Today’s Agenda


             Part I: Reference Data Management Overview
                   What is reference data?
                   What is Reference Data Management (RDM)?
                   Key requirements for RDM solutions
                   Costs, savings & ROI scenarios


             Part II: RDM Implementations

             Q&A




© 2012 The MDM Institute   www.The-MDM-Institute.com
About the MDM Institute
        Founded in 2004 to focus on                        MDM Alert™        newsletter
         MDM business drivers & technology                  MDM Market Pulse™ market
         challenges
                                                             research & multi-client studies
        MDM Institute Advisory                             MDM Fast Track™ one-day
         Council™ of 150 Global 5000 IT                      public & onsite workshop rotating
         organizations with unlimited advice to key          quarterly through major North
         individuals, e.g. CTOs, CIOs, data architects       American, European, & Asia-Pacific
                                                             metro areas
        MDM Institute Business
         Council™ website access & email support MDM & Data Governance
         to 35,000+ members                       Summit™ annual conferences in
                                                  London, NYC, San Francisco, Shanghai,
        MDM Road Map & Milestones™               Singapore, Sydney, Tokyo & Toronto
         annual strategic planning assumptions
                                          About Aaron Zornes
                   Most quoted industry analyst authority on topics of MDM, RDM & MDG
                           Founder & Chief Research Officer of the MDM Institute
                Founder & conference chairman for MDM & Data Governance Summits series
                     Founded & ran META Group’s largest research practice for 14 years
                    M.S. in Management Information Systems from University of Arizona


             “Independent, Authoritative, & Relevant”
© 2012 The MDM Institute   www.The-MDM-Institute.com
What is Reference Data?

    Reference data =“coded, semantically stable, relatively static
            data sets shared by multiple constituencies”
                       (people, systems, & other master data domains)

                                                                    Industry
    Customers
                                                          Geo
                                               Business
                                                Unit ID
                               Sales
            Cost /            Person
           Revenue                                                             Product
             Acct



  In the logical view, private & public forms of reference data
       connect domains & application; consistent values
 (& semantics) required for multi-domain views & hierarchies
© 2012 The MDM Institute   www.The-MDM-Institute.com
Why Reference Data? Why Now?

        Errors in reference data will
         ripple outwards affecting quality             Inconsistent
                                                        Reporting
         of master data in each domain,
         which in turn affects quality in                             Transaction
                                                                        Failure
         all dependent transactional
         systems                                                              Regulatory
                                                                            Non-compliance
        RDM needed in both operational
         & analytical MDM use cases
         where capability often used to
         provide attributes, hierarchies                                       Systemic
                                                                                Failure
         & KPIs

     Central role of reference data means RDM becoming
“starting point” for many organizations planning MDM & MDG
© 2012 The MDM Institute   www.The-MDM-Institute.com
RDM Prologue


        In addition to MDM functionality, RDM systems also
         manage complex mappings btw different reference data
         representations & different data domains across enterprise
        Governance of RDM is vital— manual or custom RDM often
         lacks change management, audit controls & granular
         security/permissions
        Because reference data is used to drive key business
         processes & application logic, errors in reference data can
         have major negative & multiplicative business impact

  Just as businesses no longer build own CRM, ERP, &MDM
   systems, so too are organizations beginning to acquire
commercial RDM, which can be easily tailored or configured &
    have full ongoing support of major software vendor
© 2012 The MDM Institute   www.the-MDM-Institute.com
Reference Data Categories

                                     Multi-Domain                  Real-Time / Transactional
                                    RDM Use Cases                       RDM Use Cases
                            Countries & Subdivisions (FIPS10)
                                  Currencies (ISO 4217)
                                 Time Zones (ISO 8601)                    Security Prices
     Public                Industry Classification (NAICS, ISIC)    SWIFT BIC Codes (Payments)
   (External)                                                       ICD-9/10 Codes (Healthcare)
                                                                   ACORD/ISO Codes (Insurance)
                              Customized Public Reference
      Semi-
                            Standards (e.g. customized D&B)
    Private?
    (Shared)
                              Shared Private Data (Finance)

                                       Legal Entities
     Private                         Chart of Accounts               Reference data required for
   (Internal)                          Organizations                   transaction processing
                                        Employees

                            (i.e., much of HR & Finance Data)

© 2012 The MDM Institute     www.The-MDM-Institute.com
Why Manage Reference Data Independently?
                           (“Hub of hubs”? Federated vs. Centralized?)

                                                                                          Industry
                       Geo                                                               (NAICS, ISIC)
                                                                         Geo
        Customers                                                       (ISO3166,
                                                                           FIPS)
                                                       Business
                                                        Unit ID
                                        Sales
                                       Person
                 Geo
         ERP                  Cost /
                                                                                                         Geo
                             Revenue
                               Acct                                                            Product
                                             Geo                  Geo
                                   Finance                   HR                    Geo
                                                                         BI/Analytics


    In the logical model, reference data connects domains &
   applications; in implementations local copies exist for each
   consumer; challenges include: governance, synchronizing,
     versioning, & custom hierarchies/internationalizations
© 2012 The MDM Institute   www.The-MDM-Institute.com
Critique of Current Approaches
                 for Multi-Domain Reference Data
  RDM Solution                     Drawback                            Recommendation
  Custom-built, manual             Heavy TCO burden                    Avoid unless reference data
  solutions                                                            demands are truly unique
  Spreadsheets                     Difficult to govern, secure,        Distribute data in spreadsheets;
                                   version, & audit; no modeling,      govern data in RDM solution
                                   poor hierarchy management
  Repurpose hierarchy              Poor cross-domain support, no       Seek out multi-domain RDM
  management solution              classification mapping, few         solution with hierarchy
  (MSFT MDS, ORCL DRM)             enterprise integration options      management
  Customize existing               Rudimentary data modeling,          Use multi-domain RDM solution
  domain-specific MDM              lifecycle mgmt capabilities, &      to maintain connections &
  (Customer or Product)            governance features (esp.           govern/update into CDI & PIM
                                   authoring & workflow)               via data services

  ERP / Enterprise                 Limited governance, versioning,     Master in external platform.
  Application                      distribution; also reference data   RDM can be used to govern
                                   customized use in app may have      baseline set, versions and
                                   limited appeal in other systems     adaptations
  Real-time / industry-            Premium priced R/T RDM              Leverage R/T RDM solutions for
  specific RDM                     solutions do not represent good     R/T use cases (trading, claims
                                   economic sense                      processing, payments)
© 2012 The MDM Institute   www.The-MDM-Institute.com
“Top 10” RDM Technical Evaluation Criteria

          1.  Administration of diverse reference data types
          2.  Ability to map reference data
          3.  Management of reference data sets
          4.  Architecture/performance
          5.  Hierarchy management over
              reference data sets
          6. Connectivity/integration
          7. Import & export
          8. Versioning support
          9. Security & access control
          10. E2E lifecycle management
     Coming to market are RDM solutions characterized by
   multiple, diverse levels of integration w/ market-dominant
   MDM hubs as well as repackagings of existing mid-market
              MDM solutions – HOW TO EVALUATE?
© 2012 The MDM Institute   www.The-MDM-Institute.com
“Administration of Diverse                                                                  RDM Top 10
                Reference Data Types”                                                                     Eval Criteria #1




  Private Ref Data



                                                                                           Public Ref Data




                                                       From R. Thompson,/Credit Suisse, “Multidomain Enterprise Reference
                                                       Data,” 7th Annual MDM & Data Governance Summit New York 2012

    RDM solution should support a w ide m ix of data structures from
          nam e:value pairs to hierarchies (see criteria #5).
© 2012 The MDM Institute   www.The-MDM-Institute.com
“Ability to Map Reference Data”                                                             RDM Top 10
                                                                                                         Eval Criteria #2
              – pt. 1 (cross-dom ain m apping)
                                                                           LOCATIONS
          FINANCE                                                            ISO 3166    Name
                                                                             Code
            Issuing Country                     Name         ISO 4217
            (ISO3166)                                        Code           USA         United States of America
                                                                            CHN         People’s Republic of China
          USA                                  US Dollar     USD
                                                                            JPN         Japan
          CHN                                  Yuan Renminbi CNY
                                                                            ASM         American Samoa
          JPN                                  Japanese Yen JPY
                                                                            IOT         British India Ocean Terr.
                                                                            ECU         Ecuador
                                                                            SLV         El Salvador
                                          Official      ISO3166             GUM         Guam
                                          Currency                          HTI         Haiti
                                         USD           ASM                  MHL         Marshall Islands
                    LOCATION & FINANCE




                                         USD           IOT                  FSM         Micronesia
                                         USD           ECU                  MNP         Northern Mariana Islands
                                         USD           SLV                  PLW         Palau
                                         USD           GUM
                                                                            PAN         Panama
                                         USD           HTI
                                         USD           MHL                  PRI         Puerto Rico
                                         USD           FSM                  TLS         East Timor
                                         USD           MNP                  TCA         Turks and Caicos Islands
                                         USD           PLW                  VIR         Virgin Islands
                                         USD           PAN
                                         USD           PRI
                                         USD
                                         USD
                                                       TLS
                                                       TCA              RDM solutions need to preserve
                                         USD           USA               values & m appings betw een
                                                                         reference data sets – both in
                                         USD           VIR
                                         CNY           CHN
                                         JPY           JPN
                                                                         dom ain and across dom ains.
© 2012 The MDM Institute                 www.The-MDM-Institute.com
“Ability to Map Reference Data”                                         RDM Top 10
                                                                                    Eval Criteria #2
             – pt. 2 (tem poral referential integrity)
 2012 VERSION
  2012     Description                                          2007 VERSION
  NAICS                                                         2007     Description
 311224   Soybean and Other Oilseed                    MERGE    NAICS
          Processing                                            311222   Soybean Processing
 221114   Solar Electric Power
          Generation                                            311223   Other Oilseed Processing
 221115   Wind Electric Power                                   221119   Other Electric Power
          Generation                                                     Generation - solar electric
 221116   Geothermal Electric Power                                      power generation
          Generation
 221117   Biomass Electric Power
          Generation
 221118   Other Electric Power                          SPLIT
          Generation



  RDM solution needs to m aintain link s betw een versions, creating a
 m igration path betw een versions of reference data. “Crossw alks” are
         im portant for understanding how som ething changed.
© 2012 The MDM Institute   www.The-MDM-Institute.com
“Mgmt of Reference Data Sets”                                    RDM Top 10
              (Governance w ork flow s)                                       Eval Criteria #3




                                                       RACI             Tasks       User
  Sequence of                                                 Update sales
  interactions                                          R     hierarchies           Rogers
                                                              Change industry
                                                        R     classifications       Romanova
                                                              Approve hierarchies
                                                        A     and effective dates   Stark
    Permissions                                               Approve industry
                                                        A     classifications       Banner
                                                        A     Approve merge into    Fury
   Responsibilities                                           effective dated




  An RDM solution needs to support governance w ork flow s; includes
   defining: responsible & accountable parties (including system s),
  perm issions & area of responsibility for each party (field, instance,
  container level), how parties interact/ tasks, & auditing/ history…
© 2012 The MDM Institute   www.The-MDM-Institute.com
“Hierarchy Management Over                                           RDM Top 10
                                                                                    Eval Criteria #5
                 Reference Data Sets”

                                                       Viewing customers by industry classification



                                                         SIC Codes
                                                         Customer & SIC Code Mapping


                                                                Viewing drugs by Active Ingredient
                                                                interactions and ICD10 Codes


                                                                 ICD-10 Codes
                                                                 Active Ingredients & ICD10 Mapping
                                                                 Active Ingredients & Product Mapping


  RDM solution should harness relationships betw een reference data
      sets & ex isting party or thing data to create hierarchies
© 2012 The MDM Institute   www.The-MDM-Institute.com
“Versioning Support”                                              RDM Top 10
                                                                                  Eval Criteria #8
                   (a.k .a. tim e travel)

          Cost Centers                           Cost Centers              Cost Centers
        (as-of 2012 Q2)                           (Current)            (Effective 2013 Q1)
                    TUR Cost Ctr                        DEU Cost Ctr                  DEU Cost Ctr
                                            EMEA OPS                   EMEA OPS
   EMEA OPS         DEU Cost Ctr                        FRA Cost Ctr                  FRA Cost Ctr

                    FRA Cost Ctr                        TUR Cost Ctr                  TUR Cost Ctr
                                                                        AP OPS
                    JPN Cost Ctr            APLA OPS    JPN Cost Ctr                  JPN Cost Ctr
   APLA OPS
                    MEX Cost Ctr                        MEX Cost Ctr   CALA OPS       MEX Cost Ctr

                    CAN Cost Ctr                        CAN Cost Ctr                  CAN Cost Ctr
    NA OPS                                   NA OPS                     NA OPS
                    USA Cost Ctr                        USA Cost Ctr                  USA Cost Ctr


RDM solution needs versioning & “as of” / effective dating to support
    recall of reference data values, relationships or hierarchies.
      (versioning has *m ajor* im plications for analytics/ BI !)
© 2012 The MDM Institute   www.The-MDM-Institute.com
Reference Data Management
                Strategic Planning Assumption


          During 2012-13, reference data will emerge as a key
           entry point for enterprises & in turn influence choice of
           MDM for Customer, Product & other domains
          Concurrently, every MDM vendor will rush to market
           RDM solutions to apply MDM approach for centralized
           governance, stewardship & control
          By 2013-14, large enterprises will also mandate that
           Reference Data be part of MDM platform native entities
          By 2015, RDM will be commoditized via the efforts of
           MSFT & ORCL especially

                Managing “simple” reference data will prove
               to be a key sales entry point for MDM vendors
© 2012 The MDM Institute   www.The-MDM-Institute.com   MDM MILESTONE
Competition for Multi-Domain RDM
             Custom-built, manual solutions
             Hierarchy management system adaptations
                   Do not readily support publish-subscribe, classification mapping,
                    etc.
             Custom MDM domain type
                   Lack of data modeling flexibility, rudimentary lifecycle
                    management capabilities & limited data governance features,
                    esp. authoring & workflow
             Multi-domain RDM
                   RDBMS vs. semantic/OODBMS
             Purpose-built or industry-specific RDM
                   Premium priced real-time RDM solutions do not represent good
                    economic sense

   Seek out m ulti-dom ain RDM solution providers that understand &
      have ex perience addressing com plex ity of reference data
© 2012 The MDM Institute   www.The-MDM-Institute.com
“Top 10” RDM Technical Evaluation Criteria
                                              Re-Cap
          1.  Administration of diverse reference data types
          2.  Ability to map reference data
          3.  Management of reference data sets
          4.  Architecture/performance
          5.  Hierarchy management over
              reference data sets
          6. Connectivity/integration
          7. Import & export
          8. Versioning support
          9. Security & access control
          10. E2E lifecycle management

© 2012 The MDM Institute   www.The-MDM-Institute.com
MDM Institute Field Reports – RDM

          Aprimo LRDM                                          Microsoft RDM
           (Teradata)                                            (to be announced)
          DataFlux qMDM                                        Orchestra EBX5
          IBM MDM RDM Hub                                      Profisee
          Informatica RDM                                      SAP MDG-R
          Kalido                                               Oracle Hyperion DRM
          ASG ROCHADE                                          Software AG WebMethods
           (Metadata-driven RDM)                                 OneData

                                          ** General-purpose or multi-domain RDM, not industry-specific or real-
                                          time RDM solutions such as capital markets, pharma, e.g., AIM, Asset
                                          Control, Eagle, Golden Source, Kingland Systems 360 Data, &RSD



© 2012 The MDM Institute   www.The-MDM-Institute.com
MDM Institute’s Field Reports on RDM




© 2012 The MDM Institute   www.The-MDM-Institute.com
Field Report:
                Orchestra Networks EBX5 for RDM
    Strengths                                                    Caveats
      Robust solution for centralized DG,                        Nascent North
       mgmt, stewardship, & distribution                           American market
       of enterprise reference data                                presence
                                1
      Enterprise-scalable RDM                                    Shortage of EBX-

      Strong taxonomy support &                                   knowledgable
       mappings                                                    consultancies
      Model-driven ease of deployment,                           Vulnerability in

       implementation, & use (built-in                             rapidly evolving
          process flows + semantic database                        market crowded with
          underpinning)                                            mega vendors &
         Support for temporal reference                           other nouveau MDM
          data                                                     vendors
         Cloud-based, SaaS option                                Under invested in
                   1 – BNP Paribas, Crédit Suisse, Michelin, …     marketing
© 2012 The MDM Institute   www.The-MDM-Institute.com
Technip: MDM / RDM essential to delivering
multi-billion € oil & gas projects




• Projects require coordination across multiple company and
  functional areas
   – Up to 16 Technip companies can be involved for one project
• Data coherence, sharing and timely availability are key
  success factors
• Private and Public reference data
Implementation: Hub and Registry
Adaptation / Customization essential to supporting
downstream applications
                                             Same structure,
                                             Different values

                                            Child inherits
                                            structure, but not
                                            labels. Good where
                                            same hierarchy is
        Parent                              used globally and
                                            only labels are
                                            changed


                                                                      Different
                                                                  structure, Same
                                                                       values

                                                                 Child inherits values,
                  Different structure,                           but not structure.
                   Different values                              Good when
                                                                 hierarchy is
                 Child partially inherits                        customized to fit
                 structure and values.                           functional area.
                 Good where hierarchy
                 and labels change
                 overseas, such as a
                 foreign subsidiary with
                 a different product
                 hierarchy
Benefits realized in every functional area
Bottom Line
             RDM is more than “reference tables”– i.e., also complex
              mappings (logical & physical) between different
              representations, data domains, versions & hierarchies
             RDM impedance mismatch = inconsistent reporting,
              regulatory noncompliance, transaction failures &
              systemic failures
             Central role of reference data means RDM can be
              expected to become “starting point” for many
              organizations planning MDM & MDG
             Majority of RDM solutions do not address notion of
              "temporal" reference data or provide governance
             Market misconception/dogma that “RDM *must* be in
              same stack as multi-domain MDM”
                           Buy, *don’t* build, RDM
© 2012 The MDM Institute   www.The-MDM-Institute.com
Q&A
        Aaron Zornes                                   Conrad Chuang
        Chief Research Officer                         Sr. Product Marketing Manager
        The MDM Institute                              Orchestra Networks
         aaron.zornes@tcdii.com                        conrad.chuang@orchestranetworks.com
        www.linkedin.com/in/aaronzornes                www.orchestranetworks.com/rdm
        @azornes                                       @onmdm




© 2012 The MDM Institute   www.The-MDM-Institute.com
© 2010 The MDM Institute   www.The-MDM-Institute.com
© 2010 The MDM Institute   www.The-MDM-Institute.com
MDM & Data Governance Summit™
                   Conference Series
                              MDM & Data Governance Summit Singapore
                                 Marina Bay Sands Resort ▪ December 4-5
                              MDM & Data Governance Summit Shanghai
                           Shanghai International Convention Center ▪ March 2013
                                MDM & Data Governance Summit Europe
                                 Radisson BLU – London ▪ April 15-17, 2013
                             MDM & Data Governance Summit Asia-Pacific
                            Four Points Darling Harbour– Sydney ▪ May 20-21, 2013
                            MDM & Data Governance Summit San Francisco
                              Hyatt Embarcadero – San Francisco ▪ May 2013
                                     MDM & Data Governance Tokyo
                                   Belle Salle Kanda– Tokyo ▪ June 14, 2013
                                MDM & Data Governance Summit Canada
                                     The Carlu – Toronto ▪ June 2013
                              MDM & Data Governance Summit New York
                            Marriott Marquis NYC Times Square ▪ October 2-4, 2013

    “More MDM programs get their successful start at
  MDM & Data Governance Summits than anywhere else”
© 2012 The MDM Institute    www.The-MDM-Institute.com
About Orchestra Networks
• Orchestra Networks is a leading Reference / Master
  Data Management vendor.
• Sole focus is MDM/RDM Platform: EBX5
• Company founded in 2000
• Stable, privately-held




                           www.orchestranetworks.com/rdm

Understanding Reference Data with Aaron Zornes

  • 1.
    Understanding Reference Data Management Aaron Zornes Chief Research Officer The MDM Institute Conrad Chuang Sr. Product Marketing Manager Orchestra Networks
  • 2.
    Today’s Agenda  Part I: Reference Data Management Overview  What is reference data?  What is Reference Data Management (RDM)?  Key requirements for RDM solutions  Costs, savings & ROI scenarios  Part II: RDM Implementations  Q&A © 2012 The MDM Institute www.The-MDM-Institute.com
  • 3.
    About the MDMInstitute  Founded in 2004 to focus on  MDM Alert™ newsletter MDM business drivers & technology  MDM Market Pulse™ market challenges research & multi-client studies  MDM Institute Advisory  MDM Fast Track™ one-day Council™ of 150 Global 5000 IT public & onsite workshop rotating organizations with unlimited advice to key quarterly through major North individuals, e.g. CTOs, CIOs, data architects American, European, & Asia-Pacific metro areas  MDM Institute Business Council™ website access & email support MDM & Data Governance to 35,000+ members Summit™ annual conferences in London, NYC, San Francisco, Shanghai,  MDM Road Map & Milestones™ Singapore, Sydney, Tokyo & Toronto annual strategic planning assumptions About Aaron Zornes  Most quoted industry analyst authority on topics of MDM, RDM & MDG  Founder & Chief Research Officer of the MDM Institute  Founder & conference chairman for MDM & Data Governance Summits series  Founded & ran META Group’s largest research practice for 14 years  M.S. in Management Information Systems from University of Arizona “Independent, Authoritative, & Relevant” © 2012 The MDM Institute www.The-MDM-Institute.com
  • 4.
    What is ReferenceData? Reference data =“coded, semantically stable, relatively static data sets shared by multiple constituencies” (people, systems, & other master data domains) Industry Customers Geo Business Unit ID Sales Cost / Person Revenue Product Acct In the logical view, private & public forms of reference data connect domains & application; consistent values (& semantics) required for multi-domain views & hierarchies © 2012 The MDM Institute www.The-MDM-Institute.com
  • 5.
    Why Reference Data?Why Now?  Errors in reference data will ripple outwards affecting quality Inconsistent Reporting of master data in each domain, which in turn affects quality in Transaction Failure all dependent transactional systems Regulatory Non-compliance  RDM needed in both operational & analytical MDM use cases where capability often used to provide attributes, hierarchies Systemic Failure & KPIs Central role of reference data means RDM becoming “starting point” for many organizations planning MDM & MDG © 2012 The MDM Institute www.The-MDM-Institute.com
  • 6.
    RDM Prologue  In addition to MDM functionality, RDM systems also manage complex mappings btw different reference data representations & different data domains across enterprise  Governance of RDM is vital— manual or custom RDM often lacks change management, audit controls & granular security/permissions  Because reference data is used to drive key business processes & application logic, errors in reference data can have major negative & multiplicative business impact Just as businesses no longer build own CRM, ERP, &MDM systems, so too are organizations beginning to acquire commercial RDM, which can be easily tailored or configured & have full ongoing support of major software vendor © 2012 The MDM Institute www.the-MDM-Institute.com
  • 7.
    Reference Data Categories Multi-Domain Real-Time / Transactional RDM Use Cases RDM Use Cases Countries & Subdivisions (FIPS10) Currencies (ISO 4217) Time Zones (ISO 8601) Security Prices Public Industry Classification (NAICS, ISIC) SWIFT BIC Codes (Payments) (External) ICD-9/10 Codes (Healthcare) ACORD/ISO Codes (Insurance) Customized Public Reference Semi- Standards (e.g. customized D&B) Private? (Shared) Shared Private Data (Finance) Legal Entities Private Chart of Accounts Reference data required for (Internal) Organizations transaction processing Employees (i.e., much of HR & Finance Data) © 2012 The MDM Institute www.The-MDM-Institute.com
  • 8.
    Why Manage ReferenceData Independently? (“Hub of hubs”? Federated vs. Centralized?) Industry Geo (NAICS, ISIC) Geo Customers (ISO3166, FIPS) Business Unit ID Sales Person Geo ERP Cost / Geo Revenue Acct Product Geo Geo Finance HR Geo BI/Analytics In the logical model, reference data connects domains & applications; in implementations local copies exist for each consumer; challenges include: governance, synchronizing, versioning, & custom hierarchies/internationalizations © 2012 The MDM Institute www.The-MDM-Institute.com
  • 9.
    Critique of CurrentApproaches for Multi-Domain Reference Data RDM Solution Drawback Recommendation Custom-built, manual Heavy TCO burden Avoid unless reference data solutions demands are truly unique Spreadsheets Difficult to govern, secure, Distribute data in spreadsheets; version, & audit; no modeling, govern data in RDM solution poor hierarchy management Repurpose hierarchy Poor cross-domain support, no Seek out multi-domain RDM management solution classification mapping, few solution with hierarchy (MSFT MDS, ORCL DRM) enterprise integration options management Customize existing Rudimentary data modeling, Use multi-domain RDM solution domain-specific MDM lifecycle mgmt capabilities, & to maintain connections & (Customer or Product) governance features (esp. govern/update into CDI & PIM authoring & workflow) via data services ERP / Enterprise Limited governance, versioning, Master in external platform. Application distribution; also reference data RDM can be used to govern customized use in app may have baseline set, versions and limited appeal in other systems adaptations Real-time / industry- Premium priced R/T RDM Leverage R/T RDM solutions for specific RDM solutions do not represent good R/T use cases (trading, claims economic sense processing, payments) © 2012 The MDM Institute www.The-MDM-Institute.com
  • 10.
    “Top 10” RDMTechnical Evaluation Criteria 1. Administration of diverse reference data types 2. Ability to map reference data 3. Management of reference data sets 4. Architecture/performance 5. Hierarchy management over reference data sets 6. Connectivity/integration 7. Import & export 8. Versioning support 9. Security & access control 10. E2E lifecycle management Coming to market are RDM solutions characterized by multiple, diverse levels of integration w/ market-dominant MDM hubs as well as repackagings of existing mid-market MDM solutions – HOW TO EVALUATE? © 2012 The MDM Institute www.The-MDM-Institute.com
  • 11.
    “Administration of Diverse RDM Top 10 Reference Data Types” Eval Criteria #1 Private Ref Data Public Ref Data From R. Thompson,/Credit Suisse, “Multidomain Enterprise Reference Data,” 7th Annual MDM & Data Governance Summit New York 2012 RDM solution should support a w ide m ix of data structures from nam e:value pairs to hierarchies (see criteria #5). © 2012 The MDM Institute www.The-MDM-Institute.com
  • 12.
    “Ability to MapReference Data” RDM Top 10 Eval Criteria #2 – pt. 1 (cross-dom ain m apping) LOCATIONS FINANCE ISO 3166 Name Code Issuing Country Name ISO 4217 (ISO3166) Code USA United States of America CHN People’s Republic of China USA US Dollar USD JPN Japan CHN Yuan Renminbi CNY ASM American Samoa JPN Japanese Yen JPY IOT British India Ocean Terr. ECU Ecuador SLV El Salvador Official ISO3166 GUM Guam Currency HTI Haiti USD ASM MHL Marshall Islands LOCATION & FINANCE USD IOT FSM Micronesia USD ECU MNP Northern Mariana Islands USD SLV PLW Palau USD GUM PAN Panama USD HTI USD MHL PRI Puerto Rico USD FSM TLS East Timor USD MNP TCA Turks and Caicos Islands USD PLW VIR Virgin Islands USD PAN USD PRI USD USD TLS TCA RDM solutions need to preserve USD USA values & m appings betw een reference data sets – both in USD VIR CNY CHN JPY JPN dom ain and across dom ains. © 2012 The MDM Institute www.The-MDM-Institute.com
  • 13.
    “Ability to MapReference Data” RDM Top 10 Eval Criteria #2 – pt. 2 (tem poral referential integrity) 2012 VERSION 2012 Description 2007 VERSION NAICS 2007 Description 311224 Soybean and Other Oilseed MERGE NAICS Processing 311222 Soybean Processing 221114 Solar Electric Power Generation 311223 Other Oilseed Processing 221115 Wind Electric Power 221119 Other Electric Power Generation Generation - solar electric 221116 Geothermal Electric Power power generation Generation 221117 Biomass Electric Power Generation 221118 Other Electric Power SPLIT Generation RDM solution needs to m aintain link s betw een versions, creating a m igration path betw een versions of reference data. “Crossw alks” are im portant for understanding how som ething changed. © 2012 The MDM Institute www.The-MDM-Institute.com
  • 14.
    “Mgmt of ReferenceData Sets” RDM Top 10 (Governance w ork flow s) Eval Criteria #3 RACI Tasks User Sequence of Update sales interactions R hierarchies Rogers Change industry R classifications Romanova Approve hierarchies A and effective dates Stark Permissions Approve industry A classifications Banner A Approve merge into Fury Responsibilities effective dated An RDM solution needs to support governance w ork flow s; includes defining: responsible & accountable parties (including system s), perm issions & area of responsibility for each party (field, instance, container level), how parties interact/ tasks, & auditing/ history… © 2012 The MDM Institute www.The-MDM-Institute.com
  • 15.
    “Hierarchy Management Over RDM Top 10 Eval Criteria #5 Reference Data Sets” Viewing customers by industry classification SIC Codes Customer & SIC Code Mapping Viewing drugs by Active Ingredient interactions and ICD10 Codes ICD-10 Codes Active Ingredients & ICD10 Mapping Active Ingredients & Product Mapping RDM solution should harness relationships betw een reference data sets & ex isting party or thing data to create hierarchies © 2012 The MDM Institute www.The-MDM-Institute.com
  • 16.
    “Versioning Support” RDM Top 10 Eval Criteria #8 (a.k .a. tim e travel) Cost Centers Cost Centers Cost Centers (as-of 2012 Q2) (Current) (Effective 2013 Q1) TUR Cost Ctr DEU Cost Ctr DEU Cost Ctr EMEA OPS EMEA OPS EMEA OPS DEU Cost Ctr FRA Cost Ctr FRA Cost Ctr FRA Cost Ctr TUR Cost Ctr TUR Cost Ctr AP OPS JPN Cost Ctr APLA OPS JPN Cost Ctr JPN Cost Ctr APLA OPS MEX Cost Ctr MEX Cost Ctr CALA OPS MEX Cost Ctr CAN Cost Ctr CAN Cost Ctr CAN Cost Ctr NA OPS NA OPS NA OPS USA Cost Ctr USA Cost Ctr USA Cost Ctr RDM solution needs versioning & “as of” / effective dating to support recall of reference data values, relationships or hierarchies. (versioning has *m ajor* im plications for analytics/ BI !) © 2012 The MDM Institute www.The-MDM-Institute.com
  • 17.
    Reference Data Management Strategic Planning Assumption  During 2012-13, reference data will emerge as a key entry point for enterprises & in turn influence choice of MDM for Customer, Product & other domains  Concurrently, every MDM vendor will rush to market RDM solutions to apply MDM approach for centralized governance, stewardship & control  By 2013-14, large enterprises will also mandate that Reference Data be part of MDM platform native entities  By 2015, RDM will be commoditized via the efforts of MSFT & ORCL especially Managing “simple” reference data will prove to be a key sales entry point for MDM vendors © 2012 The MDM Institute www.The-MDM-Institute.com MDM MILESTONE
  • 18.
    Competition for Multi-DomainRDM  Custom-built, manual solutions  Hierarchy management system adaptations  Do not readily support publish-subscribe, classification mapping, etc.  Custom MDM domain type  Lack of data modeling flexibility, rudimentary lifecycle management capabilities & limited data governance features, esp. authoring & workflow  Multi-domain RDM  RDBMS vs. semantic/OODBMS  Purpose-built or industry-specific RDM  Premium priced real-time RDM solutions do not represent good economic sense Seek out m ulti-dom ain RDM solution providers that understand & have ex perience addressing com plex ity of reference data © 2012 The MDM Institute www.The-MDM-Institute.com
  • 19.
    “Top 10” RDMTechnical Evaluation Criteria Re-Cap 1. Administration of diverse reference data types 2. Ability to map reference data 3. Management of reference data sets 4. Architecture/performance 5. Hierarchy management over reference data sets 6. Connectivity/integration 7. Import & export 8. Versioning support 9. Security & access control 10. E2E lifecycle management © 2012 The MDM Institute www.The-MDM-Institute.com
  • 20.
    MDM Institute FieldReports – RDM  Aprimo LRDM  Microsoft RDM (Teradata) (to be announced)  DataFlux qMDM  Orchestra EBX5  IBM MDM RDM Hub  Profisee  Informatica RDM  SAP MDG-R  Kalido  Oracle Hyperion DRM  ASG ROCHADE  Software AG WebMethods (Metadata-driven RDM) OneData ** General-purpose or multi-domain RDM, not industry-specific or real- time RDM solutions such as capital markets, pharma, e.g., AIM, Asset Control, Eagle, Golden Source, Kingland Systems 360 Data, &RSD © 2012 The MDM Institute www.The-MDM-Institute.com
  • 21.
    MDM Institute’s FieldReports on RDM © 2012 The MDM Institute www.The-MDM-Institute.com
  • 22.
    Field Report: Orchestra Networks EBX5 for RDM Strengths Caveats  Robust solution for centralized DG,  Nascent North mgmt, stewardship, & distribution American market of enterprise reference data presence 1  Enterprise-scalable RDM  Shortage of EBX-  Strong taxonomy support & knowledgable mappings consultancies  Model-driven ease of deployment,  Vulnerability in implementation, & use (built-in rapidly evolving process flows + semantic database market crowded with underpinning) mega vendors &  Support for temporal reference other nouveau MDM data vendors  Cloud-based, SaaS option  Under invested in 1 – BNP Paribas, Crédit Suisse, Michelin, … marketing © 2012 The MDM Institute www.The-MDM-Institute.com
  • 24.
    Technip: MDM /RDM essential to delivering multi-billion € oil & gas projects • Projects require coordination across multiple company and functional areas – Up to 16 Technip companies can be involved for one project • Data coherence, sharing and timely availability are key success factors • Private and Public reference data
  • 25.
  • 26.
    Adaptation / Customizationessential to supporting downstream applications Same structure, Different values Child inherits structure, but not labels. Good where same hierarchy is Parent used globally and only labels are changed Different structure, Same values Child inherits values, Different structure, but not structure. Different values Good when hierarchy is Child partially inherits customized to fit structure and values. functional area. Good where hierarchy and labels change overseas, such as a foreign subsidiary with a different product hierarchy
  • 27.
    Benefits realized inevery functional area
  • 28.
    Bottom Line  RDM is more than “reference tables”– i.e., also complex mappings (logical & physical) between different representations, data domains, versions & hierarchies  RDM impedance mismatch = inconsistent reporting, regulatory noncompliance, transaction failures & systemic failures  Central role of reference data means RDM can be expected to become “starting point” for many organizations planning MDM & MDG  Majority of RDM solutions do not address notion of "temporal" reference data or provide governance  Market misconception/dogma that “RDM *must* be in same stack as multi-domain MDM” Buy, *don’t* build, RDM © 2012 The MDM Institute www.The-MDM-Institute.com
  • 29.
    Q&A Aaron Zornes Conrad Chuang Chief Research Officer Sr. Product Marketing Manager The MDM Institute Orchestra Networks aaron.zornes@tcdii.com conrad.chuang@orchestranetworks.com www.linkedin.com/in/aaronzornes www.orchestranetworks.com/rdm @azornes @onmdm © 2012 The MDM Institute www.The-MDM-Institute.com
  • 30.
    © 2010 TheMDM Institute www.The-MDM-Institute.com
  • 31.
    © 2010 TheMDM Institute www.The-MDM-Institute.com
  • 32.
    MDM & DataGovernance Summit™ Conference Series MDM & Data Governance Summit Singapore Marina Bay Sands Resort ▪ December 4-5 MDM & Data Governance Summit Shanghai Shanghai International Convention Center ▪ March 2013 MDM & Data Governance Summit Europe Radisson BLU – London ▪ April 15-17, 2013 MDM & Data Governance Summit Asia-Pacific Four Points Darling Harbour– Sydney ▪ May 20-21, 2013 MDM & Data Governance Summit San Francisco Hyatt Embarcadero – San Francisco ▪ May 2013 MDM & Data Governance Tokyo Belle Salle Kanda– Tokyo ▪ June 14, 2013 MDM & Data Governance Summit Canada The Carlu – Toronto ▪ June 2013 MDM & Data Governance Summit New York Marriott Marquis NYC Times Square ▪ October 2-4, 2013 “More MDM programs get their successful start at MDM & Data Governance Summits than anywhere else” © 2012 The MDM Institute www.The-MDM-Institute.com
  • 33.
    About Orchestra Networks •Orchestra Networks is a leading Reference / Master Data Management vendor. • Sole focus is MDM/RDM Platform: EBX5 • Company founded in 2000 • Stable, privately-held www.orchestranetworks.com/rdm