The document discusses simulations conducted to prevent flashovers on a double-circuit 220kV transmission line due to lightning strikes. Monte Carlo simulations were used to model lightning strikes on towers, conductors, and shield wires. Based on the simulations, installing surge arresters (LSAs) on towers was found to reduce flashover rates. Installing LSAs on the lower phase conductor reduced flashovers when tower footing resistance was above 21 ohms but below 47 ohms. Installing LSAs on the middle and lower phases further reduced flashovers when resistance was above 47 ohms but below 150 ohms.
SPICE MODEL of RF-500TB-0.5V in SPICE PARK. English Version is http://www.spicepark.net. Japanese Version is http://www.spicepark.com by Bee Technologies.
Cable sizing to withstand short-circuit current - ExampleLeonardo ENERGY
A short circuit causes very extreme stresses in a cable which are proportional to the square of the current:
A temperature rise in the conducting components such as conductor, screen, metal sheath, armour. Indirectly the temperature of adjoining insulation and protective covers also increases,
electro-magnetic forces between the current-carrying components.
The temperature rise is important for its effect on ageing, heat pressure characteristics etc. and should be limited to a permissible short-circuit temperature. The thermo-mechanical effects of the current shall also be considered.
For the given short-circuit condition the short-circuit capacity of a cable should be investigated with respect to all these parameters. For multi-core cables in most instances the thermal effect - related to the magnitude of fault current and clearance time - is the critical parameter, since the cable will normally have enough mechanical strength. With single-core cables however the mechanical effect - related to the magnitude of the peak short-circuit current - is of such significance that, next to the thermal, the mechanical strength of both cable and its supports should be investigated.
Also accessories must be rated with respect to thermal and mechanical short-circuit stresses.
The short circuit strength of a cable system is not quantitatively defined with regard to permissible number of repeated short circuits, degree of deformation or destruction or impairment quality. It is expected, however, that a cable installation will remain safe in operation and that any deformation remains within tolerable limits even after several short circuits.
This course provides practical overview of short circuit performance of a cable.
Transients Caused by Switching of 420 kV Three-Phase Variable Shunt ReactorBérengère VIGNAUX
This paper describes transients caused by uncontrolled and controlled switching of three-phase 420 kV variable shunt reactor (VSR).
Inrush currents due to VSR energization and overvoltages due to de-energization were determined at tap positions corresponding to lowest 80 MVAr and highest 150 MVAr reactive power. Based on the calculation results, mitigation measures and operating switching strategy of VSR were proposed.
SPICE MODEL of RF-500TB-0.5V in SPICE PARK. English Version is http://www.spicepark.net. Japanese Version is http://www.spicepark.com by Bee Technologies.
Cable sizing to withstand short-circuit current - ExampleLeonardo ENERGY
A short circuit causes very extreme stresses in a cable which are proportional to the square of the current:
A temperature rise in the conducting components such as conductor, screen, metal sheath, armour. Indirectly the temperature of adjoining insulation and protective covers also increases,
electro-magnetic forces between the current-carrying components.
The temperature rise is important for its effect on ageing, heat pressure characteristics etc. and should be limited to a permissible short-circuit temperature. The thermo-mechanical effects of the current shall also be considered.
For the given short-circuit condition the short-circuit capacity of a cable should be investigated with respect to all these parameters. For multi-core cables in most instances the thermal effect - related to the magnitude of fault current and clearance time - is the critical parameter, since the cable will normally have enough mechanical strength. With single-core cables however the mechanical effect - related to the magnitude of the peak short-circuit current - is of such significance that, next to the thermal, the mechanical strength of both cable and its supports should be investigated.
Also accessories must be rated with respect to thermal and mechanical short-circuit stresses.
The short circuit strength of a cable system is not quantitatively defined with regard to permissible number of repeated short circuits, degree of deformation or destruction or impairment quality. It is expected, however, that a cable installation will remain safe in operation and that any deformation remains within tolerable limits even after several short circuits.
This course provides practical overview of short circuit performance of a cable.
Transients Caused by Switching of 420 kV Three-Phase Variable Shunt ReactorBérengère VIGNAUX
This paper describes transients caused by uncontrolled and controlled switching of three-phase 420 kV variable shunt reactor (VSR).
Inrush currents due to VSR energization and overvoltages due to de-energization were determined at tap positions corresponding to lowest 80 MVAr and highest 150 MVAr reactive power. Based on the calculation results, mitigation measures and operating switching strategy of VSR were proposed.
Circuit-based method for extracting the resistive leakage current of metal ox...journalBEEI
Resistive leakage current based condition assessment of metal oxide surge arrester (MOSA) is one of the most extensively employed technique to monitor its degradation. An extraction method is customarily required to extract the resistive component from the total leakage current. The existing methods to extract the resistive current are complex and less accurate. Therefore, this paper describes a simple and accurate circuit-based method to extract the resistive current using equivalent model and measured leakage current of the arrester. The accuracy of the proposed method is validated through experimental results on ABB’s 120 kV surge arrester, EMTP and QuickField software simulations. The performance of the method is also analyzed and verified experimentally on 72, 180 and 240 kV rated ABB’s surge arresters. The obtained results of resistive leakage current have shown the maximum error of 0.001%. Simple and easier computational steps with higher accuracy are the key benefits of the proposed technique.
Wind parks are made up of a large number of
saturable inductances (power transformers, inductive voltage
transformers (IVTs)), as well as capacitors (cables, wind turbine
harmonic filters, capacitor voltage transformers (CVTs), voltage
grading capacitors in circuit-breakers). Therefore, they may
present scenarios in which ferroresonance occurs. This paper
presents the scenarios that can lead to ferroresonant circuits in
doubly fed induction generator (DFIG) based wind parks.
Surge generator cable fault locators ("thumpers") provide pre-location and pinpoint cable fault location. Cable fault prelocation using ICE (Impulse Current Method) is preferred for extensive underground cable fault location and pinpointing cable faults in water damaged cable joints. Precise location of cable faults through surge generator fault locators (cable thumping) is very quick and limits expensive excavation by pinpoint accuracy.
IJERA (International journal of Engineering Research and Applications) is International online, ... peer reviewed journal. For more detail or submit your article, please visit www.ijera.com
• modelling of the electric railway system including locomotives;
• influence of the electric railway system on power quality in the transmission system simulations and power quality measurements);
• modelling of reactive power compensation for electric railway systems and analysis of switching transients;
• influence of the electric railway system on pipelines and telecommunication cables.
Case Study: Cyclic Voltametric MeasurementHasnain Ali
The design of an ac Cyclic Voltammetric Measurement System for the in –situ measurement of dissolved oxygen in sediment on the seabed. The measurement strategy should be based on linear ramp cyclic voltammetry
Epistemic Interaction - tuning interfaces to provide information for AI supportAlan Dix
Paper presented at SYNERGY workshop at AVI 2024, Genoa, Italy. 3rd June 2024
https://alandix.com/academic/papers/synergy2024-epistemic/
As machine learning integrates deeper into human-computer interactions, the concept of epistemic interaction emerges, aiming to refine these interactions to enhance system adaptability. This approach encourages minor, intentional adjustments in user behaviour to enrich the data available for system learning. This paper introduces epistemic interaction within the context of human-system communication, illustrating how deliberate interaction design can improve system understanding and adaptation. Through concrete examples, we demonstrate the potential of epistemic interaction to significantly advance human-computer interaction by leveraging intuitive human communication strategies to inform system design and functionality, offering a novel pathway for enriching user-system engagements.
Essentials of Automations: Optimizing FME Workflows with ParametersSafe Software
Are you looking to streamline your workflows and boost your projects’ efficiency? Do you find yourself searching for ways to add flexibility and control over your FME workflows? If so, you’re in the right place.
Join us for an insightful dive into the world of FME parameters, a critical element in optimizing workflow efficiency. This webinar marks the beginning of our three-part “Essentials of Automation” series. This first webinar is designed to equip you with the knowledge and skills to utilize parameters effectively: enhancing the flexibility, maintainability, and user control of your FME projects.
Here’s what you’ll gain:
- Essentials of FME Parameters: Understand the pivotal role of parameters, including Reader/Writer, Transformer, User, and FME Flow categories. Discover how they are the key to unlocking automation and optimization within your workflows.
- Practical Applications in FME Form: Delve into key user parameter types including choice, connections, and file URLs. Allow users to control how a workflow runs, making your workflows more reusable. Learn to import values and deliver the best user experience for your workflows while enhancing accuracy.
- Optimization Strategies in FME Flow: Explore the creation and strategic deployment of parameters in FME Flow, including the use of deployment and geometry parameters, to maximize workflow efficiency.
- Pro Tips for Success: Gain insights on parameterizing connections and leveraging new features like Conditional Visibility for clarity and simplicity.
We’ll wrap up with a glimpse into future webinars, followed by a Q&A session to address your specific questions surrounding this topic.
Don’t miss this opportunity to elevate your FME expertise and drive your projects to new heights of efficiency.
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.
The Art of the Pitch: WordPress Relationships and SalesLaura Byrne
Clients don’t know what they don’t know. What web solutions are right for them? How does WordPress come into the picture? How do you make sure you understand scope and timeline? What do you do if sometime changes?
All these questions and more will be explored as we talk about matching clients’ needs with what your agency offers without pulling teeth or pulling your hair out. Practical tips, and strategies for successful relationship building that leads to closing the deal.
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...James Anderson
Effective Application Security in Software Delivery lifecycle using Deployment Firewall and DBOM
The modern software delivery process (or the CI/CD process) includes many tools, distributed teams, open-source code, and cloud platforms. Constant focus on speed to release software to market, along with the traditional slow and manual security checks has caused gaps in continuous security as an important piece in the software supply chain. Today organizations feel more susceptible to external and internal cyber threats due to the vast attack surface in their applications supply chain and the lack of end-to-end governance and risk management.
The software team must secure its software delivery process to avoid vulnerability and security breaches. This needs to be achieved with existing tool chains and without extensive rework of the delivery processes. This talk will present strategies and techniques for providing visibility into the true risk of the existing vulnerabilities, preventing the introduction of security issues in the software, resolving vulnerabilities in production environments quickly, and capturing the deployment bill of materials (DBOM).
Speakers:
Bob Boule
Robert Boule is a technology enthusiast with PASSION for technology and making things work along with a knack for helping others understand how things work. He comes with around 20 years of solution engineering experience in application security, software continuous delivery, and SaaS platforms. He is known for his dynamic presentations in CI/CD and application security integrated in software delivery lifecycle.
Gopinath Rebala
Gopinath Rebala is the CTO of OpsMx, where he has overall responsibility for the machine learning and data processing architectures for Secure Software Delivery. Gopi also has a strong connection with our customers, leading design and architecture for strategic implementations. Gopi is a frequent speaker and well-known leader in continuous delivery and integrating security into software delivery.
State of ICS and IoT Cyber Threat Landscape Report 2024 previewPrayukth K V
The IoT and OT threat landscape report has been prepared by the Threat Research Team at Sectrio using data from Sectrio, cyber threat intelligence farming facilities spread across over 85 cities around the world. In addition, Sectrio also runs AI-based advanced threat and payload engagement facilities that serve as sinks to attract and engage sophisticated threat actors, and newer malware including new variants and latent threats that are at an earlier stage of development.
The latest edition of the OT/ICS and IoT security Threat Landscape Report 2024 also covers:
State of global ICS asset and network exposure
Sectoral targets and attacks as well as the cost of ransom
Global APT activity, AI usage, actor and tactic profiles, and implications
Rise in volumes of AI-powered cyberattacks
Major cyber events in 2024
Malware and malicious payload trends
Cyberattack types and targets
Vulnerability exploit attempts on CVEs
Attacks on counties – USA
Expansion of bot farms – how, where, and why
In-depth analysis of the cyber threat landscape across North America, South America, Europe, APAC, and the Middle East
Why are attacks on smart factories rising?
Cyber risk predictions
Axis of attacks – Europe
Systemic attacks in the Middle East
Download the full report from here:
https://sectrio.com/resources/ot-threat-landscape-reports/sectrio-releases-ot-ics-and-iot-security-threat-landscape-report-2024/
Securing your Kubernetes cluster_ a step-by-step guide to success !KatiaHIMEUR1
Today, after several years of existence, an extremely active community and an ultra-dynamic ecosystem, Kubernetes has established itself as the de facto standard in container orchestration. Thanks to a wide range of managed services, it has never been so easy to set up a ready-to-use Kubernetes cluster.
However, this ease of use means that the subject of security in Kubernetes is often left for later, or even neglected. This exposes companies to significant risks.
In this talk, I'll show you step-by-step how to secure your Kubernetes cluster for greater peace of mind and reliability.
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
Keynote at DIGIT West Expo, Glasgow on 29 May 2024.
Cheryl Hung, ochery.com
Sr Director, Infrastructure Ecosystem, Arm.
The key trends across hardware, cloud and open-source; exploring how these areas are likely to mature and develop over the short and long-term, and then considering how organisations can position themselves to adapt and thrive.
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Ramesh Iyer
In today's fast-changing business world, Companies that adapt and embrace new ideas often need help to keep up with the competition. However, fostering a culture of innovation takes much work. It takes vision, leadership and willingness to take risks in the right proportion. Sachin Dev Duggal, co-founder of Builder.ai, has perfected the art of this balance, creating a company culture where creativity and growth are nurtured at each stage.
GraphRAG is All You need? LLM & Knowledge GraphGuy Korland
Guy Korland, CEO and Co-founder of FalkorDB, will review two articles on the integration of language models with knowledge graphs.
1. Unifying Large Language Models and Knowledge Graphs: A Roadmap.
https://arxiv.org/abs/2306.08302
2. Microsoft Research's GraphRAG paper and a review paper on various uses of knowledge graphs:
https://www.microsoft.com/en-us/research/blog/graphrag-unlocking-llm-discovery-on-narrative-private-data/
DevOps and Testing slides at DASA ConnectKari Kakkonen
My and Rik Marselis slides at 30.5.2024 DASA Connect conference. We discuss about what is testing, then what is agile testing and finally what is Testing in DevOps. Finally we had lovely workshop with the participants trying to find out different ways to think about quality and testing in different parts of the DevOps infinity loop.
UiPath Test Automation using UiPath Test Suite series, part 3DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 3. In this session, we will cover desktop automation along with UI automation.
Topics covered:
UI automation Introduction,
UI automation Sample
Desktop automation flow
Pradeep Chinnala, Senior Consultant Automation Developer @WonderBotz and UiPath MVP
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
Univ Of Zagreb Uglesic Prevention Of Flashover
1. EMTP-RV USER GROUP MEETING, DUBROVNIK, 30 APRIL 2009
Prevention of Flashover on a Double-circuit 220 kV
Line
Ivo Uglešić*, A. Xemard**, V. Milardić*, B. Filipović-Grčić*
*Faculty of Electrical Engineering and Computing
University of Zagreb, Croatia
**EDF R&D, Paris, France 1
2. OUTLINE OF PRESENTATION
INTRODUCTION
SIMULATION OF LIGHTNING STROKES TO
TRANSMISSION LINE
MODELING PROCEDURE FOR TRANSIENT
SIMULATIONS
SIMULATION RESULTS
CONCLUSIONS
2
3. INTRODUCTION
- The case study is related to the improvement of the lightning
performance of a 220 kV double-circuit overhead line, which connects
the thermo power plant to the rest of the power system.
- Several double-circuit outages provoked by lightning caused the
interruption of power supply of the power plant.
- To avoid back-flashovers due to lightning strokes to tower or
overhead shielding wires, the tower footing resistance should be as
low as possible.
- Installation of unbalanced insulation on a double-circuit line is one of
possible solution for suppression of double-circuit simultaneous
faults.
- Installation of line surge arresters (LSA).
3
4. SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
The goal of the simulation is to determine the distribution of lightning
current amplitudes which strike HV transmission line towers and shield
wires or the phase conductors directly.
The Monte Carlo method is used – reproducing numerically a
stochastic problem.
The log–normal distribution of lightning current amplitude:
P - probability of occurrence of lightning current amplitude
higher than I.
4
5. SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
The general expression for the striking distance:
R - striking distance,
I - lightning current amplitude,
a - constant [3.3 – 10.6],
b - constant [0.5 – 0.85].
In calculations is used a=7.2, b=0.65.
5
6. SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
6,7 m
6,7 m
4,5 m
A 4,5 m
6,0 m
6,0 m
6,5 m
B 6,5 m
6,0mm
6,0
C 5,0 m
5,0 m
17,10m
19,50m
22,00m
24,60m
27,30m
30,00m
3D model of the part of the studied transmission line
6
7. SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
-Total number of simulations 37932,
-1000 simulations finished with phase conductor strikes,
-25635 ground strikes,
-11297 with shielding wire and tower strikes,
-shielding failure occurs in 8.85% cases.
According to statistical calculation, the following characteristics of
the crest values of the current for lightning striking phase conductors
are calculated:
- average value: 15.40 kA,
- variance: 98.36 kA,
- standard deviation: 9.92 kA,
- maximal phase conductor strike current: 42.80 kA,
7
- critical current: 47.30 kA.
8. SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
Distribution of lightning currents striking phase conductors
0,1
0,09
0,08
0,07
0,06
Probability
0,05
0,04
0,03
0,02
0,01
0
1-3 3-5 5-7 7-9 9-11 11-13 13-15 15-17 17-19 19-21 21-23 23-25 25-27 27-29 29-31 31-33 33-35 35-37 37-39 39-41 >41
Classes (kA)
Distribution of lightning currents striking phase conductors 8
9. SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
Distribution of lightning currents striking top of towers or shielding wire
0,25
0,2
0,15
Probability
0,1
0,05
0
0 -20 -30 - 40 -50 -60 -70 -80 -90 0 0 0 0 0 0 0 0 0 0
1-1 10 20 30 40 50 60 70 80 -10 -11 -12 -13 -14 -15 -16 -17 -18 -19
90 1 00 1 10 1 20 1 30 1 40 1 50 1 60 1 70 1 80
Classes (kA)
Distribution of lightning currents striking top of towers or shielding wire
9
10. MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
The lightning stroke hitting a tower or a phase conductor can be
replaced by a surge current generator and a resistor (Norton
generator).
The CIGRE Lightning Current Waveform model can approximate well
the concave form of the lightning current front.
The transmission line, conductors and earth wire is represented by
several multi-phase untransposed distributed parameter line spans at
both sides of the point of the lightning stroke impact.
Tower surge impedances are calculated using equation:
10
11. MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
Phase voltages at the instant at which a lightning stroke impacts the
line must be included.
Insulators are represented using the area criterion that involves
determining the instant of breakdown using the formula:
t
k
U U0 d DE
T0
U(τ) is the voltage applied at time t,
U0 is a minimum voltage to be exceeded before any breakdown
process can start or continue,
k and U0 and DE are constants corresponding to an air gap
configuration and overvoltage polarity,
T0 is the time from which U(τ) > U0.
11
12. MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
Tower footing resistances are modelled taking into account ionization:
R0 - footing resistance at low current and low frequency, i.e. 50 Hz,
I - stroke current through the resistance,
Ig - limiting current to initiate sufficient soil ionization.
ρ - soil resistivity m ;
E0 - soil ionization gradient, recommended value: 400 kV/m .
12
13. MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
EMTP-RV Model of footing resistance ionization
13
14. MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
The model of gapless type LSA includes non-linear and dynamic
behaviour of the arrester.
800
700
600
500
Voltage (kV)
400
300
200
100
0
0,1 1 10 100
Current (kA)
U-I characteristic of surge arrester for the 220 kV line (Ur=210 kV) 14
15. Shield wire
lower
upper
middle
Transmision line
10 km
1
Z=139.3 Ω
Transmision line
276 m
Z=139.3 Ω 2
Transmision line
343 m
3
Z=135.2 Ω
Transmision line
289 m
4
Z=139.3 Ω
Transmision line
402 m
5
Model of 220 kV double-circuit line
Z=139.3 Ω
1000 Ω
Transmision line
295 m
6
Z=139.3 Ω
Stroke to tower
Transmision line
213 m
31 kA, 72 kA,
96 kA, 138 kA
7
Z=135.2 Ω
Transmision line
MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
459 m
8
Z=139.3 Ω
Transmision line
350 m
9
Z=139.3 Ω
15
Transmision line
10 km
16. SIMULATION RESULTS
When a lightning strikes the top of a 220 kV tower the occurrence of
the back-flashover depends on many parameters:
- peak current magnitude and maximal steepness,
- tower footing resistance,
- flashover voltage of insulation clearances,
- magnitude and phase angle of the voltage,
- atmospheric condition (rain, snow, pressure, temperature, humidity)
etc.
16
19. SIMULATION RESULTS
Back-flashovers in relation to the lightning current magnitude and the
footing resistance of a tower (LSA in the middle phase)
19
21. SIMULATION RESULTS
Back-flashovers in relation to the lightning current magnitude and the
footing resistance of a tower (LSAs in middle and lower phases)
21
22. SIMULATION RESULTS
7
NO LSA
LSA in B
Number of Back-flashover Rates (annual, per 100km of line)
LSA in C
6 LSAs in B and C
5
4
3
2
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Tower resistance (Ohms)
Back-flashover rate of one circuit of the 220 kV line: not protected by
LSAs, protected by LSA in middle phase (B), LSA in lower phase (C)
22
and LSAs in lower and middle phases (B and C)
23. SIMULATION RESULTS
8
NO LSA
LSA in B
7 LSA in C
Number of Flashover Rates (annual, per 100km of line)
LSAs in B and C
6
5
4
3
2
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Tower resistance (Ohms)
Total flashover rate (back and shield failure) of one circuit of the 220 kV
line: not protected by LSAs, protected by LSA in middle phase (B), LSA
in lower phase (C) and LSAs in lower and middle phases (B and C) 23
24. CONCLUSIONS
The following recommendations can be given for the purpose of
optimization of the number of LSAs:
-Improvement of footing resistances on towers if economically
justified.
-No LSA (tower footing resistance < 21 ).
-LSA in the lower phase (tower footing resistance > 21 and < 47 ).
-LSAs in the middle and lower phases (tower footing resistance > 47
< 150 ).
-Arresters installed in all 3 phases at selected towers with tower
footing resistance > 150 (the installation of three LSAs in one circuit
will only prevent back-flashover in that circuit on that tower and back-
flashovers could occur on neighboring towers).
24
25. EMTP-RV USER GROUP MEETING, DUBROVNIK, 30 APRIL 2009
Prevention of Flashover on a Double-circuit 220 kV
Line
Ivo Uglešić*, A. Xemard**, V. Milardić*, B. Filipović-Grčić*
*Faculty of Electrical Engineering and Computing
University of Zagreb, Croatia
**EDF R&D, Paris, France 25