (2500 MHz to 2700 MHz)
 8 GB SD card
 Fan assembly, antenna, screws, and standoffs
Ask questions on the EngineerZone
 http://ez.analog.com/community/fpga
Check out the Wiki
 http://wiki.analog.com/resources/eval/user-guides/ad-fmcomms1-ebz
57

Integrated Software-Defined Radio (SDR) - VE2013

  • 1.
    Integrated Software DefinedRadio Reference Designs and Systems Applications Robin Getz, Title, Location
  • 2.
    Legal Disclaimer  Noticeof proprietary information, Disclaimers and Exclusions Of Warranties The ADI Presentation is the property of ADI. All copyright, trademark, and other intellectual property and proprietary rights in the ADI Presentation and in the software, text, graphics, design elements, audio and all other materials originated or used by ADI herein (the "ADI Information") are reserved to ADI and its licensors. The ADI Information may not be reproduced, published, adapted, modified, displayed, distributed or sold in any manner, in any form or media, without the prior written permission of ADI. THE ADI INFORMATION AND THE ADI PRESENTATION ARE PROVIDED "AS IS". WHILE ADI INTENDS THE ADI INFORMATION AND THE ADI PRESENTATION TO BE ACCURATE, NO WARRANTIES OF ANY KIND ARE MADE WITH RESPECT TO THE ADI PRESENTATION AND THE ADI INFORMATION, INCLUDING WITHOUT LIMITATION ANY WARRANTIES OF ACCURACY OR COMPLETENESS. TYPOGRAPHICAL ERRORS AND OTHER INACCURACIES OR MISTAKES ARE POSSIBLE. ADI DOES NOT WARRANT THAT THE ADI INFORMATION AND THE ADI PRESENTATION WILL MEET YOUR REQUIREMENTS, WILL BE ACCURATE, OR WILL BE UNINTERRUPTED OR ERROR FREE. ADI EXPRESSLY EXCLUDES AND DISCLAIMS ALL EXPRESS AND IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NON-INFRINGEMENT OF ANY THIRD PARTY INTELLECTUAL PROPERTY RIGHTS. ADI SHALL NOT BE RESPONSIBLE FOR ANY DAMAGE OR LOSS OF ANY KIND ARISING OUT OF OR RELATED TO YOUR USE OF THE ADI INFORMATION AND THE ADI PRESENTATION, INCLUDING WITHOUT LIMITATION DATA LOSS OR CORRUPTION, COMPUTER VIRUSES, ERRORS, OMISSIONS, INTERRUPTIONS, DEFECTS OR OTHER FAILURES, REGARDLESS OF WHETHER SUCH LIABILITY IS BASED IN TORT, CONTRACT OR OTHERWISE. USE OF ANY THIRD-PARTY SOFTWARE REFERENCED WILL BE GOVERNED BY THE APPLICABLE LICENSE AGREEMENT, IF ANY, WITH SUCH THIRD PARTY. 2
  • 3.
    Today’s Agenda Software DefinedRadio (SDR) Overview Math Behind SDR  Zero-IF or direct-conversion transmitter/receiver  Brief introduction to digital modulation How to Solve Channel Impairments  Imperfections introduced by the modulator/demodulator with particular focus on the effect of temperature and frequency changes  In-factory and in-field algorithms will be examined that can reduce the effect of these imperfections, and particular focus is placed on the efficacy of in-factory set-and-forget algorithms Solutions for SDR  FMComms1 board  Tools, drivers, and example HDL designs 3
  • 4.
    What Is aSoftware Defined Radio? A software defined radio system (SDR) is a radio communication system where components that have been typically implemented in hardware (e.g., mixers, filters, amplifiers, modulators/demodulators, detectors) are instead implemented by means of software on a personal computer or embedded system. While the concept of SDR is not new (circa ~1970 DoD labs), many techniques which used to be only theoretically possible are now being implemented due to the rapidly evolving capabilities of analog and digital electronics.  Why SDR?  Makes RF hardware easier  Easy to add new features, since they are all in software  Easier to have one set of hardware handle multiple modulation techniques 4
  • 5.
    Direct Conversion Technique(FMComms1) 5 Clock Generator / Sync Clock Distribution Frequency Synthesizer ADL5375 ADL5602 ADL5380AD8366AD9643 AD9548 AD9523-1 ADF4351 LPC(32Data+3CLKLVDS)FMCConnector(500MHz) FPGADevelopmentPlatform RF Out RF In` Slave Clock In Sync In DAC 16-Bit 1250MSPS* AD9122 Modulator 400 – 6000MHz 20dB Fixed Gain 50 – 4000MHz ADC 14-Bit 250MSPS 0.25dB Step Size 600MHz Bandwidth Demodulator 400 – 6000MHz Output: 1 – 1000MHzInput: 1 – 750MHz Output: 35 – 4400MHz ADL5605/6 700 - 1000MHz 1800 – 2700MHz π π Frequency Synthesizer Master Clock Out 16 + 1 LVDS Pair @ 1000 Mbps 500MHz (DDR) 16 + 1 LVDS Pair @ 500 Mbps 250MHz DDR π Pi network Solder bump jumperS S S S S 1 LVDS Pair 50MHz Ref Clock SMA connector I2C / USB to SPI SPI SPI SPI SPI SPI SPI SPI Power 5V @ 500mA ADL5523 400MHz to 4000MHz Low Noise Amplifier Tuned for Frequency π Tx Rx RF output power control is accomplished by adjusting baseband data Optional Front End Optional Front end 2 2 -9dB 0dB0dB Non-SMA connector • AD9122 DAC runs at 1000MSPS, due to max speed of AD9523-1
  • 6.
    Direct Conversion (Zero-IF)TRx A direct-conversion transceiver, also known as homodyne, synchrodyne, or zero-IF transceiver, is a radio transceiver design that (de)modulates the radio signal using a local oscillator (LO) whose frequency is identical to, or very close to, the carrier frequency of the intended signal.  Carrier frequency = local oscillator (LO) frequency  Attractive due to simplicity of the signal path  Suitable for high levels of integration  Allows wider bandwidth designs 6
  • 7.
    Homodyne Transmitter Advantagesand Challenges Advantages:  Low component count leads to lower system cost and power consumption  Direct up-conversion produces less mixing product spurs  Requires fewer filters Challenges:  During the analog modulation process, gain and phase mismatches of IQ signals have a direct impact on sideband suppression performance  Out of band transmissions  LO / carrier leakage  I/Q mismatch causes image in the output spectrum • This results in degraded error vector magnitude (EVM) at the receiver, which in turn degrades the bit error rate (BER) 7
  • 8.
    Homodyne Receiver Advantagesand Challenges Advantages:  Low component count leads to lower system cost  No image reject filter needed  Filtering requirements more relaxed at baseband  Gain stages at baseband provide power savings Challenges:  DC offset appearing at baseband  Self mixing  Offset voltages  Images appearing symmetrically about zero frequency  I/Q mismatches in phase and amplitude  Even order nonlinearities  Two high frequency interferers close to the channel of interest can result in even order nonlinearities that fall within the band of interest 8
  • 9.
    Back to Basics:Euler’s Formulas Sin ω0t is 90° out of phase with respect to cos ω0t  With perfect amplitude and phase matching the signal content at - ω0 cancels 9
  • 10.
    Amplitude and PhaseMismatch Amplitude Mismatch Phase Mismatch ω0 −ω0 A+B 2 A-B 2 Desired Signal Image 10
  • 11.
    Error Vector Magnitude—EVM ∑ ∑ = = − = M k M k kR kRkZ EVM 1 2 1 2 )( )()( 11 Noise and Imperfections in transmit and receive signal chains result in demodulated voltages which are displaced from their ideal location.  Error Vector Magnitude expresses this dislocation  Large EVM will result in Symbol Errors and degraded Bit Error Rate  Higher Order Modulation Schemes → Symbols Closer Together → EVM More Critical Ideal (Reference) Signal Phase Error (I/Q Error Phase) Magnitude Error (I/Q Error Mag) I Q Actual Signal φ Unit = %
  • 12.
    Effects of Gain,Offset, and Phase Errors -1.5 -1 -0.5 0 0.5 1 1.5 -1.5 -1 -0.5 0 0.5 1 1.5 -1.5 -1 -0.5 0 0.5 1 1.5 -1.5 -1 -0.5 0 0.5 1 1.5 -1.5 -1 -0.5 0 0.5 1 1.5 -1.5 -1 -0.5 0 0.5 1 1.5 fLO +10% Quadrature Gain Error fLO 1o Quadrature Phase Error fLO +1% Quadrature Offset Error 12
  • 13.
    Symbol Decision Threshold If the symbollands on the edge or outside of the box, bit errors will occur
  • 14.
    Effects of I/QMismatch f1f0 f2-f0-f1-f2 0 Desired Signal Ideal Gain Error IdealPhase Error ** EVM Degradation ** ** Images Occupy BW ** ** Interfere with Desired Signal ** 14
  • 15.
    Direct Conversion TransmitterArchitecture 15 ADL5375 ADL5602 RF Out DAC 16-Bit 1250MSPS* AD9122 Modulator 400 – 6000MHz 20dB Fixed Gain 50 – 4000MHz ADL5605/ADL5606 700 – 1000MHz 1800 – 2700MHz π π 16 + 1 LVDS Pair @ 1000 Mbps 500MHz (DDR) SPI 0dB0dB
  • 16.
    Complex IF UsingIF DACs A complex IF architecture uses IF DACs to synthesize an IF signal and its complex conjugate as the inputs to a quadrature modulator This makes a single sideband (SSB) upconverter that rejects the normal mixing product, easing the BPF filtering requirements 16 IF DAC IF DAC PA BPFΣ BPF RF RFIF IF RF RF 0 LO 90 LOFs Fs
  • 17.
    Complex IF Imperfections Complex IF systems create several images:  FDAC – FOUT: the main desired signal’s image  Harmonics (2nd, 3rd, etc.), real or folded  These must be low pass filtered prior to the quadrature modulator  Careful frequency planning must be done to avoid folded products falling too close to the desired signal that are then upconverted  Post-modulator, a band pass filter is used to filter the undesired products 17 IF DAC IF DAC Σ IF RF 0 LO 90 Fs IF Fs RFLO image harmonic
  • 18.
    Causes of Non-IdealSideband Suppressions 18
  • 19.
    Fixes for Non-IdealIssues 19 MULTICHIP SYNCHRONIZATION D15P/D15N D0P/D0N DATA RECEIVER FIFO HB1 HB2 HB3 NCO AND MOD fDATA/2 PRE MOD HB1_CLK MODE HB2_CLK HB3_CLK INTP FACTOR PHASE CORRECTION INTERNAL CLOCK TIMING AND CONTROL LOGIC 16 16 10 16 16 I OFFSET Q OFFSET INV SINC AUX 1.2G DAC 1 16-BIT IOUT1P IOUT1N AUX 1.2G DAC 2 16-BIT IOUT2P IOUT2N REF AND BIAS FSADJ DACCLKP DACCLKN REFCLKP REFCLKN REFIO10 GAIN1 10 GAIN2 DAC_CLK SERIAL INPUT/OUTPUT PORT PROGRAMMING REGISTERS POWER-ON RESET SDO SDIO SCLK CS RESET IRQ 0 1 CLOCK MULTIPLIER (2× TO 16×) CLK RCVR CLK RCVR PLL CONTROL SYNC DAC CLK_SEL DAC_CLK PLL_LOCK DCI FRAME 08281-002 INVSINC_CLK AD9122 Block Diagram
  • 20.
    Fixes for Non-IdealIssues 20 Wanted Signal Unwanted Image LO Feedthrough
  • 21.
    AD9122 Functional BlockDiagram 21 MULTICHIP SYNCHRONIZATION D15P/D15N D0P/D0N DATA RECEIVER FIFO HB1 HB2 HB3 NCO AND MOD fDATA/2 PRE MOD HB1_CLK MODE HB2_CLK HB3_CLK INTP FACTOR PHASE CORRECTION INTERNAL CLOCK TIMING AND CONTROL LOGIC 16 16 10 16 16 I OFFSET Q OFFSET INV SINC AUX 1.2G DAC 1 16-BIT IOUT1P IOUT1N AUX 1.2G DAC 2 16-BIT IOUT2P IOUT2N REF AND BIAS FSADJ DACCLKP DACCLKN REFCLKP REFCLKN REFIO10 GAIN1 10 GAIN2 DAC_CLK SERIAL INPUT/OUTPUT PORT PROGRAMMING REGISTERS POWER-ON RESET SDO SDIO SCLK CS RESET IRQ 0 1 CLOCK MULTIPLIER (2× TO 16×) CLK RCVR CLK RCVR PLL CONTROL SYNC DAC CLK_SEL DAC_CLK PLL_LOCK DCI FRAME 08281-002 INVSINC_CLK
  • 22.
    Premod/Filters/NCO 22 Increasing Interpolation Factor: Decreases fDATA,  Decreases signal bandwidth  Increases power of DAC, decreases power of FPGA
  • 23.
    Digital Inside DAC Increasinginterpolation factor:  Decreases fDATA  Decreases signal bandwidth  Increases power of DAC  Decreases power of FPGA Trade off system level performance between FPGA processing and fixed processing Decreased system timing constraints on FPGA 23
  • 24.
    AD9122 Interpolation ata DAC Output 24 1X 2X 4X
  • 25.
    AD9122 Digital Up-Conversion,DAC Out (DC -> 600 MHz) 25 No upconversion f(DATA)/2 upconversion 8 x f(DATA)/7 upconversion
  • 26.
    AD9122 Digital Up-Conversionat RF (Centre @ 2.4 GHz) 26 No upconversion f(DATA)/2 upconversion 8 x f(DATA)/7 upconversion
  • 27.
    When is ThisUseful? No “cans” on top of Tx or Rx chains to isolate them Any interaction between Tx and Rx PLLs will “bleed into the other” when the frequencies are within 100 kHz (due to PCB size constraints) 27 Clock Distribution Frequency Synthesizer ADL5375 ADL5380 AD9523-1 ADF4351 Modulator 400 MHz to 6000 MHz Demodulator 400 – 6000MHz Output: 1 – 1000MHz Output: 35 – 4400MHz Frequency Synthesizer Master Clock Out SPI SPI SPI Figure A Rx and Tx PLL 50 kHz different Figure B Rx and Tx PLL 100 MHz different (RF is the same due to the DAC shift) ADF4351 Tx Synthesizer 35 MHz to 4400 MHz ADF4351 Rx Synthesizer 35 MHz to 4400 MHz
  • 28.
    Receive Architectures Direct (Zero-IF)Conversion Cos(ωRF) Cos(ωRF)=1+Sin2(ωRF) Cos(ωSIG) Cos(ωSIG)=1+Sin2(ωSIG) LNA(t)=α1x(t)+α2x2(t) input(t)=A1Cos(ω1t)+A2Cos(ω2t) feedthrough(t)=α2A1A2Cos(ω2-ω1)t ADL5380AD8366AD9643 RF In` ADC 14-Bit 250MSPS 0.25dB Step Size 600MHz Bandwidth Demodulator 400MHZ to 6000MHz 16 + 1 LVDS Pair @ 500 Mbps 250MHz DDR SPI SPI ADL5523 400MHz to 4000MHz Low Noise Amplifier Tuned for Frequency π Rx -9dB 28
  • 29.
    The Imperfect I/QDemodulator I/Q DEMODULATOR LOIN RFIN 0 89.5 G1 G4 G3 G2 fVo s1 V fo s2 IIN QIN Imbalance In Phase Splitter Gain Imbalance (G1,G2,G3,G4) Offset Voltages 29
  • 30.
    Imperfections in theI/Q Signal Path Control Tuning90 0 R +/- 5% R +/- 5% LPF LPF Voffset1 Voffset2 Voffset3 Voffset4 ADC ADC Offsets within the Dual Channel ADC PCB and Layout Mismatches Component Mismatches 30
  • 31.
    Critical IQ DemodulatorSpecs—LO to RF Leakage If some of the LO leaks to the RF input, it mixes (multiplies) with itself in the mixer, generating unwanted dc offsets on top of the recovered baseband data stream ADCLNA ω Desired -70dBm 0dBm Leakage -60dBm ω -40dBm -30dBm(~20mVp-p) A B C Assume, Gain from A to C =30dB LO to RF leakage ~ 60dB FLO FLO X 31
  • 32.
    DC Offset andQuadrature Error Correction DC offset and quadrature error correction implemented digitally at the end of the receive chain  Most efficient approach in order to compensate for all potential mismatches or errors in the signal path DC Correction  If DC free coding is used, a notch filter can be applied Quadrature Error Correction  Gain Correction  Calculate I^2 – Q^2 to determine the power difference between I and Q.  The power difference should be driven to zero.  Phase Correction  Perform a cross-multiply between I and Q.  Can be viewed as a mixer. The DC term is proportional to the phase difference between I and Q.  By definition this should be zero if they are perfectly orthogonal. 32
  • 33.
    Summary Direct conversion orhomodyne receivers have there own merits and challenges Gain, phase, and offset errors are a few of the challenges that can be addressed with quadrature error correction algorithms  Gain, phase, and offset errors cause degradations in receiver EVM and sensitivity  Quadrature error correction will improve EVM and sensitivity Direct conversion offers advantages in power, cost, and performance over IF sampling architectures Quadrature error correction enables realizable direct conversion solutions for macro level base stations/SDR platforms Analog Devices’ first generation of QEC is available integrated into the following products  AD9262 – dual 16b continuous time sigma delta ADC  AD9269 – dual 16b pipeline ADC 33
  • 34.
    Clocking AD9523-1: multi-output, clock distributionfunction with low jitter performance, On-chip PLL and VCO with two VCO dividers On-chip VCO Two cascaded PLL stages:  First stage, PLL1, consists of an integer division PLL that uses an external voltage-controlled crystal oscillator (VCXO) from 15 MHz to 250 MHz.  Second stage, PLL2, is a frequency multiplying PLL that translates the first stage output frequency to a range of 2.940 GHz to 3.125 GHz. Clock Generator / Sync Clock Distribution AD9548 AD9523-1 Output: 1 – 1000MHzInput: 1 Hz - 750MHz 50MHz Ref Clock SPI SPI 122.88MHz VCXO On FMCOMMS1 34
  • 35.
  • 36.
    PLL2 Configuration 122.88MHz 983.04MHz 983.04MHz 122.88MHz 1024.00MHz 1024.00MHz  Currentconfig:  122.88 MHz / 1 * 24 = 2949.12 MHz  2949.12 MHz / 3 = 983.04 MHz  983.04 MHz / 4 = 245.76 MSPS (ADC)  Possible config:  122.88 MHz / 1 * 25 = 3072.00 MHz  3072.00 MHz / 3 = 1024.00 MHz  1024.00 MHz / 5 = 204.8 MSPS (ADC)  1024.00 MHz / 8 = 128.0 MSPS (ADC)  Possible config (max ADC rate):  122.88 MHz / 10 * 244 = 2998.272 MHz  2998.272 MHz / 3 = 999.4240 MHz  999.4240 MHz / 4 = 249.856 MSPS (ADC) 36
  • 37.
    Possible FMComms1 Clocking 37 DAC_DCO ADC_CLK DAC_REFCLK DAC_CLK N/C N/C N/C N/C LOGEN_TX_REFIN ADC_SYNC N/C LOGEN_RX_REFIN N/C N/C AssumesDAC is doing 8x interpolation Can be 1024/n: • 204.80 MHz • 170.67 MHz • 146.29 MHz • 128.00 MHz • 113.78 MHz • 102.40 MHz • 93.09 MHz • 85.33 MHz • 78.77 MHz • 73.14 MHz • 68.67 MHz • 64.00 MHz • 60.23 MHz • 56.89 MHz • 53.89 MHz • 51.20 MHz • 48.76 MHz • 46.55 MHz • 44.52 MHz • 42.67 MHz • 40.96 MHz Loose Zero Delay, and no long can sync multiple cards together OUT1 or OUT2 OUT1 only
  • 38.
    Power FMC provides 12V, and 3.3 V Switchers  ADP2323 LDOs  ADP3335  ADP3333  ADP151  ADP150  ADP1740 38
  • 39.
    ADP2323: Ultrahigh ConversionEfficiency in Compact Solution Size  Compact dual output solution size: 24 mm x 21 mm  Heat dissipation is spread evenly with the use of external low-side Mosfet 39  Ultrahigh and flat efficiency ~95% with a 12 V input and a 5 V output at 3 A load (ADP2323)  Optional pulse frequency modulation (PFM) reduces the switching losses at light load condition  Possible configuration up to 6 output rails in evenly phase-shifted topology to reduce input ripple voltage/current and minimize input capacitor size 24mm 21mm 50 55 60 65 70 75 80 85 90 95 100 0 0.5 1 1.5 2 2.5 3 Efficiency[%] OutputCurrent [A] Efficiency at 12Vin, 300kHz Vout=5V Vout=1.2V Vin A1 A2 ADP2323 (A) INTVCC SCFG SYNC SCFG SYNC SCFG 100kΩ180kΩ Vin B1 B2 ADP2323 (B) SCFG SYNC SCFG SYNC Vin C1 C2 ADP2323 (C) SCFG SYNC ADP2323
  • 40.
    ADP2323: Configurability forMulti-Rail Applications 40  Reduces input ripple voltage/current and size of the input capacitor through phase shift. Avoids beat frequency interference in multi-rail applications  Two/three ADP2323’s can be used for four/six output rails configuration Connect SCFG to INTVCC for clock output Connect SCFG with 100/180kΩ resistor to GND for 60/120° phase shift Vin A1 A2 ADP2323 (A) INTVCC SCFG SYNC SCFG SYNC SCFG 100kΩ180kΩ Vin B1 B2 ADP2323 (B) SCFG SYNC SCFG SYNC Vin C1 C2 ADP2323 (C) SCFG SYNC A1 B1 C1 60° 120 ° Without Phase Shift, Input Voltage Ripple = 142mV With Phase Shift, Input Voltage Ripple = 86mV Up to 40% input voltage ripple reduction Input Voltage Ripple Comparison with/without phase shift
  • 41.
    New ADI LowNoise High PSRR LDOs Summary ADM7160 (ES)  Target power for >14B ADC  200 mA, 1.8, 2.5, 3.3 Vout  9 µV rms broadband noise  Low tempco ADP7182 Neg VOUT LDO (ES)  200 mA, –30 Vin  Adjustable from –1.22 V to –VIN  PSRR 60 dB @10 kHz at VO = –3.3 V ADP150 ADP151 (MP)  150 mA/200 mA, 5.5 Vin  9 µV rms broadband noise  20 nV/√Hz spectral eN @ 100 kHz  70 dB PSRR @ 10 kHz 41 ADP7102 ADP7104 (MP)  300 mA/500 mA, 20 Vin  15 µV rms broadband noise  35 nV/√Hz spectral eN @ 100 kHz  80 dB PSRR @ 10 kHz  Power good output ADM7150 (1st Si) RF LDO (ES)  1.5 nV/√Hz spectral noise @ 100 kHz  800 mA, 4.5 to 16 Vin  Vout Range: 1.5 V to 5.5 V  100 dB PSRR DC to 100 kHz  65 dB PSRR at 1 MHz  40 dB at 10 MHz MP Mass Production ES Engineering Samples, contact ADI
  • 42.
    ADP7102/ADP7104 – LowNoise Performance  ADP7102/ADP7104  The ADP7104 noise does not increase with output voltage  No noise bypass required  ~15 µV rms for all outputs 42 0.01 0.1 1 1.E+01 1.E+02 1.E+03 1.E+04 1.E+05 uV/rt-Hz Freq (Hz) Noise Spectral Density 3.3V 5V RELEASED  ADP7102/ADP7104  No added bypass capacitor required  Stable with 1 µF output capacitor  PSRR = 70 dB @ 1 kHz, 500 mA  PSRR = 58 dB @ 10 kHz, 500 mA  PSRR = 50 dB @ 100 kHz, 500 mA  PSRR = 35 dB @ 1 MHz, 500 mA
  • 43.
    Spectral Density NoisePerformance vs. Frequency The ADP151 1/f noise superior to competition below 100 Hz Competition noise somewhat better than ADP151 above 100 Hz 43 0.001 0.01 0.1 1 10 10 100 1000 10000 100000 Noise Spectral Density 4.5V HMC860LP3E 3.3V HMC860LP3E ADP151-3.3V HMC976LP3E
  • 44.
    ADP151’s Ultralow NoiseAdvantage When Powering the ADF4350 Integrated PLL/VCO Chip Next slide compares phase noise vs frequency when powered by ADP151, AA batteries, & the older generation ADP3334 LDO  The ADP151 offers 1/3 the output noise of the ADP3334 LDO RMS jitter is also improved  Reduces from 1.23 ps to 0.87 ps by using ADP151 vs. the ADP3334 ADP151 output noise 10 µV rms over 10 Hz to 100 kHz independent of Vout, no CNR required ADP151 reduces PLL output phase noise (equivalent to reduced timing jitter) 44 RELEASED
  • 45.
    PLL Phase Noise(at 4.4 GHz) vs. Frequency Offset 45 -120 -110 -100 -90 -80 -70 -60 1,000 10,000 100,000 1,000,000 USB 1 x ADP3334 SUPPLY 1 x ADP3334 SUPPLY 1 x ADP150 AA BATTERY (2 x 1.5V) PhaseNoise(dBc/Hz) Hz ADP151 Low Noise LDO and 2 x AA Battery ADP3334 LDO
  • 46.
    Traditional RF EvaluationPlatforms (Antenna to Bits) 46  Discrete single product evaluation boards, connected with wires  6 power supplies  4 different USB applications  Not easy to replicate, or use as part of a SDR prototyping solution  Needed small form factor, open design
  • 47.
  • 48.
    FMCOMMS1 Connected toXilinx Development System ML605 (Virtex-6) 48 Top Bottom
  • 49.
    FMC-Comms Board –Tx, Rx, Clocks, Power 49 Rx Tx Rx Tx AD9548 Network Clock Generator/Synchronizer AD9523-1 Low Jitter Clock Generator AD9122 DAC, 16-Bit, 1250 MSPS* ADL5375 Modulator 400 MHz to 6000MHz ADL5602 20 dB Fixed Gain 50 MHz to 4000 MHz ADF4351 Tx Synthesizer 35 MHz to 4400 MHz AD9643 ADC 14-bit , 250 MSPS AD8366 0.25dB Step Size VGA 600MHz Bandwidth ADL5380 Demodulator 400 – 6000MHz ADF4351 Rx Synthesizer 35 MHz to 4400 MHz FMC ConnectorADC Inputs Clock Sync Clock Sync Inputs DAC Outputs +5 V Output for External Amp ADP2323 Dual 3 A Step- Down Switcher ADP7104 High Accuracy 500 mA LDO ADP1740 2 A LDO ADP1740 2 A LDO ADP7104 High Accuracy 500 mA LDO ADP151 Ultralow Noise 200 mA Linear Regulator ADP151 Ultra Low Noise 200 mA Linear Regulator ADG3304 4 Channel, Bidirectional, Logic Level Translator • AD9122 DAC runs at 1000MSPS, due to max speed of AD9523-1
  • 50.
    FMCOMMS1-EBZ Block Diagram 50 Clock Generator/ Sync Clock Distribution Frequency Synthesizer ADL5375 ADL5602 ADL5380AD8366AD9643 AD9548 AD9523-1 ADF4351 LPC(32Data+3CLKLVDS)FMCConnector(500MHz) FPGADevelopmentPlatform RF Out RF In Slave Clock In Sync In DAC 16-Bit 1250MSPS* AD9122 Modulator 400 – 6000MHz 20dB Fixed Gain 50 – 4000MHz ADC 14-Bit 250MSPS 0.25dB Step Size 600MHz Bandwidth Demodulator 400 – 6000MHz Output: 1 – 1000MHzInput: 1Hz – 750MHz Output: 35 – 4400MHz ADL5605/ADL5606 700 – 1000MHz 1800 – 2700MHz π π Frequency Synthesizer Master Clock Out 16 + 1 LVDS Pair @ 1000 Mbps 500MHz (DDR) 16 + 1 LVDS Pair @ 500 Mbps 250MHz DDR π Pi network Solder bump jumperS S S S S 1 LVDS Pair 50MHz Ref Clock SMA connector I2C/USB to SPI SPI SPI SPI SPI SPI SPI SPI Power 5V @ 500mA ADL5523 400 – 4000MHz Low Noise Amplifier Tuned for frequency π Tx Rx RF output power control is accomplished by adjusting baseband data Optional Front end Optional Front End 2 2 -9dB 0dB0dB Non-SMA connector • AD9122 DAC runs at 1000MSPS, due to max speed of AD9523-1
  • 51.
    Reference Designs HDL:  ML605(Microblaze)  KC705 (Microblaze)  VC707 (Microblaze)  ZC702 (ARM)  ZC706 (ARM)  Zed Board (ARM) Software:  Linux  Recommended solution  Drivers for all programmable parts (AD9122, AD9548, AD9523-1, ADF4351, AD9643, AD8366)  Streams data over network for Microblaze platforms  GTK+ based application for ARM based platforms  No-OS  Basic drivers http://wiki.analog.com/resources/eval/user-guides/ad-fmcomms1-ebz/reference_hdl 51
  • 52.
    System Level/Software LevelBlock Diagram 52 DAC ADC HDMI SPDIF I2S FMComms ADV7511 HDMI Tx ADAU1761 Audio Codec 512 MB DDR3 Zed Board
  • 53.
    IIO Scope –Linux Application Visualize Data: Control Things from GUI: 53
  • 54.
    Tweet it out!@ADI_News #ADIDC13 What We Covered Software Defined Radio (SDR) Overview How to Solve Channel Impairments  New features in ADI DACs and ADCs to solve these problems Solutions for SDR  FMComms1 board  Tools, drivers, and example HDL designs  Where to go to get things 54
  • 55.
    Tweet it out!@ADI_News #ADIDC13 Part number Description AD9122 DUAL, 16-BIT, 1200 MSPS, TxDAC+® DIGITAL-TO-ANALOG CONVERTER ADL5375 400 MHz TO 6 GHz BROADBAND QUADRATURE MODULATOR ADL5602 50 MHz TO 4.0 GHz RF/IF GAIN BLOCK AD9548 QUAD/OCTAL INPUT NETWORK CLOCK GENERATOR/SYNCHRONIZER AD9523-1 LOW JITTER CLOCK GENERATOR WITH 14 LVPECL/LVDS/HSTL/29 LVCMOS OUTPUTS ADF4351 WIDEBAND SYNTHESIZER WITH INTEGRATED VCO AD9643 14-BIT, 170 MSPS/210 MSPS/250 MSPS, 1.8 V DUAL ANALOG-TO-DIGITAL CONVERTER (ADC) AD8366 DC TO 600 MHz, DUAL-DIGITAL VARIABLE GAIN AMPLIFIERS ADL5380 400 MHz TO 6000 MHz QUADRATURE DEMODULATOR ADG3304 LOW VOLTAGE 1.15 V TO 5.5 V, 4 CHANNEL, BIDIRECTIONAL, LOGIC LEVEL TRANSLATOR ADP2323 DUAL 3A, 20V SYNCHRONOUS STEP-DOWN REGULATOR WITH INTEGRATED HIGH-SIDE MOSFET ADP3335 HIGH ACCURACY ULTRALOW QUIESCENT CURRENT, 500 mA, ANYCAP® LOW DROPOUT ADP3333 HIGH ACCURACY ULTRALOW IQ, 300 mA, ANYCAP LOW DROPOUT REGULATOR ADP150 ULTRALOW NOISE, 150 MA CMOS LINEAR REGULATOR ADP151 ULTRA LOW NOISE, 200 mA CMOS LINEAR REGULATOR ADP1740 2 A, LOW VIN DROPOUT, LINEAR REGULATOR FMComms1-EBZ FMC COMMUNICATIONS Selection Table of Products Covered Today 55
  • 56.
    Tweet it out!@ADI_News #ADIDC13 FMComms1 Demo in Exhibition Hall Ubuntu Linux on ZC702 FMComms1 on FMC HDMI Display and USB Keyboard/Mouse Full Transmit and Receive 56 Image of demo/board This demo board is available for purchase: www.analog.com/DC13-hardware
  • 57.
    Tweet it out!@ADI_News #ADIDC13 Next Steps Come see the demo Buy the AD-FMComms1-EBZ Board (self assemble your own kit) $750 Or buy the Avnet Kit – it’s in stock $1499  Avnet ZedBoard 7020 baseboard  Xilinx ISE® WebPACK software with a device locked ChipScope license (device locked to XC7Z020)  Analog Devices AD-FMCOMMS1-EBZ FMC module  Linux drivers, applications software, HDL source, reference designs, full schematics, and Gerbers  Two pulse LTE blade antennas (2500 MHz to 2700 MHz)  8 GB SD card  Fan assembly, antenna, screws, and standoffs Ask questions on the EngineerZone  http://ez.analog.com/community/fpga Check out the Wiki  http://wiki.analog.com/resources/eval/user-guides/ad-fmcomms1-ebz 57